80_FR_72011 80 FR 71790 - Darren K. Vaughn, Scott M. Fodor, Trust; Notice of Transfer of Exemption

80 FR 71790 - Darren K. Vaughn, Scott M. Fodor, Trust; Notice of Transfer of Exemption

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 221 (November 17, 2015)

Page Range71790-71790
FR Document2015-29267

Federal Register, Volume 80 Issue 221 (Tuesday, November 17, 2015)
[Federal Register Volume 80, Number 221 (Tuesday, November 17, 2015)]
[Notices]
[Page 71790]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-29267]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 10309-001]


Darren K. Vaughn, Scott M. Fodor, Trust; Notice of Transfer of 
Exemption

    1. By letter filed November 3, 2015, Darren K. Vaughn informed the 
Commission that the exemption from licensing for the Flying W Project 
No. 10309, originally issued July 21, 1987 \1\ has been transferred to 
Scott M. Fodor, Trust. The name of the project has been changed from 
Flying W to Scott M. Fodor, Trust. The project is located on an 
irrigation pipe near Emmett in Valley County, Idaho. The transfer of an 
exemption does not require Commission approval.
---------------------------------------------------------------------------

    \1\ 40 FERC ] 62,056 (1987), Order Granting Exemption from 
Licensing (Conduit).
---------------------------------------------------------------------------

    2. Scott M. Fodor, Trust is now the exemptee of the Scott M. Fodor, 
Trust Project, No. 10309. All correspondence should be forwarded to: 
Scott M. Fodor, Trust, 10644 W. Coleman Road, Barryton, MI 49305.

    Dated: November 10, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29267 Filed 11-16-15; 8:45 am]
BILLING CODE 6717-01-P



                                                  71790                       Federal Register / Vol. 80, No. 221 / Tuesday, November 17, 2015 / Notices

                                                  Cimarron in Gunnison County,                               Qualifying Conduit Hydropower                        (4) appurtenant facilities. The proposed
                                                  Colorado.                                                Facility Description: The proposed                     project would have an estimated annual
                                                    Applicant Contact: Gabe Stephens,                      project would consist of: (1) Replacing                generating capacity of 11.4 megawatt-
                                                  Black Canyon Resources, LLC, P.O. Box                    the existing gate valves with an impulse               hours.
                                                  1781, Gunnison, CO 81230, Phone No.                      turbine with an installed capacity of 2
                                                                                                                                                                    A qualifying conduit hydropower
                                                  (970) 946–5096.                                          kW; (3) a 15-foot-long, 8-inch-diameter
                                                    FERC Contact: Robert Bell, Phone No.                                                                          facility is one that is determined or
                                                                                                           discharge pipe reducing to 6-inch
                                                  (202) 502–6062, email: robert.bell@                      diameter connecting to the existing 6-                 deemed to meet all of the criteria shown
                                                  ferc.gov.                                                inch-diameter irrigation pipeline; and                 in the table below.

                                                                                       TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                        Satisfies
                                                           Statutory provision                                                           Description                                                     (Y/N)

                                                  FPA 30(a)(3)(A), as amended             The conduit the facility uses a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar man-                 Y
                                                    by HREA.                                made water conveyance that is operated for the distribution of water for agricultural, munic-
                                                                                            ipal, or industrial consumption and not primarily for the generation of electricity.
                                                  FPA 30(a)(3)(C)(i), as amended          The facility is constructed, operated, or maintained for the generation of electric power and                    Y
                                                    by HREA.                                uses for such generation only the hydroelectric potential of a non-federally owned conduit.
                                                  FPA 30(a)(3)(C)(ii), as amend-          The facility has an installed capacity that does not exceed 5 megawatts ..................................       Y
                                                    ed by HREA.
                                                  FPA 30(a)(3)(C)(iii), as amend-         On or before August 9, 2013, the facility is not licensed, or exempted from the licensing re-                    Y
                                                    ed by HREA.                            quirements of Part I of the FPA.



                                                     Preliminary Determination: Based                      facility meets the qualifying criteria                   Dated: November 10, 2015.
                                                  upon the above criteria, Commission                      must set forth their evidentiary basis.                Nathaniel J. Davis, Sr.,
                                                  staff preliminarily determines that the                     The Commission strongly encourages                  Deputy Secretary.
                                                  proposal satisfies the requirements for a                electronic filing. Please file motions to              [FR Doc. 2015–29264 Filed 11–16–15; 8:45 am]
                                                  qualifying conduit hydropower facility,                  intervene and comments using the                       BILLING CODE 6717–01–P
                                                  which is not required to be licensed or                  Commission’s eFiling system at http://
                                                  exempted from licensing.                                 www.ferc.gov/docs-filing/efiling.asp.
                                                                                                           Commenters can submit brief comments                   DEPARTMENT OF ENERGY
                                                     Comments and Motions to Intervene:
                                                                                                           up to 6,000 characters, without prior
                                                  Deadline for filing comments contesting
                                                                                                           registration, using the eComment system                Federal Energy Regulatory
                                                  whether the facility meets the qualifying                at http://www.ferc.gov/docs-filing/                    Commission
                                                  criteria is 45 days from the issuance                    ecomment.asp. You must include your
                                                  date of this notice.                                     name and contact information at the end                [Project No. 10309–001]
                                                     Deadline for filing motions to                        of your comments. For assistance,
                                                  intervene is 30 days from the issuance                   please contact FERC Online Support at                  Darren K. Vaughn, Scott M. Fodor,
                                                  date of this notice.                                     FERCOnlineSupport@ferc.gov, (866)                      Trust; Notice of Transfer of Exemption
                                                     Anyone may submit comments or a                       208–3676 (toll free), or (202) 502–8659                   1. By letter filed November 3, 2015,
                                                  motion to intervene in accordance with                   (TTY). In lieu of electronic filing, please            Darren K. Vaughn informed the
                                                  the requirements of Rules of Practice                    send a paper copy to: Secretary, Federal               Commission that the exemption from
                                                  and Procedure, 18 CFR 385.210 and                        Energy Regulatory Commission, 888                      licensing for the Flying W Project No.
                                                  385.214. Any motions to intervene must                   First Street NE., Washington, DC 20426.                10309, originally issued July 21, 1987 1
                                                  be received on or before the specified                   A copy of all other filings in reference               has been transferred to Scott M. Fodor,
                                                  deadline date for the particular                         to this application must be accompanied                Trust. The name of the project has been
                                                  proceeding.                                              by proof of service on all persons listed              changed from Flying W to Scott M.
                                                                                                           in the service list prepared by the                    Fodor, Trust. The project is located on
                                                     Filing and Service of Responsive                      Commission in this proceeding, in                      an irrigation pipe near Emmett in Valley
                                                  Documents: All filings must (1) bear in                  accordance with 18 CFR 4.34(b) and                     County, Idaho. The transfer of an
                                                  all capital letters the ‘‘COMMENTS                       385.2010.                                              exemption does not require Commission
                                                  CONTESTING QUALIFICATION FOR A                              Locations of Notice of Intent: Copies               approval.
                                                  CONDUIT HYDROPOWER FACILITY’’                            of the notice of intent can be obtained                   2. Scott M. Fodor, Trust is now the
                                                  or ‘‘MOTION TO INTERVENE,’’ as                           directly from the applicant or such                    exemptee of the Scott M. Fodor, Trust
                                                  applicable; (2) state in the heading the                 copies can be viewed and reproduced at                 Project, No. 10309. All correspondence
                                                  name of the applicant and the project                    the Commission in its Public Reference                 should be forwarded to: Scott M. Fodor,
                                                  number of the application to which the                   Room, Room 2A, 888 First Street NE.,                   Trust, 10644 W. Coleman Road,
                                                  filing responds; (3) state the name,                     Washington, DC 20426. The filing may                   Barryton, MI 49305.
                                                  address, and telephone number of the                     also be viewed on the web at http://
                                                  person filing; and (4) otherwise comply                                                                           Dated: November 10, 2015.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                           www.ferc.gov/docs-filing/elibrary.asp
                                                  with the requirements of sections                        using the ‘‘eLibrary’’ link. Enter the                 Nathaniel J. Davis, Sr.,
                                                  385.2001 through 385.2005 of the                         docket number (e.g., CD16–2–000) in                    Deputy Secretary.
                                                  Commission’s regulations.1 All                           the docket number field to access the                  [FR Doc. 2015–29267 Filed 11–16–15; 8:45 am]
                                                  comments contesting Commission staff’s                   document. For assistance, call toll-free               BILLING CODE 6717–01–P
                                                  preliminary determination that the                       1–866–208–3676 or email FERCOnline
                                                                                                           Support@ferc.gov. For TTY, call (202)                    1 40 FERC ¶ 62,056 (1987), Order Granting
                                                    1 18   CFR 385.2001–2005 (2015).                       502–8659.                                              Exemption from Licensing (Conduit).



                                             VerDate Sep<11>2014    18:14 Nov 16, 2015   Jkt 238001   PO 00000   Frm 00021   Fmt 4703   Sfmt 9990   E:\FR\FM\17NON1.SGM    17NON1



Document Created: 2015-12-14 14:01:09
Document Modified: 2015-12-14 14:01:09
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 71790 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR