80_FR_80122 80 FR 79876 - Energy Resources USA, Inc.; Notice of Competing Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene

80 FR 79876 - Energy Resources USA, Inc.; Notice of Competing Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 246 (December 23, 2015)

Page Range79876-79876
FR Document2015-32276

Federal Register, Volume 80 Issue 246 (Wednesday, December 23, 2015)
[Federal Register Volume 80, Number 246 (Wednesday, December 23, 2015)]
[Notices]
[Page 79876]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-32276]



[[Page 79876]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14741-000]


Energy Resources USA, Inc.; Notice of Competing Preliminary 
Permit Application Accepted for Filing and Soliciting Comments and 
Motions To Intervene

    On November 28, 2015, Energy Resources USA, Inc. (Energy Resources) 
filed an application for a preliminary permit, pursuant to section 4(f) 
of the Federal Power Act (FPA), proposing to study the feasibility of 
the Selden Lock and Dam Hydroelectric Project (Selden Project or 
project) to be located at the U.S. Army Corps of Engineers' Selden Lock 
and Dam on the Black Warrior River in Green County, Alabama. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    Energy Resources' permit application is filed in competition with 
Lock+TM Hydro Friends Fund III, proposed Selden Lock and Dam 
Hydroelectric Project No. 14672-000, which was publicly noticed 
November 24, 2015. The deadline for filing competing applications is 
January 25, 2016. Energy Resources competing permit application is 
timely filed.
    The proposed project would consist of the following: (1) A 200-
foot-long, 140-foot-wide intake channel; (2) a 133-foot-long, 83-foot-
wide powerhouse containing two generating units with a total capacity 
of 12.5 megawatts; (3) a 4000-foot-long, 1600-foot-wide tailrace; (4) a 
4.16/69 kilo-Volt (kV) substation; (5) a 330-foot-long addition to the 
existing access road; and (6) a 3-mile-long, 69 kV transmission line. 
The proposed project would have an estimated average annual generation 
of 68,900 megawatt-hours, and operate as directed by the Corps.
    Applicant Contact: Mr. Ander Gonzalez, Energy Resources USA Inc., 
2655 Le Jeune Road, Suite 804, Coral Gables, Florida 33134; Phone: 
(954) 248-8425; Email: [email protected]
    FERC Contact: Christiane Casey; phone: (202) 502-8577.
    Deadline for filing comments and motions to intervene: 60 days from 
the issuance of this notice.
    The Commission strongly encourages electronic filing. Please file 
comments and motions to intervene using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-14741-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14741) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: December 17, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-32276 Filed 12-22-15; 8:45 am]
BILLING CODE 6717-01-P



                                              79876                    Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Notices

                                              DEPARTMENT OF ENERGY                                       The Commission strongly encourages                    Take notice that the Commission
                                                                                                      electronic filing. Please file comments               received the following electric rate
                                              Federal Energy Regulatory                               and motions to intervene using the                    filings:
                                              Commission                                              Commission’s eFiling system at http://                   Docket Numbers: ER10–3117–005.
                                                                                                      www.ferc.gov/docs-filing/efiling.asp.                    Applicants: Lea Power Partners, LLC.
                                              [Project No. 14741–000]                                 Commenters can submit brief comments                     Description: Triennial Market Power
                                                                                                      up to 6,000 characters, without prior                 Analysis Filing for Southwest Power
                                              Energy Resources USA, Inc.; Notice of                   registration, using the eComment system               Pool region of Lea Power Partners, LLC.
                                              Competing Preliminary Permit                            at http://www.ferc.gov/docs-filing/                      Filed Date: 12/16/15.
                                              Application Accepted for Filing and                     ecomment.asp. You must include your                      Accession Number: 20151216–5246.
                                              Soliciting Comments and Motions To                      name and contact information at the end                  Comments Due: 5 p.m. ET 2/16/16.
                                              Intervene                                               of your comments. For assistance,                        Docket Numbers: ER14–2852–002.
                                                 On November 28, 2015, Energy                         please contact FERC Online Support at                    Applicants: Westar Energy, Inc.
                                              Resources USA, Inc. (Energy Resources)                  FERCOnlineSupport@ferc.gov, (866)                        Description: Compliance filing:
                                              filed an application for a preliminary                  208–3676 (toll free), or (202) 502–8659               Compliance Filing, Formula Rate
                                              permit, pursuant to section 4(f) of the                 (TTY). In lieu of electronic filing, please           Protocols, TFR to be effective 3/1/2015.
                                              Federal Power Act (FPA), proposing to                   send a paper copy to: Secretary, Federal                 Filed Date: 12/17/15.
                                              study the feasibility of the Selden Lock                Energy Regulatory Commission, 888                        Accession Number: 20151217–5069.
                                              and Dam Hydroelectric Project (Selden                   First Street NE., Washington, DC 20426.                  Comments Due: 5 p.m. ET 1/7/16.
                                              Project or project) to be located at the                The first page of any filing should                      Docket Numbers: ER15–2592–001.
                                              U.S. Army Corps of Engineers’ Selden                    include docket number P–14741–000.                       Applicants: Sierra Pacific Power
                                              Lock and Dam on the Black Warrior                          More information about this project,               Company.
                                              River in Green County, Alabama. The                     including a copy of the application, can                 Description: Tariff Amendment: Rate
                                              sole purpose of a preliminary permit, if                be viewed or printed on the ‘‘eLibrary’’              Schedule No. 55 SPPC Amendment
                                              issued, is to grant the permit holder                   link of the Commission’s Web site at                  12.17.15 to be effective 1/1/2016.
                                              priority to file a license application                  http://www.ferc.gov/docs-filing/                         Filed Date: 12/17/15.
                                              during the permit term. A preliminary                   elibrary.asp. Enter the docket number                    Accession Number: 20151217–5001.
                                              permit does not authorize the permit                    (P–14741) in the docket number field to                  Comments Due: 5 p.m. ET 12/24/15.
                                              holder to perform any land-disturbing                   access the document. For assistance,                     Docket Numbers: ER16–519–001.
                                              activities or otherwise enter upon lands                contact FERC Online Support.                             Applicants: Nevada Power Company.
                                              or waters owned by others without the                     Dated: December 17, 2015.                              Description: Tariff Amendment:
                                              owners’ express permission.                             Nathaniel J. Davis, Sr.,                              OATT Revision to Schedule 1
                                                 Energy Resources’ permit application                 Deputy Secretary.                                     Correction of Effective Date to be
                                              is filed in competition with Lock+TM                    [FR Doc. 2015–32276 Filed 12–22–15; 8:45 am]          effective 5/15/2015.
                                              Hydro Friends Fund III, proposed                                                                                 Filed Date: 12/17/15.
                                                                                                      BILLING CODE 6717–01–P
                                              Selden Lock and Dam Hydroelectric                                                                                Accession Number: 20151217–5047.
                                              Project No. 14672–000, which was                                                                                 Comments Due: 5 p.m. ET 1/7/16.
                                              publicly noticed November 24, 2015.                     DEPARTMENT OF ENERGY                                     Docket Numbers: ER16–540–000.
                                              The deadline for filing competing                                                                                Applicants: Public Service Company
                                              applications is January 25, 2016. Energy                Federal Energy Regulatory                             of Colorado.
                                              Resources competing permit application                  Commission                                               Description: Initial rate filing: 2015–
                                              is timely filed.                                                                                              12–15 CSU Confirm to be effective 1/1/
                                                 The proposed project would consist of                Combined Notice of Filings #1                         2013.
                                              the following: (1) A 200-foot-long, 140-                                                                         Filed Date: 12/16/15.
                                              foot-wide intake channel; (2) a 133-foot-                  Take notice that the Commission
                                                                                                      received the following electric corporate                Accession Number: 20151216–5210.
                                              long, 83-foot-wide powerhouse                                                                                    Comments Due: 5 p.m. ET 1/6/16.
                                              containing two generating units with a                  filings:
                                              total capacity of 12.5 megawatts; (3) a                    Docket Numbers: EC16–23–000.                          Docket Numbers: ER16–541–000.
                                              4000-foot-long, 1600-foot-wide tailrace;                   Applicants: Prairie Rose Wind, LLC,                   Applicants: Pennsylvania Windfarms,
                                              (4) a 4.16/69 kilo-Volt (kV) substation;                Prairie Rose Transmission, LLC.                       LLC.
                                              (5) a 330-foot-long addition to the                        Description: Supplement to October                    Description: Baseline eTariff Filing:
                                              existing access road; and (6) a 3-mile-                 30, 2015 Application Prairie Rose Wind,               Pennsylvania Windfarms, LLC and
                                              long, 69 kV transmission line. The                      LLC, et al. for Authorization Under                   Green Mountain Storage, LLC CFA to be
                                              proposed project would have an                          Section 203 of the Federal Power Act.                 effective 12/17/2015.
                                              estimated average annual generation of                     Filed Date: 12/16/15.                                 Filed Date: 12/16/15.
                                              68,900 megawatt-hours, and operate as                      Accession Number: 20151216–5171.                      Accession Number: 20151216–5211.
                                              directed by the Corps.                                     Comments Due: 5 p.m. ET 12/28/15.                     Comments Due: 5 p.m. ET 1/6/16.
                                                 Applicant Contact: Mr. Ander                            Docket Numbers: EC16–24–000.                          Docket Numbers: ER16–542–000.
                                              Gonzalez, Energy Resources USA Inc.,                       Applicants: Chisholm View Wind                        Applicants: Public Service Company
                                              2655 Le Jeune Road, Suite 804, Coral                    Project, LLC.                                         of Colorado.
                                              Gables, Florida 33134; Phone: (954)                        Description: Supplement to October                    Description: Initial rate filing:
                                                                                                                                                            20151216lCSU Confirm 2nd to be
tkelley on DSK3SPTVN1PROD with NOTICES




                                              248–8425; Email: agonzalez@                             30, 2015 Application for Authorization
                                              energyresources.es                                      Under Section 203 of the Federal Power                effective 1/1/2015.
                                                 FERC Contact: Christiane Casey;                      Act of Chisholm View Wind Project,                       Filed Date: 12/16/15.
                                              phone: (202) 502–8577.                                  LLC.                                                     Accession Number: 20151216–5212.
                                                 Deadline for filing comments and                        Filed Date: 12/16/15.                                 Comments Due: 5 p.m. ET 1/6/16.
                                              motions to intervene: 60 days from the                     Accession Number: 20151216–5169.                      Docket Numbers: ER16–543–000.
                                              issuance of this notice.                                   Comments Due: 5 p.m. ET 12/28/15.                     Applicants: Caprock Wind LLC.


                                         VerDate Sep<11>2014   19:12 Dec 22, 2015   Jkt 238001   PO 00000   Frm 00060   Fmt 4703   Sfmt 4703   E:\FR\FM\23DEN1.SGM   23DEN1



Document Created: 2018-03-02 09:21:00
Document Modified: 2018-03-02 09:21:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 79876 

2025 Federal Register | Disclaimer | Privacy Policy