80_FR_78968 80 FR 78726 - David O. Harde; Notice of Termination of License (Minor Project) by Implied Surrender and Soliciting Comments, Protests and Motions To Intervene

80 FR 78726 - David O. Harde; Notice of Termination of License (Minor Project) by Implied Surrender and Soliciting Comments, Protests and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 242 (December 17, 2015)

Page Range78726-78727
FR Document2015-31722

Federal Register, Volume 80 Issue 242 (Thursday, December 17, 2015)
[Federal Register Volume 80, Number 242 (Thursday, December 17, 2015)]
[Notices]
[Pages 78726-78727]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-31722]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 8722-018]


David O. Harde; Notice of Termination of License (Minor Project) 
by Implied Surrender and Soliciting Comments, Protests and Motions To 
Intervene

    Take notice that the following hydroelectric proceeding has been 
initiated by the Commission:
    a. Type of Proceeding: Termination of License by Implied Surrender.
    b. Project No.: 8722-018.
    c. Date Initiated: December 11, 2015.
    d. Licensee: David O. Harde.

[[Page 78727]]

    e. Name and Location of Project: Landis-Harde Hydroelectric Project 
located on Perry Creek, in El Dorado County, California.
    f. Filed Pursuant to: Standard Article 16.
    g. Licensee Contact Information: Mr. David O. Harde, 6540 Perry 
Creek Road, Somerset, California 95684, Phone: (530) 620-5629.
    h. FERC Contact: Mr. Ashish Desai, (202) 502-8370, 
Ashish.Desai@ferc.gov.
    i. Deadline for filing comments, motions to intervene and protests, 
is 30 days from the issuance date of this notice. The Commission 
strongly encourages electronic filing. Please file motions to 
intervene, protests, comments, and recommendations, using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-8722-018.
    j. Description of Project Facilities: (1) A 4-foot-high, 42-foot-
long reinforced concrete dam; (2) a 24-inch-diameter, 1,000-foot-long 
penstock; (3) a powerhouse containing a single generating unit with a 
rated capacity of 100 kW; and (4) a 500-foot-long tap connecting the 
project with an existing Pacific Gas and Electric Company 21-kv 
transmission line west of the powerhouse.
    k. Description of Proceeding: The licensee is in violation of 
standard Article 16 of its license, issued on April 27, 1990 (51 FERC ] 
61,088). Article 16 states in part: If the Licensee shall abandon or 
discontinue good faith operation of the project or refuse or neglect to 
comply with the terms of the license and the lawful orders of the 
Commission mailed to the record address of the Licensee or its agent, 
the Commission will deem it to be the intent of the Licensee to 
surrender the license.
    Commission records indicate that the project has not been 
operational since 2006 when the licensee determined, that the project 
was no longer financially viable due to low water flows and high 
insurance rates. After several years of correspondence regarding 
transferring the license to a third party and resuming project 
operation, the licensee has become non-responsive. Most recently, by 
letter dated September 1, 2015, the licensee informed the Commission of 
its intent to file a license transfer application shortly thereafter. 
The licensee did not file a transfer application. By letter dated 
September 4, 2015, Commission staff requested the licensee file 
documentation regarding the non-operational status of the project 
within 30 days. The licensee did not file the requested information. By 
letter dated October 27, 2015, the Commission ordered the licensee to 
file a plan and schedule to resume project operations or a transfer 
application within 30 days, and failure to do so would result in 
termination of the project license by implied surrender. The licensee 
has not filed a response.
    l. This notice is available for review and reproduction at the 
Commission in the Public Reference Room, Room 2A, 888 First Street NE., 
Washington, DC 20426. The filing may also be viewed on the Commission's 
Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the 
Docket number (P-8722-018) excluding the last three digits in the 
docket number field to access the notice. You may also register online 
at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via 
email of new filings and issuances related to this or other pending 
projects. For assistance, call toll-free 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the license surrender. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: December 11, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-31722 Filed 12-16-15; 8:45 am]
BILLING CODE 6717-01-P



                                                    78726                     Federal Register / Vol. 80, No. 242 / Thursday, December 17, 2015 / Notices

                                                    requirements, interventions, protests,                  issue a Notice of Schedule for                        environmental mailing list, will receive
                                                    service, and qualifying facilities filings              Environmental Review. If a Notice of                  copies of the environmental documents,
                                                    can be found at: http://www.ferc.gov/                   Schedule for Environmental Review is                  and will be notified of meetings
                                                    docs-filing/efiling/filing-req.pdf. For                 issued, it will indicate, among other                 associated with the Commission’s
                                                    other information, call (866) 208–3676                  milestones, the anticipated date for the              environmental review process.
                                                    (toll free). For TTY, call (202) 502–8659.              Commission staff’s issuance of the final              Environmental commentors will not be
                                                      Dated: December 11, 2015.                             environmental impact statement (FEIS)                 required to serve copies of filed
                                                                                                            or EA for this proposal. The filing of the            documents on all other parties.
                                                    Nathaniel J. Davis, Sr.,
                                                                                                            EA in the Commission’s public record                  However, the non-party commentors
                                                    Deputy Secretary.
                                                                                                            for this proceeding or the issuance of a              will not receive copies of all documents
                                                    [FR Doc. 2015–31718 Filed 12–16–15; 8:45 am]            Notice of Schedule for Environmental                  filed by other parties or issued by the
                                                    BILLING CODE 6717–01–P                                  Review will serve to notify federal and               Commission (except for the mailing of
                                                                                                            state agencies of the timing for the                  environmental documents issued by the
                                                                                                            completion of all necessary reviews, and              Commission) and will not have the right
                                                    DEPARTMENT OF ENERGY                                    the subsequent need to complete all                   to seek court review of the
                                                                                                            federal authorizations within 90 days of              Commission’s final order.
                                                    Federal Energy Regulatory
                                                                                                            the date of issuance of the Commission                   The Commission strongly encourages
                                                    Commission
                                                                                                            staff’s FEIS or EA.                                   electronic filings of comments, protests
                                                    [Docket No. CP16–27–000]                                   There are two ways to become                       and interventions in lieu of paper using
                                                                                                            involved in the Commission’s review of                the ‘‘eFiling’’ link at http://
                                                    Paulsboro Natural Gas Pipeline                          this project. First, any person wishing to            www.ferc.gov. Persons unable to file
                                                    Company, LLC; Notice of Application                     obtain legal status by becoming a party               electronically should submit an original
                                                                                                            to the proceedings for this project                   and 5 copies of the protest or
                                                       Take notice that on December 1, 2015,
                                                                                                            should, on or before the comment date                 intervention to the Federal Energy
                                                    Paulsboro Natural Gas Pipeline
                                                                                                            stated below, file with the Federal                   Regulatory Commission, 888 First Street
                                                    Company, LLC (PNGPC), 800
                                                                                                            Energy Regulatory Commission, 888                     NE., Washington, DC 20426.
                                                    Billingsport Road, Paulsboro, New
                                                                                                            First Street NE., Washington, DC 20426,                  This filing is accessible on-line at
                                                    Jersey 08066, filed an application in
                                                                                                            a motion to intervene in accordance                   http://www.ferc.gov, using the
                                                    Docket No. CP16–27–000 under sections                   with the requirements of the
                                                    7(b) and 7(c) of the Natural Gas Act                                                                          ‘‘eLibrary’’ link and is available for
                                                                                                            Commission’s Rules of Practice and                    review in the Commission’s Public
                                                    (NGA), and part 157 of the                              Procedure (18 CFR 385.214 or 385.211)
                                                    Commission’s regulations requesting                                                                           Reference Room in Washington, DC.
                                                                                                            and the Regulations under the NGA (18                 There is an ‘‘eSubscription’’ link on the
                                                    authorization to relocate, replace,                     CFR 157.10). A person obtaining party
                                                    remove, in part, and abandon in place,                                                                        Web site that enables subscribers to
                                                                                                            status will be placed on the service list             receive email notification when a
                                                    in part, an approximately 2.4-mile, 6-                  maintained by the Secretary of the
                                                    and 8-inch diameter existing natural gas                                                                      document is added to a subscribed
                                                                                                            Commission and will receive copies of                 docket(s). For assistance with any FERC
                                                    pipeline between Delaware County,                       all documents filed by the applicant and
                                                    Pennsylvania, and Gloucester County,                                                                          Online service, please email
                                                                                                            by all other parties. A party must submit             FERCOnlineSupport@ferc.gov, or call
                                                    New Jersey. PNGPC also requests a                       5 copies of filings made with the
                                                    blanket certificate pursuant to part 157,                                                                     (866) 208–3676 (toll free). For TTY, call
                                                                                                            Commission and must mail a copy to
                                                    subpart F, of the Commission’s                                                                                (202) 502–8659.
                                                                                                            the applicant and to every other party in
                                                    regulations, authorizing PNGPC to                                                                                Comment Date: 5:00 p.m. Eastern
                                                                                                            the proceeding. Only parties to the
                                                    engage in certain self-implementing                                                                           Time on January 4, 2016.
                                                                                                            proceeding can ask for court review of
                                                    routine construction, operation and                     Commission orders in the proceeding.                    Dated: December 11, 2015.
                                                    abandonment activities, as well as                         However, a person does not have to                 Nathaniel J. Davis, Sr.,
                                                    waivers of certain regulatory                           intervene in order to have comments                   Deputy Secretary.
                                                    requirements, including the                             considered. The second way to                         [FR Doc. 2015–31721 Filed 12–16–15; 8:45 am]
                                                    Commission’s interstate pipeline open                   participate is by filing with the                     BILLING CODE 6717–01–P
                                                    access, tariff, accounting, posting, and                Secretary of the Commission, as soon as
                                                    reporting requirements, all as more fully               possible, an original and two copies of
                                                    set forth in the application which is on                comments in support of or in opposition               DEPARTMENT OF ENERGY
                                                    file with the Commission and open to                    to this project. The Commission will
                                                    public inspection.                                      consider these comments in                            Federal Energy Regulatory
                                                       Any questions regarding this                         determining the appropriate action to be              Commission
                                                    application should be directed to Mark                  taken, but the filing of a comment alone
                                                    Wilgus, Senior Community Relations                                                                            [Project No. 8722–018]
                                                                                                            will not serve to make the filer a party
                                                    Specialist, Paulsboro Natural Gas                       to the proceeding. The Commission’s                   David O. Harde; Notice of Termination
                                                    Pipeline Company LLC, 800 Billingsport                  rules require that persons filing                     of License (Minor Project) by Implied
                                                    Road, Paulsboro, New Jersey 08066, or                   comments in opposition to the project                 Surrender and Soliciting Comments,
                                                    by calling (856) 224–4354 (telephone) or                provide copies of their protests only to              Protests and Motions To Intervene
                                                    by email at mark.wilgus@                                the party or parties directly involved in
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    pbfenergy.com.                                          the protest.                                            Take notice that the following
                                                       Pursuant to section 157.9 of the                        Persons who wish to comment only                   hydroelectric proceeding has been
                                                    Commission’s rules, 18 CFR 157.9,                       on the environmental review of this                   initiated by the Commission:
                                                    within 90 days of this Notice the                       project should submit an original and                   a. Type of Proceeding: Termination of
                                                    Commission staff will either: complete                  two copies of their comments to the                   License by Implied Surrender.
                                                    its environmental assessment (EA) and                   Secretary of the Commission.                            b. Project No.: 8722–018.
                                                    place it into the Commission’s public                   Environmental commentors will be                        c. Date Initiated: December 11, 2015.
                                                    record (eLibrary) for this proceeding; or               placed on the Commission’s                              d. Licensee: David O. Harde.


                                               VerDate Sep<11>2014   16:53 Dec 16, 2015   Jkt 238001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\17DEN1.SGM   17DEN1


                                                                              Federal Register / Vol. 80, No. 242 / Thursday, December 17, 2015 / Notices                                                78727

                                                       e. Name and Location of Project:                     correspondence regarding transferring                 project number of the application to
                                                    Landis-Harde Hydroelectric Project                      the license to a third party and resuming             which the filing responds; (3) furnish
                                                    located on Perry Creek, in El Dorado                    project operation, the licensee has                   the name, address, and telephone
                                                    County, California.                                     become non-responsive. Most recently,                 number of the person protesting or
                                                       f. Filed Pursuant to: Standard Article               by letter dated September 1, 2015, the                intervening; and (4) otherwise comply
                                                    16.                                                     licensee informed the Commission of its               with the requirements of 18 CFR
                                                       g. Licensee Contact Information: Mr.                 intent to file a license transfer                     385.2001 through 385.2005. All
                                                    David O. Harde, 6540 Perry Creek Road,                  application shortly thereafter. The                   comments, motions to intervene, or
                                                    Somerset, California 95684, Phone:                      licensee did not file a transfer                      protests must set forth their evidentiary
                                                    (530) 620–5629.                                         application. By letter dated September                basis and otherwise comply with the
                                                       h. FERC Contact: Mr. Ashish Desai,                   4, 2015, Commission staff requested the               requirements of 18 CFR 4.34(b). All
                                                    (202) 502–8370, Ashish.Desai@ferc.gov.                  licensee file documentation regarding                 comments, motions to intervene, or
                                                       i. Deadline for filing comments,                     the non-operational status of the project             protests should relate to project works
                                                    motions to intervene and protests, is 30                within 30 days. The licensee did not file             which are the subject of the license
                                                    days from the issuance date of this                     the requested information. By letter                  surrender. Agencies may obtain copies
                                                    notice. The Commission strongly                         dated October 27, 2015, the Commission                of the application directly from the
                                                    encourages electronic filing. Please file               ordered the licensee to file a plan and               applicant. A copy of any protest or
                                                    motions to intervene, protests,                         schedule to resume project operations or              motion to intervene must be served
                                                    comments, and recommendations, using                    a transfer application within 30 days,                upon each representative of the
                                                    the Commission’s eFiling system at                      and failure to do so would result in                  applicant specified in the particular
                                                    http://www.ferc.gov/docs-filing/                        termination of the project license by                 application. If an intervener files
                                                    efiling.asp. Commenters can submit                      implied surrender. The licensee has not               comments or documents with the
                                                    brief comments up to 6,000 characters,                  filed a response.                                     Commission relating to the merits of an
                                                    without prior registration, using the                      l. This notice is available for review             issue that may affect the responsibilities
                                                    eComment system at http://                              and reproduction at the Commission in                 of a particular resource agency, they
                                                    www.ferc.gov/docs-filing/                               the Public Reference Room, Room 2A,                   must also serve a copy of the document
                                                    ecomment.asp. You must include your                     888 First Street NE., Washington, DC                  on that resource agency. A copy of all
                                                    name and contact information at the end                 20426. The filing may also be viewed on
                                                    of your comments. For assistance,                                                                             other filings in reference to this
                                                                                                            the Commission’s Web site at http://                  application must be accompanied by
                                                    please contact FERC Online Support at                   www.ferc.gov/docs-filing/elibrary.asp.
                                                    FERCOnlineSupport@ferc.gov, (866)                                                                             proof of service on all persons listed in
                                                                                                            Enter the Docket number (P–8722–018)                  the service list prepared by the
                                                    208–3676 (toll free), or (202) 502–8659                 excluding the last three digits in the
                                                    (TTY). In lieu of electronic filing, please                                                                   Commission in this proceeding, in
                                                                                                            docket number field to access the                     accordance with 18 CFR 4.34(b) and
                                                    send a paper copy to: Secretary, Federal                notice. You may also register online at
                                                    Energy Regulatory Commission, 888                                                                             385.2010.
                                                                                                            http://www.ferc.gov/docs-filing/
                                                    First Street NE., Washington, DC 20426.                 esubscription.asp to be notified via                    Dated: December 11, 2015.
                                                    The first page of any filing should                     email of new filings and issuances                    Nathaniel J. Davis, Sr.,
                                                    include docket number P–8722–018.                       related to this or other pending projects.            Deputy Secretary.
                                                       j. Description of Project Facilities: (1)            For assistance, call toll-free 1–866–208–             [FR Doc. 2015–31722 Filed 12–16–15; 8:45 am]
                                                    A 4-foot-high, 42-foot-long reinforced                  3676 or email FERCOnlineSupport@                      BILLING CODE 6717–01–P
                                                    concrete dam; (2) a 24-inch-diameter,                   ferc.gov. For TTY, call (202) 502–8659.
                                                    1,000-foot-long penstock; (3) a                            m. Individuals desiring to be included
                                                    powerhouse containing a single                          on the Commission’s mailing list should               DEPARTMENT OF ENERGY
                                                    generating unit with a rated capacity of                so indicate by writing to the Secretary
                                                    100 kW; and (4) a 500-foot-long tap                     of the Commission.                                    Federal Energy Regulatory
                                                    connecting the project with an existing                    n. Comments, Protests, or Motions to               Commission
                                                    Pacific Gas and Electric Company 21-kv                  Intervene: Anyone may submit
                                                                                                                                                                  [Docket No. CP15–504–000]
                                                    transmission line west of the                           comments, a protest, or a motion to
                                                    powerhouse.                                             intervene in accordance with the                      Dominion Carolina Gas Transmission;
                                                       k. Description of Proceeding: The                    requirements of Rules of Practice and                 Notice of Schedule for Environmental
                                                    licensee is in violation of standard                    Procedure, 18 CFR 385.210, .211, .214.                Review of the Columbia to Eastover
                                                    Article 16 of its license, issued on April              In determining the appropriate action to              Project
                                                    27, 1990 (51 FERC ¶ 61,088). Article 16                 take, the Commission will consider all
                                                    states in part: If the Licensee shall                   protests or other comments filed, but                    On May 29, 2015, Dominion Carolina
                                                    abandon or discontinue good faith                       only those who file a motion to                       Gas Transmission (Dominion) filed an
                                                    operation of the project or refuse or                   intervene in accordance with the                      application in Docket No. CP15–504–
                                                    neglect to comply with the terms of the                 Commission’s Rules may become a                       000 requesting a Certificate of Public
                                                    license and the lawful orders of the                    party to the proceeding. Any comments,                Convenience and Necessity pursuant to
                                                    Commission mailed to the record                         protests, or motions to intervene must                Section 7(c) of the Natural Gas Act to
                                                    address of the Licensee or its agent, the               be received on or before the specified                construct and operate certain natural gas
                                                    Commission will deem it to be the                       comment date for the particular                       pipeline facilities. The proposed project
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    intent of the Licensee to surrender the                 application.                                          is known as the Columbia to Eastover
                                                    license.                                                   o. Filing and Service of Responsive                Project (Project), and would provide
                                                       Commission records indicate that the                 Documents: Any filing must (1) bear in                18,000 dekatherms per day of firm
                                                    project has not been operational since                  all capital letters the title                         transportation service to the existing
                                                    2006 when the licensee determined, that                 ‘‘COMMENTS’’, ‘‘PROTEST’’, or                         International Paper Plant in Eastover,
                                                    the project was no longer financially                   ‘‘MOTION TO INTERVENE’’ as                            South Carolina.
                                                    viable due to low water flows and high                  applicable; (2) set forth in the heading                 On June 12, 2015, the Federal Energy
                                                    insurance rates. After several years of                 the name of the applicant and the                     Regulatory Commission (Commission or


                                               VerDate Sep<11>2014   16:53 Dec 16, 2015   Jkt 238001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\17DEN1.SGM   17DEN1



Document Created: 2018-03-02 09:18:16
Document Modified: 2018-03-02 09:18:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 78726 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR