80_FR_78456 80 FR 78215 - Guidance and Application for Hydroelectric Incentive Payments

80 FR 78215 - Guidance and Application for Hydroelectric Incentive Payments

DEPARTMENT OF ENERGY
Office of Energy Efficiency and Renewable Energy

Federal Register Volume 80, Issue 241 (December 16, 2015)

Page Range78215-78216
FR Document2015-31618

The U.S. Department of Energy (DOE) is publishing Guidance for the Energy Policy Act of 2005 Section 242 Program. The guidance describes the hydroelectric incentive payment requirements and explains the type of information that owners or authorized operators of qualified hydroelectric facilities can provide DOE when applying for hydroelectric incentive payments. This incentive is available for electric energy generated and sold for a specified 10-year period as authorized under section 242 of the Energy Policy Act of 2005. In Congressional appropriations for Federal fiscal year 2015, DOE received funds to support this hydroelectric incentive program for the first time. At this time, DOE is only accepting applications from owners and authorized operators of qualified hydroelectric facilities for hydroelectricity generated and sold in calendar year 2014.

Federal Register, Volume 80 Issue 241 (Wednesday, December 16, 2015)
[Federal Register Volume 80, Number 241 (Wednesday, December 16, 2015)]
[Notices]
[Pages 78215-78216]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-31618]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Office of Energy Efficiency and Renewable Energy


Guidance and Application for Hydroelectric Incentive Payments

AGENCY: Wind and Water Power Program, Office of Energy Efficiency and 
Renewable Energy, Department of Energy.

ACTION: Notice of availability of guidance and open application period.

-----------------------------------------------------------------------

SUMMARY: The U.S. Department of Energy (DOE) is publishing Guidance for 
the Energy Policy Act of 2005 Section 242 Program. The guidance 
describes the hydroelectric incentive payment requirements and explains 
the type of information that owners or authorized operators of 
qualified hydroelectric facilities can provide DOE when applying for 
hydroelectric incentive payments. This incentive is available for 
electric energy generated and sold for a specified 10-year period as 
authorized under section 242 of the Energy Policy Act of 2005. In 
Congressional appropriations for Federal fiscal year 2015, DOE received 
funds to support this hydroelectric incentive program for the first 
time. At

[[Page 78216]]

this time, DOE is only accepting applications from owners and 
authorized operators of qualified hydroelectric facilities for 
hydroelectricity generated and sold in calendar year 2014.

DATES: DOE is currently accepting applications from December 16, 2015 
through February 1, 2016. Applications must be sent to 
[email protected] by midnight EDT, February 1, 2016, or they 
will not be considered timely filed for calendar year 2014 incentive 
payments.

ADDRESSES: DOE's guidance is available at: http://energy.gov/eere/water/water-power-program.
    Written correspondence may be sent to the Office of Energy 
Efficiency and Renewable Energy (EE-4), by email at 
[email protected].

FOR FURTHER INFORMATION CONTACT: Requests for additional information 
should be directed to Mr. Steven Lindenberg, Office of Energy 
Efficiency and Renewable Energy (EE-4), U.S. Department of Energy, 1000 
Independence Avenue SW, Washington, DC 20585-0121, (202) 586-2783, 
[email protected]. Electronic communications are recommended 
for correspondence and required for submission of application 
information.

SUPPLEMENTARY INFORMATION: In the Energy Policy Act of 2005 (EPAct 
2005; Pub. L. 109-58), Congress established a new program to support 
the expansion of hydropower energy development at existing dams and 
impoundments through an incentive payment procedure. Under section 242 
of EPAct 2005, the Secretary of Energy is directed to provide incentive 
payments to the owner or authorized operator of qualified hydroelectric 
facilities for electric energy generated and sold by a qualified 
hydroelectric facility for a specified 10-year period (See 42 U.S.C. 
15881). The conference report to the law that made appropriations for 
Fiscal Year 2015 includes $3,960,000 for conventional hydropower under 
section 242 of EPAct 2005.
    DOE developed and announced guidance in January 2015 describing the 
application process and the information necessary for DOE to make a 
determination of eligibility under section 242. See 80 FR 2685 (January 
20, 2015). The guidance announced today includes certain minor 
modifications to the January 2015 guidance based on DOE's experience 
with the January 2015 application process. Specifically, DOE is 
amending some portions of the guidance document to more precisely 
describe what types of production are considered ``new'' production and 
the information necessary to demonstrate adequate metering. The final 
guidance is available at: http://energy.gov/eere/water/water-power-program. Each application will be reviewed based on the guidance. DOE 
notes that applicants that received payments for calendar year 2013 and 
that are eligible for calendar year 2014 payments must still submit a 
full calendar year 2014 application.
    When submitting information to DOE for the Section 242 program, it 
is recommended that applicants carefully read and review the complete 
content of the Guidance for this process. When reviewing applications, 
DOE may corroborate the information provided with information that DOE 
finds through FERC e-filings, contact with power off-taker, and other 
due diligence measures carried out by reviewing officials. DOE may 
require the applicant to conduct and submit an independent audit at its 
own expense, or DOE may conduct an audit to verify the number of 
kilowatt-hours claimed to have been generated and sold by the qualified 
hydroelectric facility and for which an incentive payment has been 
requested or made.

    Issued in Washington, DC, on December 10, 2015.
Douglas Hollett,
Deputy Assistant Secretary for Renewable Power, Energy Efficiency and 
Renewable Energy.
[FR Doc. 2015-31618 Filed 12-15-15; 8:45 am]
BILLING CODE 6450-01-P



                                                                            Federal Register / Vol. 80, No. 241 / Wednesday, December 16, 2015 / Notices                                               78215

                                                       EXHIBIT A: MODIFIED TABLE 5.1—TEST LOAD SIZES—10 CFR 430, SUBPART B, APPENDIX J2—Continued
                                                           Container volume                                  Minimum load                            Maximum load                       Average load

                                                      cu. ft.                     liter                 lb                  kg                  lb                  kg             lb                  kg
                                                       ≥<                         ≥<

                                              6.30–6.40   ...............        178.4–181.2                  3.00               1.36                26.00               11.79          14.50                6.58
                                              6.40–6.50   ...............        181.2–184.1                  3.00               1.36                26.40               11.97          14.70                6.67
                                              6.50–6.60   ...............        184.1–186.9                  3.00               1.36                26.90               12.20          15.10                6.85
                                              6.60–6.70   ...............        186.9–189.7                  3.00               1.36                27.30               12.38          15.30                6.94
                                              6.70–6.80   ...............        189.7–192.6                  3.00               1.36                27.70               12.56          15.50                7.03
                                              6.80–6.90   ...............        192.6–195.4                  3.00               1.36                28.10               12.75          15.70                7.12
                                              6.90–7.00   ...............        195.4–198.2                  3.00               1.36                28.50               12.93          15.90                7.21
                                              7.00–7.10   ...............        198.2–201.0                  3.00               1.36                28.90               13.11          16.10                7.30
                                              7.10–7.20   ...............        201.0–203.9                  3.00               1.36                29.30               13.29          16.30                7.39
                                              7.20–7.30   ...............        203.9–206.7                  3.00               1.36                29.70               13.47          16.50                7.48
                                              7.30–7.40   ...............        206.7–209.5                  3.00               1.36                30.10               13.65          16.70                7.57
                                              7.40–7.50   ...............        209.5–212.4                  3.00               1.36                30.50               13.83          16.90                7.67
                                              7.50–7.60   ...............        212.4–215.2                  3.00               1.36                31.00               14.06          17.30                7.85
                                              7.60–7.70   ...............        215.2–218.0                  3.00               1.36                31.40               14.24          17.50                7.94
                                              7.70–7.80   ...............        218.0–220.9                  3.00               1.36                31.80               14.42          17.70                8.03
                                              7.80–7.90   ...............        220.9–223.7                  3.00               1.36                32.20               14.61          17.90                8.12
                                              7.90–8.00   ...............        223.7–226.5                  3.00               1.36                32.60               14.79          18.10                8.21



                                              Exhibit B: Notice to Manufacturers                       Attn: Michelangelo Troisi                               Whirlpool Corporation
                                                                                                       1800 Valley Rd                                          Attn: Sean Southard
                                              November 9, 2015                                                                                                 Senior Analyst, Regulatory Affairs
                                                                                                       Wayne, NJ 07470
                                              Alliance Laundry Systems, LLC                                                                                    2000 M–63 North, MD1604
                                                                                                       LG Electronics USA, Inc.
                                              Attn: Andrew Huerth                                                                                              Benton Harbor, MI 49022
                                                                                                       Attn: John I. Taylor
                                              PO Box 990                                                                                                       Fax: 269/923–7258
                                                                                                       2000 Millbrook Dr
                                              Shepard Street Ripon, WI 54971                                                                                   Email: sean_m_southard@
                                                                                                       Lincolnshire, IL 60069
                                              Association of Home Appliance                                                                                   whirlpool.com
                                                                                                       Miele, Inc.
                                                Manufacturers                                          Attn: Steve Polinski                                   [FR Doc. 2015–31623 Filed 12–15–15; 8:45 am]
                                              Attn: Jennifer Cleary                                    9 Independence Way                                     BILLING CODE 6450–01–P
                                              1111 19th Street NW., Suite 402                          Princeton, NJ 08450
                                              Washington, DC 20036
                                                                                                       Samsung Electronics America, Inc.                      DEPARTMENT OF ENERGY
                                              Arcelik A.S.                                             Attn: Doug Czerwonka
                                              Attn: Salih Zeki Bugay                                   85 Challenger Rd                                       Office of Energy Efficiency and
                                              125 W Tremont Ave #1134                                  Ridgefield Park, NJ 07660                              Renewable Energy
                                              Charlotte, NC 28203
                                                                                                       Versonel
                                              Asko Appliances AB                                       180 Earland Drive                                      Guidance and Application for
                                              Attn: Jonas Lidberg                                      Building #8                                            Hydroelectric Incentive Payments
                                              Socerbruksgatan 3SE–531 40                               New Holland, PA 17557
                                              Lidköping, Sweden                                                                                              AGENCY: Wind and Water Power
                                                                                                          Re: Petition for Waiver & Application               Program, Office of Energy Efficiency and
                                              Avanti Products                                          for Interim Waiver Regarding                           Renewable Energy, Department of
                                              10880 NW 30th Street                                     Measurement of Energy Consumption of                   Energy.
                                              Miami, FL 33172                                          Residential Clothes Washers, Using 10                  ACTION: Notice of availability of
                                              Bosch Home Appliances Corporation                        CFR part 430, subpart B, Appendix J2                   guidance and open application period.
                                              Attn: Michelle Buranday                                     Dear Madam or Sir:
                                              1901 Main St                                                Whirlpool Corporation (‘‘Whirlpool’’)               SUMMARY:   The U.S. Department of
                                              Irvine, CA 92614                                         is submitting the enclosed Petition for                Energy (DOE) is publishing Guidance
                                              Danby Products, Inc.                                     Waiver and Application for Interim                     for the Energy Policy Act of 2005
                                              PO Box 669                                               Waiver (pursuant to 10 CFR 430.27) to                  Section 242 Program. The guidance
                                              Findlay, OH 45839–0669                                   the US Department of Energy (‘‘DOE’’),                 describes the hydroelectric incentive
                                              Electrolux Home Products                                 relating to the Test Procedures for                    payment requirements and explains the
                                              Attn: George Hawranko                                    energy and water consumption of                        type of information that owners or
                                              10200 David Taylor Dr Rm TKY435                          clothes washers. This letter provides                  authorized operators of qualified
                                              Charlotte, NC 28262                                      notice to other known manufacturers of                 hydroelectric facilities can provide DOE
                                                                                                       similar products. The DOE Assistant                    when applying for hydroelectric
                                              Fisher & Paykel Appliances Inc.                          Secretary for Conservation and                         incentive payments. This incentive is
                                              Attn: Laurence Mawhinney                                 Renewable Energy will receive and                      available for electric energy generated
                                              695 Town Center Dr Ste 180
tkelley on DSK9F6TC42PROD with NOTICES




                                                                                                       consider timely written comments on                    and sold for a specified 10-year period
                                              Costa Mesa, CA 92626                                     the Petition for Waiver and Application                as authorized under section 242 of the
                                              General Electric Company                                 for Interim Waiver. Any manufacturer                   Energy Policy Act of 2005. In
                                              Attn: Earl F. Jones                                      submitting written comments should                     Congressional appropriations for
                                              4000 Buechel Bank Road AP2–225                           provide a copy to Whirlpool                            Federal fiscal year 2015, DOE received
                                              Louisville, KY 40225                                     Corporation at the address shown                       funds to support this hydroelectric
                                              Haier America                                            below.                                                 incentive program for the first time. At


                                         VerDate Sep<11>2014    17:21 Dec 15, 2015   Jkt 238001   PO 00000   Frm 00055   Fmt 4703   Sfmt 4703   E:\FR\FM\16DEN1.SGM      16DEN1


                                              78216                    Federal Register / Vol. 80, No. 241 / Wednesday, December 16, 2015 / Notices

                                              this time, DOE is only accepting                        necessary to demonstrate adequate                     FERC) issued its Notice of Application
                                              applications from owners and                            metering. The final guidance is available             for the project. Among other things, that
                                              authorized operators of qualified                       at: http://energy.gov/eere/water/water-               notice alerted agencies issuing federal
                                              hydroelectric facilities for                            power-program. Each application will                  authorizations of the requirement to
                                              hydroelectricity generated and sold in                  be reviewed based on the guidance.                    complete all necessary reviews and to
                                              calendar year 2014.                                     DOE notes that applicants that received               reach a final decision on a request for
                                              DATES: DOE is currently accepting                       payments for calendar year 2013 and                   a federal authorization within 90 days of
                                              applications from December 16, 2015                     that are eligible for calendar year 2014              the date of issuance of the Commission
                                              through February 1, 2016. Applications                  payments must still submit a full                     staff’s Environmental Assessment (EA)
                                              must be sent to hydroincentive@                         calendar year 2014 application.                       for the project. This instant notice
                                              ee.doe.gov by midnight EDT, February                       When submitting information to DOE                 identifies the FERC staff’s planned
                                              1, 2016, or they will not be considered                 for the Section 242 program, it is                    schedule for the completion of the EA
                                              timely filed for calendar year 2014                     recommended that applicants carefully                 for the project.
                                              incentive payments.                                     read and review the complete content of
                                                                                                      the Guidance for this process. When                   Schedule for Environmental Review
                                              ADDRESSES: DOE’s guidance is available
                                              at: http://energy.gov/eere/water/water-                 reviewing applications, DOE may                       Issuance of EA—January 28, 2016.
                                              power-program.                                          corroborate the information provided                  90-day Federal Authorization Decision
                                                 Written correspondence may be sent                   with information that DOE finds                             Deadline—April 27, 2016.
                                              to the Office of Energy Efficiency and                  through FERC e-filings, contact with
                                                                                                                                                               If a schedule change becomes
                                              Renewable Energy (EE–4), by email at                    power off-taker, and other due diligence
                                                                                                                                                            necessary, additional notice will be
                                              hydroincentive@ee.doe.gov.                              measures carried out by reviewing
                                                                                                                                                            provided so that the relevant agencies
                                              FOR FURTHER INFORMATION CONTACT:
                                                                                                      officials. DOE may require the applicant
                                                                                                                                                            are kept informed of the project’s
                                                                                                      to conduct and submit an independent
                                              Requests for additional information                                                                           progress.
                                                                                                      audit at its own expense, or DOE may
                                              should be directed to Mr. Steven
                                                                                                      conduct an audit to verify the number                 Project Description
                                              Lindenberg, Office of Energy Efficiency
                                                                                                      of kilowatt-hours claimed to have been
                                              and Renewable Energy (EE–4), U.S.                                                                               The Line WB2VA Integrity Project
                                                                                                      generated and sold by the qualified
                                              Department of Energy, 1000                                                                                    would include modifications to
                                                                                                      hydroelectric facility and for which an
                                              Independence Avenue SW, Washington,                                                                           Columbia’s existing facilities at 17 sites
                                                                                                      incentive payment has been requested
                                              DC 20585–0121, (202) 586–2783,                                                                                in Hardy County, West Virginia, and
                                                                                                      or made.
                                              hydroincentive@ee.doe.gov. Electronic                                                                         Shenandoah, Page, Rockingham, and
                                              communications are recommended for                        Issued in Washington, DC, on December               Greene Counties, Virginia. Proposed
                                              correspondence and required for                         10, 2015.                                             modifications include installation of pig
                                              submission of application information.                  Douglas Hollett,                                      launchers and receivers; replacement of
                                              SUPPLEMENTARY INFORMATION: In the                       Deputy Assistant Secretary for Renewable              short sections of existing pipeline,
                                                                                                      Power, Energy Efficiency and Renewable                mainline valves, and other appurtenant
                                              Energy Policy Act of 2005 (EPAct 2005;
                                                                                                      Energy.
                                              Pub. L. 109–58), Congress established a                                                                       facilities; and abandonment of two
                                                                                                      [FR Doc. 2015–31618 Filed 12–15–15; 8:45 am]          existing 20-inch-diameter pipelines
                                              new program to support the expansion
                                                                                                      BILLING CODE 6450–01–P                                beneath the South Fork of the
                                              of hydropower energy development at
                                              existing dams and impoundments                                                                                Shenandoah River that would be
                                              through an incentive payment                                                                                  replaced with a new 24-inch-diameter
                                                                                                      DEPARTMENT OF ENERGY                                  pipeline.
                                              procedure. Under section 242 of EPAct
                                              2005, the Secretary of Energy is directed               Federal Energy Regulatory                             Background
                                              to provide incentive payments to the                    Commission
                                              owner or authorized operator of                                                                                 On May 14, 2015, we issued a Notice
                                              qualified hydroelectric facilities for                  [Docket No. CP15–150–000]                             of Intent to Prepare an Environmental
                                              electric energy generated and sold by a                                                                       Assessment for the Proposed WB2VA
                                                                                                      Columbia Gas Transmission, LLC ;                      Integrity Project and Request for
                                              qualified hydroelectric facility for a
                                                                                                      Notice of Schedule for Environmental                  Comments on Environmental Issues
                                              specified 10-year period (See 42 U.S.C.
                                                                                                      Review of the Proposed Line WB2VA                     (NOI). The NOI was published in the
                                              15881). The conference report to the law
                                                                                                      Integrity Project                                     Federal Register and was mailed to 163
                                              that made appropriations for Fiscal Year
                                              2015 includes $3,960,000 for                               On April 2, 2015, Columbia Gas                     interested parties, including federal,
                                              conventional hydropower under section                   Transmission, LLC (Columbia) filed an                 state, and local government
                                              242 of EPAct 2005.                                      application in Docket No. CP15–150–                   representatives and agencies; elected
                                                 DOE developed and announced                          000, requesting authorization and a                   officials; affected landowners;
                                              guidance in January 2015 describing the                 Certificate of Public Convenience and                 environmental and public interest
                                              application process and the information                 Necessity pursuant to section 7(b) and                groups; potentially interested Native
                                              necessary for DOE to make a                             7(c) of the Natural Gas Act, to abandon,              American tribes; other interested
                                              determination of eligibility under                      modify, and install certain natural gas               parties; and local libraries and
                                              section 242. See 80 FR 2685 (January 20,                pipeline facilities. The proposed project             newspapers.
                                              2015). The guidance announced today                     is known as the Line WB2VA Integrity                    In response to the NOI, the
                                              includes certain minor modifications to                 Project. The purpose of the project is to             Commission received comments from
tkelley on DSK9F6TC42PROD with NOTICES




                                              the January 2015 guidance based on                      allow the use of modern inline                        non-government organizations, and
                                              DOE’s experience with the January 2015                  inspection devices and upgrade pipeline               federal and state agencies. The primary
                                              application process. Specifically, DOE is               segments in compliance with U.S.                      environmental issues raised by the
                                              amending some portions of the guidance                  Department of Transportation safety                   commentors include: air quality, steep
                                              document to more precisely describe                     standards.                                            slopes and slope-prone soils, recreation,
                                              what types of production are considered                    On April 15, 2015, the Federal Energy              public lands, karst topography,
                                              ‘‘new’’ production and the information                  Regulatory Commission (Commission or                  threatened and endangered species,


                                         VerDate Sep<11>2014   17:21 Dec 15, 2015   Jkt 238001   PO 00000   Frm 00056   Fmt 4703   Sfmt 4703   E:\FR\FM\16DEN1.SGM   16DEN1



Document Created: 2015-12-16 01:00:47
Document Modified: 2015-12-16 01:00:47
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability of guidance and open application period.
DatesDOE is currently accepting applications from December 16, 2015 through February 1, 2016. Applications must be sent to [email protected] by midnight EDT, February 1, 2016, or they will not be considered timely filed for calendar year 2014 incentive payments.
ContactRequests for additional information should be directed to Mr. Steven Lindenberg, Office of Energy Efficiency and Renewable Energy (EE-4), U.S. Department of Energy, 1000 Independence Avenue SW, Washington, DC 20585-0121, (202) 586-2783, [email protected] Electronic communications are recommended for correspondence and required for submission of application information.
FR Citation80 FR 78215 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR