[Federal Register Volume 80, Number 227 (Wednesday, November 25, 2015)]
[Notices]
[Pages 73750-73751]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-29960]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD16-3-000]


Susan Raymond; Notice of Preliminary Determination of a 
Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On November 12, 2015, Susan Raymond filed a notice of intent to 
construct a qualifying conduit hydropower facility, pursuant to section 
30 of the Federal Power Act (FPA), as amended by section 4 of the 
Hydropower Regulatory Efficiency Act of 2013 (HREA). The proposed 
Powell Mesa Micro-Hydropower Project would have an installed capacity 
of 7.6 kilowatts (kW), and would be located at the end of an existing 
12-inch pipeline used to control overflow from Susan Raymond's 
irrigation system. The project would be located near the Town of 
Hotchkiss, in Delta County, Colorado.
    Applicant Contact: Susan Raymond, 34670 Powell Mesa Road, 
Hotchkiss, CO 81419, Phone No. (970) 250-3714.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A proposed powerhouse, approximately 8 
feet by 10 feet, at the end of the existing 12-inch overflow pipeline; 
(2) two short penstocks teeing off the existing 12-inch-diameter 
overflow pipeline; (3) two Turgo turbine/generator units with a total 
installed capacity of 7.6 kW; (4) an approximately 4 feet by 8 feet 
underground tailrace, discharging to a short, 8-inch-diameter pipeline 
that discharges to the same pond as the existing 12-inch overflow 
pipeline; and (5) appurtenant facilities.
    The proposed project would have a total installed capacity of 7.6 
kW.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
                                                              Satisfies
       Statutory provision               Description            (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by    The conduit the facility            Y
 HREA.                             uses is a tunnel,
                                   canal, pipeline,
                                   aqueduct, flume, ditch,
                                   or similar manmade
                                   water conveyance that
                                   is operated for the
                                   distribution of water
                                   for agricultural,
                                   municipal, or
                                   industrial consumption
                                   and not primarily for
                                   the generation of
                                   electricity.
FPA 30(a)(3)(C)(i), as amended    The facility is                     Y
 by HREA.                          constructed, operated,
                                   or maintained for the
                                   generation of electric
                                   power and uses for such
                                   generation only the
                                   hydroelectric potential
                                   of a non-federally
                                   owned conduit.
FPA 30(a)(3)(C)(ii), as amended   The facility has an                 Y
 by HREA.                          installed capacity that
                                   does not exceed 5
                                   megawatts.
FPA 30(a)(3)(C)(iii), as amended  On or before August 9,              Y
 by HREA.                          2013, the facility is
                                   not licensed, or
                                   exempted from the
                                   licensing requirements
                                   of Part I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The primary purpose of the overflow 
pipeline is to assist the operation of Susan Raymond's irrigation 
system, not for the generation of electricity. Therefore, based upon 
the above criteria, Commission staff preliminarily determines that the 
proposal satisfies the requirements for a qualifying conduit hydropower 
facility, which is not required to be licensed or exempted from 
licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied

[[Page 73751]]

by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) 
and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD16-3) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.

    Dated: November 19, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-29960 Filed 11-24-15; 8:45 am]
BILLING CODE 6717-01-P



                                              73750                    Federal Register / Vol. 80, No. 227 / Wednesday, November 25, 2015 / Notices

                                              must file in accordance with Rules 211                  DEPARTMENT OF ENERGY                                    Applicant Contact: Susan Raymond,
                                              and 214 of the Commission’s                                                                                   34670 Powell Mesa Road, Hotchkiss, CO
                                              Regulations (18 CFR 385.211 and                         Federal Energy Regulatory                             81419, Phone No. (970) 250–3714.
                                              385.214) on or before 5:00 p.m. Eastern                 Commission                                              FERC Contact: Christopher Chaney,
                                              time on the specified comment date.                                                                           Phone No. (202) 502–6778, email:
                                              Protests may be considered, but                         [Docket No. CD16–3–000]                               christopher.chaney@ferc.gov.
                                              intervention is necessary to become a                                                                           Qualifying Conduit Hydropower
                                              party to the proceeding.                                Susan Raymond; Notice of Preliminary                  Facility Description: The proposed
                                                                                                      Determination of a Qualifying Conduit                 project would consist of: (1) A proposed
                                                 eFiling is encouraged. More detailed                                                                       powerhouse, approximately 8 feet by 10
                                                                                                      Hydropower Facility and Soliciting
                                              information relating to filing                          Comments and Motions To Intervene                     feet, at the end of the existing 12-inch
                                              requirements, interventions, protests,                                                                        overflow pipeline; (2) two short
                                              service, and qualifying facilities filings                On November 12, 2015, Susan                         penstocks teeing off the existing 12-
                                              can be found at: http://www.ferc.gov/                   Raymond filed a notice of intent to                   inch-diameter overflow pipeline; (3) two
                                              docs-filing/efiling/filing-req.pdf. For                 construct a qualifying conduit                        Turgo turbine/generator units with a
                                              other information, call (866) 208–3676                  hydropower facility, pursuant to section              total installed capacity of 7.6 kW; (4) an
                                              (toll free). For TTY, call (202) 502–8659.              30 of the Federal Power Act (FPA), as                 approximately 4 feet by 8 feet
                                                Dated: November 19, 2015.                             amended by section 4 of the                           underground tailrace, discharging to a
                                              Nathaniel J. Davis, Sr.,
                                                                                                      Hydropower Regulatory Efficiency Act                  short, 8-inch-diameter pipeline that
                                                                                                      of 2013 (HREA). The proposed Powell                   discharges to the same pond as the
                                              Deputy Secretary.                                       Mesa Micro-Hydropower Project would                   existing 12-inch overflow pipeline; and
                                              [FR Doc. 2015–29963 Filed 11–24–15; 8:45 am]            have an installed capacity of 7.6                     (5) appurtenant facilities.
                                              BILLING CODE 6717–01–P                                  kilowatts (kW), and would be located at                 The proposed project would have a
                                                                                                      the end of an existing 12-inch pipeline               total installed capacity of 7.6 kW.
                                                                                                      used to control overflow from Susan                     A qualifying conduit hydropower
                                                                                                      Raymond’s irrigation system. The                      facility is one that is determined or
                                                                                                      project would be located near the Town                deemed to meet all of the criteria shown
                                                                                                      of Hotchkiss, in Delta County, Colorado.              in the table below.

                                                                                TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                  Satisfies
                                                           Statutory provision                                                             Description                                             (Y/N)

                                              FPA 30(a)(3)(A), as amended by HREA ...             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or             Y
                                                                                                    similar manmade water conveyance that is operated for the distribution of water for
                                                                                                    agricultural, municipal, or industrial consumption and not primarily for the genera-
                                                                                                    tion of electricity.
                                              FPA 30(a)(3)(C)(i), as amended by HREA              The facility is constructed, operated, or maintained for the generation of electric                Y
                                                                                                    power and uses for such generation only the hydroelectric potential of a non-feder-
                                                                                                    ally owned conduit.
                                              FPA 30(a)(3)(C)(ii), as amended by HREA             The facility has an installed capacity that does not exceed 5 megawatts .....................      Y
                                              FPA 30(a)(3)(C)(iii), as amended by                 On or before August 9, 2013, the facility is not licensed, or exempted from the licens-            Y
                                                HREA.                                               ing requirements of Part I of the FPA.



                                                 Preliminary Determination: The                       385.214. Any motions to intervene must                facility meets the qualifying criteria
                                              primary purpose of the overflow                         be received on or before the specified                must set forth their evidentiary basis.
                                              pipeline is to assist the operation of                  deadline date for the particular                         The Commission strongly encourages
                                              Susan Raymond’s irrigation system, not                  proceeding.                                           electronic filing. Please file motions to
                                              for the generation of electricity.                         Filing and Service of Responsive                   intervene and comments using the
                                              Therefore, based upon the above                         Documents: All filings must (1) bear in               Commission’s eFiling system at http://
                                              criteria, Commission staff preliminarily                all capital letters the ‘‘COMMENTS                    www.ferc.gov/docs-filing/efiling.asp.
                                              determines that the proposal satisfies                  CONTESTING QUALIFICATION FOR A                        Commenters can submit brief comments
                                              the requirements for a qualifying
                                                                                                      CONDUIT HYDROPOWER FACILITY’’                         up to 6,000 characters, without prior
                                              conduit hydropower facility, which is
                                                                                                      or ‘‘MOTION TO INTERVENE,’’ as                        registration, using the eComment system
                                              not required to be licensed or exempted
                                                                                                      applicable; (2) state in the heading the              at http://www.ferc.gov/docs-filing/
                                              from licensing.
                                                 Comments and Motions to Intervene:                   name of the applicant and the project                 ecomment.asp. You must include your
                                              Deadline for filing comments contesting                 number of the application to which the                name and contact information at the end
                                              whether the facility meets the qualifying               filing responds; (3) state the name,                  of your comments. For assistance,
                                              criteria is 45 days from the issuance                   address, and telephone number of the                  please contact FERC Online Support at
                                              date of this notice.                                    person filing; and (4) otherwise comply               FERCOnlineSupport@ferc.gov, (866)
tkelley on DSK3SPTVN1PROD with NOTICES




                                                 Deadline for filing motions to                       with the requirements of sections                     208–3676 (toll free), or (202) 502–8659
                                              intervene is 30 days from the issuance                  385.2001 through 385.2005 of the                      (TTY). In lieu of electronic filing, please
                                              date of this notice.                                    Commission’s regulations.1 All                        send a paper copy to: Secretary, Federal
                                                 Anyone may submit comments or a                      comments contesting Commission staff’s                Energy Regulatory Commission, 888
                                              motion to intervene in accordance with                  preliminary determination that the                    First Street NE., Washington, DC 20426.
                                              the requirements of Rules of Practice                                                                         A copy of all other filings in reference
                                              and Procedure, 18 CFR 385.210 and                         1 18   CFR 385.2001–2005 (2015).                    to this application must be accompanied


                                         VerDate Sep<11>2014   19:15 Nov 24, 2015   Jkt 238001   PO 00000   Frm 00053   Fmt 4703   Sfmt 4703   E:\FR\FM\25NON1.SGM   25NON1


                                                                       Federal Register / Vol. 80, No. 227 / Wednesday, November 25, 2015 / Notices                                            73751

                                              by proof of service on all persons listed               Delivery Lateral—NEC to be effective 4/                  b. Project No.: 8396–021.
                                              in the service list prepared by the                     1/2014.                                                  c. Date Filed: October 26, 2015.
                                              Commission in this proceeding, in                         Filed Date: 11/17/15.                                  d. Applicant: Great Bear Hydropower,
                                              accordance with 18 CFR 4.34(b) and                        Accession Number: 20151117–5144.                    Inc.
                                              385.2010.                                                 Comments Due: 5 p.m. ET 11/30/15.                      e. Name of Project: Columbia Dam
                                                Locations of Notice of Intent: Copies                   Any person desiring to intervene or                 Hydroelectric Project.
                                              of the notice of intent can be obtained                 protest in any of the above proceedings                  f. Location: On the Paulins Kill, in
                                              directly from the applicant or such                     must file in accordance with Rules 211                Knowlton Township, Warren County,
                                              copies can be viewed and reproduced at                  and 214 of the Commission’s                           New Jersey.
                                              the Commission in its Public Reference                                                                           g. Filed Pursuant to: Federal Power
                                                                                                      Regulations (18 CFR § 385.211 and
                                              Room, Room 2A, 888 First Street NE.,                                                                          Act, 16 U.S.C. 791a–825r.
                                                                                                      § 385.214) on or before 5:00 p.m. Eastern                h. Applicant Contact: Mr. Terry
                                              Washington, DC 20426. The filing may                    time on the specified comment date.
                                              also be viewed on the web at http://                                                                          McDonnell, President, Great Bear
                                                                                                      Protests may be considered, but                       Hydropower, Inc., 15 Brigham Hill Rd.,
                                              www.ferc.gov/docs-filing/elibrary.asp                   intervention is necessary to become a
                                              using the ‘‘eLibrary’’ link. Enter the                                                                        Norwich, Vermont 05055, Phone: (802)
                                                                                                      party to the proceeding.                              345–5616, Email: t.p.mcd@comcast.net.
                                              docket number (i.e., CD16–3) in the
                                                                                                      Filings in Existing Proceedings                          i. FERC Contact: Mr. Ashish Desai,
                                              docket number field to access the
                                                                                                                                                            (202) 502–8370, Ashish.Desai@ferc.gov.
                                              document. For assistance, call toll-free                   Docket Numbers: RP15–23–009.                          j. Deadline for filing comments,
                                              1–866–208–3676 or email                                    Applicants: Transwestern Pipeline                  motions to intervene and protests, is 30
                                              FERCOnlineSupport@ferc.gov. For TTY,                    Company, LLC.                                         days from the issuance date of this
                                              call (202) 502–8659.                                       Description: Compliance filing RP15–               notice. The Commission strongly
                                                Dated: November 19, 2015.                             23 Settlement Compliance Filing to be                 encourages electronic filing. Please file
                                              Nathaniel J. Davis, Sr.,                                effective 12/1/2015.                                  motions to intervene, protests,
                                                                                                         Filed Date: 11/18/15.                              comments, and recommendations, using
                                              Deputy Secretary.
                                                                                                         Accession Number: 20151118–5029.                   the Commission’s eFiling system at
                                              [FR Doc. 2015–29960 Filed 11–24–15; 8:45 am]
                                                                                                         Comments Due: 5 p.m. ET 11/30/15.
                                              BILLING CODE 6717–01–P                                                                                        http://www.ferc.gov/docs-filing/
                                                                                                         Any person desiring to protest in any              efiling.asp. Commenters can submit
                                                                                                      of the above proceedings must file in                 brief comments up to 6,000 characters,
                                              DEPARTMENT OF ENERGY                                    accordance with Rule 211 of the                       without prior registration, using the
                                                                                                      Commission’s Regulations (18 CFR                      eComment system at http://
                                              Federal Energy Regulatory                               § 385.211) on or before 5:00 p.m. Eastern             www.ferc.gov/docs-filing/
                                              Commission                                              time on the specified comment date.                   ecomment.asp. You must include your
                                                                                                         The filings are accessible in the                  name and contact information at the end
                                              Combined Notice of Filings                              Commission’s eLibrary system by                       of your comments. For assistance,
                                                                                                      clicking on the links or querying the                 please contact FERC Online Support at
                                                Take notice that the Commission has                   docket number.
                                              received the following Natural Gas                                                                            FERCOnlineSupport@ferc.gov, (866)
                                                                                                         eFiling is encouraged. More detailed               208–3676 (toll free), or (202) 502–8659
                                              Pipeline Rate and Refund Report filings:                information relating to filing                        (TTY). In lieu of electronic filing, please
                                              Filings Instituting Proceedings                         requirements, interventions, protests,                send a paper copy to: Secretary, Federal
                                                Docket Numbers: RP16–199–000.                         service, and qualifying facilities filings            Energy Regulatory Commission, 888
                                                Applicants: Natural Gas Pipeline                      can be found at: http://www.ferc.gov/                 First Street NE., Washington, DC 20426.
                                              Company of America.                                     docs-filing/efiling/filing-req.pdf. For               The first page of any filing should
                                                Description: § 4(d) Rate Filing: City of              other information, call (866) 208–3676                include docket number P–8396–021.
                                              Sullivan to be effective 12/1/2015.                     (toll free). For TTY, call (202) 502–8659.               k. Description of Request: The
                                                Filed Date: 11/17/15.                                   Dated: November 18, 2015.                           applicant proposes to surrender the
                                                Accession Number: 20151117–5119.                      Nathaniel J. Davis, Sr.,                              license and remove all project works
                                                Comments Due: 5 p.m. ET 11/30/15.                     Deputy Secretary.                                     inside the powerhouse and disconnect
                                                Docket Numbers: RP16–200–000.                         [FR Doc. 2015–29964 Filed 11–24–15; 8:45 am]
                                                                                                                                                            the electrical connection to the utility
                                                Applicants: Natural Gas Pipeline                                                                            company. There would be no work
                                                                                                      BILLING CODE 6717–01–P
                                              Company of America.                                                                                           involving ground disturbance and the
                                                Description: § 4(d) Rate Filing: Village                                                                    equipment required to control the level
                                              of Bethany to be effective 12/1/2015.                   DEPARTMENT OF ENERGY                                  of the lake would remain in place, along
                                                Filed Date: 11/17/15.                                                                                       with all public safety features. The
                                                Accession Number: 20151117–5131.                      Federal Energy Regulatory                             applicant has consulted with the
                                                Comments Due: 5 p.m. ET 11/30/15.                     Commission                                            relevant stakeholders and federal, state,
                                                Docket Numbers: RP16–201–000.                                                                               and local agencies, all of which support
                                                                                                      [Project No. 8396–021]
                                                Applicants: Natural Gas Pipeline                                                                            the decommissioning of the project.
                                              Company of America.                                     Great Bear Hydropower, Inc.; Notice of                   l. Locations of the Application: A
                                                Description: § 4(d) Rate Filing: City of              Application Accepted for Filing,                      copy of the application is available for
                                              Pickneyville to be effective 12/1/2015.                 Soliciting Comments, Motions To                       inspection and reproduction at the
                                                Filed Date: 11/17/15.                                 Intervene, and Protests                               Commission’s Public Reference Room,
tkelley on DSK3SPTVN1PROD with NOTICES




                                                Accession Number: 20151117–5140.                                                                            located at 888 First Street NE., Room
                                                Comments Due: 5 p.m. ET 11/30/15.                       Take notice that the following                      2A, Washington, DC 20426, or by calling
                                                Docket Numbers: RP16–202–000.                         hydroelectric application has been filed              (202) 502–8371. This filing may also be
                                                Applicants: Transcontinental Gas                      with the Commission and is available                  viewed on the Commission’s Web site at
                                              Pipe Line Company.                                      for public inspection:                                http://www.ferc.gov/docs-filing/
                                                Description: § 4(d) Rate Filing: Non-                   a. Type of Application: Surrender of                elibrary.asp. Enter the docket number
                                              Conforming Agreement—Bayonne                            License.                                              excluding the last three digits in the


                                         VerDate Sep<11>2014   19:15 Nov 24, 2015   Jkt 238001   PO 00000   Frm 00054   Fmt 4703   Sfmt 4703   E:\FR\FM\25NON1.SGM   25NON1



Document Created: 2018-03-01 11:14:19
Document Modified: 2018-03-01 11:14:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 73750 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR