80_FR_75711 80 FR 75480 - Dominion Virginia Power Combined License Application for North Anna, Unit 3

80 FR 75480 - Dominion Virginia Power Combined License Application for North Anna, Unit 3

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 231 (December 2, 2015)

Page Range75480-75483
FR Document2015-30536

The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in a response to a September 23, 2015, letter from Dominion Virginia Power (Dominion or applicant), which requested an exemption from the requirement to submit an annual update of the Final Safety Analysis Report (FSAR) included in Dominion's Combined License (COL) application for calendar year 2015. The NRC staff reviewed this request and determined that it is appropriate to grant the exemption based on the schedule for completion of the applicant's seismic closure plan (SCP) submitted on October 22, 2014, which outlined a revised approach to performing certain aspects of the seismic analysis for the North Anna 3 COL application (COLA) as well as use of the most current NRC- approved ground motion model.

Federal Register, Volume 80 Issue 231 (Wednesday, December 2, 2015)
[Federal Register Volume 80, Number 231 (Wednesday, December 2, 2015)]
[Notices]
[Pages 75480-75483]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-30536]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 52-016; NRC-2008-0066]


Dominion Virginia Power Combined License Application for North 
Anna, Unit 3

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing an 
exemption in a response to a September 23, 2015, letter from Dominion 
Virginia Power (Dominion or applicant), which requested an exemption 
from the requirement to submit an annual update of the Final Safety 
Analysis Report (FSAR) included in Dominion's Combined License (COL) 
application for calendar year 2015. The NRC staff reviewed this request 
and determined that it is appropriate to grant the exemption based on 
the schedule for completion of the applicant's seismic closure plan 
(SCP) submitted on October 22, 2014, which outlined a revised approach 
to performing certain aspects of the seismic analysis for the North 
Anna 3 COL application (COLA) as well as use of the most current NRC-
approved ground motion model.

DATES: The effective date of the Dominion FSAR exemption issuance is 
December 2, 2015.

ADDRESSES: Please refer to Docket ID NRC-2008-0066 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0066. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at

[[Page 75481]]

http://www.nrc.gov/reading-rm/adams.html. To begin the search, select 
``ADAMS Public Documents'' and then select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. The ADAMS accession number for each 
document referenced in this document (if that document is available in 
ADAMS) is provided the first time that a document is referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: James Shea, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-1388; email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Background

    By letter dated November 26, 2007 (ADAMS accession number 
ML073320913), Dominion submitted its application to the NRC for a COL 
to construct and operate a General Electric-Hitachi Economic Simplified 
Boiling-Water Reactor (ESBWR) at North Anna Power Station (North Anna), 
Unit 3 site pursuant to part 52 of title 10 of the Code of Federal 
Regulations (10 CFR), ``Licenses, Certifications, and Approvals for 
Nuclear Power Plants.'' By letter dated June 28, 2010, Dominion revised 
its application to incorporate by reference the Mitsubishi Heavy 
Industries, Ltd. United States-Advanced Pressurized Water Reactor 
technology to construct and operate at the North Anna, Unit 3 site.
    On August 23, 2011, a 5.8 magnitude earthquake occurred near 
Mineral, Virginia, which is approximately 11 miles from the North Anna 
Unit 3 site. In view of the earthquake, the NRC staff requested 
additional analysis of the proposed reactor design to verify that the 
design, if built at the North Anna site, would satisfy the requirements 
of 10 CFR part 50, Appendix A, ``General Design Criteria,'' Criterion 
2, ``Design Bases for Protection Against Natural Phenomena,'' and 10 
CFR part 50, Appendix S, ``Earthquake Engineering Criteria for Nuclear 
Power Plants.'' During the applicant's seismic evaluation, the NRC 
staff had requests for additional information and had held public 
meetings with the applicant to provide staff feedback on the North Anna 
3 site seismic analyses.
    By letter dated April 25, 2013, Dominion notified the NRC staff 
that it planned to revert back to ESBWR reactor technology for its 
North Anna Unit 3 COLA. Dominion then submitted a revised application 
that incorporated by reference the ESBWR Design Control Document (DCD), 
Revision 9, by letter dated December 18, 2013. After meeting with the 
NRC staff in 2014 and performing seismic sensitivity analyses, Dominion 
modified its site-specific seismic analyses approach intended to 
simplify it and make it more consistent with the seismic analyses 
presented in the ESBWR DCD. Therefore, in its SCP submitted on October 
22, 2014 (ADAMS accession number ML14297A199), Dominion outlined a 
schedule for completing all technical reports, analyses, and COLA 
changes needed to address seismic issues by December 31, 2015.

II. Request/Action

    The regulations specified in 10 CFR 50.71(e)(3)(iii) require that 
an applicant for a COL under 10 CFR part 52 shall, during the period 
from docketing of a COL application until the NRC makes a finding under 
10 CFR 52.103(g) pertaining to facility operation, submit an annual 
update to the application's FSAR, which is a part of the application.
    Pursuant to 10 CFR 50.71(e)(3)(iii), the next annual update of the 
North Anna, Unit 3, COL application FSAR would be due on or before 
December 31, 2015. By letter to the NRC dated September 23, 2015, 
Dominion requested a one-time exemption from the 10 CFR 
50.71(e)(3)(iii) requirement to submit the scheduled 2015 COL 
application FSAR update, and proposed a new submission deadline of June 
30, 2016, for the next FSAR update (ADAMS Accession Number 
ML15268A039). Dominion then proposes to submit the next annual FSAR 
update required by 10 CFR 50.71(e)(3) in 2017.
    Dominion's requested exemption is a one-time schedule change from 
the requirements of 10 CFR 50.71(e)(3)(iii). The exemption, as 
requested, would allow Dominion to submit the next FSAR update no later 
than June 30, 2016. Dominion states that the FSAR, if submitted as 
requested, would include all the FSAR changes based on the Dominion SCP 
to allow a more efficient and effective submittal of an updated FSAR 
reflecting all changes associated with the site-specific seismic 
analyses.

III. Discussion

    Pursuant to 10 CFR 50.12, the NRC may, upon application by any 
interested person or upon its own initiative, grant exemptions from the 
requirements of 10 CFR part 50, including section 50.71(e)(3)(iii) 
when: (1) The exemptions are authorized by law, will not present an 
undue risk to public health or safety, and are consistent with the 
common defense and security; and (2) special circumstances are present. 
As relevant to the requested exemption, special circumstances exist if: 
(1) ``Application of the regulation in the particular circumstances 
would not serve the underlying purpose of the rule or is not necessary 
to achieve the underlying purpose of the rule'' (10 CFR 
50.12(a)(2)(ii)); or (2) ``The exemption would provide only temporary 
relief from the applicable regulation and the licensee or applicant has 
made good faith efforts to comply with the regulation'' (10 CFR 
50.12(a)(2)(v)).
    The review of the North Anna, Unit 3, ESBWR COL application has 
been ongoing since Dominion submitted the revised COL application dated 
December 18, 2013. The technical issues currently under consideration 
by the NRC staff are primarily associated with the revised North Anna, 
Unit 3 seismic analyses, which Dominion has been addressing since it 
submitted the revised COL application, as described in detail in the 
2014 SCP. According to the SCP, in December 2015, Dominion is scheduled 
to submit to the NRC technical reports and COL application markups that 
incorporate the results of analyses of seismic design capacities of 
certain structures, systems, and components. In addition, during the 
week of September 28, 2015, the NRC staff completed an audit associated 
with the proposed North Anna, Unit 3 site-specific seismic issues. The 
NRC staff plans to conduct a second audit in the first or second 
quarter of 2016 relating to the capacities of the systems structures 
and components to withstand the site-specific seismic ground motion. 
Therefore, the NRC staff may identify additional requests for 
information regarding seismic issues in the course of its review 
through the end of December 2015; as a result of the technical reports 
and COL application markups due to be submitted in December 2015; and 
as a result of the second technical audit planned for spring 2016. The 
COL application markups due in December 2015, together with any NRC 
staff requests for additional information, will likely result in the 
need to change the FSAR. These changes could not be completed before 
the current FSAR update is due at the end of calendar year 2015.

[[Page 75482]]

Authorized by Law

    The exemption is a one-time schedule exemption from the 
requirements of 10 CFR 50.71(e)(3)(iii). The exemption, as requested, 
would allow Dominion to submit the next North Anna, Unit 3, COL 
application FSAR update on or before June 30, 2016, in lieu of the 
required scheduled submittal on or before December 31, 2015. As stated 
above, 10 CFR 50.12 allows the NRC to grant such an exemption. The NRC 
staff has determined that granting Dominion a one-time exemption from 
the requirements of 10 CFR 50.71(e)(3)(iii) with updates to the FSAR to 
be submitted on or before June 30, 2016, will provide only temporary 
relief from this regulation and will not result in a violation of the 
Atomic Energy Act of 1954, as amended, or NRC regulations. Therefore, 
the exemption is authorized by law.

No Undue Risk to Public Health and Safety

    The underlying purpose of 10 CFR 50.71(e)(3)(iii) is to provide for 
a timely and comprehensive update of the FSAR associated with a COL 
application in order to support an effective and efficient review by 
the NRC staff and issuance of the NRC staff's safety evaluation report. 
The requested exemption is solely administrative in nature, in that it 
pertains to the schedule for submission to the NRC of revisions to an 
application under 10 CFR part 52, for which a license has not been 
granted. Based on the nature of the requested exemption as described 
above, no new accident precursors are created by the exemption; thus, 
neither the probability, nor the consequences of postulated accidents 
are increased. Therefore, there is no undue risk to public health and 
safety.

Consistent With Common Defense and Security

    The exemption would allow Dominion to submit the next FSAR update 
prior to final North Anna, Unit 3 NRC staff safety evaluation. This 
schedule change has no relation to security issues. Therefore, the 
common defense and security is not impacted by this exemption.

Special Circumstances

    Special circumstances, in accordance with 10 CFR 50.12(a)(2), are 
present whenever: (1) Application of the regulation in the particular 
circumstances would not serve the underlying purpose of the rule or is 
not necessary to achieve the underlying purpose of the rule'' (10 CFR 
50.12(a)(2)(ii)); or (2) The exemption would provide only temporary 
relief from the applicable regulation and the licensee or applicant has 
made good faith efforts to comply with the regulation (10 CFR 
50.12(a)(2)(v)).
    The underlying purpose of 10 CFR 50.71(e)(3)(iii) in the context of 
a COL application is to provide for a timely and comprehensive update 
of the FSAR associated with a COL application in order to support an 
effective and efficient review by the NRC staff and issuance of the NRC 
staff's safety evaluation report. As discussed above, the requested 
one-time exemption is solely administrative in nature, in that it 
pertains to a one-time schedule change for submittal of revisions to an 
application under 10 CFR part 52, for which a license has not been 
granted. In addition, since the remaining review of the application 
primarily relates to the issues discussed in the Dominion SCP, there 
will not likely be any significant FSAR updates until the elements of 
the SCP and the NRC staff seismic audits are completed. Completion of 
the SCP (through submission of technical reports and COL application 
markups) in December 2015 and the additional information submitted as a 
result of NRC staff audits scheduled for spring of 2016 cannot be 
reflected in a December 2015 FSAR update, but will be reflected in an 
FSAR update scheduled for June 2016. At that time, the revised FSAR 
update submitted by Dominion will be reviewed by the NRC to confirm 
that COL markups and changes identified in requests for additional 
information responses will be reflected in the FSAR prior to completion 
of the final North Anna, Unit 3 NRC staff safety evaluation. The 
requested one-time exemption would permit Dominion time to submit all 
the necessary technical information for NRC staff review and the 
updated COL markups associated with the revised North Anna, Unit 3, 
seismic analyses in accordance with the submitted Dominion SCP. The NRC 
staff has determined that this one-time exemption will support the 
staff's effective and efficient review of the COL application, as well 
as issuance of the safety evaluation report, and, therefore, submission 
of an FSAR update in December 2015 is not necessary to achieve the 
underlying purpose of 10 CFR 50.71(e)(3)(iii). Accordingly, the NRC 
staff finds that special circumstances are present under 10 CFR 
50.12(a)(2)(ii) in connection with Dominion's requested exemption.
    Further, the NRC staff finds that granting a one-time exemption 
from 10 CFR 50.71(e)(3)(iii) would provide only temporary relief, since 
Dominion would update the FSAR in June 2016. The 2014 Dominion SCP 
outlined the approach to meet NRC regulatory requirements and address 
requests for additional information as a result of NRC staff technical 
review. Under the Dominion SCP for the proposed North Anna, Unit 3, 
technical reports and analyses have been submitted as they have been 
completed to date, and two sets of COLA markups (the first revising 
geotechnical information and the second incorporating the results of 
soil-structure interaction analyses, structure-soil-structure 
interaction analyses, and stability analyses) have been completed and 
submitted for NRC staff review. As described in the Dominion SCP, the 
last technical reports and a third set of COLA markups, which 
incorporate the results of the analyses of the design capacities of 
certain structures, systems, and components (SSCs), are scheduled in 
the SCP to be submitted in December 2015. Accordingly, the NRC staff 
finds that Dominion has made good faith efforts to comply with the 
regulation, and the special circumstances defined by 10 CFR 
50.12(a)(2)(v) are present.
    Therefore, the special circumstances required by 10 CFR 50.12(a)(2) 
for the granting of an exemption from 10 CFR 50.71(e)(3)(iii) exist.

Eligibility for Categorical Exclusion From Environmental Review

    With respect to the exemption's impact on the quality of the human 
environment, the NRC has determined that this specific exemption 
request is eligible for categorical exclusion as identified in 10 CFR 
51.22(c)(25). Under 10 CFR 51.22(c)(25), granting of an exemption from 
the requirements of any regulation of 10 CFR Chapter 1 (which includes 
10 CFR 50.71(e)(3)(iii)) is an action that is a categorical exclusion, 
provided that:
    (i) There is no significant hazards consideration;
    (ii) There is no significant change in the types or significant 
increase in the amounts of any effluents that may be released offsite;
    (iii) There is no significant increase in individual or cumulative 
public or occupational radiation exposure;
    (iv) There is no significant construction impact;
    (v) There is no significant increase in the potential for or 
consequences from radiological accidents; and
    (vi) The requirements from which an exemption is sought involve:
    (A) Recordkeeping requirements;
    (B) Reporting requirements;
    (C) Inspection or surveillance requirements;
    (D) Equipment servicing or maintenance scheduling requirements;

[[Page 75483]]

    (E) Education, training, experience, qualification, requalification 
or other employment suitability requirements;
    (F) Safeguard plans, and materials control and accounting inventory 
scheduling requirements;
    (G) Scheduling requirements;
    (H) Surety, insurance or indemnity requirements; or
    (I) Other requirements of an administrative, managerial, or 
organizational nature.
    The requirements from which this exemption is sought involve only 
``(B) Reporting requirements'' or ``(G) Scheduling requirements'' of 
those required by 10 CFR 51.22(c)(25)(vi).
    The NRC staff's determination that each of the applicable criteria 
for this categorical exclusion is met as follows:
    I. 10 CFR 51.22(c)(25)(i): There is no significant hazards 
consideration.
    Staff Analysis: The criteria for determining if an exemption 
involves a significant hazards consideration are found in 10 CFR 50.92. 
The proposed action involves only a schedule change regarding the 
submission of an update to the application for which the licensing 
review is ongoing. Therefore, there is no significant hazard 
consideration because granting the proposed exemption would not:
    (1) Involve a significant increase in the probability or 
consequences of an accident previously evaluated; or
    (2) Create the possibility of a new or different kind of accident 
from any accident previously evaluated; or
    (3) Involve a significant reduction in a margin of safety.
    II. 10 CFR 51.22(c)(25)(ii): There is no significant change in the 
types or significant increase in the amounts of any effluents that may 
be released offsite.
    Staff Analysis: The proposed action involves only a schedule 
change, which is administrative in nature, and does not involve any 
changes in the types or significant increase in the amounts of 
effluents that may be released offsite.
    III. 10 CFR 51.22(c)(25)(iii): There is no significant increase in 
individual or cumulative public or occupational radiation exposure.
    Staff Analysis: Since the proposed action involves only a schedule 
change, which is administrative in nature, it does not contribute to 
any significant increase in occupational or public radiation exposure.
    IV. 10 CFR 51.22(c)(25)(iv): There is no significant construction 
impact.
    Staff Analysis: The proposed action involves only a schedule 
change, which is administrative in nature. The NRC has not granted the 
COL application, and the requested exemption will not allow 
construction at the North Anna site; therefore, the proposed action 
does not involve any construction impact.
    V. 10 CFR 51.22(c)(25)(v): There is no significant increase in the 
potential for or consequences from radiological accidents.
    Staff Analysis: The proposed action involves only a schedule change 
which is administrative in nature and does not impact the probability 
or consequences of accidents.
    VI. 10 CFR 51.22(c)(25)(vi): The requirements from which this 
exemption is sought involve only ``(B) Reporting requirements'' or 
``(G) Scheduling requirements.''
    Staff Analysis: The exemption request involves requirements in both 
of these categories because it involves submitting an updated FSAR by 
Dominion, and also relates to the schedule for submitting FSAR updates 
to the NRC.
    Accordingly, Dominion's exemption requests satisfies the criteria 
of 10 CFR 51.22(c)(25) for categorical exclusion from environmental 
review, and the granting of this exemption will not have a significant 
effect on the quality of the human environment.

IV. Conclusion

    The NRC has determined that, pursuant to 10 CFR 50.12, the 
exemption is authorized by law, will not present an undue risk to the 
public health and safety, and is consistent with the common defense and 
security. Also, special circumstances as described in 10 CFR 
50.12(a)(2)(ii) and (v) are present. Therefore, the NRC hereby grants 
Dominion a one-time exemption from the requirements of 10 CFR 
50.71(e)(3)(iii) pertaining to the North Anna, Unit 3, COL application 
to allow submission of the next North Anna 3 FSAR update no later than 
June 30, 2016.
    Pursuant to 10 CFR 51.22, the NRC has determined that the exemption 
request meets the applicable categorical exclusion criteria set forth 
in 10 CFR 51.22(c)(25), and the granting of this exemption will not 
have a significant effect on the quality of the human environment.
    This exemption is effective upon issuance.

    Dated at Rockville, Maryland, this 20th day November 2015.

    For the Nuclear Regulatory Commission.
Francis M. Akstulewicz,
Director, Division of New Reactor Licensing, Office of New Reactors.
[FR Doc. 2015-30536 Filed 12-1-15; 8:45 am]
 BILLING CODE 7590-01-P



                                                  75480                      Federal Register / Vol. 80, No. 231 / Wednesday, December 2, 2015 / Notices

                                                  H. Recordkeeping                                             4. Notify the OTPCA and the                          Signed at Washington, DC, on November
                                                                                                            Bridgeport, CT, Area Office in writing                25, 2015.
                                                    1. NSCI must/would maintain a
                                                                                                            and 15 working days prior to any                      David Michaels,
                                                  record of any recordable injury, illness,
                                                  in-patient hospitalizations, amputations,                 proposed change in the energy control                 Assistant Secretary of Labor for Occupational
                                                                                                            operations (including changes                         Safety and Health.
                                                  loss of an eye or fatality (using the
                                                  OSHA 301 Incident Report form to                          addressed by condition C–13) that                     [FR Doc. 2015–30483 Filed 12–1–15; 8:45 am]
                                                  investigate and record energy control-                    affects NSCI’s ability to comply with the             BILLING CODE 4510–26–P

                                                  related recordable injuries as defined by                 conditions specified herein.
                                                  29 CFR 1904.4, 1904.7, 1904.8 through                        5. Obtain OSHA’s approval prior to
                                                  1904.12 10), resulting from the task of                   implementing the proposed change in                   NUCLEAR REGULATORY
                                                  grinding roll mill passes located in the                  the energy control operations that                    COMMISSION
                                                  roll mill stands by completing the                        affects NSCI’s ability to comply with the
                                                                                                                                                                  [Docket No. 52–016; NRC–2008–0066]
                                                  OSHA 301 Incident Report form and                         conditions specified herein.
                                                  OSHA 300 Log of Work-Related Injuries                        6. Provide a written evaluation report,            Dominion Virginia Power Combined
                                                  and Illnesses.                                            by January 31st at the beginning of each              License Application for North Anna,
                                                    2. NSCI must/would maintain records                     calendar year, with a report covering the             Unit 3
                                                  of all tests and inspections of the                       year just ended, to the OTPCA and the
                                                  component configuration or operation,                     Bridgeport, CT, Area Office                           AGENCY:  Nuclear Regulatory
                                                  and energy control procedures, as well                    summarizing the quarterly inspections                 Commission.
                                                  as associated hazardous condition                         and functionality tests of the trapped                ACTION: Exemption; issuance.
                                                  corrective actions and repairs.                           key system components and
                                                                                                            configuration or operation and energy                 SUMMARY:    The U.S. Nuclear Regulatory
                                                  I. Notifications                                          control procedures that affect the                    Commission (NRC) is issuing an
                                                     To assist OSHA in administering the                    grinding of roll mill passes located in               exemption in a response to a September
                                                  conditions specified herein, NSCI shall/                  the roll mill stands, to ensure that the              23, 2015, letter from Dominion Virginia
                                                  would:                                                    energy control procedure and the                      Power (Dominion or applicant), which
                                                     1. Notify the OTPCA and the                            conditions of this variance are being                 requested an exemption from the
                                                  Bridgeport, CT, Area Office of any                        followed.                                             requirement to submit an annual update
                                                  recordable injuries, illnesses, in-patient                                                                      of the Final Safety Analysis Report
                                                                                                               Note: The evaluation report is to
                                                  hospitalizations, amputations, loss of an                                                                       (FSAR) included in Dominion’s
                                                                                                            contain summaries of: (1) The number
                                                  eye or fatality (by submitting the                                                                              Combined License (COL) application for
                                                                                                            of variance-related incidents (as
                                                  completed OSHA 301 Incident Report                                                                              calendar year 2015. The NRC staff
                                                                                                            recorded on OSHA 301 forms); and (2)
                                                  form) resulting from implementing the                                                                           reviewed this request and determined
                                                                                                            root causes of any incidents, and
                                                  alternative energy control procedures of                                                                        that it is appropriate to grant the
                                                                                                            preventive and corrective actions
                                                  the proposed variance conditions while                                                                          exemption based on the schedule for
                                                                                                            identified and implemented.
                                                  completing the task of grinding roll mill                                                                       completion of the applicant’s seismic
                                                                                                               7. Inform the OTPCA and the                        closure plan (SCP) submitted on
                                                  passes located in the roll mill stands.                   Bridgeport, CT, Area Office as soon as
                                                  The notification must be made within 8                                                                          October 22, 2014, which outlined a
                                                                                                            possible after it has knowledge that it               revised approach to performing certain
                                                  hours of the incident or 8 hours after                    will:
                                                  becoming aware of a recordable injury,                                                                          aspects of the seismic analysis for the
                                                                                                               a. Cease to do business;                           North Anna 3 COL application (COLA)
                                                  illness, in-patient hospitalizations,
                                                                                                               b. change the location and address of              as well as use of the most current NRC-
                                                  amputations, loss of an eye, or fatality.
                                                                                                            the main office for managing the                      approved ground motion model.
                                                     2. Submit a copy of the preliminary
                                                                                                            alternative energy control procedures                 DATES: The effective date of the
                                                  incident investigation (OSHA form 301)
                                                                                                            specified herein; or                                  Dominion FSAR exemption issuance is
                                                  to the OTPCA and the Bridgeport, CT,
                                                  Area Office within 24 hours of the                           c. transfer the operations specified               December 2, 2015.
                                                  incident or 24 hours after becoming                       herein to a successor company.                        ADDRESSES: Please refer to Docket ID
                                                  aware of a recordable case and submit                        8. Notify all affected employees of this           NRC–2008–0066 when contacting the
                                                  a copy of the full incident investigation                 interim order/proposed permanent                      NRC about the availability of
                                                  within 7 calendar days of the incident                    variance by the same means required to                information regarding this document.
                                                  or 7 calendar days after becoming aware                   inform them of its application for a                  You may obtain publicly-available
                                                  of the case. In addition to the                           variance.                                             information related to this document
                                                  information required by the OSHA form                        9. Request approval from OSHA for                  using any of the following methods:
                                                  301, the incident-investigation report                    the transfer of the interim order/                      • Federal Rulemaking Web site: Go to
                                                  must include a root-cause                                 proposed permanent variance to a                      http://www.regulations.gov and search
                                                  determination, and the preventive and                     successor company.                                    for Docket ID NRC–2008–0066. Address
                                                  corrective actions identified and                         Authority and Signature                               questions about NRC dockets to Carol
                                                  implemented.                                                                                                    Gallagher; telephone: 301–415–3463;
                                                     3. Provide certification within 15                        David Michaels, Ph.D., MPH,                        email: Carol.Gallagher@nrc.gov. For
                                                  working days of the incident that NSCI                    Assistant Secretary of Labor for                      technical questions, contact the
                                                                                                            Occupational Safety and Health, 200                   individual listed in the FOR FURTHER
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  informed affected workers of the
                                                  incident and the results of the incident                  Constitution Avenue NW., Washington,                  INFORMATION CONTACT section of this
                                                  investigation (including the root-cause                   DC 20210, authorized the preparation of               document.
                                                  determination and preventive and                          this notice. Accordingly, the Agency is                 • NRC’s Agencywide Documents
                                                  corrective actions identified and                         issuing this notice pursuant to Section               Access and Management System
                                                  implemented).                                             29 U.S.C. 655(6)(d), Secretary of Labor’s             (ADAMS): You may obtain publicly
                                                                                                            Order No. 1–2012 (77 FR 3912, Jan. 25,                available documents online in the
                                                    10 See   footnote 5.                                    2012), and 29 CFR 1905.11.                            ADAMS Public Documents collection at


                                             VerDate Sep<11>2014     13:24 Dec 01, 2015   Jkt 238001   PO 00000   Frm 00030   Fmt 4703   Sfmt 4703   E:\FR\FM\02DEN1.SGM   02DEN1


                                                                           Federal Register / Vol. 80, No. 231 / Wednesday, December 2, 2015 / Notices                                            75481

                                                  http://www.nrc.gov/reading-rm/                             By letter dated April 25, 2013,                    person or upon its own initiative, grant
                                                  adams.html. To begin the search, select                 Dominion notified the NRC staff that it               exemptions from the requirements of 10
                                                  ‘‘ADAMS Public Documents’’ and then                     planned to revert back to ESBWR                       CFR part 50, including section
                                                  select ‘‘Begin Web-based ADAMS                          reactor technology for its North Anna                 50.71(e)(3)(iii) when: (1) The
                                                  Search.’’ For problems with ADAMS,                      Unit 3 COLA. Dominion then submitted                  exemptions are authorized by law, will
                                                  please contact the NRC’s Public                         a revised application that incorporated               not present an undue risk to public
                                                  Document Room (PDR) reference staff at                  by reference the ESBWR Design Control                 health or safety, and are consistent with
                                                  1–800–397–4209, 301–415–4737, or by                     Document (DCD), Revision 9, by letter                 the common defense and security; and
                                                  email to pdr.resource@nrc.gov. The                      dated December 18, 2013. After meeting                (2) special circumstances are present. As
                                                  ADAMS accession number for each                         with the NRC staff in 2014 and                        relevant to the requested exemption,
                                                  document referenced in this document                    performing seismic sensitivity analyses,              special circumstances exist if: (1)
                                                  (if that document is available in                       Dominion modified its site-specific                   ‘‘Application of the regulation in the
                                                  ADAMS) is provided the first time that                  seismic analyses approach intended to                 particular circumstances would not
                                                  a document is referenced.                               simplify it and make it more consistent               serve the underlying purpose of the rule
                                                     • NRC’s PDR: You may examine and                     with the seismic analyses presented in                or is not necessary to achieve the
                                                  purchase copies of public documents at                  the ESBWR DCD. Therefore, in its SCP                  underlying purpose of the rule’’ (10 CFR
                                                  the NRC’s PDR, Room O1–F21, One                         submitted on October 22, 2014 (ADAMS
                                                                                                                                                                50.12(a)(2)(ii)); or (2) ‘‘The exemption
                                                  White Flint North, 11555 Rockville                      accession number ML14297A199),
                                                                                                                                                                would provide only temporary relief
                                                  Pike, Rockville, Maryland 20852.                        Dominion outlined a schedule for
                                                                                                                                                                from the applicable regulation and the
                                                  FOR FURTHER INFORMATION CONTACT:                        completing all technical reports,
                                                                                                          analyses, and COLA changes needed to                  licensee or applicant has made good
                                                  James Shea, Office of New Reactors,                                                                           faith efforts to comply with the
                                                  U.S. Nuclear Regulatory Commission,                     address seismic issues by December 31,
                                                                                                          2015.                                                 regulation’’ (10 CFR 50.12(a)(2)(v)).
                                                  Washington, DC 20555–0001; telephone:
                                                  301–415–1388; email: James.Shea@                                                                                 The review of the North Anna, Unit
                                                                                                          II. Request/Action
                                                  nrc.gov.                                                                                                      3, ESBWR COL application has been
                                                                                                             The regulations specified in 10 CFR                ongoing since Dominion submitted the
                                                  SUPPLEMENTARY INFORMATION:                              50.71(e)(3)(iii) require that an applicant            revised COL application dated
                                                  I. Background                                           for a COL under 10 CFR part 52 shall,                 December 18, 2013. The technical issues
                                                                                                          during the period from docketing of a                 currently under consideration by the
                                                     By letter dated November 26, 2007                    COL application until the NRC makes a                 NRC staff are primarily associated with
                                                  (ADAMS accession number                                 finding under 10 CFR 52.103(g)
                                                  ML073320913), Dominion submitted its                                                                          the revised North Anna, Unit 3 seismic
                                                                                                          pertaining to facility operation, submit              analyses, which Dominion has been
                                                  application to the NRC for a COL to                     an annual update to the application’s
                                                  construct and operate a General Electric-                                                                     addressing since it submitted the
                                                                                                          FSAR, which is a part of the                          revised COL application, as described in
                                                  Hitachi Economic Simplified Boiling-                    application.
                                                  Water Reactor (ESBWR) at North Anna                                                                           detail in the 2014 SCP. According to the
                                                                                                             Pursuant to 10 CFR 50.71(e)(3)(iii),               SCP, in December 2015, Dominion is
                                                  Power Station (North Anna), Unit 3 site                 the next annual update of the North
                                                  pursuant to part 52 of title 10 of the                                                                        scheduled to submit to the NRC
                                                                                                          Anna, Unit 3, COL application FSAR                    technical reports and COL application
                                                  Code of Federal Regulations (10 CFR),                   would be due on or before December 31,
                                                  ‘‘Licenses, Certifications, and Approvals                                                                     markups that incorporate the results of
                                                                                                          2015. By letter to the NRC dated                      analyses of seismic design capacities of
                                                  for Nuclear Power Plants.’’ By letter                   September 23, 2015, Dominion
                                                  dated June 28, 2010, Dominion revised                                                                         certain structures, systems, and
                                                                                                          requested a one-time exemption from                   components. In addition, during the
                                                  its application to incorporate by                       the 10 CFR 50.71(e)(3)(iii) requirement
                                                  reference the Mitsubishi Heavy                                                                                week of September 28, 2015, the NRC
                                                                                                          to submit the scheduled 2015 COL
                                                  Industries, Ltd. United States–Advanced                                                                       staff completed an audit associated with
                                                                                                          application FSAR update, and proposed
                                                  Pressurized Water Reactor technology to                                                                       the proposed North Anna, Unit 3 site-
                                                                                                          a new submission deadline of June 30,
                                                  construct and operate at the North                                                                            specific seismic issues. The NRC staff
                                                                                                          2016, for the next FSAR update
                                                  Anna, Unit 3 site.                                                                                            plans to conduct a second audit in the
                                                                                                          (ADAMS Accession Number
                                                     On August 23, 2011, a 5.8 magnitude                                                                        first or second quarter of 2016 relating
                                                                                                          ML15268A039). Dominion then
                                                  earthquake occurred near Mineral,                                                                             to the capacities of the systems
                                                                                                          proposes to submit the next annual
                                                  Virginia, which is approximately 11                                                                           structures and components to withstand
                                                                                                          FSAR update required by 10 CFR
                                                  miles from the North Anna Unit 3 site.                                                                        the site-specific seismic ground motion.
                                                                                                          50.71(e)(3) in 2017.
                                                  In view of the earthquake, the NRC staff                   Dominion’s requested exemption is a                Therefore, the NRC staff may identify
                                                  requested additional analysis of the                    one-time schedule change from the                     additional requests for information
                                                  proposed reactor design to verify that                  requirements of 10 CFR 50.71(e)(3)(iii).              regarding seismic issues in the course of
                                                  the design, if built at the North Anna                  The exemption, as requested, would                    its review through the end of December
                                                  site, would satisfy the requirements of                 allow Dominion to submit the next                     2015; as a result of the technical reports
                                                  10 CFR part 50, Appendix A, ‘‘General                   FSAR update no later than June 30,                    and COL application markups due to be
                                                  Design Criteria,’’ Criterion 2, ‘‘Design                2016. Dominion states that the FSAR, if               submitted in December 2015; and as a
                                                  Bases for Protection Against Natural                    submitted as requested, would include                 result of the second technical audit
                                                  Phenomena,’’ and 10 CFR part 50,                        all the FSAR changes based on the                     planned for spring 2016. The COL
                                                  Appendix S, ‘‘Earthquake Engineering                                                                          application markups due in December
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                                                                          Dominion SCP to allow a more efficient
                                                  Criteria for Nuclear Power Plants.’’                    and effective submittal of an updated                 2015, together with any NRC staff
                                                  During the applicant’s seismic                          FSAR reflecting all changes associated                requests for additional information, will
                                                  evaluation, the NRC staff had requests                  with the site-specific seismic analyses.              likely result in the need to change the
                                                  for additional information and had held                                                                       FSAR. These changes could not be
                                                  public meetings with the applicant to                   III. Discussion                                       completed before the current FSAR
                                                  provide staff feedback on the North                        Pursuant to 10 CFR 50.12, the NRC                  update is due at the end of calendar year
                                                  Anna 3 site seismic analyses.                           may, upon application by any interested               2015.


                                             VerDate Sep<11>2014   13:24 Dec 01, 2015   Jkt 238001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:\FR\FM\02DEN1.SGM   02DEN1


                                                  75482                    Federal Register / Vol. 80, No. 231 / Wednesday, December 2, 2015 / Notices

                                                  Authorized by Law                                       would provide only temporary relief                   2014 Dominion SCP outlined the
                                                    The exemption is a one-time schedule                  from the applicable regulation and the                approach to meet NRC regulatory
                                                  exemption from the requirements of 10                   licensee or applicant has made good                   requirements and address requests for
                                                  CFR 50.71(e)(3)(iii). The exemption, as                 faith efforts to comply with the                      additional information as a result of
                                                  requested, would allow Dominion to                      regulation (10 CFR 50.12(a)(2)(v)).                   NRC staff technical review. Under the
                                                  submit the next North Anna, Unit 3,                        The underlying purpose of 10 CFR                   Dominion SCP for the proposed North
                                                  COL application FSAR update on or                       50.71(e)(3)(iii) in the context of a COL              Anna, Unit 3, technical reports and
                                                  before June 30, 2016, in lieu of the                    application is to provide for a timely                analyses have been submitted as they
                                                  required scheduled submittal on or                      and comprehensive update of the FSAR                  have been completed to date, and two
                                                  before December 31, 2015. As stated                     associated with a COL application in                  sets of COLA markups (the first revising
                                                  above, 10 CFR 50.12 allows the NRC to                   order to support an effective and                     geotechnical information and the
                                                  grant such an exemption. The NRC staff                  efficient review by the NRC staff and                 second incorporating the results of soil-
                                                  has determined that granting Dominion                   issuance of the NRC staff’s safety                    structure interaction analyses, structure-
                                                  a one-time exemption from the                           evaluation report. As discussed above,                soil-structure interaction analyses, and
                                                  requirements of 10 CFR 50.71(e)(3)(iii)                 the requested one-time exemption is                   stability analyses) have been completed
                                                  with updates to the FSAR to be                          solely administrative in nature, in that              and submitted for NRC staff review. As
                                                  submitted on or before June 30, 2016,                   it pertains to a one-time schedule                    described in the Dominion SCP, the last
                                                  will provide only temporary relief from                 change for submittal of revisions to an               technical reports and a third set of
                                                  this regulation and will not result in a                application under 10 CFR part 52, for                 COLA markups, which incorporate the
                                                  violation of the Atomic Energy Act of                   which a license has not been granted. In              results of the analyses of the design
                                                  1954, as amended, or NRC regulations.                   addition, since the remaining review of               capacities of certain structures, systems,
                                                  Therefore, the exemption is authorized                  the application primarily relates to the              and components (SSCs), are scheduled
                                                  by law.                                                 issues discussed in the Dominion SCP,                 in the SCP to be submitted in December
                                                                                                          there will not likely be any significant              2015. Accordingly, the NRC staff finds
                                                  No Undue Risk to Public Health and                      FSAR updates until the elements of the                that Dominion has made good faith
                                                  Safety                                                  SCP and the NRC staff seismic audits                  efforts to comply with the regulation,
                                                     The underlying purpose of 10 CFR                     are completed. Completion of the SCP                  and the special circumstances defined
                                                  50.71(e)(3)(iii) is to provide for a timely             (through submission of technical reports              by 10 CFR 50.12(a)(2)(v) are present.
                                                  and comprehensive update of the FSAR                    and COL application markups) in                          Therefore, the special circumstances
                                                  associated with a COL application in                    December 2015 and the additional                      required by 10 CFR 50.12(a)(2) for the
                                                  order to support an effective and                       information submitted as a result of                  granting of an exemption from 10 CFR
                                                  efficient review by the NRC staff and                   NRC staff audits scheduled for spring of              50.71(e)(3)(iii) exist.
                                                  issuance of the NRC staff’s safety                      2016 cannot be reflected in a December
                                                  evaluation report. The requested                        2015 FSAR update, but will be reflected               Eligibility for Categorical Exclusion
                                                  exemption is solely administrative in                   in an FSAR update scheduled for June                  From Environmental Review
                                                  nature, in that it pertains to the                      2016. At that time, the revised FSAR                     With respect to the exemption’s
                                                  schedule for submission to the NRC of                   update submitted by Dominion will be                  impact on the quality of the human
                                                  revisions to an application under 10                    reviewed by the NRC to confirm that                   environment, the NRC has determined
                                                  CFR part 52, for which a license has not                COL markups and changes identified in                 that this specific exemption request is
                                                  been granted. Based on the nature of the                requests for additional information                   eligible for categorical exclusion as
                                                  requested exemption as described                        responses will be reflected in the FSAR               identified in 10 CFR 51.22(c)(25). Under
                                                  above, no new accident precursors are                   prior to completion of the final North                10 CFR 51.22(c)(25), granting of an
                                                  created by the exemption; thus, neither                 Anna, Unit 3 NRC staff safety                         exemption from the requirements of any
                                                  the probability, nor the consequences of                evaluation. The requested one-time                    regulation of 10 CFR Chapter 1 (which
                                                  postulated accidents are increased.                     exemption would permit Dominion time                  includes 10 CFR 50.71(e)(3)(iii)) is an
                                                  Therefore, there is no undue risk to                    to submit all the necessary technical                 action that is a categorical exclusion,
                                                  public health and safety.                               information for NRC staff review and                  provided that:
                                                                                                          the updated COL markups associated                       (i) There is no significant hazards
                                                  Consistent With Common Defense and                      with the revised North Anna, Unit 3,                  consideration;
                                                  Security                                                seismic analyses in accordance with the                  (ii) There is no significant change in
                                                    The exemption would allow                             submitted Dominion SCP. The NRC staff                 the types or significant increase in the
                                                  Dominion to submit the next FSAR                        has determined that this one-time                     amounts of any effluents that may be
                                                  update prior to final North Anna, Unit                  exemption will support the staff’s                    released offsite;
                                                  3 NRC staff safety evaluation. This                     effective and efficient review of the COL                (iii) There is no significant increase in
                                                  schedule change has no relation to                      application, as well as issuance of the               individual or cumulative public or
                                                  security issues. Therefore, the common                  safety evaluation report, and, therefore,             occupational radiation exposure;
                                                  defense and security is not impacted by                 submission of an FSAR update in                          (iv) There is no significant
                                                  this exemption.                                         December 2015 is not necessary to                     construction impact;
                                                                                                          achieve the underlying purpose of 10                     (v) There is no significant increase in
                                                  Special Circumstances                                   CFR 50.71(e)(3)(iii). Accordingly, the                the potential for or consequences from
                                                    Special circumstances, in accordance                  NRC staff finds that special                          radiological accidents; and
                                                  with 10 CFR 50.12(a)(2), are present
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                                                                          circumstances are present under 10 CFR                   (vi) The requirements from which an
                                                  whenever: (1) Application of the                        50.12(a)(2)(ii) in connection with                    exemption is sought involve:
                                                  regulation in the particular                            Dominion’s requested exemption.                          (A) Recordkeeping requirements;
                                                  circumstances would not serve the                          Further, the NRC staff finds that                     (B) Reporting requirements;
                                                  underlying purpose of the rule or is not                granting a one-time exemption from 10                    (C) Inspection or surveillance
                                                  necessary to achieve the underlying                     CFR 50.71(e)(3)(iii) would provide only               requirements;
                                                  purpose of the rule’’ (10 CFR                           temporary relief, since Dominion would                   (D) Equipment servicing or
                                                  50.12(a)(2)(ii)); or (2) The exemption                  update the FSAR in June 2016. The                     maintenance scheduling requirements;


                                             VerDate Sep<11>2014   13:24 Dec 01, 2015   Jkt 238001   PO 00000   Frm 00032   Fmt 4703   Sfmt 4703   E:\FR\FM\02DEN1.SGM   02DEN1


                                                                           Federal Register / Vol. 80, No. 231 / Wednesday, December 2, 2015 / Notices                                                    75483

                                                     (E) Education, training, experience,                 allow construction at the North Anna                  POSTAL REGULATORY COMMISSION
                                                  qualification, requalification or other                 site; therefore, the proposed action does
                                                                                                                                                                [Docket Nos. MC2016–20 and CP2016–26;
                                                  employment suitability requirements;                    not involve any construction impact.                  Order No. 2842]
                                                     (F) Safeguard plans, and materials                      V. 10 CFR 51.22(c)(25)(v): There is no
                                                  control and accounting inventory                        significant increase in the potential for             New Postal Product
                                                  scheduling requirements;                                or consequences from radiological
                                                     (G) Scheduling requirements;                         accidents.                                            AGENCY:   Postal Regulatory Commission.
                                                     (H) Surety, insurance or indemnity                      Staff Analysis: The proposed action                ACTION:   Notice.
                                                  requirements; or                                        involves only a schedule change which
                                                     (I) Other requirements of an                                                                               SUMMARY:   The Commission is noticing a
                                                                                                          is administrative in nature and does not
                                                  administrative, managerial, or                                                                                recent Postal Service filing concerning
                                                                                                          impact the probability or consequences
                                                  organizational nature.                                                                                        the addition of Priority Mail Express &
                                                                                                          of accidents.
                                                     The requirements from which this                                                                           Priority Mail Contract 22 to the
                                                                                                             VI. 10 CFR 51.22(c)(25)(vi): The                   competitive product list. This notice
                                                  exemption is sought involve only ‘‘(B)
                                                                                                          requirements from which this                          informs the public of the filing, invites
                                                  Reporting requirements’’ or ‘‘(G)
                                                                                                          exemption is sought involve only ‘‘(B)                public comment, and takes other
                                                  Scheduling requirements’’ of those
                                                                                                          Reporting requirements’’ or ‘‘(G)                     administrative steps.
                                                  required by 10 CFR 51.22(c)(25)(vi).
                                                     The NRC staff’s determination that                   Scheduling requirements.’’
                                                                                                                                                                DATES: Comments are due: December 4,
                                                  each of the applicable criteria for this                   Staff Analysis: The exemption request
                                                                                                          involves requirements in both of these                2015.
                                                  categorical exclusion is met as follows:                                                                      ADDRESSES: Submit comments
                                                     I. 10 CFR 51.22(c)(25)(i): There is no               categories because it involves
                                                                                                          submitting an updated FSAR by                         electronically via the Commission’s
                                                  significant hazards consideration.                                                                            Filing Online system at http://
                                                     Staff Analysis: The criteria for                     Dominion, and also relates to the
                                                                                                          schedule for submitting FSAR updates                  www.prc.gov. Those who cannot submit
                                                  determining if an exemption involves a
                                                                                                          to the NRC.                                           comments electronically should contact
                                                  significant hazards consideration are
                                                                                                             Accordingly, Dominion’s exemption                  the person identified in the FOR FURTHER
                                                  found in 10 CFR 50.92. The proposed
                                                                                                          requests satisfies the criteria of 10 CFR             INFORMATION CONTACT section by
                                                  action involves only a schedule change
                                                                                                          51.22(c)(25) for categorical exclusion                telephone for advice on filing
                                                  regarding the submission of an update
                                                                                                          from environmental review, and the                    alternatives.
                                                  to the application for which the
                                                  licensing review is ongoing. Therefore,                 granting of this exemption will not have              FOR FURTHER INFORMATION CONTACT:
                                                  there is no significant hazard                          a significant effect on the quality of the            David A. Trissell, General Counsel, at
                                                  consideration because granting the                      human environment.                                    202–789–6820.
                                                  proposed exemption would not:                           IV. Conclusion                                        SUPPLEMENTARY INFORMATION:
                                                     (1) Involve a significant increase in
                                                  the probability or consequences of an                      The NRC has determined that,                       Table of Contents
                                                  accident previously evaluated; or                       pursuant to 10 CFR 50.12, the                         I. Introduction
                                                     (2) Create the possibility of a new or               exemption is authorized by law, will not              II. Notice of Commission Action
                                                  different kind of accident from any                     present an undue risk to the public                   III. Ordering Paragraphs
                                                  accident previously evaluated; or                       health and safety, and is consistent with             I. Introduction
                                                     (3) Involve a significant reduction in               the common defense and security. Also,
                                                  a margin of safety.                                     special circumstances as described in 10                In accordance with 39 U.S.C. 3642
                                                     II. 10 CFR 51.22(c)(25)(ii): There is no             CFR 50.12(a)(2)(ii) and (v) are present.              and 39 CFR 3020.30 et seq., the Postal
                                                  significant change in the types or                      Therefore, the NRC hereby grants                      Service filed a formal request and
                                                  significant increase in the amounts of                  Dominion a one-time exemption from                    associated supporting information to
                                                  any effluents that may be released                      the requirements of 10 CFR                            add Priority Mail Express & Priority
                                                  offsite.                                                50.71(e)(3)(iii) pertaining to the North              Mail Contract 22 to the competitive
                                                     Staff Analysis: The proposed action                  Anna, Unit 3, COL application to allow                product list.1
                                                  involves only a schedule change, which                  submission of the next North Anna 3                     The Postal Service
                                                  is administrative in nature, and does not               FSAR update no later than June 30,                    contemporaneously filed a redacted
                                                  involve any changes in the types or                     2016.                                                 contract related to the proposed new
                                                  significant increase in the amounts of                     Pursuant to 10 CFR 51.22, the NRC                  product under 39 U.S.C. 3632(b)(3) and
                                                  effluents that may be released offsite.                 has determined that the exemption                     39 CFR 3015.5. Request, Attachment B.
                                                     III. 10 CFR 51.22(c)(25)(iii): There is              request meets the applicable categorical                To support its Request, the Postal
                                                  no significant increase in individual or                exclusion criteria set forth in 10 CFR                Service filed a copy of the contract, a
                                                  cumulative public or occupational                       51.22(c)(25), and the granting of this                copy of the Governors’ Decision
                                                  radiation exposure.                                     exemption will not have a significant                 authorizing the product, proposed
                                                     Staff Analysis: Since the proposed                   effect on the quality of the human                    changes to the Mail Classification
                                                  action involves only a schedule change,                 environment.                                          Schedule, a Statement of Supporting
                                                  which is administrative in nature, it                      This exemption is effective upon                   Justification, a certification of
                                                  does not contribute to any significant                  issuance.                                             compliance with 39 U.S.C. 3633(a), and
                                                  increase in occupational or public                                                                            an application for non-public treatment
                                                                                                            Dated at Rockville, Maryland, this 20th day         of certain materials. It also filed
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  radiation exposure.
                                                                                                          November 2015.
                                                     IV. 10 CFR 51.22(c)(25)(iv): There is                                                                      supporting financial workpapers.
                                                  no significant construction impact.                       For the Nuclear Regulatory Commission.
                                                     Staff Analysis: The proposed action                  Francis M. Akstulewicz,                                 1 Request of the United States Postal Service to

                                                  involves only a schedule change, which                  Director, Division of New Reactor Licensing,          Add Priority Mail Express & Priority Mail Contract
                                                                                                          Office of New Reactors.                               22 to Competitive Product List and Notice of Filing
                                                  is administrative in nature. The NRC                                                                          (Under Seal) of Unredacted Governors’ Decision,
                                                  has not granted the COL application,                    [FR Doc. 2015–30536 Filed 12–1–15; 8:45 am]           Contract, and Supporting Data, November 24, 2015
                                                  and the requested exemption will not                    BILLING CODE 7590–01–P                                (Request).



                                             VerDate Sep<11>2014   13:24 Dec 01, 2015   Jkt 238001   PO 00000   Frm 00033   Fmt 4703   Sfmt 4703   E:\FR\FM\02DEN1.SGM   02DEN1



Document Created: 2015-12-14 13:48:42
Document Modified: 2015-12-14 13:48:42
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption; issuance.
DatesThe effective date of the Dominion FSAR exemption issuance is December 2, 2015.
ContactJames Shea, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-1388; email: [email protected]
FR Citation80 FR 75480 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR