80_FR_80121 80 FR 79875 - Brookfield White Pine Hydro LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

80 FR 79875 - Brookfield White Pine Hydro LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 246 (December 23, 2015)

Page Range79875-79875
FR Document2015-32271

Federal Register, Volume 80 Issue 246 (Wednesday, December 23, 2015)
[Federal Register Volume 80, Number 246 (Wednesday, December 23, 2015)]
[Notices]
[Page 79875]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-32271]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2335-039]


Brookfield White Pine Hydro LLC; Notice of Application Tendered 
for Filing With the Commission and Establishing Procedural Schedule for 
Licensing and Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2335-039.
    c. Date Filed: December 11, 2015.
    d. Applicant: Brookfield White Pine Hydro LLC (White Pine Hydro).
    e. Name of Project: Williams Hydroelectric Project (Williams 
Project).
    f. Location: The existing project is located on the Kennebec River 
in Somerset County, Maine. The project does not occupy federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Ms. Kelly Maloney, Manager of Licensing and 
Compliance, Brookfield White Pine Hydro LLC, 150 Main Street, Lewiston, 
ME 04240; Telephone: (207) 755-5606.
    i. FERC Contact: Amy Chang, (202) 502-8250 or [email protected].
    j. This application is not ready for environmental analysis at this 
time.
    k. The Project Description: The Williams Project has a total 
installed capacity of 13-megawatts (MW). The project's average annual 
generation is 96,731 megawatt-hours. The power generated by the project 
is sold on the open market into the regional grid.
    The existing project consists of: (a) A 894.7-foot-long, 45.0-foot-
high dam that includes: (i) A 202-foot-long, 15-foot-high east earth 
embankment section with a concrete core wall; (ii) a 244-foot-long, 32-
foot-high stone masonry and concrete spillway section at the west end 
of the east earth embankment section with six 32.5-foot-wide, 20.5-
foot-high Tainter gates; (iii) a 71.3-foot-long, 19.5-foot-high stone 
masonry and concrete abutment section at the west end of the spillway 
section; (iv) a 203.3-foot-long, 26.5-foot-high stone masonry and 
concrete stanchion bay section at the west end of the abutment section 
with two 65.9-foot-wide, 17.5-foot-high and one 46.8-foot-wide, 17.5-
foot-high stanchion bays; (v) a 27-foot-long bulkhead section at the 
west end of the stanchion bay section with a 20.5-foot-wide, 7.0-foot-
high surface weir gate and a 6.0-foot-wide, 12.3-foot-high Tainter gate 
at the upstream end of a steel-lined sluiceway; (vi) a 95.5-foot-wide 
intake and powerhouse section at the west end of the bulkhead section 
that varies in height from 45.5 feet to 49.4 feet and includes four 
headgates and two double-bay trashracks with 3.5-inch clear-bar 
spacing; and (vii) a 51.6-foot-long, 10.5-foot-high concrete cut-off 
wall at the west end of the intake and powerhouse section; (b) a 400-
acre impoundment with a gross storage volume of 4,575 acre-feet and a 
useable storage volume of 2,065 acre-feet at a normal maximum elevation 
of 320 feet National Geodetic Vertical Datum; (c) a 40.5-foot-wide, 
105.5-foot-long concrete powerhouse that is integral with the dam and 
contains two turbine-generator units rated at 6 and 7 MW; (d) a 6,000-
foot-long excavated tailrace that varies from 150 to 175 feet wide; (e) 
a 200-foot-long generator lead and a 310-foot-long generator lead that 
connect the turbine-generator units to the regional grid; and (f) 
appurtenant facilities.
    The Williams Project operates in a store-and-release mode where the 
impoundment level is fluctuated up to six feet daily to regulate 
downstream flow and meet peak demands for hydroelectric generation. The 
existing license requires an instantaneous minimum flow of 1,360 cubic 
feet per second, or inflow (whichever is less), in the tailrace. White 
Pine Hydro proposes to install an upstream eel passage facility, 
improve a canoe portage, and improve angler access. White Pine Hydro 
also proposes to remove 375.5 acres of land and water from the existing 
project boundary because it does not serve a project purpose.
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at http://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in item (h) above.
    m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural Schedule:
    The application will be processed according to the following 
preliminary Hydro Licensing Schedule. Revisions to the schedule may be 
made as appropriate.

------------------------------------------------------------------------
               Milestone                           Target Date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready    February 2016.
 for Environmental Analysis.
Filing of recommendations, preliminary  April 2016.
 terms and conditions, and fishway
 prescriptions.
Commission issues Non-Draft             September 2016.
 Environmental Assessment (EA).
Comments on EA........................  October 2016.
Modified terms and conditions.........  December 2016.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: December 17, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-32271 Filed 12-22-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Notices                                                                                        79875

                                              Blair Hopkin                                                             project’s average annual generation is                                    generator lead that connect the turbine-
                                                                                                                       96,731 megawatt-hours. The power                                          generator units to the regional grid; and
                                              Nathaniel J. Davis, Sr.,
                                                                                                                       generated by the project is sold on the                                   (f) appurtenant facilities.
                                              Deputy Secretary.                                                        open market into the regional grid.                                          The Williams Project operates in a
                                              [FR Doc. 2015–32129 Filed 12–22–15; 8:45 am]                                The existing project consists of: (a) A                                store-and-release mode where the
                                              BILLING CODE P                                                           894.7-foot-long, 45.0-foot-high dam that                                  impoundment level is fluctuated up to
                                                                                                                       includes: (i) A 202-foot-long, 15-foot-                                   six feet daily to regulate downstream
                                                                                                                       high east earth embankment section                                        flow and meet peak demands for
                                              DEPARTMENT OF ENERGY                                                     with a concrete core wall; (ii) a 244-foot-                               hydroelectric generation. The existing
                                                                                                                       long, 32-foot-high stone masonry and                                      license requires an instantaneous
                                              Federal Energy Regulatory                                                concrete spillway section at the west
                                              Commission                                                                                                                                         minimum flow of 1,360 cubic feet per
                                                                                                                       end of the east earth embankment                                          second, or inflow (whichever is less), in
                                              [Project No. 2335–039]                                                   section with six 32.5-foot-wide, 20.5-                                    the tailrace. White Pine Hydro proposes
                                                                                                                       foot-high Tainter gates; (iii) a 71.3-foot-                               to install an upstream eel passage
                                              Brookfield White Pine Hydro LLC;                                         long, 19.5-foot-high stone masonry and                                    facility, improve a canoe portage, and
                                              Notice of Application Tendered for                                       concrete abutment section at the west                                     improve angler access. White Pine
                                              Filing With the Commission and                                           end of the spillway section; (iv) a 203.3-                                Hydro also proposes to remove 375.5
                                              Establishing Procedural Schedule for                                     foot-long, 26.5-foot-high stone masonry                                   acres of land and water from the
                                              Licensing and Deadline for                                               and concrete stanchion bay section at                                     existing project boundary because it
                                              Submission of Final Amendments                                           the west end of the abutment section                                      does not serve a project purpose.
                                                Take notice that the following                                         with two 65.9-foot-wide, 17.5-foot-high
                                                                                                                                                                                                    l. Locations of the Application: A
                                              hydroelectric application has been filed                                 and one 46.8-foot-wide, 17.5-foot-high
                                                                                                                                                                                                 copy of the application is available for
                                              with the Commission and is available                                     stanchion bays; (v) a 27-foot-long
                                                                                                                                                                                                 review at the Commission in the Public
                                              for public inspection.                                                   bulkhead section at the west end of the
                                                                                                                                                                                                 Reference Room or may be viewed on
                                                a. Type of Application: New Major                                      stanchion bay section with a 20.5-foot-
                                                                                                                                                                                                 the Commission’s Web site at http://
                                              License.                                                                 wide, 7.0-foot-high surface weir gate
                                                                                                                                                                                                 www.ferc.gov using the ‘‘eLibrary’’ link.
                                                b. Project No.: 2335–039.                                              and a 6.0-foot-wide, 12.3-foot-high
                                                                                                                                                                                                 Enter the docket number excluding the
                                                c. Date Filed: December 11, 2015.                                      Tainter gate at the upstream end of a
                                                                                                                                                                                                 last three digits in the docket number
                                                d. Applicant: Brookfield White Pine                                    steel-lined sluiceway; (vi) a 95.5-foot-
                                                                                                                                                                                                 field to access the document. For
                                              Hydro LLC (White Pine Hydro).                                            wide intake and powerhouse section at
                                                                                                                                                                                                 assistance, please contact FERC Online
                                                e. Name of Project: Williams                                           the west end of the bulkhead section
                                                                                                                                                                                                 Support at FERCOnlineSupport@
                                              Hydroelectric Project (Williams Project).                                that varies in height from 45.5 feet to
                                                                                                                                                                                                 ferc.gov, (866) 208–3676 (toll free), or
                                                f. Location: The existing project is                                   49.4 feet and includes four headgates
                                                                                                                                                                                                 (202) 502–8659 (TTY). A copy is also
                                              located on the Kennebec River in                                         and two double-bay trashracks with 3.5-
                                                                                                                                                                                                 available for inspection and
                                              Somerset County, Maine. The project                                      inch clear-bar spacing; and (vii) a 51.6-
                                                                                                                                                                                                 reproduction at the address in item (h)
                                              does not occupy federal lands.                                           foot-long, 10.5-foot-high concrete cut-off
                                                                                                                                                                                                 above.
                                                g. Filed Pursuant to: Federal Power                                    wall at the west end of the intake and
                                                                                                                       powerhouse section; (b) a 400-acre                                           m. You may also register online at
                                              Act, 16 U.S.C. 791(a)–825(r).
                                                h. Applicant Contact: Ms. Kelly                                        impoundment with a gross storage                                          http://www.ferc.gov/docs-filing/
                                              Maloney, Manager of Licensing and                                        volume of 4,575 acre-feet and a useable                                   esubscription.asp to be notified via
                                              Compliance, Brookfield White Pine                                        storage volume of 2,065 acre-feet at a                                    email of new filings and issuances
                                              Hydro LLC, 150 Main Street, Lewiston,                                    normal maximum elevation of 320 feet                                      related to this or other pending projects.
                                              ME 04240; Telephone: (207) 755–5606.                                     National Geodetic Vertical Datum; (c) a                                   For assistance, contact FERC Online
                                                i. FERC Contact: Amy Chang, (202)                                      40.5-foot-wide, 105.5-foot-long concrete                                  Support.
                                              502–8250 or amy.chang@ferc.gov.                                          powerhouse that is integral with the                                         n. Procedural Schedule:
                                                j. This application is not ready for                                   dam and contains two turbine-generator                                       The application will be processed
                                              environmental analysis at this time.                                     units rated at 6 and 7 MW; (d) a 6,000-                                   according to the following preliminary
                                                k. The Project Description: The                                        foot-long excavated tailrace that varies                                  Hydro Licensing Schedule. Revisions to
                                              Williams Project has a total installed                                   from 150 to 175 feet wide; (e) a 200-foot-                                the schedule may be made as
                                              capacity of 13-megawatts (MW). The                                       long generator lead and a 310-foot-long                                   appropriate.

                                                                                                                                   Milestone                                                                                                 Target Date

                                              Notice of Acceptance/Notice of Ready for Environmental Analysis .............................................................................................                               February 2016.
                                              Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ..........................................................                                           April 2016.
                                              Commission issues Non-Draft Environmental Assessment (EA) .................................................................................................                                 September 2016.
                                              Comments on EA ..........................................................................................................................................................................   October 2016.
                                              Modified terms and conditions ......................................................................................................................................................        December 2016.



                                                o. Final amendments to the                                             the issuance date of the notice of ready                                    Dated: December 17, 2015.
                                              application must be filed with the                                       for environmental analysis.                                               Nathaniel J. Davis, Sr.,
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Commission no later than 30 days from                                                                                                              Deputy Secretary.
                                                                                                                                                                                                 [FR Doc. 2015–32271 Filed 12–22–15; 8:45 am]
                                                                                                                                                                                                 BILLING CODE 6717–01–P




                                         VerDate Sep<11>2014        18:05 Dec 22, 2015         Jkt 238001      PO 00000       Frm 00059       Fmt 4703      Sfmt 9990       E:\FR\FM\23DEN1.SGM             23DEN1



Document Created: 2018-03-02 09:20:51
Document Modified: 2018-03-02 09:20:51
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 79875 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR