80_FR_70991 80 FR 70771 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

80 FR 70771 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 220 (November 16, 2015)

Page Range70771-70772
FR Document2015-29149

Federal Register, Volume 80 Issue 220 (Monday, November 16, 2015)
[Federal Register Volume 80, Number 220 (Monday, November 16, 2015)]
[Notices]
[Pages 70771-70772]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-29149]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-14-000]


Columbia Gas Transmission, LLC; Notice of Request Under Blanket 
Authorization

    Take notice that on November 2, 2015, Columbia Gas Transmission, 
LLC (Columbia), pursuant to its blanket certificate authorization 
granted in

[[Page 70772]]

Docket No. CP83-76-000,\1\ filed an application in accordance to 
sections 157.205, 157.208, and 157.216(b) of the Commission's 
Regulations under the Natural Gas Act (NGA) as amended, requesting 
authority to abandon and construct certain pipeline facilities located 
in Fairfield County, Ohio. The proposed abandonment and construction 
are parts of Columbia's comprehensive modernization program to address 
its aging infrastructure, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection.
---------------------------------------------------------------------------

    \1\ 22 FERC ] 62,029 (1983).
---------------------------------------------------------------------------

    Columbia proposes to abandon in-place, as well as replaces a 
portion of Line G that was originally constructed in 1902, and to 
abandon in-place Line G-137. These sections of Line G and Line G-137 
pipelines consist of 13.57 miles and 1.31 miles, respectively, of 4-, 
6-, and 8-inch diameter bare steel pipe. The existing pipelines will be 
abandoned in-place without earth disturbance and Columbia will retain 
the easement rights. Also, a 5,000 foot section at the end of Line G 
from Pleasantville valve to the Gatherco point of receipt will be 
replaced with a 4-inch diameter plastic pipe to maintain service from 
Gatherco. The new 4-inch diameter plastic Line G pipeline will be 
installed within Columbia's existing right-of-way at a 15-foot offset 
to the east of the existing Line G pipeline. The reduction in pipeline 
diameter will have no adverse impact on Columbia's ability to meet 
operational needs and firm commitment on this pipeline. The proposed 
abandonment will have no impact on the services presently provided by 
Columbia. Continuity of service to the affected consumers will be 
maintained by converting them to an alternate energy source. Columbia 
does not propose abandonment of any tariff-based interstate gas 
transportation service when it abandons the proposed facilities.
    Any questions concerning this application may be directed to Tyler 
R. Brown, Senior Counsel, Columbia Gas Transmission, LLC, 5151 San 
Felipe, Suite 2500, Houston, Texas 77056, or by phone at (713) 386-
3797.
    This filing is available for review at the Commission or may be 
viewed on the Commission's Web site at http://www.ferc.gov, using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number filed to access the document. For 
assistance, please contact FERC Online Support at FERC 
[email protected] or call toll-free at (866) 206-3676, or, for 
TTY, contact (202) 502-8659. Comments, protests and interventions may 
be filed electronically via the Internet in lieu of paper. See, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. The Commission strongly encourages 
interveners to file electronically.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice, the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to Section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to Section 7 of the NGA.

    Dated: November 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29149 Filed 11-13-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                         Federal Register / Vol. 80, No. 220 / Monday, November 16, 2015 / Notices                                                 70771

                                              or potentially significant impacts that                 at FERCOnlineSupport@ferc.gov or call                 to this project. The Commission will
                                              may result from the proposed project.                   toll-free, (886) 208–3676 or TYY, (202)               consider these comments in
                                                When completed, the Draft EIS will be                 502–8659.                                             determining the appropriate action to be
                                              circulated for review and comment, and                     Any questions concerning this                      taken, but the filing of a comment alone
                                              BPA will hold at least one public                       application may be directed to Patrick                will not serve to make the filer a party
                                              comment meeting for the Draft EIS. BPA                  Stewart, Senior Counsel, Tennessee Gas                to the proceeding. The Commission’s
                                              will consider and respond in the Final                  Pipeline Company, L.L.C., 1001                        rules require that persons filing
                                              EIS to comments received on the Draft                   Louisiana Street, Houston, Texas 77002,               comments in opposition to the project
                                              EIS. BPA’s subsequent decision will be                  by telephone at (713) 369–8765, by                    provide copies of their protests only to
                                              documented in a Record of Decision.                     facsimile at (713) 420–1601, or by email              the party or parties directly involved in
                                                Maps and further information are                      at Patrick_Stewart@kindermorgan.com.                  the protest.
                                              available from BPA at the address                          Pursuant to section 157.9 of the                      Persons who wish to comment only
                                              above.                                                  Commission’s rules, 18 CFR 157.9,                     on the environmental review of this
                                                                                                      within 90 days of this Notice, the                    project should submit an original and
                                                Issued in Portland, Oregon on November 4,
                                                                                                      Commission staff will either: Complete                two copies of their comments to the
                                              2015.
                                                                                                      its environmental assessment (EA) and                 Secretary of the Commission.
                                              Elliot E. Mainzer,                                      place it into the Commission’s public
                                              Administrator and Chief Executive Officer.                                                                    Environmental commenters will be
                                                                                                      record (eLibrary) for this proceeding; or             placed on the Commission’s
                                              [FR Doc. 2015–28936 Filed 11–13–15; 8:45 am]            issue a Notice of Schedule for                        environmental mailing list, will receive
                                              BILLING CODE 6450–01–P                                  Environmental Review. If a Notice of                  copies of the environmental documents,
                                                                                                      Schedule for Environmental Review is                  and will be notified of meetings
                                                                                                      issued, it will indicate, among other                 associated with the Commission’s
                                              DEPARTMENT OF ENERGY                                    milestones, the anticipated date for the              environmental review process.
                                                                                                      Commission staff’s issuance of the final              Environmental commenters will not be
                                              Federal Energy Regulatory                               environmental impact statement (FEIS)
                                              Commission                                                                                                    required to serve copies of filed
                                                                                                      or EA for this proposal. The filing of the            documents on all other parties.
                                              [Docket No. CP16–12–000]                                EA in the Commission’s public record                  However, the non-party commenters
                                                                                                      for this proceeding or the issuance of a              will not receive copies of all documents
                                              Tennessee Gas Pipeline Company,                         Notice of Schedule for Environmental                  filed by other parties or issued by the
                                              L.L.C.; Notice of Application                           Review will serve to notify federal and               Commission (except for the mailing of
                                                                                                      state agencies of the timing for the                  environmental documents issued by the
                                                 Take notice that on October 26, 2015,                completion of all necessary reviews, and
                                              Tennessee Gas Pipeline Company,                                                                               Commission) and will not have the right
                                                                                                      the subsequent need to complete all
                                              L.L.C. (Tennessee), 1001 Louisiana                                                                            to seek court review of the
                                                                                                      federal authorizations within 90 days of
                                              Street, Houston, Texas 77002, filed an                                                                        Commission’s final order.
                                                                                                      the date of issuance of the Commission
                                              application pursuant to section 7(c) of                                                                          The Commission strongly encourages
                                                                                                      staff’s FEIS or EA.
                                              the Natural Gas Act (NGA) requesting                       There are two ways to become                       electronic filings of comments, protests
                                              authorization to construct and operate                  involved in the Commission’s review of                and interventions in lieu of paper using
                                              its Southwest Louisiana Supply Project                  this project. First, any person wishing to            the ‘‘eFiling’’ link at http://
                                              to provide 295,000 dekatherms per day                   obtain legal status by becoming a party               www.ferc.gov. Persons unable to file
                                              of incremental capacity to serve                        to the proceedings for this project                   electronically should submit an original
                                              Mitsubishi Corporation and MMGS, Inc.                   should, on or before the comment date                 and five copies of the protest or
                                              Specifically, Tennessee proposes to                     stated below file with the Federal                    intervention to the Federal Energy
                                              construct (i) approximately 2.4 miles of                Energy Regulatory Commission, 888                     Regulatory Commission, 888 First Street
                                              30-inch-diameter pipeline lateral in                    First Street NE., Washington, DC 20426,               NE., Washington, DC 20426.
                                              Madison Parish, Louisiana; (ii)                         a motion to intervene in accordance                      Comment Date: 5:00 p.m. Eastern
                                              approximately 1.4 miles of 30-inch-                     with the requirements of the                          Time on November 30, 2015.
                                              diameter pipeline lateral in Richland                   Commission’s Rules of Practice and                      Dated: November 9, 2015.
                                              and Franklin Parishes, Louisiana; (iii)                 Procedure (18 CFR 385.214 or 385.211)                 Nathaniel J. Davis, Sr.,
                                              five meter stations to allow Tennessee to               and the Regulations under the NGA (18                 Deputy Secretary.
                                              receive gas on its existing 800 Line from               CFR 157.10). A person obtaining party                 [FR Doc. 2015–29148 Filed 11–13–15; 8:45 am]
                                              five interconnecting pipelines; (iv) one                status will be placed on the service list
                                                                                                                                                            BILLING CODE 6717–01–P
                                              new compressor station in Franklin                      maintained by the Secretary of the
                                              Parish, Louisiana; and (v) to replace a                 Commission and will receive copies of
                                              turbine engine at an existing compressor                all documents filed by the applicant and              DEPARTMENT OF ENERGY
                                              station in Rapides Parish, Louisiana.                   by all other parties. A party must submit
                                              Tennessee estimates the cost of the                     five copies of filings made in the                    Federal Energy Regulatory
                                              Project to be $170,453,208, all as more                 proceeding with the Commission and                    Commission
                                              fully set forth in the application which                must mail a copy to the applicant and
                                              is on file with the Commission and open                 to every other party. Only parties to the             [Docket No. CP16–14–000]
                                              to public inspection. The filing is                     proceeding can ask for court review of
                                              available for review at the Commission                  Commission orders in the proceeding.                  Columbia Gas Transmission, LLC;
tkelley on DSK3SPTVN1PROD with NOTICES




                                              in the Public Reference Room or may be                     However, a person does not have to                 Notice of Request Under Blanket
                                              viewed on the Commission’s Web site at                  intervene in order to have comments                   Authorization
                                              http://www.ferc.gov using the                           considered. The second way to
                                              ‘‘eLibrary’’ link. Enter the docket                     participate is by filing with the                       Take notice that on November 2,
                                              number excluding the last three digits in               Secretary of the Commission, as soon as               2015, Columbia Gas Transmission, LLC
                                              the docket number field to access the                   possible, an original and two copies of               (Columbia), pursuant to its blanket
                                              document. For assistance, contact FERC                  comments in support of or in opposition               certificate authorization granted in


                                         VerDate Sep<11>2014   19:47 Nov 13, 2015   Jkt 238001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\16NON1.SGM   16NON1


                                              70772                              Federal Register / Vol. 80, No. 220 / Monday, November 16, 2015 / Notices

                                              Docket No. CP83–76–000,1 filed an                                       maintained by converting them to an                                     or EA for this proposal. The filing of the
                                              application in accordance to sections                                   alternate energy source. Columbia does                                  EA in the Commission’s public record
                                              157.205, 157.208, and 157.216(b) of the                                 not propose abandonment of any tariff-                                  for this proceeding or the issuance of a
                                              Commission’s Regulations under the                                      based interstate gas transportation                                     Notice of Schedule for Environmental
                                              Natural Gas Act (NGA) as amended,                                       service when it abandons the proposed                                   Review will serve to notify federal and
                                              requesting authority to abandon and                                     facilities.                                                             state agencies of the timing for the
                                              construct certain pipeline facilities                                      Any questions concerning this                                        completion of all necessary reviews, and
                                              located in Fairfield County, Ohio. The                                  application may be directed to Tyler R.                                 the subsequent need to complete all
                                              proposed abandonment and                                                Brown, Senior Counsel, Columbia Gas                                     federal authorizations within 90 days of
                                              construction are parts of Columbia’s                                    Transmission, LLC, 5151 San Felipe,                                     the date of issuance of the Commission
                                              comprehensive modernization program                                     Suite 2500, Houston, Texas 77056, or by                                 staff’s FEIS or EA.
                                              to address its aging infrastructure, all as                             phone at (713) 386–3797.
                                                                                                                                                                                                 Any person or the Commission’s staff
                                              more fully set forth in the application                                    This filing is available for review at
                                                                                                                                                                                              may, within 60 days after issuance of
                                              which is on file with the Commission                                    the Commission or may be viewed on
                                                                                                                      the Commission’s Web site at http://                                    the instant notice by the Commission,
                                              and open to public inspection.                                                                                                                  file pursuant to Rule 214 of the
                                                                                                                      www.ferc.gov, using the ‘‘eLibrary’’ link.
                                                 Columbia proposes to abandon in-                                     Enter the docket number excluding the                                   Commission’s Procedural Rules (18 CFR
                                              place, as well as replaces a portion of                                 last three digits in the docket number                                  385.214) a motion to intervene or notice
                                              Line G that was originally constructed                                  filed to access the document. For                                       of intervention and pursuant to Section
                                              in 1902, and to abandon in-place Line                                   assistance, please contact FERC Online                                  157.205 of the regulations under the
                                              G–137. These sections of Line G and                                     Support at FERC OnlineSupport@                                          NGA (18 CFR 157.205), a protest to the
                                              Line G–137 pipelines consist of 13.57                                   ferc.gov or call toll-free at (866) 206–                                request. If no protest is filed within the
                                              miles and 1.31 miles, respectively, of                                  3676, or, for TTY, contact (202) 502–                                   time allowed therefore, the proposed
                                              4-, 6-, and 8-inch diameter bare steel                                  8659. Comments, protests and                                            activity shall be deemed to be
                                              pipe. The existing pipelines will be                                    interventions may be filed electronically                               authorized effective the day after the
                                              abandoned in-place without earth                                        via the Internet in lieu of paper. See, 18                              time allowed for filing a protest. If a
                                              disturbance and Columbia will retain                                    CFR 385.2001(a)(1)(iii) and the                                         protest is filed and not withdrawn
                                              the easement rights. Also, a 5,000 foot                                 instructions on the Commission’s Web                                    within 30 days after the allowed time
                                              section at the end of Line G from                                       site under the ‘‘e-Filing’’ link. The                                   for filing a protest, the instant request
                                              Pleasantville valve to the Gatherco point                               Commission strongly encourages                                          shall be treated as an application for
                                              of receipt will be replaced with a 4-inch                               interveners to file electronically.                                     authorization pursuant to Section 7 of
                                              diameter plastic pipe to maintain                                          Pursuant to section 157.9 of the                                     the NGA.
                                              service from Gatherco. The new 4-inch                                   Commission’s rules, 18 CFR 157.9,                                         Dated: November 9, 2015.
                                              diameter plastic Line G pipeline will be                                within 90 days of this Notice, the                                      Nathaniel J. Davis, Sr.,
                                              installed within Columbia’s existing                                    Commission staff will either: Complete                                  Deputy Secretary.
                                              right-of-way at a 15-foot offset to the                                 its environmental assessment (EA) and                                   [FR Doc. 2015–29149 Filed 11–13–15; 8:45 am]
                                              east of the existing Line G pipeline. The                               place it into the Commission’s public
                                                                                                                                                                                              BILLING CODE 6717–01–P
                                              reduction in pipeline diameter will have                                record (eLibrary) for this proceeding; or
                                              no adverse impact on Columbia’s ability                                 issue a Notice of Schedule for
                                              to meet operational needs and firm                                      Environmental Review. If a Notice of                                    DEPARTMENT OF ENERGY
                                              commitment on this pipeline. The                                        Schedule for Environmental Review is
                                              proposed abandonment will have no                                       issued, it will indicate, among other                                   Federal Energy Regulatory
                                              impact on the services presently                                        milestones, the anticipated date for the                                Commission
                                              provided by Columbia. Continuity of                                     Commission staff’s issuance of the final
                                              service to the affected consumers will be                               environmental impact statement (FEIS)                                   Notice of Petition for Enforcement

                                              Allco Renewable Energy Limited .................................................................................................................................            Docket Nos. EL16–11–000
                                              Allco Finance Limited ...................................................................................................................................................   QF14–109–001
                                                                                                                                                                                                                          QF14–114–001
                                                                                                                                                                                                                          QF14–115–001
                                                                                                                                                                                                                          QF14–116–001
                                                                                                                                                                                                                          QF15–117–001


                                                Take notice that on November 9,                                       Connecticut Public Utilities Regulatory                                 Protests will be considered by the
                                              2015, Allco Renewable Energy Limited                                    Authority (collectively, the Connecticut                                Commission in determining the
                                              and Allco Finance Limited (collectively,                                Agencies) to remedy the Connecticut                                     appropriate action to be taken, but will
                                              ALLCO) filed a Petition for                                             Agencies’ implementation of PURPA.                                      not serve to make protestants parties to
                                              Enforcement, pursuant to section                                        ALLCO asserts that the Connecticut                                      the proceeding. Any person wishing to
                                              210(h)(2)(B) of the Public Utility                                      Agencies’ implementation is improper                                    become a party must file a notice of
                                              Regulatory Policies Act of 1978                                         and outside the confines of PURPA, all                                  intervention or motion to intervene, as
                                              (PURPA), requesting that the Federal                                    as more fully explained in the petition.                                appropriate. Such notices, motions, or
                                              Energy Regulatory Commission                                                                                                                    protests must be filed on or before the
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                                        Any person desiring to intervene or to
                                              (Commission) exercise its authority and                                 protest this filing must file in                                        comment date. On or before the
                                              initiate enforcement action against the                                 accordance with Rules 211 and 214 of                                    comment date, it is not necessary to
                                              Connecticut Department of Energy and                                    the Commission’s Rules of Practice and                                  serve motions to intervene or protests
                                              Environmental Protection and the                                        Procedure (18 CFR 385.211, 385.214).                                    on persons other than the Applicant.

                                                1 22   FERC ¶ 62,029 (1983).



                                         VerDate Sep<11>2014        19:47 Nov 13, 2015        Jkt 238001      PO 00000       Frm 00026      Fmt 4703       Sfmt 4703      E:\FR\FM\16NON1.SGM             16NON1



Document Created: 2015-12-14 14:13:02
Document Modified: 2015-12-14 14:13:02
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 70771 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR