80_FR_70995 80 FR 70775 - Total Peaking Services, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Vaporization Capacity Increase and Bog Compressor Project, and Request for Comments on Environmental Issues

80 FR 70775 - Total Peaking Services, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Vaporization Capacity Increase and Bog Compressor Project, and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 220 (November 16, 2015)

Page Range70775-70777
FR Document2015-29147

Federal Register, Volume 80 Issue 220 (Monday, November 16, 2015)
[Federal Register Volume 80, Number 220 (Monday, November 16, 2015)]
[Notices]
[Pages 70775-70777]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-29147]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-557-000]


Total Peaking Services, LLC; Notice of Intent To Prepare an 
Environmental Assessment for the Proposed Vaporization Capacity 
Increase and Bog Compressor Project, and Request for Comments on 
Environmental Issues

November 9, 2015.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Vaporization Capacity Increase 
and BOG Compressor Project (Project) involving construction and 
operation of facilities by Total Peaking Services, LLC (Total Peaking) 
in Milford, Connecticut. The Commission will use this EA in its 
decision-making process to determine whether the Project is in the 
public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the Project. You can make a difference by providing us with 
your specific comments or concerns about the Project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before December 9, 2015.
    If you sent comments on this Project to the Commission before the 
opening of this docket on September 22, 2015, you will need to file 
those comments in Docket No. CP15-557-000 to ensure they are considered 
as part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this Project. State and local government 
representatives should notify their constituents of this proposed 
Project and encourage them to comment on their areas of concern.
    Total Peaking provided affected landowners with a fact sheet 
prepared by the FERC entitled ``An Interstate Natural Gas Facility On 
My Land? What Do I Need To Know?'' This fact sheet addresses a number 
of typically asked questions, including how to participate in the 
Commission's proceedings. It is also available for viewing on the FERC 
Web site (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or efiling@ferc.gov. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the Project docket number 
(CP15-557-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    Total Peaking proposes to modify its existing liquefied natural gas 
peak shaving facility \1\ in Milford, Connecticut to increase the 
vaporization send out capabilities from 90 million standard cubic feet 
per day (MMscf/d) to 105 MMscf/d. According to Total Peaking, the 
Project would meet its future system needs and projected peak day 
requirements.
---------------------------------------------------------------------------

    \1\ Peak shaving facilities liquefy and store natural gas during 
warmer months for vaporization and injection into natural gas 
pipelines during peak conditions such as cold weather.
---------------------------------------------------------------------------

    The Project would consist of the following modifications:


[[Page 70776]]

 Installation of two new vaporizers and removal of three 
existing vaporizers;
     installation of an additional boiloff gas (BOG) 
compressor;
     installation of a 1,500 kilovolt-ampere transformer and 
three new 400 kilowatt emergency generators to replace the existing 
transformer and emergency generator; and
     installation of a new 4,160 volt electric interconnection 
service line to provide the LNG facility with additional electricity to 
operate the new vaporization equipment.
    The general location of the Project facilities is shown in appendix 
1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE., Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would occur entirely within 
the fence line of the existing facility on paved and graveled areas. 
The construction would disturb about 0.44 acres of land within the 
approximately 24-acre facility site. Permanent operation of the 
Project's facilities would require about 0.18 acres.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\3\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \3\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed Project under these 
general headings:
     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts
    We will also evaluate reasonable alternatives to the proposed 
Project or portions of the Project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this Project to formally cooperate with us in the preparation of the 
EA.\4\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \4\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the Project's potential effects on 
historic properties.\5\ We will define the Project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the Project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this Project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \5\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes: Federal, state, and local 
government representatives and agencies; elected officials; Native 
American Tribes; other interested parties; and local libraries and 
newspapers. This list also includes all affected landowners (as defined 
in the Commission's regulations) who are potential right-of-way 
grantors, whose property may be used temporarily for Project purposes, 
or who own homes within certain distances of aboveground facilities, 
and anyone who submits comments on the Project. We will update the 
environmental mailing list as the analysis proceeds to ensure that we 
send the information related to this environmental review to all 
individuals, organizations, and government entities interested in and/
or potentially affected by the proposed Project.
    If we publish and distribute the EA, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the ``Document-less Intervention Guide'' under the ``e-filing'' link on 
the Commission's Web site. Motions to intervene are more fully 
described at http://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the Project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number

[[Page 70777]]

field (i.e., CP15-557). Be sure you have selected an appropriate date 
range. For assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: November 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29147 Filed 11-13-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                         Federal Register / Vol. 80, No. 220 / Monday, November 16, 2015 / Notices                                                      70775

                                              309 of the Federal Power Act (FPA), 16                    Dated: November 6, 2015.                              Total Peaking provided affected
                                              U.S.C. 824e, 825e, and 825h, Rule 206                   Nathaniel J. Davis, Sr.,                              landowners with a fact sheet prepared
                                              of the Federal Energy Regulatory                        Deputy Secretary.                                     by the FERC entitled ‘‘An Interstate
                                              Commission’s (Commission) Rules of                      [FR Doc. 2015–29145 Filed 11–13–15; 8:45 am]          Natural Gas Facility On My Land? What
                                              Practice and Procedure, 18 CFR 385.206,                 BILLING CODE 6717–01–P                                Do I Need To Know?’’ This fact sheet
                                              Industrial Energy Users—Ohio filed a                                                                          addresses a number of typically asked
                                              formal complaint against Ohio Power                                                                           questions, including how to participate
                                              Company (AEP-Ohio) and PJM                              DEPARTMENT OF ENERGY                                  in the Commission’s proceedings. It is
                                              Interconnection, LLC (PJM) alleging that                                                                      also available for viewing on the FERC
                                                                                                      Federal Energy Regulatory                             Web site (www.ferc.gov).
                                              AEP-Ohio has taken, and PJM has
                                                                                                      Commission
                                              allowed to be taken actions in                                                                                Public Participation
                                              contravention of the PJM Open Access                    [Docket No. CP15–557–000]
                                              Transmission Tariff and that such                                                                               For your convenience, there are three
                                                                                                      Total Peaking Services, LLC; Notice of                methods you can use to submit your
                                              actions are unjust, unreasonable, and
                                                                                                      Intent To Prepare an Environmental                    comments to the Commission. The
                                              unduly discriminatory, in violation of
                                                                                                      Assessment for the Proposed                           Commission encourages electronic filing
                                              the Federal Power Act, as more fully                    Vaporization Capacity Increase and                    of comments and has expert staff
                                              explained in the complaint.                             Bog Compressor Project, and Request                   available to assist you at (202) 502–8258
                                                 The Complainant states that a copy of                for Comments on Environmental                         or efiling@ferc.gov. Please carefully
                                              the complaint has been served on the                    Issues                                                follow these instructions so that your
                                              Respondents.                                                                                                  comments are properly recorded.
                                                                                                      November 9, 2015.
                                                 Any person desiring to intervene or to                  The staff of the Federal Energy                       (1) You can file your comments
                                              protest this filing must file in                        Regulatory Commission (FERC or                        electronically using the eComment
                                              accordance with Rules 211 and 214 of                    Commission) will prepare an                           feature on the Commission’s Web site
                                              the Commission’s Rules of Practice and                  environmental assessment (EA) that will               (www.ferc.gov) under the link to
                                              Procedure (18 CFR 385.211, 385.214).                    discuss the environmental impacts of                  Documents and Filings. This is an easy
                                              Protests will be considered by the                      the Vaporization Capacity Increase and                method for submitting brief, text-only
                                              Commission in determining the                           BOG Compressor Project (Project)                      comments on a project;
                                              appropriate action to be taken, but will                involving construction and operation of                  (2) You can file your comments
                                              not serve to make protestants parties to                facilities by Total Peaking Services, LLC             electronically by using the eFiling
                                              the proceeding. Any person wishing to                   (Total Peaking) in Milford, Connecticut.              feature on the Commission’s Web site
                                              become a party must file a notice of                    The Commission will use this EA in its                (www.ferc.gov) under the link to
                                                                                                      decision-making process to determine                  Documents and Filings. With eFiling,
                                              intervention or motion to intervene, as
                                                                                                      whether the Project is in the public                  you can provide comments in a variety
                                              appropriate. The Respondent’s answer
                                                                                                      convenience and necessity.                            of formats by attaching them as a file
                                              and all interventions, or protests must
                                                                                                         This notice announces the opening of               with your submission. New eFiling
                                              be filed on or before the comment date.                 the scoping process the Commission                    users must first create an account by
                                              The Respondent’s answer, motions to                     will use to gather input from the public              clicking on ‘‘eRegister.’’ If you are filing
                                              intervene, and protests must be served                  and interested agencies on the Project.               a comment on a particular project,
                                              on the Complainants.                                    You can make a difference by providing                please select ‘‘Comment on a Filing’’ as
                                                 The Commission encourages                            us with your specific comments or                     the filing type; or
                                              electronic submission of protests and                   concerns about the Project. Your                         (3) You can file a paper copy of your
                                              interventions in lieu of paper using the                comments should focus on the potential                comments by mailing them to the
                                              ‘‘eFiling’’ link at http://www.ferc.gov.                environmental effects, reasonable                     following address. Be sure to reference
                                              Persons unable to file electronically                   alternatives, and measures to avoid or                the Project docket number (CP15–557–
                                              should submit an original and 5 copies                  lessen environmental impacts. Your                    000) with your submission: Kimberly D.
                                              of the protest or intervention to the                   input will help the Commission staff                  Bose, Secretary, Federal Energy
                                              Federal Energy Regulatory Commission,                   determine what issues they need to                    Regulatory Commission, 888 First Street
                                              888 First Street NE., Washington, DC                    evaluate in the EA. To ensure that your               NE., Room 1A, Washington, DC 20426.
                                              20426.                                                  comments are timely and properly
                                                                                                      recorded, please send your comments so                Summary of the Proposed Project
                                                 This filing is accessible on-line at                 that the Commission receives them in                    Total Peaking proposes to modify its
                                              http://www.ferc.gov, using the                          Washington, DC on or before December                  existing liquefied natural gas peak
                                              ‘‘eLibrary’’ link and is available for                  9, 2015.                                              shaving facility 1 in Milford,
                                              electronic review in the Commission’s                      If you sent comments on this Project               Connecticut to increase the vaporization
                                              Public Reference Room in Washington,                    to the Commission before the opening of               send out capabilities from 90 million
                                              DC There is an ‘‘eSubscription’’ link on                this docket on September 22, 2015, you                standard cubic feet per day (MMscf/d)
                                              the Web site that enables subscribers to                will need to file those comments in                   to 105 MMscf/d. According to Total
                                              receive email notification when a                       Docket No. CP15–557–000 to ensure                     Peaking, the Project would meet its
                                              document is added to a subscribed                       they are considered as part of this                   future system needs and projected peak
                                              docket(s). For assistance with any FERC                 proceeding.                                           day requirements.
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Online service, please email                               This notice is being sent to the
                                                                                                                                                              The Project would consist of the
                                              FERCOnlineSupport@ferc.gov, or call                     Commission’s current environmental
                                                                                                                                                            following modifications:
                                              (866) 208–3676 (toll free). For TTY, call               mailing list for this Project. State and
                                              (202) 502–8659.                                         local government representatives should                 1 Peak shaving facilities liquefy and store natural
                                                                                                      notify their constituents of this                     gas during warmer months for vaporization and
                                                 Comment Date: 5 p.m. Eastern Time                    proposed Project and encourage them to                injection into natural gas pipelines during peak
                                              on November 25, 2015                                    comment on their areas of concern.                    conditions such as cold weather.



                                         VerDate Sep<11>2014   19:47 Nov 13, 2015   Jkt 238001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\16NON1.SGM   16NON1


                                              70776                      Federal Register / Vol. 80, No. 220 / Monday, November 16, 2015 / Notices

                                                • Installation of two new vaporizers                     • air quality and noise;                               and access roads). Our EA for this
                                              and removal of three existing                              • endangered and threatened species;                   Project will document our findings on
                                              vaporizers;                                                • public safety; and                                   the impacts on historic properties and
                                                • installation of an additional boiloff                  • cumulative impacts                                   summarize the status of consultations
                                              gas (BOG) compressor;                                      We will also evaluate reasonable                       under section 106.
                                                • installation of a 1,500 kilovolt-                   alternatives to the proposed Project or
                                                                                                      portions of the Project, and make                         Environmental Mailing List
                                              ampere transformer and three new 400
                                              kilowatt emergency generators to                        recommendations on how to lessen or                          The environmental mailing list
                                              replace the existing transformer and                    avoid impacts on the various resource                     includes: Federal, state, and local
                                              emergency generator; and                                areas.                                                    government representatives and
                                                • installation of a new 4,160 volt                       The EA will present our independent                    agencies; elected officials; Native
                                              electric interconnection service line to                analysis of the issues. The EA will be                    American Tribes; other interested
                                              provide the LNG facility with additional                available in the public record through                    parties; and local libraries and
                                              electricity to operate the new                          eLibrary. Depending on the comments                       newspapers. This list also includes all
                                              vaporization equipment.                                 received during the scoping process, we                   affected landowners (as defined in the
                                                The general location of the Project                   may also publish and distribute the EA                    Commission’s regulations) who are
                                              facilities is shown in appendix 1.2                     to the public for an allotted comment                     potential right-of-way grantors, whose
                                                                                                      period. We will consider all comments                     property may be used temporarily for
                                              Land Requirements for Construction                      on the EA before making our                               Project purposes, or who own homes
                                                 Construction of the proposed facilities              recommendations to the Commission.                        within certain distances of aboveground
                                              would occur entirely within the fence                   To ensure we have the opportunity to                      facilities, and anyone who submits
                                              line of the existing facility on paved and              consider and address your comments,                       comments on the Project. We will
                                              graveled areas. The construction would                  please carefully follow the instructions                  update the environmental mailing list as
                                              disturb about 0.44 acres of land within                 in the Public Participation section,                      the analysis proceeds to ensure that we
                                              the approximately 24-acre facility site.                beginning on page 2.                                      send the information related to this
                                              Permanent operation of the Project’s                       With this notice, we are asking                        environmental review to all individuals,
                                              facilities would require about 0.18 acres.              agencies with jurisdiction by law and/                    organizations, and government entities
                                                                                                      or special expertise with respect to the                  interested in and/or potentially affected
                                              The EA Process                                          environmental issues of this Project to                   by the proposed Project.
                                                 The National Environmental Policy                    formally cooperate with us in the                            If we publish and distribute the EA,
                                              Act (NEPA) requires the Commission to                   preparation of the EA.4 Agencies that                     copies will be sent to the environmental
                                              take into account the environmental                     would like to request cooperating                         mailing list for public review and
                                              impacts that could result from an action                agency status should follow the                           comment. If you would prefer to receive
                                              whenever it considers the issuance of a                 instructions for filing comments                          a paper copy of the document instead of
                                              Certificate of Public Convenience and                   provided under the Public Participation                   the CD version or would like to remove
                                              Necessity. NEPA also requires us 3 to                   section of this notice.                                   your name from the mailing list, please
                                              discover and address concerns the                       Consultations Under Section 106 of the                    return the attached Information Request
                                              public may have about proposals. This                   National Historic Preservation Act                        (appendix 2).
                                              process is referred to as ‘‘scoping.’’ The
                                                                                                        In accordance with the Advisory                         Becoming an Intervenor
                                              main goal of the scoping process is to
                                              focus the analysis in the EA on the                     Council on Historic Preservation’s                           In addition to involvement in the EA
                                              important environmental issues. By this                 implementing regulations for section                      scoping process, you may want to
                                              notice, the Commission requests public                  106 of the National Historic                              become an ‘‘intervenor’’ which is an
                                              comments on the scope of the issues to                  Preservation Act, we are using this                       official party to the Commission’s
                                              address in the EA. We will consider all                 notice to initiate consultation with the                  proceeding. Intervenors play a more
                                              filed comments during the preparation                   applicable State Historic Preservation                    formal role in the process and are able
                                              of the EA.                                              Office (SHPO), and to solicit their views                 to file briefs, appear at hearings, and be
                                                 In the EA we will discuss impacts that               and those of other government agencies,                   heard by the courts if they choose to
                                              could occur as a result of the                          interested Indian tribes, and the public                  appeal the Commission’s final ruling.
                                              construction and operation of the                       on the Project’s potential effects on                     An intervenor formally participates in
                                              proposed Project under these general                    historic properties.5 We will define the                  the proceeding by filing a request to
                                              headings:                                               Project-specific Area of Potential Effects                intervene. Instructions for becoming an
                                                 • Geology and soils;                                 (APE) in consultation with the SHPO as                    intervenor are in the ‘‘Document-less
                                                 • land use;                                          the Project develops. On natural gas                      Intervention Guide’’ under the ‘‘e-filing’’
                                                 • water resources, fisheries, and                    facility projects, the APE at a minimum                   link on the Commission’s Web site.
                                              wetlands;                                               encompasses all areas subject to ground                   Motions to intervene are more fully
                                                 • cultural resources;                                disturbance (examples include                             described at http://www.ferc.gov/
                                                 • vegetation and wildlife;                           construction right-of-way, contractor/                    resources/guides/how-to/intervene.asp.
                                                                                                      pipe storage yards, compressor stations,
                                                2 The appendices referenced in this notice will
                                                                                                                                                                Additional Information
                                              not appear in the Federal Register. Copies of             4 The  Council on Environmental Quality                    Additional information about the
                                              appendices were sent to all those receiving this        regulations addressing cooperating agency                 Project is available from the
                                              notice in the mail and are available at www.ferc.gov    responsibilities are at Title 40, Code of Federal
tkelley on DSK3SPTVN1PROD with NOTICES




                                              using the link called ‘‘eLibrary’’ or from the          Regulations, Part 1501.6.                                 Commission’s Office of External Affairs,
                                              Commission’s Public Reference Room, 888 First             5 The Advisory Council on Historic Preservation’s       at (866) 208–FERC, or on the FERC Web
                                              Street NE., Washington, DC 20426, or call (202)         regulations are at Title 36, Code of Federal              site at www.ferc.gov using the
                                              502–8371. For instructions on connecting to             Regulations, Part 800. Those regulations define           ‘‘eLibrary’’ link. Click on the eLibrary
                                              eLibrary, refer to the last page of this notice.        historic properties as any prehistoric or historic
                                                3 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the            district, site, building, structure, or object included
                                                                                                                                                                link, click on ‘‘General Search’’ and
                                              environmental staff of the Commission’s Office of       in or eligible for inclusion in the National Register     enter the docket number, excluding the
                                              Energy Projects.                                        of Historic Places.                                       last three digits in the Docket Number


                                         VerDate Sep<11>2014   19:47 Nov 13, 2015   Jkt 238001   PO 00000   Frm 00030   Fmt 4703   Sfmt 4703   E:\FR\FM\16NON1.SGM     16NON1


                                                                         Federal Register / Vol. 80, No. 220 / Monday, November 16, 2015 / Notices                                           70777

                                              field (i.e., CP15–557). Be sure you have                intervention or motion to intervene, as               Agreement Compliance to be effective 7/
                                              selected an appropriate date range. For                 appropriate. Such notices, motions, or                22/2014.
                                              assistance, please contact FERC Online                  protests must be filed on or before the                 Filed Date: 11/9/15.
                                              Support at FercOnlineSupport@ferc.gov                   comment date. Anyone filing a motion                    Accession Number: 20151109–5117.
                                              or toll free at (866) 208–3676, or for                  to intervene or protest must serve a copy               Comments Due: 5 p.m. ET 11/30/15.
                                              TTY, contact (202) 502–8659. The                        of that document on the Petitioner.                     Docket Numbers: ER14–2605–002.
                                              eLibrary link also provides access to the                  The Commission encourages                            Applicants: Midcontinent
                                              texts of formal documents issued by the                 electronic submission of protests and                 Independent System Operator, Inc.
                                              Commission, such as orders, notices,                    interventions in lieu of paper using the                Description: Compliance filing: 2015–
                                              and rulemakings.                                        ‘‘eFiling’’ link at http://www.ferc.gov.              11–09_SSR ER14–2605 Compliance
                                                 In addition, the Commission offers a                 Persons unable to file electronically                 Filing to be effective 7/22/2014.
                                              free service called eSubscription which                 should submit an original and 5 copies                  Filed Date: 11/9/15.
                                              allows you to keep track of all formal                  of the protest or intervention to the                   Accession Number: 20151109–5103.
                                              issuances and submittals in specific                    Federal Energy Regulatory Commission,                   Comments Due: 5 p.m. ET 11/30/15.
                                              dockets. This can reduce the amount of                  888 First Street NE., Washington, DC                    Docket Numbers: ER15–943–003.
                                              time you spend researching proceedings                  20426.                                                  Applicants: Midcontinent
                                              by automatically providing you with                        This filing is accessible online at                Independent System Operator, Inc.
                                              notification of these filings, document                 http://www.ferc.gov, using the                          Description: Compliance filing: 2015–
                                              summaries, and direct links to the                      ‘‘eLibrary’’ link and is available for                11–09_SA 6502 Edwards SSR 2015
                                              documents. Go to www.ferc.gov/docs-                     review in the Commission’s Public                     Agreement Compliance to be effective 1/
                                              filing/esubscription.asp.                               Reference Room in Washington, DC.                     1/2015.
                                                 Finally, public meetings or site visits              There is an ‘‘eSubscription’’ link on the               Filed Date: 11/9/15.
                                              will be posted on the Commission’s                      Web site that enables subscribers to                    Accession Number: 20151109–5122.
                                              calendar located at www.ferc.gov/                       receive email notification when a                       Comments Due: 5 p.m. ET 11/30/15.
                                              EventCalendar/EventsList.aspx along                     document is added to a subscribed
                                              with other related information.                         docket(s). For assistance with any FERC                 Docket Numbers: ER16–293–000.
                                                                                                      Online service, please email                            Applicants: Mesquite Solar 2, LLC.
                                                Dated: November 9, 2015.                                                                                      Description: Baseline eTariff Filing:
                                              Nathaniel J. Davis, Sr.,
                                                                                                      FERCOnlineSupport@ferc.gov, or call
                                                                                                      (866) 208–3676 (toll free). For TTY, call             Mesquite Solar 2, LLC Certificate of
                                              Deputy Secretary.                                                                                             Concurrence to be effective 11/20/2015.
                                                                                                      (202) 502–8659.
                                              [FR Doc. 2015–29147 Filed 11–13–15; 8:45 am]
                                                                                                         Comment Date: 5:00 p.m. Eastern time                 Filed Date: 11/9/15.
                                              BILLING CODE 6717–01–P                                  on December 3, 2015.                                    Accession Number: 20151109–5073.
                                                                                                                                                              Comments Due: 5 p.m. ET 11/30/15.
                                                                                                        Dated: November 9, 2015.
                                                                                                                                                              Docket Numbers: ER16–294–000.
                                              DEPARTMENT OF ENERGY                                    Nathaniel J. Davis, Sr.,
                                                                                                                                                              Applicants: Mesquite Solar 3, LLC.
                                                                                                      Deputy Secretary.                                       Description: Baseline eTariff Filing:
                                              Federal Energy Regulatory                               [FR Doc. 2015–29153 Filed 11–13–15; 8:45 am]          Mesquite Solar 3, LLC Certificate of
                                              Commission                                              BILLING CODE 6717–01–P                                Concurrence to be effective 11/20/2015.
                                              [Docket No. OR16–3–000]                                                                                         Filed Date: 11/9/15.
                                                                                                                                                              Accession Number: 20151109–5074.
                                              Oryx Southern Delaware Oil Gathering                    DEPARTMENT OF ENERGY                                    Comments Due: 5 p.m. ET 11/30/15.
                                              and Transport LLC; Notice of Petition                                                                           Docket Numbers: ER16–295–000.
                                              for Declaratory Order                                   Federal Energy Regulatory
                                                                                                      Commission                                              Applicants: Midcontinent
                                                 Take notice that on November 3,                                                                            Independent System Operator, Inc.
                                              2015, pursuant to Rule 207(a)(2) of the                 Combined Notice of Filings #2                           Description: § 205(d) Rate Filing:
                                              Federal Energy Regulatory                                                                                     2015–11–09_SA 1503 NSP-Mankato 2nd
                                                                                                         Take notice that the Commission                    Rev. GIA (G261) to be effective 11/10/
                                              Commission’s (Commission) Rules of
                                                                                                      received the following electric corporate             2015.
                                              Practice and Procedure, 18 CFR
                                                                                                      filings:                                                 Filed Date: 11/9/15.
                                              385.207(a)(2) (2015), Oryx Southern
                                              Delaware Gathering and Transport LLC,                      Docket Numbers: EC15–210–000.                         Accession Number: 20151109–5085.
                                              filed a petition for a declaratory order                   Applicants: Dominion Solar Projects                   Comments Due: 5 p.m. ET 11/30/15.
                                              seeking order approving general rate                    A, Inc., Dominion Solar Projects I, Inc.                 The filings are accessible in the
                                              structure and terms of service for new                     Description: Clarification to                      Commission’s eLibrary system by
                                              crude oil pipeline from Permian Basin                   September 24, 2015 Application for                    clicking on the links or querying the
                                              receipt points to delivery points in                    Authorization Under Section 203 of the                docket number.
                                              Crane and Midland, Texas, all as more                   Federal Power Act of Dominion Solar                      Any person desiring to intervene or
                                              fully explained in the petition.                        Projects A, Inc., et al.                              protest in any of the above proceedings
                                                 Any person desiring to intervene or to                  Filed Date: 10/30/15.                              must file in accordance with Rules 211
                                              protest this filing must file in                           Accession Number: 20151030–5509.                   and 214 of the Commission’s
                                              accordance with Rules 211 and 214 of                       Comments Due: 5 p.m. ET 11/13/15.                  Regulations (18 CFR 385.211 and
                                              the Commission’s Rules of Practice and                     Take notice that the Commission                    § 385.214) on or before 5:00 p.m. Eastern
                                                                                                      received the following electric rate
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Procedure (18 CFR 385.211, 385.214).                                                                          time on the specified comment date.
                                              Protests will be considered by the                      filings:                                              Protests may be considered, but
                                              Commission in determining the                              Docket Numbers: ER14–1210–005.                     intervention is necessary to become a
                                              appropriate action to be taken, but will                   Applicants: Midcontinent                           party to the proceeding.
                                              not serve to make protestants parties to                Independent System Operator, Inc.                        eFiling is encouraged. More detailed
                                              the proceeding. Any person wishing to                      Description: Compliance filing: 2015–              information relating to filing
                                              become a party must file a notice of                    11–09_SA 6502 Edwards SSR 2014                        requirements, interventions, protests,


                                         VerDate Sep<11>2014   19:47 Nov 13, 2015   Jkt 238001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:\FR\FM\16NON1.SGM   16NON1



Document Created: 2015-12-14 14:12:52
Document Modified: 2015-12-14 14:12:52
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 70775 

2024 Federal Register | Disclaimer | Privacy Policy