80_FR_77620 80 FR 77381 - Sunshine Act Meeting Notice

80 FR 77381 - Sunshine Act Meeting Notice

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 80, Issue 239 (December 14, 2015)

Page Range77381-77382
FR Document2015-31567

Federal Register, Volume 80 Issue 239 (Monday, December 14, 2015)
[Federal Register Volume 80, Number 239 (Monday, December 14, 2015)]
[Notices]
[Pages 77381-77382]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-31567]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2015-0001]


Sunshine Act Meeting Notice

DATE: December 14, 21, 28, 2015, January 4, 11, 18, 2016.

PLACE: Commissioners' Conference Room, 11555 Rockville Pike, Rockville, 
Maryland.

STATUS: Public and Closed.

Week of December 14, 2015

Tuesday, December 15, 2015

9:00 a.m. Hearing on Construction Permit for SHINE Medical Isotope 
Production Facility: Section 189a. of the Atomic Energy Act Proceeding 
(Public Meeting); (Contact: Steven Lynch: 301-415-1524).

    This meeting will be webcast live at the Web address--http://www.nrc.gov/.

Thursday, December 17, 2015

9:30 a.m. Briefing on Project AIM 2020 (Public Meeting); (Contact: John 
Jolicoeur: 301-415-1642).

    This meeting will be webcast live at the Web address--http://www.nrc.gov/.

Thursday, December 17, 2015

1:00 p.m. Briefing on Digital Instrumentation and Control (Public 
Meeting); (Contact: Daniel Doyle: 301-415-3748).

    This meeting will be webcast live at the Web address--http://www.nrc.gov/.

Week of December 21, 2015--Tentative

    There are no meetings scheduled for the week of December 21, 2015.

Week of December 28, 2015--Tentative

    There are no meetings scheduled for the week of December 28, 2015.

Week of January 4, 2016--Tentative

    There are no meetings scheduled for the week of January 4, 2016.

Week of January 11, 2016--Tentative

    There are no meetings scheduled for the week of January 11, 2016.

Week of January 18, 2016--Tentative

    There are no meetings scheduled for the week of January 18, 2016.
* * * * *
    The schedule for Commission meetings is subject to change on short 
notice. For more information or to verify the status of meetings, 
contact Denise McGovern at 301-415-0681 or via email at 
Denise.McGovern@nrc.gov.
* * * * *
    The NRC Commission Meeting Schedule can be found on the Internet 
at: http://www.nrc.gov/public-involve/public-meetings/schedule.html.
* * * * *
    The NRC provides reasonable accommodation to individuals with 
disabilities where appropriate. If you need a reasonable accommodation 
to participate in these public meetings, or need this meeting notice or 
the transcript or other information from the public meetings in another 
format (e.g.

[[Page 77382]]

braille, large print), please notify Kimberly Meyer, NRC Disability 
Program Manager, at 301-287-0739, by videophone at 240-428-3217, or by 
email at Kimberly.Meyer-Chambers@nrc.gov. Determinations on requests 
for reasonable accommodation will be made on a case-by-case basis.
* * * * *
    Members of the public may request to receive this information 
electronically. If you would like to be added to the distribution, 
please contact the Nuclear Regulatory Commission, Office of the 
Secretary, Washington, DC 20555 (301-415-1969), or email 
Brenda.Akstulewicz@nrc.gov or Patricia.Jimenez@nrc.gov.

    Dated: December 10, 2015.
Denise L. McGovern,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2015-31567 Filed 12-10-15; 4:15 pm]
 BILLING CODE 7590-01-P



                                                                             Federal Register / Vol. 80, No. 239 / Monday, December 14, 2015 / Notices                                           77381

                                                  email: Carol.Gallagher@nrc.gov. For                     environmental review that the adverse                 Week of December 14, 2015
                                                  technical questions, contact the                        environmental impacts of license
                                                                                                                                                                Tuesday, December 15, 2015
                                                  individual listed in the FOR FURTHER                    renewal for Davis-Besse are not so great
                                                  INFORMATION CONTACT section of this                     that preserving the option of license                 9:00 a.m. Hearing on Construction
                                                  document.                                               renewal for energy planning                               Permit for SHINE Medical Isotope
                                                     • NRC’s Agencywide Documents                         decisionmakers would be unreasonable.                     Production Facility: Section 189a.
                                                  Access and Management System                              Davis-Besse, is a pressurized water                     of the Atomic Energy Act
                                                  (ADAMS):You may obtain publicly-                        reactor located in Carroll Township,                      Proceeding (Public Meeting);
                                                  available documents online in the                       Ottawa County, Ohio. The application                      (Contact: Steven Lynch: 301–415–
                                                  ADAMS Public Documents collection at                    for the renewed license, ‘‘License                        1524).
                                                  http://www.nrc.gov/reading-rm/                          Renewal Application, Davis-Besse                        This meeting will be webcast live at
                                                  adams.html. To begin the search, select                 Nuclear Power Station,’’ dated August                 the Web address—http://www.nrc.gov/.
                                                  ‘‘ADAMS Public Documents’’ and then                     30, 2010, as supplemented by letters
                                                  select ‘‘Begin Web-based ADAMS                          dated through June 29, 2015 (ADAMS                    Thursday, December 17, 2015
                                                  Search.’’ For problems with ADAMS,                      Accession No. ML15180A252),                           9:30 a.m. Briefing on Project AIM 2020
                                                  please contact the NRC’s Public                         complied with the standards and                           (Public Meeting); (Contact: John
                                                  Document Room (PDR) reference staff at                  requirements of the Atomic Energy Act                     Jolicoeur: 301–415–1642).
                                                  1–800–397–4209, 301–415–4737, or by                     of 1954, as amended (the Act), and the                  This meeting will be webcast live at
                                                  email to pdr.resource@nrc.gov. The                      NRC’s regulations. As required by the                 the Web address—http://www.nrc.gov/.
                                                  ADAMS accession number for each                         Act and the NRC’s regulations in
                                                  document referenced (if that document                   Chapter 1 of title 10 of the Code of                  Thursday, December 17, 2015
                                                  is available in ADAMS) is provided the                  Federal Regulations (10 CFR), the NRC                 1:00 p.m. Briefing on Digital
                                                  first time that a document is referenced.               has made appropriate findings, which                      Instrumentation and Control (Public
                                                     • NRC’s PDR: You may examine and                     are set forth in the license. A public                    Meeting); (Contact: Daniel Doyle:
                                                  purchase copies of public documents at                  notice of the proposed issuance of the                    301–415–3748).
                                                  the NRC’s PDR, Room O1–F21, One                         renewed license and an opportunity for                  This meeting will be webcast live at
                                                  White Flint North, 11555 Rockville                      a hearing was published in the Federal                the Web address—http://www.nrc.gov/.
                                                  Pike, Rockville, Maryland 20852.                        Register on October 25, 2010 (75 FR
                                                  FOR FURTHER INFORMATION CONTACT:                        65528).                                               Week of December 21, 2015—Tentative
                                                  Richard Plasse, Office of Nuclear                         For further details with respect to this              There are no meetings scheduled for
                                                  Reactor Regulation, U.S. Nuclear                        action, see: (1) FirstEnergy Nuclear                  the week of December 21, 2015.
                                                  Regulatory Commission, Washington,                      Operating Company license renewal
                                                                                                          application for Davis-Besse Nuclear                   Week of December 28, 2015—Tentative
                                                  DC 20555; telephone: 301–415–1427;
                                                  email: Richard.Plasse@nrc.gov.                          Power Station, Unit 1 dated August 20,                  There are no meetings scheduled for
                                                                                                          1010, as supplemented by letters dated                the week of December 28, 2015.
                                                  SUPPLEMENTARY INFORMATION: Notice is
                                                                                                          through June 29, 2015; (2) the NRC’s
                                                  hereby given that the NRC has issued                                                                          Week of January 4, 2016—Tentative
                                                                                                          safety evaluation report published on
                                                  renewed facility operating license No.
                                                                                                          September 3, 2013 (ADAMS Accession                      There are no meetings scheduled for
                                                  NPF–3 to FirstEnergy Nuclear Operating
                                                                                                          No. ML13248A267); (3) the NRC’s                       the week of January 4, 2016.
                                                  Company, the operator of Davis-Besse.
                                                                                                          supplemental safety evaluation report
                                                  Renewed facility operating license No.                                                                        Week of January 11, 2016—Tentative
                                                                                                          published on August 10, 2015 (ADAMS
                                                  NPF–3 authorizes operation of Davis-
                                                                                                          Accession No. ML15196A429); (4) the                     There are no meetings scheduled for
                                                  Besse by the licensee at reactor core
                                                                                                          NRC’s final environmental impact                      the week of January 11, 2016.
                                                  power levels not in excess of 2817
                                                                                                          statement (NUREG–1437, Supplement
                                                  megawatts thermal, in accordance with                                                                         Week of January 18, 2016—Tentative
                                                                                                          52), for Davis-Besse published in April
                                                  the provisions of the Davis-Besse                                                                                There are no meetings scheduled for
                                                                                                          2014; and (5) the NRC’s ROD.
                                                  renewed license and technical                                                                                 the week of January 18, 2016.
                                                  specifications. The NRC’s ROD that                         Dated at Rockville, Maryland, this 8th day
                                                  supports the NRC’s decision to renew                    of December 2015.                                     *      *    *    *     *
                                                  facility operating license No. NPF–3 is                    For the Nuclear Regulatory Commission.                The schedule for Commission
                                                  available in ADAMS under Accession                      Christopher G. Miller,                                meetings is subject to change on short
                                                  No. ML15295A319. As discussed in the                    Director, Division of License Renewal, Office         notice. For more information or to verify
                                                  ROD and the final supplemental                          of Nuclear Reactor Regulation.                        the status of meetings, contact Denise
                                                  environmental impact statement (FSEIS)                  [FR Doc. 2015–31418 Filed 12–11–15; 8:45 am]          McGovern at 301–415–0681 or via email
                                                  for Davis-Besse, Supplement 52 to                       BILLING CODE 7590–01–P
                                                                                                                                                                at Denise.McGovern@nrc.gov.
                                                  NUREG–1437, ‘‘Generic Environmental                                                                           *      *    *    *     *
                                                  Impact Statement for License Renewal                                                                             The NRC Commission Meeting
                                                  of Nuclear Plants Regarding Davis-Besse                 NUCLEAR REGULATORY                                    Schedule can be found on the Internet
                                                  Nuclear Power Station’’ dated April                     COMMISSION                                            at: http://www.nrc.gov/public-involve/
                                                  2015 (ADAMS Accession No.                                                                                     public-meetings/schedule.html.
                                                                                                          [NRC–2015–0001]
                                                  ML15112A098 for Volume 1 and                                                                                  *      *    *    *     *
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  ML15113A187 for Volume 2), the NRC                      Sunshine Act Meeting Notice                              The NRC provides reasonable
                                                  has considered a range of reasonable                                                                          accommodation to individuals with
                                                  alternatives that included natural gas                  DATE: December 14, 21, 28, 2015,                      disabilities where appropriate. If you
                                                  combined-cycle (NGCC), supercritical                    January 4, 11, 18, 2016.                              need a reasonable accommodation to
                                                  pulverized coal, combination of wind,                   PLACE: Commissioners’ Conference                      participate in these public meetings, or
                                                  solar, and NGCC, and the no action                      Room, 11555 Rockville Pike, Rockville,                need this meeting notice or the
                                                  alternative. The ROD and FSEIS                          Maryland.                                             transcript or other information from the
                                                  document the NRC decision for the                       STATUS: Public and Closed.                            public meetings in another format (e.g.


                                             VerDate Sep<11>2014   17:36 Dec 11, 2015   Jkt 238001   PO 00000   Frm 00068   Fmt 4703   Sfmt 4703   E:\FR\FM\14DEN1.SGM   14DEN1


                                                  77382                      Federal Register / Vol. 80, No. 239 / Monday, December 14, 2015 / Notices

                                                  braille, large print), please notify                    202–326–4020, ext. 6818 or Jon                        4204(a)(1)(B) when warranted. The
                                                  Kimberly Meyer, NRC Disability                          Chatalian (Chatalian.Jon@PBGC.gov),                   legislative history of section 4204
                                                  Program Manager, at 301–287–0739, by                    ext. 6757, Office of the Chief Counsel,               indicates a Congressional intent that the
                                                  videophone at 240–428–3217, or by                       Suite 340, 1200 K Street NW.,                         asset sale rules be administered in a
                                                  email at Kimberly.Meyer-Chambers@                       Washington, DC 20005–4026; (TTY/                      manner that assures protection of the
                                                  nrc.gov. Determinations on requests for                 TDD users may call the Federal relay                  plan with the least practicable intrusion
                                                  reasonable accommodation will be                        service toll-free at 1–800–877–8339 and               into normal business transactions.
                                                  made on a case-by-case basis.                           ask to be connected to 202–326–4020.)                 Senate Committee on Labor and Human
                                                  *     *      *    *      *                              SUPPLEMENTARY INFORMATION:                            Resources, 96th Cong., 2nd Sess.,
                                                     Members of the public may request to                                                                       S.1076, The Multiemployer Pension
                                                                                                          Background
                                                  receive this information electronically.                                                                      Plan Amendments Act of 1980:
                                                  If you would like to be added to the                       Section 4204 of the Employee                       Summary and Analysis of
                                                  distribution, please contact the Nuclear                Retirement Income Security Act of 1974,               Considerations 16 (Comm. Print, April
                                                  Regulatory Commission, Office of the                    as amended by the Multiemployer                       1980); 128 Cong. Rec. S10117 (July 29,
                                                  Secretary, Washington, DC 20555 (301–                   Pension Plan Amendments Act of 1980                   1980). The granting of an exemption or
                                                  415–1969), or email                                     (‘‘ERISA’’ or ‘‘the Act’’), provides that a           variance from the bond/escrow
                                                  Brenda.Akstulewicz@nrc.gov or                           complete or partial withdrawal of an                  requirement does not constitute a
                                                  Patricia.Jimenez@nrc.gov.                               employer from a multiemployer plan                    finding by PBGC that a particular
                                                                                                          does not occur solely because, as a                   transaction satisfies the other
                                                    Dated: December 10, 2015.                             result of a bona fide arm’s-length sale of            requirements of section 4204(a)(1).
                                                  Denise L. McGovern,                                     assets to an unrelated party, the seller
                                                  Policy Coordinator, Office of the Secretary.                                                                     Under PBGC’s regulation on variances
                                                                                                          ceases covered operations or ceases to
                                                                                                                                                                or exemptions from the requirements of
                                                  [FR Doc. 2015–31567 Filed 12–10–15; 4:15 pm]            have an obligation to contribute for such
                                                                                                                                                                section 4204(a)(1)(B) with respect to
                                                  BILLING CODE 7590–01–P                                  operations, if the following conditions
                                                                                                                                                                sales of assets (29 CFR part 4204), a
                                                                                                          under section 4204(a)(1)(A)–(C), are
                                                                                                                                                                request for a variance or waiver of the
                                                                                                          met:
                                                                                                             (A) The purchaser has an obligation to             bond/escrow requirement under any of
                                                  PENSION BENEFIT GUARANTY                                                                                      the tests established in the regulation
                                                  CORPORATION                                             contribute to the plan with respect to
                                                                                                          the operations for substantially the same             (sections 4204.12 or 4204.13) must first
                                                  Approval of Exemption From the Bond/                    number of contributions base units for                be made to the plan in question. PBGC
                                                  Escrow Requirement Relating to the                      which the seller was obligated to                     will consider a waiver request only if
                                                  Sale of Assets by an Employer Who                       contribute;                                           the plan denies the request because it
                                                  Contributes to a Multiemployer Plan;                       (B) the purchaser obtains a bond or                does not satisfy the conditions of the
                                                  Harrington Air Systems, LLC and J.C.                    places an amount in escrow, for a period              regulatory tests or the parties assert that
                                                  Cannistraro, LLC                                        of five plan years after the sale, equal to           the financial information necessary to
                                                                                                          the greater of the seller’s average                   show satisfaction of one of the
                                                  AGENCY: Pension Benefit Guaranty                        required annual contribution to the plan              regulatory tests is privileged or
                                                  Corporation.                                            for the three plan years preceding the                confidential financial information
                                                  ACTION: Notice of approval.                             year in which the sale occurred or the                within the meaning of ‘‘Exemption
                                                                                                          seller’s required annual contribution for             Four’’ of the Freedom of Information
                                                  SUMMARY:    The Pension Benefit Guaranty                                                                      Act, 5 U.S.C. § 552(b)(4).
                                                                                                          the plan year preceding the year in
                                                  Corporation has approved a request
                                                                                                          which the sale occurred; and                             Under section 4204.22 of the
                                                  from Harrington Air Systems, LLC, and                      (C) the contract of sale provides that             regulation, the PBGC shall approve a
                                                  its sister company J.C. Cannistraro, LLC,               if the purchaser withdraws from the                   request for a variance or exemption if it
                                                  for an exemption from the bond/escrow                   plan within the first five plan years                 determines that approval of the request
                                                  requirement of section 4204(a)(1) of the                beginning after the sale and fails to pay             is warranted, based on the following
                                                  Employee Retirement Income Security                     any of its liability to the plan, the seller          reasons:
                                                  Act of 1974, as amended, with respect                   shall be secondarily liable for the
                                                  to the Sheet Metal Workers National                                                                              (1) The approval of a variance/
                                                                                                          liability it would have had but for                   exemption would more effectively or
                                                  Pension Fund. A notice of the request                   section 4204.
                                                  for exemption was published on June                                                                           equitably carry out the purposes of Title
                                                                                                             The bond or escrow described above                 IV of the Act; and
                                                  24, 2015 (80 FR 36366). The effect of                   would be paid to the plan if the
                                                  this notice is to advise the public of the              purchaser withdraws from the plan or                     (2) the approval of a variance/
                                                  decision on the exemption request.                      fails to make any required contributions              exemption would not significantly
                                                  ADDRESSES: The non-confidential                         to the plan within the first five plan                increase the risk of financial loss to the
                                                  portions of the request for a variance                  years beginning after the sale.                       plan.
                                                  and any PBGC response to the request                    Additionally, section 4204(b)(1)                         Section 4204(c) of ERISA and section
                                                  may be obtained by writing to the                       provides that if a sale of assets is                  4204.22(b) of the regulation require
                                                  Disclosure Division, Office of the                      covered by section 4204, the purchaser                PBGC to publish a notice of the
                                                  General Counsel, Pension Benefit                        assumes by operation of law the                       pendency of a request for a variance or
                                                  Guaranty Corporation, 1200 K Street                     contribution record of the seller for the             exemption in the Federal Register, and
                                                  NW., Washington, DC 20005–4026 or
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                          plan year in which the sale occurred                  to provide interested parties with an
                                                  calling 202–326–4040 during normal                      and the preceding four plan years.                    opportunity to comment on the
                                                  business hours. (TTY and TDD users                         Section 4204(c) of ERISA authorizes                proposed variance or exemption. PBGC
                                                  may call the Federal relay service toll-                the Pension Benefit Guaranty                          received no comments in response to
                                                  free at 1–800–877–8339 and ask to be                    Corporation (‘‘PBGC’’) to grant                       notice of Harrington Air Systems, LLC
                                                  connected to 202–326–4040.)                             individual or class variances or                      and J.C. Cannistraro, LLC’s request for
                                                  FOR FURTHER INFORMATION CONTACT:                        exemptions from the purchaser’s bond/                 an exemption of the bond/escrow
                                                  Bruce Perlin (Perlin.Bruce@PBGC.gov),                   escrow requirement of section                         requirement.


                                             VerDate Sep<11>2014   17:36 Dec 11, 2015   Jkt 238001   PO 00000   Frm 00069   Fmt 4703   Sfmt 4703   E:\FR\FM\14DEN1.SGM   14DEN1



Document Created: 2015-12-14 13:47:02
Document Modified: 2015-12-14 13:47:02
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesDecember 14, 21, 28, 2015, January 4, 11, 18, 2016.
FR Citation80 FR 77381 