80_FR_78969 80 FR 78727 - Dominion Carolina Gas Transmission; Notice of Schedule for Environmental Review of the Columbia to Eastover Project

80 FR 78727 - Dominion Carolina Gas Transmission; Notice of Schedule for Environmental Review of the Columbia to Eastover Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 242 (December 17, 2015)

Page Range78727-78728
FR Document2015-31720

Federal Register, Volume 80 Issue 242 (Thursday, December 17, 2015)
[Federal Register Volume 80, Number 242 (Thursday, December 17, 2015)]
[Notices]
[Pages 78727-78728]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-31720]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-504-000]


Dominion Carolina Gas Transmission; Notice of Schedule for 
Environmental Review of the Columbia to Eastover Project

    On May 29, 2015, Dominion Carolina Gas Transmission (Dominion) 
filed an application in Docket No. CP15-504-000 requesting a 
Certificate of Public Convenience and Necessity pursuant to Section 
7(c) of the Natural Gas Act to construct and operate certain natural 
gas pipeline facilities. The proposed project is known as the Columbia 
to Eastover Project (Project), and would provide 18,000 dekatherms per 
day of firm transportation service to the existing International Paper 
Plant in Eastover, South Carolina.
    On June 12, 2015, the Federal Energy Regulatory Commission 
(Commission or

[[Page 78728]]

FERC) issued its Notice of Application for the Project. The notice 
informed agencies issuing federal authorizations of the requirement 
under EPAct 2005 section 313 to complete all necessary reviews and to 
reach a final decision on a request for a federal authorization within 
90 days of the date of issuance of the Commission staff's Environmental 
Assessment (EA) for the Project. This Notice of Schedule identifies the 
Commission staff's planned schedule for the completion of the EA for 
the Project.

Schedule for Environmental Review

Issuance of EA--February 19, 2016
90-day Federal Authorization Decision Deadline--May 19, 2016
    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
Project's progress.

Project Description

    For the Columbia to Eastover Project, Dominion would construct and 
operate approximately 28 miles of new 8-inch-diameter natural gas 
pipeline and new appurtenant facilities in Calhoun and Richland 
Counties, South Carolina.

Background

    On July 16, 2015, the Commission issued a Notice of Intent to 
Prepare an Environmental Assessment for the Proposed Columbia to 
Eastover Project and Request for Comments on Environmental Issues 
(NOI). The NOI was sent to affected landowners; federal, state, and 
local government agencies; elected officials; environmental and public 
interest groups; Native American tribes; other interested parties; and 
local libraries and newspapers. The Commission received comments from 
the U.S. Fish and Wildlife Service, South Carolina Department of 
Natural Resources, Friends of the Congaree Swamp, McEntire Joint 
National Guard Base, Richland County Conservation Commission, Congaree 
Riverkeeper, and several landowners including Beckham Swamp LLC, Belle 
Grove LLC, and St. Matthews Church. In addition to general opposition 
to the Project, we received requests for minor and major reroutes of 
the pipeline to utilize more existing utility rights-of-way and a 
reduction in number and length of access roads. The primary 
environmental issues raised by the commentors are potential impacts on 
the following resources: sensitive fish species, the Cowasee Basin, 
specific archaeological sites, local tree farms, and recreation areas.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC Web site (www.ferc.gov). Using the ``eLibrary'' link, select 
``General Search'' from the eLibrary menu, enter the selected date 
range and ``Docket Number'' excluding the last three digits (i.e., 
CP15-504), and follow the instructions. For assistance with access to 
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC 
Web site also provides access to the texts of formal documents issued 
by the Commission, such as orders, notices, and rule makings.

     Dated: December 11, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-31720 Filed 12-16-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 80, No. 242 / Thursday, December 17, 2015 / Notices                                                78727

                                                       e. Name and Location of Project:                     correspondence regarding transferring                 project number of the application to
                                                    Landis-Harde Hydroelectric Project                      the license to a third party and resuming             which the filing responds; (3) furnish
                                                    located on Perry Creek, in El Dorado                    project operation, the licensee has                   the name, address, and telephone
                                                    County, California.                                     become non-responsive. Most recently,                 number of the person protesting or
                                                       f. Filed Pursuant to: Standard Article               by letter dated September 1, 2015, the                intervening; and (4) otherwise comply
                                                    16.                                                     licensee informed the Commission of its               with the requirements of 18 CFR
                                                       g. Licensee Contact Information: Mr.                 intent to file a license transfer                     385.2001 through 385.2005. All
                                                    David O. Harde, 6540 Perry Creek Road,                  application shortly thereafter. The                   comments, motions to intervene, or
                                                    Somerset, California 95684, Phone:                      licensee did not file a transfer                      protests must set forth their evidentiary
                                                    (530) 620–5629.                                         application. By letter dated September                basis and otherwise comply with the
                                                       h. FERC Contact: Mr. Ashish Desai,                   4, 2015, Commission staff requested the               requirements of 18 CFR 4.34(b). All
                                                    (202) 502–8370, Ashish.Desai@ferc.gov.                  licensee file documentation regarding                 comments, motions to intervene, or
                                                       i. Deadline for filing comments,                     the non-operational status of the project             protests should relate to project works
                                                    motions to intervene and protests, is 30                within 30 days. The licensee did not file             which are the subject of the license
                                                    days from the issuance date of this                     the requested information. By letter                  surrender. Agencies may obtain copies
                                                    notice. The Commission strongly                         dated October 27, 2015, the Commission                of the application directly from the
                                                    encourages electronic filing. Please file               ordered the licensee to file a plan and               applicant. A copy of any protest or
                                                    motions to intervene, protests,                         schedule to resume project operations or              motion to intervene must be served
                                                    comments, and recommendations, using                    a transfer application within 30 days,                upon each representative of the
                                                    the Commission’s eFiling system at                      and failure to do so would result in                  applicant specified in the particular
                                                    http://www.ferc.gov/docs-filing/                        termination of the project license by                 application. If an intervener files
                                                    efiling.asp. Commenters can submit                      implied surrender. The licensee has not               comments or documents with the
                                                    brief comments up to 6,000 characters,                  filed a response.                                     Commission relating to the merits of an
                                                    without prior registration, using the                      l. This notice is available for review             issue that may affect the responsibilities
                                                    eComment system at http://                              and reproduction at the Commission in                 of a particular resource agency, they
                                                    www.ferc.gov/docs-filing/                               the Public Reference Room, Room 2A,                   must also serve a copy of the document
                                                    ecomment.asp. You must include your                     888 First Street NE., Washington, DC                  on that resource agency. A copy of all
                                                    name and contact information at the end                 20426. The filing may also be viewed on
                                                    of your comments. For assistance,                                                                             other filings in reference to this
                                                                                                            the Commission’s Web site at http://                  application must be accompanied by
                                                    please contact FERC Online Support at                   www.ferc.gov/docs-filing/elibrary.asp.
                                                    FERCOnlineSupport@ferc.gov, (866)                                                                             proof of service on all persons listed in
                                                                                                            Enter the Docket number (P–8722–018)                  the service list prepared by the
                                                    208–3676 (toll free), or (202) 502–8659                 excluding the last three digits in the
                                                    (TTY). In lieu of electronic filing, please                                                                   Commission in this proceeding, in
                                                                                                            docket number field to access the                     accordance with 18 CFR 4.34(b) and
                                                    send a paper copy to: Secretary, Federal                notice. You may also register online at
                                                    Energy Regulatory Commission, 888                                                                             385.2010.
                                                                                                            http://www.ferc.gov/docs-filing/
                                                    First Street NE., Washington, DC 20426.                 esubscription.asp to be notified via                    Dated: December 11, 2015.
                                                    The first page of any filing should                     email of new filings and issuances                    Nathaniel J. Davis, Sr.,
                                                    include docket number P–8722–018.                       related to this or other pending projects.            Deputy Secretary.
                                                       j. Description of Project Facilities: (1)            For assistance, call toll-free 1–866–208–             [FR Doc. 2015–31722 Filed 12–16–15; 8:45 am]
                                                    A 4-foot-high, 42-foot-long reinforced                  3676 or email FERCOnlineSupport@                      BILLING CODE 6717–01–P
                                                    concrete dam; (2) a 24-inch-diameter,                   ferc.gov. For TTY, call (202) 502–8659.
                                                    1,000-foot-long penstock; (3) a                            m. Individuals desiring to be included
                                                    powerhouse containing a single                          on the Commission’s mailing list should               DEPARTMENT OF ENERGY
                                                    generating unit with a rated capacity of                so indicate by writing to the Secretary
                                                    100 kW; and (4) a 500-foot-long tap                     of the Commission.                                    Federal Energy Regulatory
                                                    connecting the project with an existing                    n. Comments, Protests, or Motions to               Commission
                                                    Pacific Gas and Electric Company 21-kv                  Intervene: Anyone may submit
                                                                                                                                                                  [Docket No. CP15–504–000]
                                                    transmission line west of the                           comments, a protest, or a motion to
                                                    powerhouse.                                             intervene in accordance with the                      Dominion Carolina Gas Transmission;
                                                       k. Description of Proceeding: The                    requirements of Rules of Practice and                 Notice of Schedule for Environmental
                                                    licensee is in violation of standard                    Procedure, 18 CFR 385.210, .211, .214.                Review of the Columbia to Eastover
                                                    Article 16 of its license, issued on April              In determining the appropriate action to              Project
                                                    27, 1990 (51 FERC ¶ 61,088). Article 16                 take, the Commission will consider all
                                                    states in part: If the Licensee shall                   protests or other comments filed, but                    On May 29, 2015, Dominion Carolina
                                                    abandon or discontinue good faith                       only those who file a motion to                       Gas Transmission (Dominion) filed an
                                                    operation of the project or refuse or                   intervene in accordance with the                      application in Docket No. CP15–504–
                                                    neglect to comply with the terms of the                 Commission’s Rules may become a                       000 requesting a Certificate of Public
                                                    license and the lawful orders of the                    party to the proceeding. Any comments,                Convenience and Necessity pursuant to
                                                    Commission mailed to the record                         protests, or motions to intervene must                Section 7(c) of the Natural Gas Act to
                                                    address of the Licensee or its agent, the               be received on or before the specified                construct and operate certain natural gas
                                                    Commission will deem it to be the                       comment date for the particular                       pipeline facilities. The proposed project
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    intent of the Licensee to surrender the                 application.                                          is known as the Columbia to Eastover
                                                    license.                                                   o. Filing and Service of Responsive                Project (Project), and would provide
                                                       Commission records indicate that the                 Documents: Any filing must (1) bear in                18,000 dekatherms per day of firm
                                                    project has not been operational since                  all capital letters the title                         transportation service to the existing
                                                    2006 when the licensee determined, that                 ‘‘COMMENTS’’, ‘‘PROTEST’’, or                         International Paper Plant in Eastover,
                                                    the project was no longer financially                   ‘‘MOTION TO INTERVENE’’ as                            South Carolina.
                                                    viable due to low water flows and high                  applicable; (2) set forth in the heading                 On June 12, 2015, the Federal Energy
                                                    insurance rates. After several years of                 the name of the applicant and the                     Regulatory Commission (Commission or


                                               VerDate Sep<11>2014   16:53 Dec 16, 2015   Jkt 238001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\17DEN1.SGM   17DEN1


                                                    78728                     Federal Register / Vol. 80, No. 242 / Thursday, December 17, 2015 / Notices

                                                    FERC) issued its Notice of Application                  Additional Information                                ADDRESSES:    Submit your comments,
                                                    for the Project. The notice informed                       In order to receive notification of the            identified by Docket ID No. EPA–HQ–
                                                    agencies issuing federal authorizations                 issuance of the EA and to keep track of               OW–2015–0668, to the Federal
                                                    of the requirement under EPAct 2005                     all formal issuances and submittals in                eRulemaking Portal: http://
                                                    section 313 to complete all necessary                   specific dockets, the Commission offers               www.regulations.gov. Follow the online
                                                    reviews and to reach a final decision on                a free service called eSubscription. This             instructions for submitting comments.
                                                    a request for a federal authorization                   can reduce the amount of time you                     Once submitted, comments cannot be
                                                    within 90 days of the date of issuance                  spend researching proceedings by                      edited or removed from Regulations.gov.
                                                    of the Commission staff’s Environmental                 automatically providing you with                      EPA may publish any comment received
                                                    Assessment (EA) for the Project. This                   notification of these filings, document               to its public docket. Do not submit
                                                    Notice of Schedule identifies the                       summaries, and direct links to the                    electronically any information you
                                                    Commission staff’s planned schedule for                 documents. Go to www.ferc.gov/docs-                   consider to be Confidential Business
                                                    the completion of the EA for the Project.               filing/esubscription.asp.                             Information (CBI) or other information
                                                                                                               Additional information about the                   whose disclosure is restricted by statute.
                                                    Schedule for Environmental Review                       Project is available from the                         Multimedia submissions (audio, video,
                                                                                                            Commission’s Office of External Affairs               etc.) must be accompanied by a written
                                                    Issuance of EA—February 19, 2016                                                                              comment. The written comment is
                                                                                                            at (866) 208–FERC or on the FERC Web
                                                    90-day Federal Authorization Decision                   site (www.ferc.gov). Using the                        considered the official comment and
                                                       Deadline—May 19, 2016                                ‘‘eLibrary’’ link, select ‘‘General Search’’          should include discussion of all points
                                                       If a schedule change becomes                         from the eLibrary menu, enter the                     you wish to make. EPA will generally
                                                    necessary, additional notice will be                    selected date range and ‘‘Docket                      not consider comments or comment
                                                    provided so that the relevant agencies                  Number’’ excluding the last three digits              contents located outside of the primary
                                                    are kept informed of the Project’s                      (i.e., CP15–504), and follow the                      submission (i.e., on the web, cloud, or
                                                    progress.                                               instructions. For assistance with access              other file sharing system). For
                                                                                                            to eLibrary, the helpline can be reached              additional submission methods, the full
                                                    Project Description                                     at (866) 208–3676, TTY (202) 502–8659,                EPA public comment policy,
                                                                                                            or at FERCOnlineSupport@ferc.gov. The                 information about CBI or multimedia
                                                      For the Columbia to Eastover Project,                                                                       submissions, and general guidance on
                                                                                                            eLibrary link on the FERC Web site also
                                                    Dominion would construct and operate                    provides access to the texts of formal                making effective comments, please visit
                                                    approximately 28 miles of new 8-inch-                   documents issued by the Commission,                   http://www2.epa.gov/dockets/
                                                    diameter natural gas pipeline and new                   such as orders, notices, and rule                     commenting-epa-dockets.
                                                    appurtenant facilities in Calhoun and                   makings.                                              FOR FURTHER INFORMATION CONTACT:
                                                    Richland Counties, South Carolina.
                                                                                                              Dated: December 11, 2015.                           Prasad Chumble, EPA Headquarters,
                                                    Background                                              Nathaniel J. Davis, Sr.,                              Office of Water, Office of Wastewater
                                                                                                            Deputy Secretary.                                     Management via email at
                                                       On July 16, 2015, the Commission                                                                           chumble.prasad@epa.gov or telephone
                                                                                                            [FR Doc. 2015–31720 Filed 12–16–15; 8:45 am]
                                                    issued a Notice of Intent to Prepare an                                                                       at 202–564–0021.
                                                                                                            BILLING CODE 6717–01–P
                                                    Environmental Assessment for the                                                                              SUPPLEMENTARY INFORMATION: On
                                                    Proposed Columbia to Eastover Project                                                                         November 10, 2015 EPA published in
                                                    and Request for Comments on                                                                                   the Federal Register (80 FR 69653) a
                                                    Environmental Issues (NOI). The NOI                     ENVIRONMENTAL PROTECTION
                                                                                                            AGENCY                                                request for information and comments
                                                    was sent to affected landowners; federal,                                                                     on existing public and private sector
                                                    state, and local government agencies;                   [EPA–HQ–OW–2015–0668; 9940–23–OW]                     programs that address stormwater
                                                    elected officials; environmental and                                                                          discharges from forest roads. This
                                                    public interest groups; Native American                 Notice of an Extension To Provide                     information will assist EPA in
                                                    tribes; other interested parties; and local             Information on Existing Programs That                 responding to the remand in
                                                    libraries and newspapers. The                           Protect Water Quality From Forest                     Environmental Defense Center, Inc. v.
                                                    Commission received comments from                       Road Discharges                                       U.S. EPA, 344 F.2d 832 (9th Cir. 2003)
                                                    the U.S. Fish and Wildlife Service,                     AGENCY: Environmental Protection                      that requires EPA to consider whether
                                                    South Carolina Department of Natural                    Agency (EPA).                                         the Clean Water Act requires the Agency
                                                    Resources, Friends of the Congaree                      ACTION: Notice; extension of comment                  to regulate stormwater discharges from
                                                    Swamp, McEntire Joint National Guard                    period.                                               forest roads. EPA is considering the
                                                    Base, Richland County Conservation                                                                            implementation, effectiveness, and
                                                    Commission, Congaree Riverkeeper, and                   SUMMARY:   The Environmental Protection               scope of existing programs in addressing
                                                    several landowners including Beckham                    Agency (EPA) is extending the comment                 water quality impacts attributable to
                                                    Swamp LLC, Belle Grove LLC, and St.                     period for the notice, ‘‘Opportunity to               stormwater discharges from forest roads
                                                    Matthews Church. In addition to general                 Provide Information on Existing                       to assist in responding to the court’s
                                                    opposition to the Project, we received                  Programs that Protect Water Quality                   question. The Agency plans to assess a
                                                    requests for minor and major reroutes of                from Forest Road Discharges.’’ In                     variety of existing programs, including
                                                    the pipeline to utilize more existing                   response to stakeholder requests, EPA is              federal, state, local, tribal, third party
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    utility rights-of-way and a reduction in                extending the comment period for an                   certifications, and combinations of these
                                                    number and length of access roads. The                  additional 32 days, from January 11,                  approaches, including voluntary best
                                                    primary environmental issues raised by                  2016, to February 12, 2016.                           management practices (BMP)-based
                                                    the commentors are potential impacts                    DATES: The comment period for the                     approaches. In preparing its response to
                                                    on the following resources: sensitive                   notice, that was published on November                the remand, EPA is coordinating with
                                                    fish species, the Cowasee Basin, specific               10, 2015 (80 FR 69653), is extended.                  other federal agencies, and will assess
                                                    archaeological sites, local tree farms,                 Comments must be received on or                       whether any additional stormwater
                                                    and recreation areas.                                   before February 12, 2016.                             controls are called for, consistent with


                                               VerDate Sep<11>2014   16:53 Dec 16, 2015   Jkt 238001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\17DEN1.SGM   17DEN1



Document Created: 2018-03-02 09:18:35
Document Modified: 2018-03-02 09:18:35
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 78727 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR