80_FR_72654 80 FR 72431 - Magnolia LNG, LLC, Kinder Morgan Louisiana Pipeline LLC; Notice of Availability of The Final Environmental Impact Statement for the Proposed Magnolia LNG and Lake Charles Expansion Projects

80 FR 72431 - Magnolia LNG, LLC, Kinder Morgan Louisiana Pipeline LLC; Notice of Availability of The Final Environmental Impact Statement for the Proposed Magnolia LNG and Lake Charles Expansion Projects

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 223 (November 19, 2015)

Page Range72431-72432
FR Document2015-29512

Federal Register, Volume 80 Issue 223 (Thursday, November 19, 2015)
[Federal Register Volume 80, Number 223 (Thursday, November 19, 2015)]
[Notices]
[Pages 72431-72432]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-29512]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP14-347-000 CP14-511-000]


Magnolia LNG, LLC, Kinder Morgan Louisiana Pipeline LLC; Notice 
of Availability of The Final Environmental Impact Statement for the 
Proposed Magnolia LNG and Lake Charles Expansion Projects

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared a final environmental impact statement (EIS) 
for the Magnolia LNG Project proposed by Magnolia LNG, LLC (Magnolia) 
and the Lake Charles Expansion Project proposed by Kinder Morgan 
Louisiana Pipeline LLC (Kinder Morgan) in the above-referenced dockets. 
The Magnolia LNG Project would include construction and operation of a 
liquefied natural gas (LNG) terminal that would include various 
liquefaction, LNG distribution, and appurtenant facilities. The Lake

[[Page 72432]]

Charles Expansion Project would include reconfiguration of Kinder 
Morgan's existing pipeline system in order to accommodate Magnolia's 
request for natural gas service at the LNG terminal site. The projects 
would provide an LNG export capacity of 1.08 billion cubic feet per day 
of natural gas.
    The final EIS assesses the potential environmental effects of 
construction and operation of the Magnolia LNG and Lake Charles 
Expansion Projects in accordance with the requirements of the National 
Environmental Policy Act (NEPA). The FERC staff concludes that approval 
of the proposed projects would result in adverse environmental impacts; 
however, these impacts would be reduced to less-than-significant levels 
with the implementation of Magnolia's and Kinder Morgan's proposed 
mitigation and the additional measures recommended in the final EIS.
    The U.S. Army Corps of Engineers, U.S. Coast Guard, U.S. Department 
of Energy, U.S. Department of Transportation, and U.S. Environmental 
Protection Agency participated as cooperating agencies in the 
preparation of the final EIS. Cooperating agencies have jurisdiction by 
law or special expertise with respect to resources potentially affected 
by a proposal and participate in the NEPA analysis. Although the 
cooperating agencies provided input on the conclusions and 
recommendations presented in the final EIS, the agencies will present 
their own conclusions and recommendations in their respective records 
of decision or determinations for the projects.
    The final EIS addresses the potential environmental effects of the 
construction, modification, and operation of the following facilities 
associated with the two projects:
     A new LNG terminal that includes four liquefaction trains, 
two LNG storage tanks, liquefaction and refrigerant units, safety and 
control systems, and associated infrastructure;
     LNG truck loading facilities;
     LNG carrier and barge loading facilities;
     one new meter station;
     one new 32,000 horsepower compressor station;
     approximately 40 feet of 36-inch-diameter feed gas line to 
supply natural gas to the LNG terminal from Kinder Morgan's existing 
natural gas transmission pipeline;
     a new 1.2-mile-long, 36-inch-diameter low pressure natural 
gas header pipeline;
     a new 700-foot-long, 24-inch-diameter high pressure 
natural gas header pipeline;
     modifications at six existing meter stations; and
     construction of miscellaneous auxiliary and appurtenant 
facilities.
    The FERC staff mailed copies of the final EIS to federal, state, 
and local government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners; other interested individuals and non-
governmental organizations; newspapers and libraries in the project 
areas; and parties to these proceedings. Paper copy versions of this 
EIS were mailed to those specifically requesting them; all others 
received a compact disk version. In addition, the final EIS is 
available for public viewing on the FERC's Web site (www.ferc.gov) 
using the eLibrary link. A limited number of hardcopies are available 
for distribution and public inspection at: Federal Energy Regulatory 
Commission, Public Reference Room, 888 First Street NE., Room 2A, 
Washington, DC 20426, (202) 502-8371.
    Additional information about the projects is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search,'' and enter the docket 
number(s) excluding the last three digits in the Docket Number field 
(i.e., CP14-347 and CP14-511). Be sure you have selected an appropriate 
date range. For assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676; for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription that allows you to keep track of all formal issuances and 
submittals in specific dockets. This can reduce the amount of time you 
spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: November 13, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29512 Filed 11-18-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                            Federal Register / Vol. 80, No. 223 / Thursday, November 19, 2015 / Notices                                                 72431

                                                    Applicants: California Independent                      Comments Due: 5 p.m. ET 12/3/15.                    DEPARTMENT OF ENERGY
                                                  System Operator Corporation.
                                                                                                             Docket Numbers: ER16–312–000.                      Federal Energy Regulatory
                                                    Description: § 205(d) Rate Filing:
                                                  2015–11–10 Filing to Maintain Default                      Applicants: Parrey, LLC.                           Commission
                                                  Loss Allocation Provisions Effectiveness                   Description: Baseline eTariff Filing:              [Project No. 6623–011]
                                                  to be effective 2/11/2016.                              Shared Facilities Agreement, FERC
                                                    Filed Date: 11/10/15.                                 Electric Rate Schedule No. 1 to be                    Idarado Mining Company, Newmont
                                                    Accession Number: 20151110–5165.                      effective 1/12/2016.                                  Mining Corporation; Notice of Transfer
                                                    Comments Due: 5 p.m. ET 12/1/15.                                                                            of Exemption
                                                                                                             Filed Date: 11/12/15.
                                                    Docket Numbers: ER16–306–000.                                                                                  1. By letter filed December 12, 2010,
                                                    Applicants: Midcontinent                                 Accession Number: 20151112–5251.
                                                                                                                                                                Idarado Mining Company and Newmont
                                                  Independent System Operator, Inc.                          Comments Due: 5 p.m. ET 12/3/15.                   Mining Corporation informed the
                                                    Description: § 205(d) Rate Filing:                                                                          Commission that the exemption from
                                                  2015–11–11_SA 2865 ITCTransmission-                        Docket Numbers: ER16–313–000.
                                                                                                             Applicants: Java Solar, LLC.                       licensing for the Bridal Veil Falls Project
                                                  Michigan Wind 3 E&P Agreement (J321)                                                                          No. 6623, originally issued August 3,
                                                  to be effective 11/12/2015.                                Description: Baseline eTariff Filing:              1989,1 has been transferred to Newmont
                                                    Filed Date: 11/12/15.                                 Shared Facilities Agreement, FERC                     Mining Corporation. The project is
                                                    Accession Number: 20151112–5008.                      Electric Rate Schedule No. 1 to be                    located on Bridal Veil Creek in San
                                                    Comments Due: 5 p.m. ET 12/3/15.                      effective 1/12/2016.                                  Miguel County, Colorado. The transfer
                                                    Docket Numbers: ER16–307–000.                            Filed Date: 11/12/15.                              of an exemption does not require
                                                    Applicants: ISO New England Inc.                                                                            Commission approval.
                                                    Description: ISO New England Inc.                        Accession Number: 20151112–5252.                      2. Newmont Mining Corporation is
                                                  submits Installed Capacity Requirement,                    Comments Due: 5 p.m. ET 12/3/15.                   now the exemptee of the Bridal Veil
                                                  Hydro Quebec Interconnection                                                                                  Falls Project, No. 6623. All
                                                  Capability Credits and Related Values                     Docket Numbers: ER16–314–000.
                                                                                                                                                                correspondence should be forwarded to:
                                                  for the 2019/2020 Capacity Commitment                     Applicants: Midcontinent                            Mr. Lawrence E. Fiske, Newmont
                                                  Period.                                                 Independent System Operator, Inc.,                    Mining Corporation, 6363 South
                                                    Filed Date: 11/10/15.                                 South Mississippi Electric Power                      Fiddler’s Green Circle, Suite 800,
                                                    Accession Number: 20151110–5193.                      Association.                                          Greenwood Village, CO 80111.
                                                    Comments Due: 5 p.m. ET 12/1/15.                        Description: § 205(d) Rate Filing:                    Dated: November 12, 2015.
                                                    Docket Numbers: ER16–308–000.                         2015–11–12_SMEPA Protocol Filing to                   Nathaniel J. Davis, Sr.,
                                                    Applicants: ISO New England Inc.                      be effective 6/1/2015.                                Deputy Secretary.
                                                    Description: ISO New England Inc.
                                                  submits Informational filing for                          Filed Date: 11/12/15.                               [FR Doc. 2015–29508 Filed 11–18–15; 8:45 am]

                                                  Qualification in the Forward Capacity                     Accession Number: 20151112–5255.                    BILLING CODE 6717–01–P

                                                  Market.                                                   Comments Due: 5 p.m. ET 12/3/15.
                                                    Filed Date: 11/10/15.
                                                                                                             The filings are accessible in the                  DEPARTMENT OF ENERGY
                                                    Accession Number: 20151110–5195.
                                                    Comments Due: 5 p.m. ET 11/25/15.                     Commission’s eLibrary system by
                                                                                                                                                                Federal Energy Regulatory
                                                    Docket Numbers: ER16–309–000.                         clicking on the links or querying the
                                                                                                                                                                Commission
                                                    Applicants: PJM Interconnection,                      docket number.
                                                                                                                                                                [Docket Nos. CP14–347–000 CP14–511–000]
                                                  L.L.C.                                                     Any person desiring to intervene or
                                                    Description: Tariff Cancellation:                     protest in any of the above proceedings               Magnolia LNG, LLC, Kinder Morgan
                                                  Notice of Cancellation of ISA No. 4076,                 must file in accordance with Rules 211                Louisiana Pipeline LLC; Notice of
                                                  Queue No. Z1–098 to be effective 1/5/                   and 214 of the Commission’s                           Availability of The Final Environmental
                                                  2016.                                                   Regulations (18 CFR 385.211 and                       Impact Statement for the Proposed
                                                    Filed Date: 11/12/15.                                 385.214) on or before 5:00 p.m. Eastern               Magnolia LNG and Lake Charles
                                                    Accession Number: 20151112–5143.                      time on the specified comment date.                   Expansion Projects
                                                    Comments Due: 5 p.m. ET 12/3/15.                      Protests may be considered, but
                                                    Docket Numbers: ER16–310–000.                         intervention is necessary to become a                   The staff of the Federal Energy
                                                    Applicants: PJM Interconnection,                                                                            Regulatory Commission (FERC or
                                                                                                          party to the proceeding.
                                                  L.L.C.                                                                                                        Commission) has prepared a final
                                                                                                             eFiling is encouraged. More detailed               environmental impact statement (EIS)
                                                    Description: § 205(d) Rate Filing:
                                                                                                          information relating to filing                        for the Magnolia LNG Project proposed
                                                  Amendment to Oregon Clean Energy
                                                                                                          requirements, interventions, protests,                by Magnolia LNG, LLC (Magnolia) and
                                                  ISA No. 3876, Queue No. Y1–069 to be
                                                  effective 5/9/2014.                                     service, and qualifying facilities filings            the Lake Charles Expansion Project
                                                    Filed Date: 11/12/15.                                 can be found at: http://www.ferc.gov/                 proposed by Kinder Morgan Louisiana
                                                    Accession Number: 20151112–5153.                      docs-filing/efiling/filing-req.pdf. For               Pipeline LLC (Kinder Morgan) in the
                                                    Comments Due: 5 p.m. ET 12/3/15.                      other information, call (866) 208–3676                above-referenced dockets. The Magnolia
                                                                                                          (toll free). For TTY, call (202) 502–8659.            LNG Project would include construction
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                    Docket Numbers: ER16–311–000.
                                                                                                                                                                and operation of a liquefied natural gas
                                                    Applicants: PJM Interconnection,                        Dated: November 12, 2015.
                                                                                                                                                                (LNG) terminal that would include
                                                  L.L.C.                                                  Nathaniel J. Davis, Sr.,                              various liquefaction, LNG distribution,
                                                    Description: § 205(d) Rate Filing: ice                Deputy Secretary.                                     and appurtenant facilities. The Lake
                                                  Agreement No. 4299; Queue No. AA2–                      [FR Doc. 2015–29506 Filed 11–18–15; 8:45 am]
                                                  072 to be effective 10/13/2015.                                                                                 1 Order Accepting Settlement Agreement and
                                                                                                          BILLING CODE 6717–01–P
                                                    Filed Date: 11/12/15.                                                                                       Granting Exemption from Licensing (5MW or less),
                                                    Accession Number: 20151112–5204.                                                                            (48 FERC ¶ 61,188).



                                             VerDate Sep<11>2014   16:00 Nov 18, 2015   Jkt 238001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\19NON1.SGM   19NON1


                                                  72432                     Federal Register / Vol. 80, No. 223 / Thursday, November 19, 2015 / Notices

                                                  Charles Expansion Project would                            • modifications at six existing meter              ENVIRONMENTAL PROTECTION
                                                  include reconfiguration of Kinder                       stations; and                                         AGENCY
                                                  Morgan’s existing pipeline system in                       • construction of miscellaneous                    [FRL–9937–20–ORD]
                                                  order to accommodate Magnolia’s                         auxiliary and appurtenant facilities.
                                                  request for natural gas service at the                                                                        Office of Research and Development;
                                                  LNG terminal site. The projects would                      The FERC staff mailed copies of the
                                                                                                          final EIS to federal, state, and local                Ambient Air Monitoring Reference and
                                                  provide an LNG export capacity of 1.08                                                                        Equivalent Methods: Designation of
                                                  billion cubic feet per day of natural gas.              government representatives and
                                                                                                                                                                One New Reference Method and One
                                                     The final EIS assesses the potential                 agencies; elected officials;
                                                                                                                                                                New Equivalent Method
                                                  environmental effects of construction                   environmental and public interest
                                                  and operation of the Magnolia LNG and                   groups; Native American tribes;                       AGENCY: Environmental Protection
                                                  Lake Charles Expansion Projects in                      potentially affected landowners; other                Agency (EPA).
                                                  accordance with the requirements of the                 interested individuals and non-                       ACTION: Notice of the designation of one
                                                  National Environmental Policy Act                       governmental organizations;                           new reference method and one new
                                                  (NEPA). The FERC staff concludes that                   newspapers and libraries in the project               equivalent method for monitoring
                                                  approval of the proposed projects would                 areas; and parties to these proceedings.              ambient air quality.
                                                  result in adverse environmental                         Paper copy versions of this EIS were
                                                  impacts; however, these impacts would                   mailed to those specifically requesting               SUMMARY:  Notice is hereby given that
                                                  be reduced to less-than-significant                                                                           the Environmental Protection Agency
                                                                                                          them; all others received a compact disk
                                                  levels with the implementation of                                                                             (EPA) has designated, in accordance
                                                                                                          version. In addition, the final EIS is
                                                  Magnolia’s and Kinder Morgan’s                                                                                with 40 CFR part 53, one new reference
                                                                                                          available for public viewing on the                   method for measuring concentrations of
                                                  proposed mitigation and the additional                  FERC’s Web site (www.ferc.gov) using
                                                  measures recommended in the final EIS.                                                                        carbon monoxide (CO) and one new
                                                                                                          the eLibrary link. A limited number of                equivalent method for measuring
                                                     The U.S. Army Corps of Engineers,                    hardcopies are available for distribution
                                                  U.S. Coast Guard, U.S. Department of                                                                          concentrations of ozone (O3) in the
                                                                                                          and public inspection at: Federal Energy              ambient air.
                                                  Energy, U.S. Department of
                                                                                                          Regulatory Commission, Public                         FOR FURTHER INFORMATION CONTACT:
                                                  Transportation, and U.S. Environmental
                                                                                                          Reference Room, 888 First Street NE.,                 Robert Vanderpool, Human Exposure
                                                  Protection Agency participated as
                                                  cooperating agencies in the preparation                 Room 2A, Washington, DC 20426, (202)                  and Atmospheric Sciences Division
                                                  of the final EIS. Cooperating agencies                  502–8371.                                             (MD–D205–03), National Exposure
                                                  have jurisdiction by law or special                        Additional information about the                   Research Laboratory, U.S. EPA,
                                                  expertise with respect to resources                     projects is available from the                        Research Triangle Park, North Carolina
                                                  potentially affected by a proposal and                  Commission’s Office of External Affairs,              27711. Email: Vanderpool.Robert@
                                                  participate in the NEPA analysis.                       at (866) 208–FERC, or on the FERC Web                 epa.gov.
                                                  Although the cooperating agencies                       site (www.ferc.gov) using the eLibrary                SUPPLEMENTARY INFORMATION:    In
                                                  provided input on the conclusions and                   link. Click on the eLibrary link, click on            accordance with regulations at 40 CFR
                                                  recommendations presented in the final                  ‘‘General Search,’’ and enter the docket              part 53, the EPA evaluates various
                                                  EIS, the agencies will present their own                number(s) excluding the last three digits             methods for monitoring the
                                                  conclusions and recommendations in                      in the Docket Number field (i.e., CP14–               concentrations of those ambient air
                                                  their respective records of decision or                 347 and CP14–511). Be sure you have                   pollutants for which EPA has
                                                  determinations for the projects.                        selected an appropriate date range. For               established National Ambient Air
                                                     The final EIS addresses the potential                assistance, please contact FERC Online                Quality Standards (NAAQSs) as set
                                                  environmental effects of the                            Support at FercOnlineSupport@ferc.gov                 forth in 40 CFR part 50. Monitoring
                                                  construction, modification, and                         or toll free at (866) 208–3676; for TTY,              methods that are determined to meet
                                                  operation of the following facilities                                                                         specific requirements for adequacy are
                                                                                                          contact (202) 502–8659. The eLibrary
                                                  associated with the two projects:                                                                             designated by the EPA as either
                                                                                                          link also provides access to the texts of
                                                     • A new LNG terminal that includes                                                                         reference or equivalent methods (as
                                                                                                          formal documents issued by the
                                                  four liquefaction trains, two LNG                                                                             applicable), thereby permitting their use
                                                  storage tanks, liquefaction and                         Commission, such as orders, notices,
                                                                                                          and rulemakings.                                      under 40 CFR part 58 by States and
                                                  refrigerant units, safety and control                                                                         other agencies for determining
                                                  systems, and associated infrastructure;                    In addition, the Commission offers a               compliance with the NAAQSs. A list of
                                                     • LNG truck loading facilities;                      free service called eSubscription that                all reference or equivalent methods that
                                                     • LNG carrier and barge loading                      allows you to keep track of all formal                have been previously designated by EPA
                                                  facilities;                                             issuances and submittals in specific                  may be found at http://www.epa.gov/
                                                     • one new meter station;                             dockets. This can reduce the amount of                ttn/amtic/criteria.html.
                                                     • one new 32,000 horsepower                          time you spend researching proceedings                   The EPA hereby announces the
                                                  compressor station;                                     by automatically providing you with                   designation of one new reference
                                                     • approximately 40 feet of 36-inch-                  notification of these filings, document               method for measuring concentrations of
                                                  diameter feed gas line to supply natural                summaries, and direct links to the                    carbon monoxide (CO) in the ambient
                                                  gas to the LNG terminal from Kinder                     documents. Go to www.ferc.gov/docs-                   air and one new equivalent method for
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  Morgan’s existing natural gas                           filing/esubscription.asp.                             measuring concentrations of ozone (O3)
                                                  transmission pipeline;                                                                                        in the ambient air. These designations
                                                                                                            Dated: November 13, 2015.
                                                     • a new 1.2-mile-long, 36-inch-                                                                            are made under the provisions of 40
                                                  diameter low pressure natural gas                       Nathaniel J. Davis, Sr.,                              CFR part 53, as amended on August 31,
                                                  header pipeline;                                        Deputy Secretary.                                     2011(76 FR 54326–54341).
                                                     • a new 700-foot-long, 24-inch-                      [FR Doc. 2015–29512 Filed 11–18–15; 8:45 am]             The new reference method for CO is
                                                  diameter high pressure natural gas                      BILLING CODE 6717–01–P                                an automated method (analyzer)
                                                  header pipeline;                                                                                              utilizing a measurement principle based


                                             VerDate Sep<11>2014   16:00 Nov 18, 2015   Jkt 238001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\19NON1.SGM   19NON1



Document Created: 2015-12-14 13:56:55
Document Modified: 2015-12-14 13:56:55
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 72431 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR