80_FR_70999 80 FR 70779 - Swan Lake North Hydro LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests

80 FR 70779 - Swan Lake North Hydro LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 220 (November 16, 2015)

Page Range70779-70780
FR Document2015-29158

Federal Register, Volume 80 Issue 220 (Monday, November 16, 2015)
[Federal Register Volume 80, Number 220 (Monday, November 16, 2015)]
[Notices]
[Pages 70779-70780]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-29158]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13318-003]


Swan Lake North Hydro LLC; Notice of Application Tendered for 
Filing With the Commission and Soliciting Additional Study Requests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Unconstructed major project.
    b. Project No.: 13318-003.
    c. Date filed: October 28, 2015.
    d. Applicant: Swan Lake North Hydro LLC.
    e. Name of Project: Swan Lake North Pumped Storage Hydroelectric 
Project.


[[Page 70780]]

f. Location: Approximately 11 miles northeast of the City of Klamath 
Falls, Klamath County, Oregon. The proposed project boundary would 
include about 730 acres of federal land managed by the U.S. Bureau of 
Land Management.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. Sec. Sec.  
791(a)-825(r).
    h. Applicant Contact: Joe Eberhardt, EDF-Renewable Energy, 1000 SW 
Broadway Ave., Ste. 1800, Portland, OR 97205; Phone: (503) 889-3838.
    i. FERC Contact: Dianne Rodman, dianne.rodman@ferc.gov; phone: 
(202) 502-6077.
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See, 94 FERC ] 
61,076 (2001).
    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: December 27, 2015.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support 
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). In lieu of electronic filing, please send a paper copy 
to: Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE., Washington, DC 20426. The first page of any filing should include 
docket number P-13318-003.
    m. The application is not ready for environmental analysis at this 
time.
    n. The proposed project would be a closed-loop system using 
groundwater for initial fill and consist of the following new 
facilities: (1) A 7,972-foot-long earthen embankment forming a 
geomembrane-lined upper reservoir with a surface area of 64.21 acres 
and a storage capacity of 2,568 acre-feet at a maximum surface 
elevation of 6,135 feet above mean sea level (msl); (2) a 8,003-foot-
long earthen embankment forming a geomembrane-lined lower reservoir 
with a surface area of 60.14 acres and a storage capacity of 3,206 
acre-feet at a maximum surface elevation of 4,457 feet msl; (3) a 500-
foot-long, rip-rap lined trapezoidal spillway built into the crest of 
each embankment; (4) a 0.5-percent slope perforated polyvinyl chloride 
tube of varying diameter and accompanying optical fiber drainage system 
designed to detect, collect, and monitor water leakage from the 
reservoirs; (5) a 25-inch-diameter bottom outlet with manual valve for 
gravitational dewatering of the lower reservoir; (6) an upper intake 
consisting of a bell mouth, 38.6-foot-wide by 29.8-foot-long inclined 
screen, head gate, and 13.8-foot-diameter foundational steel pipe; (7) 
a 36.5-foot-diameter, 9,655-foot-long steel high-pressure penstock from 
the upper reservoir to the powerhouse that is predominantly above 
ground with a 14-foot-long buried segment; (8) three 9.8-foot-diameter, 
1,430-foot-long steel low-pressure penstocks from the lower reservoir 
to the powerhouse that are predominantly above ground with a 78-foot-
long buried segment; (9) a partially-buried powerhouse with three 
131.1-megawatt (MW) reversible pump-turbine units with a total 
installed capacity of 393.3 MW; (10) a 32.8 mile, 230-kilovolt above-
ground transmission line interconnecting to an existing non-project 
substation; (11) approximately 10.7 miles of improved project access 
road; (12) approximately 3.4 miles of new permanent project access 
road; (13) approximately 8.3 miles of temporary project access road; 
and (14) appurtenant facilities. The project would generate about 1,187 
gigawatt-hours annually.
    o. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    p. Procedural schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule will be made as appropriate.

Issue Notice of Acceptance--March 2016
Issue Scoping Document 1 for comments--April 2016
Comments on Scoping Document 1--June 2016
Issue Scoping Document 2--July 2016
Issue notice of ready for environmental analysis--July 2016
Commission issues draft EIS--December 2017
Comments on draft EIS--February 2017
Commission issues final EIS--June 2017

    Dated: November 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29158 Filed 11-13-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                         Federal Register / Vol. 80, No. 220 / Monday, November 16, 2015 / Notices                                                 70779

                                              DEPARTMENT OF ENERGY                                    DEPARTMENT OF ENERGY                                     m. Blackstone Hydro filed a Pre-
                                                                                                                                                            Application Document (PAD; including
                                              Federal Energy Regulatory                               Federal Energy Regulatory                             a proposed process plan and schedule)
                                              Commission                                              Commission                                            with the Commission, pursuant to 18
                                                                                                      [Project No. 3023–012]                                CFR 5.6 of the Commission’s
                                              [Docket No. ID–7757–000]                                                                                      regulations.
                                                                                                      Blackstone Hydro, Inc.; Notice of Intent                 n. A copy of the PAD is available for
                                              Drury, Scott D.; Notice of Filing                       To File License Application, Filing of                review at the Commission in the Public
                                                                                                      Pre-Application Document, Approving                   Reference Room or may be viewed on
                                                 Take notice that on November 6,                      Use of the Traditional Licensing                      the Commission’s Web site (http://
                                              2015, Scott D. Drury filed an application               Process                                               www.ferc.gov), using the ‘‘eLibrary’’
                                              for authorization to hold interlocking                                                                        link. Enter the docket number,
                                              positions, pursuant to section 305(b) of                  a. Type of Filing: Notice of Intent to              excluding the last three digits in the
                                              the Federal Power Act, 16 U.S.C.                        File License Application and Request to               docket number field to access the
                                              825d(b) and Part 45 of the Regulations                  Use the Traditional Licensing Process.                document. For assistance, contact FERC
                                              of the Federal Energy Regulatory                          b. Project No.: 3023–012.                           Online Support at
                                              Commission (Commission), 18 CFR part                      c. Date Filed: September 16, 2015.                  FERCOnlineSupport@ferc.gov, (866)
                                              45.                                                       d. Submitted By: Blackstone Hydro,                  208–3676 (toll free), or (202) 502–8659
                                                 Any person desiring to intervene or to               Inc.                                                  (TTY). A copy is also available for
                                              protest this filing must file in                          e. Name of Project: Tupperware                      inspection and reproduction at the
                                              accordance with Rules 211 and 214 of                    Hydroelectric Project.                                address in paragraph h.
                                                                                                        f. Location: On the Blackstone River                   o. The licensee states its unequivocal
                                              the Commission’s Rules of Practice and
                                                                                                      in Providence County, Rhode Island and                intent to submit an application for a
                                              Procedure (18 CFR 385.211, 385.214).
                                                                                                      Worcester County, Massachusetts. No                   new license for Project No. 3023–012.
                                              Protests will be considered by the
                                                                                                      federal lands are occupied by the project             Pursuant to 18 CFR 16.8, 16.9, and 16.10
                                              Commission in determining the
                                                                                                      works or located within the project                   each application for a new license and
                                              appropriate action to be taken, but will
                                                                                                      boundary.                                             any competing license applications
                                              not serve to make protestants parties to
                                                                                                        g. Filed Pursuant to: 18 CFR 5.3 of the             must be filed with the Commission at
                                              the proceeding. Any person wishing to
                                                                                                      Commission’s regulations.                             least 24 months prior to the expiration
                                              become a party must file a notice of                      h. Potential Applicant Contact: Lewis
                                              intervention or motion to intervene, as                                                                       of the existing license. All applications
                                                                                                      C. Loon, Blackstone Hydro, Inc., 37                   for license for this project must be filed
                                              appropriate. Such notices, motions, or                  Alfred Plourde Parkway, Suite 2,
                                              protests must be filed on or before the                                                                       by September 30, 2018.
                                                                                                      Lewiston, ME 04240; (207) 786–8834; or                   p. Register online at http://
                                              comment date. On or before the                          by email at Lewis.Loon@kruger.com.
                                              comment date, it is not necessary to                                                                          www.ferc.gov/docs-filing/
                                                                                                        i. FERC Contact: Amy Chang at (202)                 esubscription.asp to be notified via
                                              serve motions to intervene or protests                  502–8250; or email at amy.chang@
                                              on persons other than the Applicant.                                                                          email of new filing and issuances
                                                                                                      ferc.gov.                                             related to this or other pending projects.
                                                 The Commission encourages                              j. Blackstone Hydro, Inc. (Blackstone               For assistance, contact FERC Online
                                              electronic submission of protests and                   Hydro) filed its request to use the                   Support.
                                              interventions in lieu of paper using the                Traditional Licensing Process on
                                              ‘‘eFiling’’ link at http://www.ferc.gov.                September 16, 2015. Blackstone Hydro                    Dated: November 9, 2015.
                                              Persons unable to file electronically                   provided public notice of its request on              Nathaniel J. Davis, Sr.,
                                              should submit an original and 5 copies                  September 15 and 16, 2015. In a letter                Deputy Secretary.
                                              of the protest or intervention to the                   dated November 9, 2015, the Director of               [FR Doc. 2015–29154 Filed 11–13–15; 8:45 am]
                                              Federal Energy Regulatory Commission,                   the Division of Hydropower Licensing                  BILLING CODE 6717–01–P
                                              888 First Street NE., Washington, DC                    approved Blackstone Hydro request to
                                              20426.                                                  use the Traditional Licensing Process.
                                                 This filing is accessible on-line at                   k. With this notice, we are initiating              DEPARTMENT OF ENERGY
                                              http://www.ferc.gov, using the                          informal consultation with the U.S. Fish
                                              ‘‘eLibrary’’ link and is available for                  and Wildlife Service and NOAA                         Federal Energy Regulatory
                                              electronic review in the Commission’s                   Fisheries under section 7 of the                      Commission
                                              Public Reference Room in Washington,                    Endangered Species Act and the joint                  [Project No. 13318–003]
                                              DC. There is an ‘‘eSubscription’’ link on               agency regulations thereunder at 50
                                              the Web site that enables subscribers to                CFR, Part 402. We are also initiating                 Swan Lake North Hydro LLC; Notice of
                                              receive email notification when a                       consultation with the Massachusetts                   Application Tendered for Filing With
                                              document is added to a subscribed                       and Rhode Island State Historic                       the Commission and Soliciting
                                              docket(s). For assistance with any FERC                 Preservation Officers, as required by                 Additional Study Requests
                                              Online service, please email                            section 106, National Historic                          Take notice that the following
                                              FERCOnlineSupport@ferc.gov, or call                     Preservation Act, and the implementing                hydroelectric application has been filed
                                              (866) 208–3676 (toll free). For TTY, call               regulations of the Advisory Council on                with the Commission and is available
                                              (202) 502–8659.                                         Historic Preservation at 36 CFR 800.2.                for public inspection.
                                                 Comment Date: 5 p.m. Eastern Time                      l. With this notice, we are designating               a. Type of Application: Unconstructed
tkelley on DSK3SPTVN1PROD with NOTICES




                                              on November 27, 2015.                                   Blackstone Hydro as the Commission’s                  major project.
                                                                                                      non-federal representative for carrying                 b. Project No.: 13318–003.
                                                Dated: November 9, 2015.                              out informal consultation pursuant to                   c. Date filed: October 28, 2015.
                                              Nathaniel J. Davis, Sr.,                                section 7 of the Endangered Species Act                 d. Applicant: Swan Lake North Hydro
                                              Deputy Secretary.                                       and consultation pursuant to section                  LLC.
                                              [FR Doc. 2015–29152 Filed 11–13–15; 8:45 am]            106 of the National Historic                            e. Name of Project: Swan Lake North
                                              BILLING CODE 6717–01–P                                  Preservation Act.                                     Pumped Storage Hydroelectric Project.


                                         VerDate Sep<11>2014   19:47 Nov 13, 2015   Jkt 238001   PO 00000   Frm 00033   Fmt 4703   Sfmt 4703   E:\FR\FM\16NON1.SGM   16NON1


                                              70780                      Federal Register / Vol. 80, No. 220 / Monday, November 16, 2015 / Notices

                                                 f. Location: Approximately 11 miles                  a geomembrane-lined upper reservoir                      p. Procedural schedule: The
                                              northeast of the City of Klamath Falls,                 with a surface area of 64.21 acres and                application will be processed according
                                              Klamath County, Oregon. The proposed                    a storage capacity of 2,568 acre-feet at a            to the following preliminary Hydro
                                              project boundary would include about                    maximum surface elevation of 6,135 feet               Licensing Schedule. Revisions to the
                                              730 acres of federal land managed by                    above mean sea level (msl); (2) a 8,003-              schedule will be made as appropriate.
                                              the U.S. Bureau of Land Management.                     foot-long earthen embankment forming                  Issue Notice of Acceptance—March
                                                 g. Filed Pursuant to: Federal Power                  a geomembrane-lined lower reservoir                      2016
                                              Act 16 U.S.C. §§ 791(a)–825(r).                         with a surface area of 60.14 acres and                Issue Scoping Document 1 for
                                                 h. Applicant Contact: Joe Eberhardt,                 a storage capacity of 3,206 acre-feet at a               comments—April 2016
                                              EDF-Renewable Energy, 1000 SW                           maximum surface elevation of 4,457 feet               Comments on Scoping Document 1—
                                              Broadway Ave., Ste. 1800, Portland, OR                  msl; (3) a 500-foot-long, rip-rap lined                  June 2016
                                              97205; Phone: (503) 889–3838.                           trapezoidal spillway built into the crest             Issue Scoping Document 2—July 2016
                                                 i. FERC Contact: Dianne Rodman,                      of each embankment; (4) a 0.5-percent                 Issue notice of ready for environmental
                                              dianne.rodman@ferc.gov; phone: (202)                    slope perforated polyvinyl chloride tube                 analysis—July 2016
                                              502–6077.                                               of varying diameter and accompanying                  Commission issues draft EIS—December
                                                 j. Cooperating agencies: Federal, state,             optical fiber drainage system designed                   2017
                                              local, and tribal agencies with                         to detect, collect, and monitor water                 Comments on draft EIS—February 2017
                                              jurisdiction and/or special expertise                   leakage from the reservoirs; (5) a 25-                Commission issues final EIS—June 2017
                                              with respect to environmental issues                    inch-diameter bottom outlet with
                                              that wish to cooperate in the                                                                                   Dated: November 9, 2015.
                                                                                                      manual valve for gravitational
                                              preparation of the environmental                        dewatering of the lower reservoir; (6) an             Nathaniel J. Davis, Sr.,
                                              document should follow the                              upper intake consisting of a bell mouth,              Deputy Secretary.
                                              instructions for filing such requests                   38.6-foot-wide by 29.8-foot-long                      [FR Doc. 2015–29158 Filed 11–13–15; 8:45 am]
                                              described in item l below. Cooperating                  inclined screen, head gate, and 13.8-                 BILLING CODE 6717–01–P
                                              agencies should note the Commission’s                   foot-diameter foundational steel pipe;
                                              policy that agencies that cooperate in                  (7) a 36.5-foot-diameter, 9,655-foot-long
                                              the preparation of the environmental                    steel high-pressure penstock from the                 DEPARTMENT OF ENERGY
                                              document cannot also intervene. See, 94                 upper reservoir to the powerhouse that
                                              FERC ¶ 61,076 (2001).                                   is predominantly above ground with a                  Federal Energy Regulatory
                                                 k. Pursuant to section 4.32(b)(7) of 18              14-foot-long buried segment; (8) three                Commission
                                              CFR of the Commission’s regulations, if                 9.8-foot-diameter, 1,430-foot-long steel
                                              any resource agency, Indian Tribe, or                                                                         Combined Notice of Filings #1
                                                                                                      low-pressure penstocks from the lower
                                              person believes that an additional                      reservoir to the powerhouse that are                     Take notice that the Commission
                                              scientific study should be conducted in                 predominantly above ground with a 78-                 received the following electric corporate
                                              order to form an adequate factual basis                 foot-long buried segment; (9) a partially-            filings:
                                              for a complete analysis of the                          buried powerhouse with three 131.1-                      Docket Numbers: EC16–29–000.
                                              application on its merit, the resource                  megawatt (MW) reversible pump-                           Applicants: Holtwood, LLC, BIF III
                                              agency, Indian Tribe, or person must file               turbine units with a total installed                  Holtwood LLC.
                                              a request for a study with the                          capacity of 393.3 MW; (10) a 32.8 mile,                  Description: Joint Application of
                                              Commission not later than 60 days from                  230-kilovolt above-ground transmission                Holtwood, LLC et al. for Authorization
                                              the date of filing of the application, and              line interconnecting to an existing non-              under Section 203 of the FPA and
                                              serve a copy of the request on the                      project substation; (11) approximately                Request for Limited Waivers.
                                              applicant.                                              10.7 miles of improved project access                    Filed Date: 11/6/15.
                                                 l. Deadline for filing additional study              road; (12) approximately 3.4 miles of                    Accession Number: 20151106–5197.
                                              requests and requests for cooperating                   new permanent project access road; (13)                  Comments Due: 5 p.m. ET 11/27/15.
                                              agency status: December 27, 2015.                       approximately 8.3 miles of temporary
                                                 The Commission strongly encourages                                                                            Docket Numbers: EC16–30–000.
                                                                                                      project access road; and (14)                            Applicants: Talen Ironwood, LLC,
                                              electronic filing. Please file additional               appurtenant facilities. The project
                                              study requests and requests for                                                                               Talen Energy Marketing, LLC,
                                                                                                      would generate about 1,187 gigawatt-                  TransCanada Facility USA, Inc.,
                                              cooperating agency status using the                     hours annually.
                                              Commission’s eFiling system at http://                                                                        TransCanada Power Marketing, Ltd.
                                                                                                         o. A copy of the application is
                                              www.ferc.gov/docs-filing/efiling.asp. For                                                                        Description: Joint Application of
                                                                                                      available for review at the Commission
                                              assistance, please contact FERC Online                                                                        Talen Ironwood, LLC et al. for
                                                                                                      in the Public Reference Room or may be
                                              Support at FERCOnlineSupport@                                                                                 Authorization of Disposition of
                                                                                                      viewed on the Commission’s Web site at
                                              ferc.gov, (866) 208–3676 (toll free), or                http://www.ferc.gov using the                         Jurisdictional Facilities under Section
                                              (202) 502–8659 (TTY). In lieu of                        ‘‘eLibrary’’ link. Enter the docket                   203 of the FPA and Requests for
                                              electronic filing, please send a paper                  number excluding the last three digits in             Waivers.
                                              copy to: Secretary, Federal Energy                      the docket number field to access the                    Filed Date: 11/6/15.
                                                                                                      document. For assistance, contact FERC                   Accession Number: 20151106–5198.
                                              Regulatory Commission, 888 First Street
                                                                                                                                                               Comments Due: 5 p.m. ET 11/27/15.
                                              NE., Washington, DC 20426. The first                    Online Support. A copy is also available
                                              page of any filing should include docket                for inspection and reproduction at the                   Take notice that the Commission
                                              number P–13318–003.                                     address in item h above.                              received the following exempt
tkelley on DSK3SPTVN1PROD with NOTICES




                                                 m. The application is not ready for                     You may also register online at http://            wholesale generator filings:
                                              environmental analysis at this time.                    www.ferc.gov/docs-filing/                                Docket Numbers: EG16–19–000.
                                                 n. The proposed project would be a                   esubscription.asp to be notified via                     Applicants: BIF III Holtwood LLC.
                                              closed-loop system using groundwater                    email of new filings and issuances                       Description: Notice of Self-
                                              for initial fill and consist of the                     related to this or other pending projects.            Certification of Exempt Wholesale
                                              following new facilities: (1) A 7,972–                  For assistance, contact FERC Online                   Generator Status of BIF III Holtwood
                                              foot-long earthen embankment forming                    Support.                                              LLC.


                                         VerDate Sep<11>2014   19:47 Nov 13, 2015   Jkt 238001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\16NON1.SGM   16NON1



Document Created: 2015-12-14 14:13:05
Document Modified: 2015-12-14 14:13:05
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 70779 