80_FR_76237 80 FR 76003 - Delfin LNG LLC; Notice of Amendment to Application

80 FR 76003 - Delfin LNG LLC; Notice of Amendment to Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 234 (December 7, 2015)

Page Range76003-76004
FR Document2015-30736

Federal Register, Volume 80 Issue 234 (Monday, December 7, 2015)
[Federal Register Volume 80, Number 234 (Monday, December 7, 2015)]
[Notices]
[Pages 76003-76004]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-30736]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-490-001]


Delfin LNG LLC; Notice of Amendment to Application

    Take notice that on November 19, 2015 Delfin LNG LLC (Delfin LNG), 
1100 Louisiana Street, Houston, Texas 77002, filed in Docket No. CP15-
490-001, an amendment to its May 8, 2015 application pursuant to 
section 7(c) of the Natural Gas Act and Part 157 of the Commission's 
regulations requesting authorization to reactivate, construct, own, 
operate and maintain certain pipeline and compression facilities that 
comprise the onshore portion of Delfin LNG's proposed Deepwater Port 
(DWP), an offshore liquefied natural gas facility located off the coast 
of Louisiana in the Gulf of Mexico. The Amendment increases the amount 
of compression and capacity previously proposed, all as more fully set 
forth in the application which is on file with the Commission and open 
to public inspection. This filing may be viewed on the web at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in

[[Page 76004]]

the docket number field to access the document. For assistance, please 
contact FERC at [email protected] or call toll-free, (886) 
208-3676 or TYY, (202) 502-8659.
    Any questions regarding this Application should be directed to 
Daniel P. Werner, Delfin LNG LLC, 1100 Louisiana Street, Suite 3550, 
Houston, Texas 77002; phone: 346-240-2574, or J. Patrick Nevins, Hogan 
Lovells US LLP, 555 Thirteenth Street NW., Washington, DC 20004; phone: 
202-637-6441.
    Delfin LNG's onshore facilities will connect with the DWP 
facilities that are subject to jurisdiction of the Maritime Authority 
(MARAD) and the United States Coast Guard (USCG). Additionally, as part 
of Delfin LNG's DWP, Delfin LNG proposes to utilize a segment of 
pipeline abandoned by High Island Offshore System, LLC (HIOS) that 
extends from the terminus of the UTOS pipeline offshore. HIOS filed to 
abandon certain pipeline facilities on November 19, 2015 in Docket No. 
CP16-20-000.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenter's will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenter's will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and ill not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's Web site under the ``e-Filing'' link.
    Comment Date: December 22, 2015.

    Dated: December 1, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-30736 Filed 12-4-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 80, No. 234 / Monday, December 7, 2015 / Notices                                                  76003

                                                  County Wind, LLC, FPL Energy Cabazon                       Accession Number: 20151130–5083.                   2775; Queue No. Y3–045/Y3–052/Y3–
                                                  Wind, LLC, FPL Energy Cape, LLC, FPL                       Comments Due: 5 p.m. ET 12/21/15.                  107 to be effective 10/29/2015.
                                                  Energy Cowboy Wind, LLC, FPL Energy                        Docket Numbers: ER16–417–000.                         Filed Date: 11/30/15.
                                                  Green Power Wind, LLC, FPL Energy                          Applicants: Southern California                       Accession Number: 20151130–5172.
                                                  Hancock County Wind, LLC, FPL                           Edison Company.                                          Comments Due: 5 p.m. ET 12/21/15.
                                                  Energy Illinois Wind, LLC, FPL Energy                      Description: § 205(d) Rate Filing:                    The filings are accessible in the
                                                  Marcus Hook, L.P., FPL Energy MH50                      Distribution Service Agreement Mirasol                Commission’s eLibrary system by
                                                  L.P., FPL Energy Montezuma Wind,                        Development, LLC Ivanhoe Land 1A                      clicking on the links or querying the
                                                  LLC, FPL Energy Mower County, LLC,                      Project to be effective 1/30/2016.                    docket number.
                                                  FPL Energy New Mexico Wind, LLC,                           Filed Date: 11/30/15.                                 Any person desiring to intervene or
                                                  FPL Energy North Dakota Wind, LLC,                         Accession Number: 20151130–5092.                   protest in any of the above proceedings
                                                  FPL Energy North Dakota Wind II, LLC,                      Comments Due: 5 p.m. ET 12/21/15.                  must file in accordance with Rules 211
                                                  FPL Energy Oklahoma Wind, LLC, FPL                         Docket Numbers: ER16–418–000.                      and 214 of the Commission’s
                                                  Energy Oliver Wind I, LLC, FPL Energy                      Applicants: Southern California                    Regulations (18 CFR 385.211 and
                                                  Oliver Wind II, LLC, FPL Energy Sooner                  Edison Company.                                       385.214) on or before 5:00 p.m. Eastern
                                                  Wind, LLC, FPL Energy South Dakota                         Description: § 205(d) Rate Filing:                 time on the specified comment date.
                                                  Wind, LLC, FPL Energy Stateline II, Inc.,               Distribution Service Agreement Mirasol                Protests may be considered, but
                                                  FPL Energy Vansycle, L.L.C, FPL Energy                  Development, LLC Ivanhoe Land 1B                      intervention is necessary to become a
                                                  Wyman, LLC, FPL Energy Wyman IV,                        Project to be effective 1/30/2016.                    party to the proceeding.
                                                  LLC, Garden Wind, LLC, Genesis Solar,                      Filed Date: 11/30/15.                                 eFiling is encouraged. More detailed
                                                  LLC, Golden West Power Partners, LLC,                      Accession Number: 20151130–5093.                   information relating to filing
                                                  Gray County Wind Energy, LLC, Green                        Comments Due: 5 p.m. ET 12/21/15.                  requirements, interventions, protests,
                                                  Mountain Storage, LLC, Hatch Solar                                                                            service, and qualifying facilities filings
                                                                                                             Docket Numbers: ER16–419–000.
                                                  Energy Center I, LLC, Hawkeye Power                        Applicants: Dominion Energy                        can be found at: http://www.ferc.gov/
                                                  Partners, LLC, High Majestic Wind                       Marketing, Inc.                                       docs-filing/efiling/filing-req.pdf. For
                                                  Energy Center, LLC, High Majestic Wind                     Description: Compliance filing:                    other information, call (866) 208–3676
                                                  II, LLC, High Winds, LLC, Jamaica Bay                   Compliance Filing—DEMI Removal of                     (toll free). For TTY, call (202) 502–8659.
                                                  Peaking Facility, LLC, Lake Benton                      Affiliate Waiver to be effective                        Dated: November 30, 2015.
                                                  Power Partners II, LLC, Langdon Wind,                   11/1/2015.                                            Nathaniel J. Davis, Sr.,
                                                  LLC, Limon Wind, LLC, Limon Wind II,                       Filed Date: 11/30/15.                              Deputy Secretary.
                                                  LLC, Limon Wind III, LLC, Logan Wind                       Accession Number: 20151130–5124.
                                                  Energy LLC, Mammoth Plains Wind                                                                               [FR Doc. 2015–30705 Filed 12–4–15; 8:45 am]
                                                                                                             Comments Due: 5 p.m. ET 12/21/15.                  BILLING CODE 6717–01–P
                                                  Project, LLC.
                                                     Description: Supplement to October                      Docket Numbers: ER16–420–000.
                                                  28, 2015 Notice of Change in Status of                     Applicants: Southwest Power Pool,
                                                  the NextEra Energy Companies [Part 1 of                 Inc.                                                  DEPARTMENT OF ENERGY
                                                  2].                                                        Description: § 205(d) Rate Filing: 3103
                                                                                                          Plains and Eastern Clean Line                         Federal Energy Regulatory
                                                     Filed Date: 11/25/15.                                                                                      Commission
                                                     Accession Number: 20151125–5220.                     Oklahoma & SPS Inter Agr to be
                                                     Comments Due: 5 p.m. ET 12/16/15.                    effective 11/6/2015.                                  [Docket No. CP15–490–001]
                                                                                                             Filed Date: 11/30/15.
                                                     Docket Numbers: ER16–414–000.
                                                                                                             Accession Number: 20151130–5152.                   Delfin LNG LLC; Notice of Amendment
                                                     Applicants: PJM Interconnection,
                                                                                                             Comments Due: 5 p.m. ET 12/21/15.                  to Application
                                                  L.L.C.
                                                     Description: § 205(d) Rate Filing:                      Docket Numbers: ER16–421–000.                         Take notice that on November 19,
                                                  Revised Service Agreement No. 1135;                        Applicants: Dominion Nuclear                       2015 Delfin LNG LLC (Delfin LNG),
                                                  Queue K4 (ISA—Assignment                                Connecticut, Inc.                                     1100 Louisiana Street, Houston, Texas
                                                  Agreement) to be effective 6/4/2004.                       Description: Compliance filing:                    77002, filed in Docket No. CP15–490–
                                                     Filed Date: 11/30/15.                                Compliance Filing—DNCI Removal of                     001, an amendment to its May 8, 2015
                                                     Accession Number: 20151130–5047.                     Affiliate Waiver to be effective                      application pursuant to section 7(c) of
                                                     Comments Due: 5 p.m. ET 12/21/15.                    11/1/2015.                                            the Natural Gas Act and Part 157 of the
                                                     Docket Numbers: ER16–415–000.                           Filed Date: 11/30/15.                              Commission’s regulations requesting
                                                     Applicants: PJM Interconnection,                        Accession Number: 20151130–5153.                   authorization to reactivate, construct,
                                                  L.L.C.                                                     Comments Due: 5 p.m. ET 12/21/15.                  own, operate and maintain certain
                                                     Description: § 205(d) Rate Filing:                      Docket Numbers: ER16–422–000.                      pipeline and compression facilities that
                                                  Revised Service Agreement No. 1791;                        Applicants: PJM Interconnection,                   comprise the onshore portion of Delfin
                                                  Queue R74 (WMPA—Assignment                              L.L.C.                                                LNG’s proposed Deepwater Port (DWP),
                                                  Agreement) to be effective 10/30/2007.                     Description: § 205(d) Rate Filing:                 an offshore liquefied natural gas facility
                                                     Filed Date: 11/30/15.                                Original Service Agreement No. 4300;                  located off the coast of Louisiana in the
                                                     Accession Number: 20151130–5057.                     Queue No. Z1–079 to be effective                      Gulf of Mexico. The Amendment
                                                     Comments Due: 5 p.m. ET 12/21/15.                    10/30/2015.                                           increases the amount of compression
                                                                                                             Filed Date: 11/30/15.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                     Docket Numbers: ER16–416–000.                                                                              and capacity previously proposed, all as
                                                     Applicants: PJM Interconnection,                        Accession Number: 20151130–5163.                   more fully set forth in the application
                                                  L.L.C.                                                     Comments Due: 5 p.m. ET 12/21/15.                  which is on file with the Commission
                                                     Description: § 205(d) Rate Filing:                      Docket Numbers: ER16–423–000.                      and open to public inspection. This
                                                  Original Service Agreement No. 4312;                       Applicants: PJM Interconnection,                   filing may be viewed on the web at
                                                  Queue No. AA2–058 to be effective                       L.L.C.                                                http://www.ferc.gov using the
                                                  10/29/2015.                                                Description: § 205(d) Rate Filing:                 ‘‘eLibrary’’ link. Enter the docket
                                                     Filed Date: 11/30/15.                                Second Revised Service Agreement No.                  number excluding the last three digits in


                                             VerDate Sep<11>2014   18:36 Dec 04, 2015   Jkt 238001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\07DEN1.SGM   07DEN1


                                                  76004                       Federal Register / Vol. 80, No. 234 / Monday, December 7, 2015 / Notices

                                                  the docket number field to access the                   Commission and will receive copies of                   Dated: December 1, 2015.
                                                  document. For assistance, please contact                all documents filed by the applicant and              Nathaniel J. Davis, Sr.,
                                                  FERC at FERCOnlineSupport@ferc.gov                      by all other parties. A party must submit             Deputy Secretary.
                                                  or call toll-free, (886) 208–3676 or TYY,               7 copies of filings made with the                     [FR Doc. 2015–30736 Filed 12–4–15; 8:45 am]
                                                  (202) 502–8659.                                         Commission and must mail a copy to                    BILLING CODE 6717–01–P
                                                     Any questions regarding this                         the applicant and to every other party in
                                                  Application should be directed to                       the proceeding. Only parties to the
                                                  Daniel P. Werner, Delfin LNG LLC, 1100                  proceeding can ask for court review of                DEPARTMENT OF ENERGY
                                                  Louisiana Street, Suite 3550, Houston,
                                                                                                          Commission orders in the proceeding.
                                                  Texas 77002; phone: 346–240–2574, or                                                                          Federal Energy Regulatory
                                                  J. Patrick Nevins, Hogan Lovells US                        However, a person does not have to                 Commission
                                                  LLP, 555 Thirteenth Street NW.,                         intervene in order to have comments
                                                  Washington, DC 20004; phone: 202–                       considered. The second way to                         Notice of Effectiveness of Exempt
                                                  637–6441.                                               participate is by filing with the                     Wholesale Generator Status
                                                     Delfin LNG’s onshore facilities will                 Secretary of the Commission, as soon as               Willey Battery Utility,
                                                  connect with the DWP facilities that are                possible, an original and two copies of                 LLC ...............................   EG15–108–000
                                                  subject to jurisdiction of the Maritime                 comments in support of or in opposition               Little Elk Wind Project,
                                                  Authority (MARAD) and the United                                                                                LLC ...............................   EG15–109–000
                                                                                                          to this project. The Commission will                  Patriot Wind Farm, LLC ..               EG15–110–000
                                                  States Coast Guard (USCG).                              consider these comments in                            Chapman Ranch Wind I,
                                                  Additionally, as part of Delfin LNG’s                   determining the appropriate action to be                LLC ...............................   EG15–111–000
                                                  DWP, Delfin LNG proposes to utilize a                   taken, but the filing of a comment alone              Silver State Solar Power
                                                  segment of pipeline abandoned by High                   will not serve to make the filer a party                South, LLC ...................        EG15–112–000
                                                  Island Offshore System, LLC (HIOS) that                                                                       RE Garland LLC ...............          EG15–113–000
                                                                                                          to the proceeding. The Commission’s
                                                  extends from the terminus of the UTOS                                                                         RE Garland A LLC ...........            EG15–114–000
                                                                                                          rules require that persons filing                     Latigo Wind Park, LLC ....              EG15–116–000
                                                  pipeline offshore. HIOS filed to abandon
                                                  certain pipeline facilities on November                 comments in opposition to the project                 Parrey, LLC ......................      EG15–117–000
                                                  19, 2015 in Docket No. CP16–20–000.                     provide copies of their protests only to              South Plains Wind En-
                                                     Pursuant to section 157.9 of the                     the party or parties directly involved in               ergy, LLC ......................      EG15–118–000
                                                                                                          the protest.                                          PHR Holdings LLC ..........             EG15–119–000
                                                  Commission’s rules, 18 CFR 157.9,                                                                             Golden West Power Part-
                                                  within 90 days of this Notice the                          Persons who wish to comment only                     ners, LLC ......................      EG15–120–000
                                                  Commission staff will either: Complete                  on the environmental review of this
                                                  its environmental assessment (EA) and                                                                           Take notice that during the month of
                                                                                                          project should submit an original and                 October 2015, the status of the above-
                                                  place it into the Commission’s public                   two copies of their comments to the
                                                  record (eLibrary) for this proceeding; or                                                                     captioned entities as Exempt Wholesale
                                                                                                          Secretary of the Commission.                          Generators became effective by
                                                  issue a Notice of Schedule for                          Environmental commenter’s will be
                                                  Environmental Review. If a Notice of                                                                          operation of the Commission’s
                                                                                                          placed on the Commission’s                            regulations. 18 CFR 366.7(a).
                                                  Schedule for Environmental Review is
                                                                                                          environmental mailing list, will receive
                                                  issued, it will indicate, among other                                                                           Dated: November 30, 2015.
                                                                                                          copies of the environmental documents,
                                                  milestones, the anticipated date for the                                                                      Nathaniel J. Davis, Sr.,
                                                  Commission staff’s issuance of the final                and will be notified of meetings
                                                                                                                                                                Deputy Secretary.
                                                  environmental impact statement (FEIS)                   associated with the Commission’s
                                                                                                                                                                [FR Doc. 2015–30699 Filed 12–4–15; 8:45 am]
                                                  or EA for this proposal. The filing of the              environmental review process.
                                                                                                                                                                BILLING CODE 6717–01–P
                                                  EA in the Commission’s public record                    Environmental commenter’s will not be
                                                  for this proceeding or the issuance of a                required to serve copies of filed
                                                  Notice of Schedule for Environmental                    documents on all other parties.                       DEPARTMENT OF ENERGY
                                                  Review will serve to notify federal and                 However, the non-party commentary,
                                                  state agencies of the timing for the                    will not receive copies of all documents              Federal Energy Regulatory
                                                  completion of all necessary reviews, and                filed by other parties or issued by the               Commission
                                                  the subsequent need to complete all                     Commission (except for the mailing of
                                                  federal authorizations within 90 days of                environmental documents issued by the                 Notice of Staff Attendance
                                                  the date of issuance of the Commission                  Commission) and ill not have the right                   The Federal Energy Regulatory
                                                  staff’s FEIS or EA.                                     to seek court review of the                           Commission (Commission) hereby gives
                                                     There are two ways to become                         Commission’s final order.                             notice that members of the
                                                  involved in the Commission’s review of
                                                                                                             The Commission strongly encourages                 Commission’s staff may attend the
                                                  this project. First, any person wishing to
                                                                                                          electronic filings of comments, protests              following meeting related to the
                                                  obtain legal status by becoming a party
                                                                                                          and interventions in lieu of paper using              transmission planning activities of the
                                                  to the proceedings for this project
                                                                                                          the ‘‘eFiling’’ link at http://                       South Carolina Regional Planning
                                                  should, on or before the comment date
                                                                                                          www.ferc.gov. Persons unable to file                  (SCRTP) Stakeholder Group.
                                                  stated below, file with the Federal
                                                  Energy Regulatory Commission, 888                       electronically should submit an original              South Carolina Regional Transmission
                                                  First Street NE., Washington, DC 20426,                 and 5 copies of the protest or                           Planning Meeting, December 9, 2015
                                                                                                          intervention to the Federal Energy                       (10:00 a.m.–1:00 p.m.)
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  a motion to intervene in accordance
                                                  with the requirements of the                            Regulatory Commission, 888 First Street                  The above-referenced meeting will be
                                                  Commission’s Rules of Practice and                      NE., Washington, DC 20426. See, 18                    held at:
                                                  Procedure (18 CFR 385.214 or 385.211)                   CFR 385.2001(a)(1)(iii) and the                       Hilton Garden Inn—Charleston Airport,
                                                  and the Regulations under the NGA (18                   instructions on the Commission’s Web                     Cypress I Room, 5265 International
                                                  CFR 157.10). A person obtaining party                   site under the ‘‘e-Filing’’ link.                        Blvd., North Charleston, SC 29418.
                                                  status will be placed on the service list                                                                        (843) 308–9330
                                                                                                             Comment Date: December 22, 2015.
                                                  maintained by the Secretary of the                                                                               The meeting is open to the public.


                                             VerDate Sep<11>2014   18:36 Dec 04, 2015   Jkt 238001   PO 00000   Frm 00046   Fmt 4703   Sfmt 4703   E:\FR\FM\07DEN1.SGM    07DEN1



Document Created: 2015-12-14 13:30:28
Document Modified: 2015-12-14 13:30:28
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesDecember 22, 2015.
FR Citation80 FR 76003 

2025 Federal Register | Disclaimer | Privacy Policy