80_FR_75309 80 FR 75079 - Magnum Gas Storage, LLC; Notice of Application for Amendment

80 FR 75079 - Magnum Gas Storage, LLC; Notice of Application for Amendment

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 230 (December 1, 2015)

Page Range75079-75080
FR Document2015-30399

Federal Register, Volume 80 Issue 230 (Tuesday, December 1, 2015)
[Federal Register Volume 80, Number 230 (Tuesday, December 1, 2015)]
[Notices]
[Pages 75079-75080]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-30399]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-18-000]


Magnum Gas Storage, LLC; Notice of Application for Amendment

    Take notice that on November 16, 2015, Magnum Gas Storage, LLC 
(Magnum), 3165 E. Millrock Dr., #330, Holladay, Utah 84121, filed an 
application pursuant to section 7(c) of the Natural Gas Act (NGA) and 
Parts 157 and 284 of the Commission's Regulations requesting that the 
Commission approve an amendment (Amendment) to the certificate of 
public convenience and necessity issued to the Magnum in Docket No. 
CP10-22-000 on March 17, 2011 (March 17 Order). The March 17 Order 
authorized Magnum to construct facilities in Millard, Juab, and Utah 
Counties, Utah consisting of four salt caverns, various related 
aboveground supporting facilities and a 61.6-mile long, 36-inch 
diameter, header pipeline extending from the storage site to points of 
interconnection with existing interstate gas transmission facilities 
owned by Kern River Gas Transmission Company and Questar Pipeline 
Company near Goshen, Utah.
    The Amendment requested by Magnum would authorize the relocation of 
Magnum's approved natural gas storage caverns and associated surface 
facilities within the previously analyzed Project area, grant authority 
to Magnum to provide a new firm wheeling transportation service under 
market-based rates, and extend the time by which the facilities must be 
constructed and placed in service. The filing may be viewed on the Web 
at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits, in the docket number field to 
access the document. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions concerning this application should be directed to 
Tiffany A. James, Vice President, Project Development and Government 
Affairs, Magnum Gas Storage, LLC, 3165 E. Millrock Dr., #330, Holladay, 
Utah 84121, telephone: (801) 993-7001, email: 
[email protected], or J. Gordon Pennington, Attorney at Law, 
Georgetown Place, 1101 30th Street NW., Suite 500, Washington, DC 
20007, phone: (202) 625-4330, email: [email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule will serve to 
notify federal and state agencies of the timing for the completion of 
all necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.

[[Page 75080]]

    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 5 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    Motions to intervene, protests and comments may be filed 
electronically via the Internet in lieu of paper; see, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. The Commission strongly encourages 
electronic filings.
    Comment Date: December 15, 2015

    Dated: November 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-30399 Filed 11-30-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                          Federal Register / Vol. 80, No. 230 / Tuesday, December 1, 2015 / Notices                                           75079

                                              necessary in order to attend the                        and 214 of the Commission’s                           aboveground supporting facilities and a
                                              workshop. Please be advised that we                     Regulations (18 CFR 385.211 and                       61.6-mile long, 36-inch diameter, header
                                              may include your name and associated                    § 385.214) on or before 5:00 p.m. Eastern             pipeline extending from the storage site
                                              company/organization only in a meeting                  time on the specified comment date.                   to points of interconnection with
                                              summary that we will make available to                  Protests may be considered, but                       existing interstate gas transmission
                                              the general public after the workshop,                  intervention is necessary to become a                 facilities owned by Kern River Gas
                                              and by providing this information you                   party to the proceeding.                              Transmission Company and Questar
                                              are consenting to allowing us to make it                                                                      Pipeline Company near Goshen, Utah.
                                                                                                      Filings in Existing Proceedings
                                              publicly available. DOI’s contractor will
                                              collect and manage the information                         Docket Numbers: RP16–144–000.                         The Amendment requested by
                                              until the workshop is over. The                            Applicants: TransColorado Gas                      Magnum would authorize the relocation
                                              contractors and the government will                     Transmission Company L.                               of Magnum’s approved natural gas
                                              only use your information for the                          Description: Filing Withdrawal:                    storage caverns and associated surface
                                              limited purposes stated above, will only                Motion to Withdraw Filing.                            facilities within the previously analyzed
                                              share it with authorized personnel, and                    Filed Date: 11/18/15.                              Project area, grant authority to Magnum
                                              will not share it with third parties for                   Accession Number: 20151118–5075.                   to provide a new firm wheeling
                                              promotional purposes.                                      Comments Due: 5 p.m. ET 11/30/15.                  transportation service under market-
                                                Information on Services for                              Any person desiring to protest in any              based rates, and extend the time by
                                              Individuals with Disabilities:                          of the above proceedings must file in                 which the facilities must be constructed
                                              Individuals requiring special                           accordance with Rule 211 of the                       and placed in service. The filing may be
                                              accommodations at the meeting, please                   Commission’s Regulations (18 CFR                      viewed on the Web at http://
                                              contact Ronee Penoi no later than the                   385.211) on or before 5:00 p.m. Eastern               www.ferc.gov using the ‘‘eLibrary’’ link.
                                              close of business on December 3th,                      time on the specified comment date.                   Enter the docket number, excluding the
                                              2015.                                                      The filings are accessible in the                  last three digits, in the docket number
                                                Minutes: A summary report of the                      Commission’s eLibrary system by                       field to access the document. For
                                              meeting will be available for printing at               clicking on the links or querying the                 assistance, contact FERC at
                                              the DOE Wind Program Online                             docket number.                                        FERCOnlineSupport@ferc.gov or call
                                              Publication and Product Library at:                        eFiling is encouraged. More detailed               toll-free, (886) 208–3676 or TYY, (202)
                                              wind.energy.gov/publications.html.                      information relating to filing                        502–8659.
                                                Dated: November 25, 2015.                             requirements, interventions, protests,
                                                                                                      service, and qualifying facilities filings               Any questions concerning this
                                              Jose Zayas,
                                                                                                      can be found at: http://www.ferc.gov/                 application should be directed to
                                              Director, Wind and Water Power                                                                                Tiffany A. James, Vice President, Project
                                              Technologies, Office of Energy Efficiency and           docs-filing/efiling/filing-req.pdf. For
                                              Renewable Energy.                                       other information, call (866) 208–3676                Development and Government Affairs,
                                                                                                      (toll free). For TTY, call (202) 502–8659.            Magnum Gas Storage, LLC, 3165 E.
                                              [FR Doc. 2015–30452 Filed 11–30–15; 8:45 am]
                                                                                                        Dated: November 19, 2015.
                                                                                                                                                            Millrock Dr., #330, Holladay, Utah
                                              BILLING CODE 6450–01–P
                                                                                                                                                            84121, telephone: (801) 993–7001,
                                                                                                      Nathaniel J. Davis, Sr.,
                                                                                                                                                            email: tjames@westernenergyhub.com,
                                                                                                      Deputy Secretary.
                                              DEPARTMENT OF ENERGY                                                                                          or J. Gordon Pennington, Attorney at
                                                                                                      [FR Doc. 2015–30397 Filed 11–30–15; 8:45 am]
                                                                                                                                                            Law, Georgetown Place, 1101 30th
                                                                                                      BILLING CODE 6717–01–P
                                              Federal Energy Regulatory                                                                                     Street NW., Suite 500, Washington, DC
                                              Commission                                                                                                    20007, phone: (202) 625–4330, email:
                                                                                                      DEPARTMENT OF ENERGY                                  Pennington5@verizon.net.
                                              Combined Notice of Filings
                                                                                                                                                               Pursuant to section 157.9 of the
                                                Take notice that the Commission has                   Federal Energy Regulatory                             Commission’s rules, 18 CFR 157.9,
                                              received the following Natural Gas                      Commission                                            within 90 days of this Notice the
                                              Pipeline Rate and Refund Report filings:                [Docket No. CP16–18–000]                              Commission staff will either: complete
                                              Filings Instituting Proceedings                                                                               its environmental assessment (EA) and
                                                                                                      Magnum Gas Storage, LLC; Notice of                    place it into the Commission’s public
                                                Docket Numbers: RP16–203–000.                         Application for Amendment                             record (eLibrary) for this proceeding, or
                                                Applicants: Kern River Gas
                                                                                                                                                            issue a Notice of Schedule for
                                              Transmission Company.                                     Take notice that on November 16,
                                                Description: § 4(d) Rate Filing: 2015                 2015, Magnum Gas Storage, LLC                         Environmental Review. If a Notice of
                                              Molycorp to be effective 9/21/2015.                     (Magnum), 3165 E. Millrock Dr., #330,                 Schedule for Environmental Review is
                                                Filed Date: 11/18/15.                                 Holladay, Utah 84121, filed an                        issued, it will indicate, among other
                                                Accession Number: 20151118–5088.                      application pursuant to section 7(c) of               milestones, the anticipated date for the
                                                Comments Due: 5 p.m. ET 11/30/15.                     the Natural Gas Act (NGA) and Parts                   Commission staff’s issuance of the final
                                                Docket Numbers: RP16–204–000.                         157 and 284 of the Commission’s                       environmental impact statement (FEIS)
                                                Applicants: Alliance Pipeline L.P.                    Regulations requesting that the                       or EA for this proposal. The filing of the
                                                Description: § 4(d) Rate Filing:                      Commission approve an amendment                       EA in the Commission’s public record
                                              November 21—30 2015 Auction to be                       (Amendment) to the certificate of public              for this proceeding or the issuance of a
                                                                                                                                                            Notice of Schedule will serve to notify
tkelley on DSK3SPTVN1PROD with NOTICES




                                              effective 11/21/2015.                                   convenience and necessity issued to the
                                                Filed Date: 11/18/15.                                 Magnum in Docket No. CP10–22–000 on                   federal and state agencies of the timing
                                                Accession Number: 20151118–5101.                      March 17, 2011 (March 17 Order). The                  for the completion of all necessary
                                                Comments Due: 5 p.m. ET 11/30/15.                     March 17 Order authorized Magnum to                   reviews, and the subsequent need to
                                                Any person desiring to intervene or                   construct facilities in Millard, Juab, and            complete all federal authorizations
                                              protest in any of the above proceedings                 Utah Counties, Utah consisting of four                within 90 days of the date of issuance
                                              must file in accordance with Rules 211                  salt caverns, various related                         of the Commission staff’s FEIS or EA.


                                         VerDate Sep<11>2014   23:35 Nov 30, 2015   Jkt 238001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\01DEN1.SGM   01DEN1


                                              75080                       Federal Register / Vol. 80, No. 230 / Tuesday, December 1, 2015 / Notices

                                                 There are two ways to become                         via the Internet in lieu of paper; see, 18               FERC Contact: Christiane Casey,
                                              involved in the Commission’s review of                  CFR 385.2001(a)(1)(iii) and the                       christiane.casey@ferc.gov, (202) 502–
                                              this project. First, any person wishing to              instructions on the Commission’s Web                  8577.
                                              obtain legal status by becoming a party                 site under the ‘‘e-Filing’’ link. The                    Competing Application: This
                                              to the proceedings for this project                     Commission strongly encourages                        application competes with Project No.
                                              should, on or before the comment date                   electronic filings.                                   14664–000 filed March 3, 2015.
                                              stated below, file with the Federal                        Comment Date: December 15, 2015                    Competing applications had to be filed
                                              Energy Regulatory Commission, 888                         Dated: November 24, 2015.                           on or before July 20, 2015.
                                              First Street NE., Washington, DC 20426,                                                                          Deadline for filing comments and
                                                                                                      Nathaniel J. Davis, Sr.,
                                              a motion to intervene in accordance                                                                           motions to intervene: 60 days from the
                                              with the requirements of the                            Deputy Secretary.
                                                                                                                                                            issuance of this notice. Comments and
                                              Commission’s Rules of Practice and                      [FR Doc. 2015–30399 Filed 11–30–15; 8:45 am]          motions to intervene may be filed
                                              Procedure (18 CFR 385.214 or 385.211)                   BILLING CODE 6717–01–P                                electronically via the Internet. See 18
                                              and the Regulations under the NGA (18                                                                         CFR 385.2001(a)(1)(iii) and the
                                              CFR 157.10). A person obtaining party                                                                         instructions on the Commission’s Web
                                              status will be placed on the service list               DEPARTMENT OF ENERGY                                  site http://www.ferc.gov/docs-filing/
                                              maintained by the Secretary of the                                                                            efiling.asp. Commenters can submit
                                              Commission and will receive copies of                   Federal Energy Regulatory
                                                                                                      Commission                                            brief comments up to 6,000 characters,
                                              all documents filed by the applicant and                                                                      without prior registration, using the
                                              by all other parties. A party must submit                                                                     eComment system at http://
                                              5 copies of filings made with the                       [Project No. 14686–000]                               www.ferc.gov/docs-filing/
                                              Commission and must mail a copy to                                                                            ecomment.asp. You must include your
                                              the applicant and to every other party in               Energy Resources USA Inc.; Notice of
                                                                                                      Preliminary Permit Application                        name and contact information at the end
                                              the proceeding. Only parties to the                                                                           of your comments. For assistance,
                                              proceeding can ask for court review of                  Accepted for Filing and Soliciting
                                                                                                      Comments and Motions To Intervene                     please contact FERC Online Support at
                                              Commission orders in the proceeding.                                                                          FERCOnlineSupport@ferc.gov or toll
                                                 However, a person does not have to                      On June 25, 2015, Energy Resources                 free at 1–866–208–3676, or for TTY,
                                              intervene in order to have comments                     USA Inc., filed an application for a                  (202) 502–8659. Although the
                                              considered. The second way to                           preliminary permit, pursuant to section               Commission strongly encourages
                                              participate is by filing with the                       4(f) of the Federal Power Act (FPA),                  electronic filing, documents may also be
                                              Secretary of the Commission, as soon as                                                                       paper-filed. To paper-file, mail an
                                                                                                      proposing to study the feasibility of a
                                              possible, an original and two copies of                                                                       original and five copies to: Kimberly D.
                                                                                                      hydropower project to be located at the
                                              comments in support of or in opposition                                                                       Bose, Secretary, Federal Energy
                                                                                                      U.S. Army Corps of Engineers’ (Corps)
                                              to this project. The Commission will                                                                          Regulatory Commission, 888 First Street
                                                                                                      David D. Terry Lock and Dam on the
                                              consider these comments in                                                                                    NE., Washington, DC 20426.
                                                                                                      Arkansas River near the town of Little
                                              determining the appropriate action to be                                                                         More information about this project,
                                                                                                      Rock in Pulaski County, Arkansas. The
                                              taken, but the filing of a comment alone                                                                      including a copy of the application, can
                                                                                                      sole purpose of a preliminary permit, if
                                              will not serve to make the filer a party                                                                      be viewed or printed on the ‘‘eLibrary’’
                                                                                                      issued, is to grant the permit holder
                                              to the proceeding. The Commission’s                                                                           link of Commission’s Web site at http://
                                                                                                      priority to file a license application
                                              rules require that persons filing
                                                                                                      during the permit term. A preliminary                 www.ferc.gov/docs-filing/elibrary.asp.
                                              comments in opposition to the project
                                                                                                      permit does not authorize the permit                  Enter the docket number (P–14686) in
                                              provide copies of their protests only to
                                                                                                      holder to perform any land-disturbing                 the docket number field to access the
                                              the party or parties directly involved in
                                                                                                      activities or otherwise enter upon lands              document. For assistance, contact FERC
                                              the protest.
                                                 Persons who wish to comment only                     or waters owned by others without the                 Online Support.
                                              on the environmental review of this                     owners’ express permission.                             Dated: November 24, 2015.
                                              project should submit an original and                      The proposed project would consist of              Nathaniel J. Davis, Sr.,
                                              two copies of their comments to the                     the following: (1) A 100-foot-long                    Deputy Secretary.
                                              Secretary of the Commission.                            overflow bank extension connecting to
                                                                                                                                                            [FR Doc. 2015–30402 Filed 11–30–15; 8:45 am]
                                              Environmental commenters will be                        the existing dam; (2) a 770-foot-long,
                                                                                                                                                            BILLING CODE 6717–01–P
                                              placed on the Commission’s                              200-foot-wide intake channel with a 85-
                                              environmental mailing list, will receive                foot-long retaining wall; (3) a 220-foot-
                                              copies of the environmental documents,                  long, 90-foot-wide powerhouse                         DEPARTMENT OF ENERGY
                                              and will be notified of meetings                        containing four generating units with a
                                              associated with the Commission’s                        total capacity of 18 megawatts; (4) a 500-            Federal Energy Regulatory
                                              environmental review process.                           foot-long, 200-foot-wide tailrace with a              Commission
                                              Environmental commenters will not be                    85-foot-long retaining wall; (5) a 4.16/69
                                                                                                      kilo-Volt (kV) substation; and (6) a 4-               [Project No. 14518–001]
                                              required to serve copies of filed
                                              documents on all other parties.                         mile-long, 69 kV transmission line. The
                                                                                                                                                            New England Hydropower Company,
                                              However, the non-party commenters                       proposed project would have an
                                                                                                                                                            LLC; Notice of Surrender of
                                              will not receive copies of all documents                estimated average annual generation of
                                                                                                                                                            Preliminary Permit
                                              filed by other parties or issued by the                 128,200 megawatt-hours, and operate as
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Commission (except for the mailing of                   directed by the Corps.                                   Take notice that New England
                                              environmental documents issued by the                      Applicant Contact: Mr. Ander                       Hydropower Company, LLC, permittee
                                              Commission) and will not have the right                 Gonzalez, Energy Resources USA Inc.,                  for the proposed Lensdale Pond Dam
                                              to seek court review of the                             2655 Le Jeune Road, Suite 804, Coral                  Hydroelectric Project, has requested that
                                              Commission’s final order.                               Gables, Florida 33134; Phone: +34 93                  its preliminary permit be terminated.
                                                 Motions to intervene, protests and                   252 38 40; Email: agonzalez@                          The permit was issued on July 25, 2013,
                                              comments may be filed electronically                    energyresources.es                                    and would have expired on June 30,


                                         VerDate Sep<11>2014   23:35 Nov 30, 2015   Jkt 238001   PO 00000   Frm 00038   Fmt 4703   Sfmt 4703   E:\FR\FM\01DEN1.SGM   01DEN1



Document Created: 2018-03-02 09:09:40
Document Modified: 2018-03-02 09:09:40
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesDecember 15, 2015
FR Citation80 FR 75079 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR