80_FR_77207 80 FR 76969 - Tennessee Gas Pipeline Company, L.L.C; Notice of Application

80 FR 76969 - Tennessee Gas Pipeline Company, L.L.C; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 238 (December 11, 2015)

Page Range76969-76970
FR Document2015-31213

Federal Register, Volume 80 Issue 238 (Friday, December 11, 2015)
[Federal Register Volume 80, Number 238 (Friday, December 11, 2015)]
[Notices]
[Pages 76969-76970]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-31213]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 [Docket No. CP16-21-000; Docket No. PF14-22-000]


Tennessee Gas Pipeline Company, L.L.C; Notice of Application

    Take notice that on November 20, 2015, Tennessee Gas Pipeline 
Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 
77002, filed an application pursuant to sections 7(b) and 7(c) of the 
Natural Gas Act (NGA) and the Federal Energy Regulatory Commission 
(Commission) seeking authority to (i) construct, install, modify, and 
operate certain pipeline and compression facilities to be located in 
Pennsylvania, New York, Massachusetts, New Hampshire, and Connecticut, 
and (ii) to abandon certain facilities, as part of the Northeast Energy 
Direct Project (NED Project), as described in more detail below. 
Tennessee proposes to provide up to 1.3 billion cubic feet per day 
(Bcf/d) of firm capacity at a cost of approximately $5.2 billion 
dollars, all as more fully set forth in the application. The filing is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at http://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. There is an 
``eSubscription'' link on the Web site that enables subscribers to 
receive email notification when a document is added to a subscribed 
docket(s). For assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659.
    Specifically, the NED Project includes two components: (1) The 
Supply Path Component, which is comprised of facilities from Troy, 
Pennsylvania, to Wright, New York (Supply Path Component), and (2) the 
Market Path Component, which is comprised of facilities from Wright, 
New York, to Dracut, Massachusetts (Market Path Component). The Supply 
Path Component facilities include: (i) Approximately 174 miles of 
pipeline facilities in Pennsylvania and New York of which approximately 
41 miles will be looped, (ii) three new compressor stations totaling 
153,500 horsepower (hp), (iii) modifications to one existing compressor 
station, (iv) two new meter stations, and (v) various appurtenant 
facilities. The Market Path Component facilities include: (i) 
Approximately 188 miles of mainline pipeline facilities in New York, 
Massachusetts, and New Hampshire, (ii) approximately 58 miles of 
lateral and pipeline looping, including a total of five delivery 
laterals in Massachusetts and New Hampshire, one pipeline loop in 
Connecticut, (iii) six new compressor stations totaling 207,600 hp, 
(iv) construction of 13 new meter stations, (v) modification of 14 
existing meter stations, and (vi) various appurtenant facilities.
    Any questions regarding the proposed project should be directed to 
Jacquelyne M. Rocan, Assistant General Counsel, at Tennessee Gas 
Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002 
or at (713) 420-4544 (phone), or (713) 420-1601 (facsimile), or email: 
[email protected], or Shannon M. Miller, Regulatory 
Affairs, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, 
Houston, Texas 77002, or at (713) 420-4038 (phone), or (713) 420-1605 
(facsimile), or email: [email protected].
    On October 2, 2014, Commission staff granted Tennessee's request to 
utilize the National Environmental Policy Act (NEPA) Pre-Filing Process 
and assigned Docket No. PF14-22-000 to staff activities involving the 
project. Now, as of the filing of this application on November 20, 
2015, the NEPA Pre-Filing Process for this project has ended. From this 
time forward, this proceeding will be conducted in Docket No. CP16-21-
000 as noted in the caption of this Notice.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice, the Commission staff will issue a Notice 
of Schedule for Environmental Review. If a Notice of Schedule for 
Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) for this proposal. The 
issuance of a Notice of Schedule for Environmental Review will serve to 
notify federal and state agencies of the timing for the completion of 
all necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made in the proceeding with the Commission 
and must mail a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at

[[Page 76970]]

http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: January 6, 2016.

    Dated: December 7, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-31213 Filed 12-10-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 80, No. 238 / Friday, December 11, 2015 / Notices                                           76969

                                                    Dated: December 7, 2015.                              looped, (ii) three new compressor                     this project. First, any person wishing to
                                                  Nathaniel J. Davis, Sr.,                                stations totaling 153,500 horsepower                  obtain legal status by becoming a party
                                                  Deputy Secretary.                                       (hp), (iii) modifications to one existing             to the proceedings for this project
                                                  [FR Doc. 2015–31212 Filed 12–10–15; 8:45 am]            compressor station, (iv) two new meter                should, on or before the comment date
                                                  BILLING CODE 6717–01–P                                  stations, and (v) various appurtenant                 stated below file with the Federal
                                                                                                          facilities. The Market Path Component                 Energy Regulatory Commission, 888
                                                                                                          facilities include: (i) Approximately 188             First Street NE., Washington, DC 20426,
                                                  DEPARTMENT OF ENERGY                                    miles of mainline pipeline facilities in              a motion to intervene in accordance
                                                                                                          New York, Massachusetts, and New                      with the requirements of the
                                                  Federal Energy Regulatory                               Hampshire, (ii) approximately 58 miles                Commission’s Rules of Practice and
                                                  Commission                                              of lateral and pipeline looping,                      Procedure (18 CFR 385.214 or 385.211)
                                                  [Docket No. CP16–21–000; Docket No.                     including a total of five delivery laterals           and the Regulations under the NGA (18
                                                  PF14–22–000]                                            in Massachusetts and New Hampshire,                   CFR 157.10). A person obtaining party
                                                                                                          one pipeline loop in Connecticut, (iii)               status will be placed on the service list
                                                  Tennessee Gas Pipeline Company,                         six new compressor stations totaling                  maintained by the Secretary of the
                                                  L.L.C; Notice of Application                            207,600 hp, (iv) construction of 13 new               Commission and will receive copies of
                                                                                                          meter stations, (v) modification of 14                all documents filed by the applicant and
                                                     Take notice that on November 20,                     existing meter stations, and (vi) various             by all other parties. A party must submit
                                                  2015, Tennessee Gas Pipeline Company,                   appurtenant facilities.                               7 copies of filings made in the
                                                  L.L.C. (Tennessee), 1001 Louisiana                        Any questions regarding the proposed                proceeding with the Commission and
                                                  Street, Houston, Texas 77002, filed an                  project should be directed to Jacquelyne              must mail a copy to the applicant and
                                                  application pursuant to sections 7(b)                   M. Rocan, Assistant General Counsel, at               to every other party. Only parties to the
                                                  and 7(c) of the Natural Gas Act (NGA)                   Tennessee Gas Pipeline Company,                       proceeding can ask for court review of
                                                  and the Federal Energy Regulatory                       L.L.C., 1001 Louisiana Street, Houston,               Commission orders in the proceeding.
                                                  Commission (Commission) seeking                         Texas 77002 or at (713) 420–4544                         However, a person does not have to
                                                  authority to (i) construct, install,                    (phone), or (713) 420–1601 (facsimile),               intervene in order to have comments
                                                  modify, and operate certain pipeline                    or email: Jacquelyne_Rocan@                           considered. The second way to
                                                  and compression facilities to be located                kindermorgan.com, or Shannon M.                       participate is by filing with the
                                                  in Pennsylvania, New York,                              Miller, Regulatory Affairs, Tennessee                 Secretary of the Commission, as soon as
                                                  Massachusetts, New Hampshire, and                       Gas Pipeline Company, L.L.C., 1001                    possible, an original and two copies of
                                                  Connecticut, and (ii) to abandon certain                Louisiana Street, Houston, Texas 77002,               comments in support of or in opposition
                                                  facilities, as part of the Northeast Energy             or at (713) 420–4038 (phone), or (713)                to this project. The Commission will
                                                  Direct Project (NED Project), as                        420–1605 (facsimile), or email:                       consider these comments in
                                                  described in more detail below.                         shannon_miller@kindermorgan.com.                      determining the appropriate action to be
                                                  Tennessee proposes to provide up to 1.3                    On October 2, 2014, Commission staff               taken, but the filing of a comment alone
                                                  billion cubic feet per day (Bcf/d) of firm              granted Tennessee’s request to utilize                will not serve to make the filer a party
                                                  capacity at a cost of approximately $5.2                the National Environmental Policy Act                 to the proceeding. The Commission’s
                                                  billion dollars, all as more fully set forth            (NEPA) Pre-Filing Process and assigned                rules require that persons filing
                                                  in the application. The filing is available             Docket No. PF14–22–000 to staff                       comments in opposition to the project
                                                  for review at the Commission in the                     activities involving the project. Now, as             provide copies of their protests only to
                                                  Public Reference Room or may be                         of the filing of this application on                  the party or parties directly involved in
                                                  viewed on the Commission’s Web site at                  November 20, 2015, the NEPA Pre-                      the protest.
                                                  http://www.ferc.gov using the                           Filing Process for this project has ended.               Persons who wish to comment only
                                                  ‘‘eLibrary’’ link. Enter the docket                     From this time forward, this proceeding               on the environmental review of this
                                                  number excluding the last three digits in               will be conducted in Docket No. CP16–                 project should submit an original and
                                                  the docket number field to access the                   21–000 as noted in the caption of this                two copies of their comments to the
                                                  document. There is an ‘‘eSubscription’’                 Notice.                                               Secretary of the Commission.
                                                  link on the Web site that enables                          Pursuant to section 157.9 of the                   Environmental commentors will be
                                                  subscribers to receive email notification               Commission’s rules, 18 CFR 157.9,                     placed on the Commission’s
                                                  when a document is added to a                           within 90 days of this Notice, the                    environmental mailing list, will receive
                                                  subscribed docket(s). For assistance,                   Commission staff will issue a Notice of               copies of the environmental documents,
                                                  please contact FERC Online Support at                   Schedule for Environmental Review. If                 and will be notified of meetings
                                                  FERCOnlineSupport@ferc.gov or toll                      a Notice of Schedule for Environmental                associated with the Commission’s
                                                  free at (866) 208–3676, or for TTY,                     Review is issued, it will indicate, among             environmental review process.
                                                  contact (202) 502–8659.                                 other milestones, the anticipated date                Environmental commentors will not be
                                                     Specifically, the NED Project includes               for the Commission staff’s issuance of                required to serve copies of filed
                                                  two components: (1) The Supply Path                     the final environmental impact                        documents on all other parties.
                                                  Component, which is comprised of                        statement (FEIS) for this proposal. The               However, the non-party commentors
                                                  facilities from Troy, Pennsylvania, to                  issuance of a Notice of Schedule for                  will not receive copies of all documents
                                                  Wright, New York (Supply Path                           Environmental Review will serve to                    filed by other parties or issued by the
                                                  Component), and (2) the Market Path                     notify federal and state agencies of the              Commission (except for the mailing of
                                                  Component, which is comprised of
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                                                                          timing for the completion of all                      environmental documents issued by the
                                                  facilities from Wright, New York, to                    necessary reviews, and the subsequent                 Commission) and will not have the right
                                                  Dracut, Massachusetts (Market Path                      need to complete all federal                          to seek court review of the
                                                  Component). The Supply Path                             authorizations within 90 days of the                  Commission’s final order.
                                                  Component facilities include: (i)                       date of issuance of the Commission                       The Commission strongly encourages
                                                  Approximately 174 miles of pipeline                     staff’s FEIS.                                         electronic filings of comments, protests
                                                  facilities in Pennsylvania and New York                    There are two ways to become                       and interventions in lieu of paper using
                                                  of which approximately 41 miles will be                 involved in the Commission’s review of                the ‘‘eFiling’’ link at


                                             VerDate Sep<11>2014   18:51 Dec 10, 2015   Jkt 238001   PO 00000   Frm 00044   Fmt 4703   Sfmt 4703   E:\FR\FM\11DEN1.SGM   11DEN1


                                                  76970                       Federal Register / Vol. 80, No. 238 / Friday, December 11, 2015 / Notices

                                                  http://www.ferc.gov. Persons unable to                  allow for bi-directional flow; (vi) to                000, as noted in the caption of this
                                                  file electronically should submit an                    construct various appurtenances                       Notice.
                                                  original and 5 copies of the protest or                 (collectively, the TEAL Project); (vii) to               Pursuant to section 157.9 of the
                                                  intervention to the Federal Energy                      abandon by lease to NEXUS 950,155                     Commission’s rules, 18 CFR 157.9,
                                                  Regulatory Commission, 888 First Street                 Dth/d; and (vii) for any waivers the                  within 90 days of this Notice, the
                                                  NE., Washington, DC 20426.                              Commission deems necessary for the                    Commission staff will issue a Notice of
                                                     Comment Date: January 6, 2016.                       TEAL Project. Texas Eastern estimates                 Schedule for Environmental Review. If
                                                                                                          the cost of the TEAL Project to be                    a Notice of Schedule for Environmental
                                                    Dated: December 7, 2015.
                                                                                                          approximately $183,519,668.                           Review is issued, it will indicate, among
                                                  Nathaniel J. Davis, Sr.,
                                                                                                             These applications will be reviewed                other milestones, the anticipated date
                                                  Deputy Secretary.                                                                                             for the Commission staff’s issuance of
                                                                                                          contemporaneously with the application
                                                  [FR Doc. 2015–31213 Filed 12–10–15; 8:45 am]                                                                  the final environmental impact
                                                                                                          for an operating lease filed by DTE Gas
                                                  BILLING CODE 6717–01–P
                                                                                                          Company in Docket No. CP16–24–000                     statement (FEIS) for this proposal. The
                                                                                                          on November 24, 2015.                                 issuance of a Notice of Schedule for
                                                                                                             All of the applications are on file with           Environmental Review will serve to
                                                  DEPARTMENT OF ENERGY                                                                                          notify federal and state agencies of the
                                                                                                          the Commission and open to public
                                                                                                          inspection. The filing is available for               timing for the completion of all
                                                  Federal Energy Regulatory                                                                                     necessary reviews, and the subsequent
                                                  Commission                                              review at the Commission in the Public
                                                                                                          Reference Room or may be viewed on                    need to complete all federal
                                                  [Docket Nos. CP16–22–000; PF15–10–000;                  the Commission’s Web site Web at                      authorizations within 90 days of the
                                                  CP16–23–000; PF15–11–000; CP16–24–000]                  http://www.ferc.gov using the                         date of issuance of the Commission
                                                                                                          ‘‘eLibrary’’ link. Enter the docket                   staff’s FEIS.
                                                  NEXUS Gas Transmission, LLC; Texas                                                                               There are two ways to become
                                                                                                          number excluding the last three digits in
                                                  Eastern Transmission, LP; DTE Gas                                                                             involved in the Commission’s review of
                                                                                                          the docket number field to access the
                                                  Company; Notice of Applications                                                                               this project. First, any person wishing to
                                                                                                          document. For assistance, contact FERC
                                                                                                                                                                obtain legal status by becoming a party
                                                     Take notice that on November 20,                     at FERCOnlineSupport@ferc.gov or call
                                                                                                                                                                to the proceedings for this project
                                                  2015, NEXUS Gas Transmission, LLC                       toll-free, (886) 208–3676 or TYY, (202)
                                                                                                                                                                should, on or before the comment date
                                                  (NEXUS), 5400 Westheimer Court,                         502–8659.
                                                                                                                                                                stated below file with the Federal
                                                  Houston, Texas 77056, filed in Docket                      Any questions concerning the
                                                                                                                                                                Energy Regulatory Commission, 888
                                                  No. CP16–22–000 an application                          application in Docket No. CP16–22–000                 First Street NE., Washington, DC 20426,
                                                  pursuant to section 7(c) of the Natural                 may be directed to Berk Donaldson or                  a motion to intervene in accordance
                                                  Gas Act (NGA) for authorization: (i) To                 Leanne Sidorkewicz, NEXUS Gas                         with the requirements of the
                                                  construct approximately 255.9 miles of                  Transmission LLC, 5400 Westheimer                     Commission’s Rules of Practice and
                                                  new, 36-inch-diameter interstate                        Court, Houston, Texas 77056, by                       Procedure (18 CFR 385.214 or 385.211)
                                                  pipeline in Ohio and Michigan; (ii) to                  telephone at (713) 627–4488, or by                    and the Regulations under the NGA (18
                                                  construct four compressor stations,                     email at bdonaldson@                                  CFR 157.10). A person obtaining party
                                                  totaling 130,000 horsepower (HP); (iii)                 spectraenergy.com or lsidorkewicz@                    status will be placed on the service list
                                                  to construct various appurtenances                      spectraenergy.com.                                    maintained by the Secretary of the
                                                  (collectively, the NEXUS Project); (iv) of                 Any questions concerning the                       Commission and will receive copies of
                                                  its proposed pro forma tariff; (v) for a                application in Docket No. CP16–23–000                 all documents filed by the applicant and
                                                  Part 157, Subpart F construction                        may be directed to Berk Donaldson,                    by all other parties. A party must submit
                                                  certificate; (vi) for a Part 284, Subpart G             General Manger, Rates and Certificates,               seven copies of filings made in the
                                                  blanket certificate; and (vii) for any                  Texas Eastern Transmission, LP, PO Box                proceeding with the Commission and
                                                  waivers the Commission deems                            1642, Houston, Texas 77251–1642, by                   must mail a copy to the applicant and
                                                  necessary for the NEXUS Project.                        telephone at (713) 624–4488, or by                    to every other party. Only parties to the
                                                  NEXUS states that the proposed                          facsimile at (713) 627–5947.                          proceeding can ask for court review of
                                                  pipeline will have a capacity of 1.5                       On December 30, 2014, the                          Commission orders in the proceeding.
                                                  million dekatherms per day (Dth/d) and                  Commission staff granted NEXUS’                          However, a person does not have to
                                                  estimates the cost of the NEXUS Project                 request to utilize the Pre-Filing Process             intervene in order to have comments
                                                  to be approximately $2,095,267,444.                     and assigned Docket No. PF15–10–000                   considered. The second way to
                                                     Additionally, on November 20, 2015,                  to staff’s activities involved in the                 participate is by filing with the
                                                  Texas Eastern Transmission, LP (Texas                   NEXUS Project. Now, as of the                         Secretary of the Commission, as soon as
                                                  Eastern), 5400 Westheimer Court,                        November 20, 2015 application, the Pre-               possible, an original and two copies of
                                                  Houston, Texas 77056, filed in Docket                   Filing Process for the NEXUS Project                  comments in support of or in opposition
                                                  No. CP16–23–000 an application                          has ended. From this time forward, this               to this project. The Commission will
                                                  pursuant to sections 7(b) and 7(c) of the               proceeding will be conducted in Docket                consider these comments in
                                                  NGA for authorization: (i) To construct                 No. CP16–22–000, as noted in the                      determining the appropriate action to be
                                                  approximately 4.4 miles of 36-inch-                     caption of this Notice.                               taken, but the filing of a comment alone
                                                  diameter pipeline loop in Monroe                           On January 16, 2015, the Commission                will not serve to make the filer a party
                                                  County, Ohio; (ii) to construct 1,790 feet              staff granted Texas Eastern’s request to              to the proceeding. The Commission’s
                                                  of connecting pipeline to the NEXUS                     utilize the Pre-Filing Process and
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                                                                                                                                rules require that persons filing
                                                  Project in Columbiana County, Ohio;                     assigned Docket No. PF15–11–000 to                    comments in opposition to the project
                                                  (iii) to construct a new 18,800 HP                      staff’s activities involved in the TEAL               provide copies of their protests only to
                                                  compressor station in Columbiana                        Project. Now, as of the November 20,                  the party or parties directly involved in
                                                  County, Ohio; (iv) to construct a new                   2015 application, the Pre-Filing Process              the protest.
                                                  9,400 HP compressor unit at its existing                for the TEAL Project has ended. From                     Persons who wish to comment only
                                                  Colerain Compressor Station in Belmont                  this time forward, this proceeding will               on the environmental review of this
                                                  County, Ohio; (v) to modify Line 73 to                  be conducted in Docket No. CP16–23–                   project should submit an original and


                                             VerDate Sep<11>2014   18:51 Dec 10, 2015   Jkt 238001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\11DEN1.SGM   11DEN1



Document Created: 2018-03-02 09:13:22
Document Modified: 2018-03-02 09:13:22
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesJanuary 6, 2016.
FR Citation80 FR 76969 