DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 246 (December 23, 2015)

Page Range79878-79880
FR Document2015-32272

Federal Register, Volume 80 Issue 246 (Wednesday, December 23, 2015)
[Federal Register Volume 80, Number 246 (Wednesday, December 23, 2015)]
[Notices]
[Pages 79878-79880]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-32272]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Ready for Environmental Analysis and 
Soliciting Comments, Recommendations, Terms and Conditions, and 
Prescriptions

------------------------------------------------------------------------
                                                                Project
                                                                  No.
------------------------------------------------------------------------
FFP Missouri 16, LLC........................................   13753-002
FFP Missouri 15, LLC........................................   13762-002
Solia 8 Hydroelectric, LLC..................................   13771-002
FFP Missouri 13, LLC........................................   13763-002
Solia 5 Hydroelectric, LLC..................................   13766-002
Solia 4 Hydroelectric, LLC..................................   13767-002
FFP Missouri 12, LLC........................................   13755-002
FFP Missouri 5, LLC.........................................   13757-002
FFP Missouri 6, LLC.........................................   13761-002
Solia 6 Hydroelectric, LLC..................................   13768-002
------------------------------------------------------------------------

    Take notice that the following hydroelectric applications have been 
filed with the Commission and are available for public inspection.
    a. Type of Application: Original Major License.
    b. Project Nos.: 13753-002; 13762-002; 13771-002; 13763-002; 13766-
002; 13767-002; 13755-002; 13757-002; 13761-002; 13768-002.
    c. Date filed: P-13753, P-13762, P-13771, P-13763, and P-13766 were 
filed on February 27, 2014; P-13755 was filed on February 3, 2014; P-
13757, P-13761, and P-13768 were filed on March 14, 2014.
    d. Applicants: FFP Missouri 16, LLC; FFP Missouri 15, LLC; Solia 8 
Hydroelectric, LLC; FFP Missouri 13, LLC; Solia 5 Hydroelectric, LLC; 
Solia 4 Hydroelectric, LLC; FFP Missouri 12, LLC; FFP Missouri 5, LLC; 
FFP Missouri 6, LLC, and; Solia 6 Hydroelectric, LLC. All applicants 
are subsidiaries of FFP New Hydro, LLC.
    e. Name of Projects: Opekiska Lock and Dam Hydroelectric Project; 
Morgantown Lock and Dam Hydroelectric Project; Point Marion Lock and 
Dam Hydroelectric Project; Grays Landing Lock and Dam Hydroelectric 
Project; Maxwell Lock and Dam Hydroelectric Project; Monongahela Lock 
and Dam Number Four Hydroelectric Project; Allegheny Lock and Dam 
Number Two Hydroelectric Project; Emsworth Locks and Dam Hydroelectric 
Project; Emsworth Back Channel Hydroelectric Project; Montgomery 
Hydroelectric Project.
    f. Location: The proposed projects would be located at U.S. Army 
Corps of Engineers' (Corps) dams on the Monongahela, Allegheny, and 
Ohio rivers as described in the table below. The projects would occupy 
approximately 41.2 acres of federal land managed by the Corps.

----------------------------------------------------------------------------------------------------------------
                                                                                                   Federal land
                                                                                                      used by
        Project No.                 Projects           County and state          City/town            project
                                                                                                      (acres)
----------------------------------------------------------------------------------------------------------------
P-13753....................  Opekiska Lock and Dam  Monongalia, WV.......  Between Fairmont and            * 4.5
                                                                            Morgantown.
P-13762....................  Morgantown Lock and    Monongalia, WV.......  Morgantown...........             1.0
                              Dam.
P-13771....................  Point Marion Lock and  Fayette, PA..........  Point Marion.........             1.4
                              Dam.
P-13763....................  Grays Landing Lock     Greene, PA...........  Near Masontown.......          * 12.0
                              and Dam.
P-13766....................  Maxwell Lock and Dam.  Washington, PA.......  Downstream of                   * 1.0
                                                                            Fredericktown.
P-13767....................  Monongahela Lock and   Washington, PA.......  Charleroi............           * 1.0
                              Dam Number Four.

[[Page 79879]]

 
P-13755....................  Allegheny Lock and     Allegheny, PA........  Borough of Sharpsburg             3.2
                              Dam Number Two.
P-13757....................  Emsworth Locks and     Allegheny, PA........  Neville Township.....             9.7
                              Dam.
P-13761....................  Emsworth Back Channel  Allegheny, PA........  Neville Township.....             2.3
                              Dam.
P-13768....................  Montgomery Locks &     Beaver, PA...........  Borough of Industry..             5.1
                              Dam.
----------------------------------------------------------------------------------------------------------------
* Value is estimated from exhibit G.

    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Kellie Doherty, Vice President--
Environmental, Rye Development, LLC, 745 Atlantic Ave, 8th Floor, 
Boston, MA 02111 or at (781)856-2030.
    i. FERC Contact: Nicholas Ettema, (202) 502-6565 or 
[email protected].
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include the 
applicable project name(s) and docket number(s) (e.g., Opekiska Lock 
and Dam P-13753-002).
    The Commission's Rules of Practice and Procedures require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. These applications have been accepted, and are ready for 
environmental analysis at this time.
    l. The proposed Opekiska Lock and Dam Hydroelectric Project would 
be the most upstream project at river mile (RM) 115.4 on the 
Monongahela River and would consist of the following new facilities: 
(1) A 180-foot-long, 95-foot-wide intake channel directing flow to a 
30-foot-long, 50-foot-high, 70-foot-wide intake structure with 3-inch 
bar spacing trash racks; (2) a 120-foot-long, 60-foot-high, 70-foot-
wide reinforced concrete powerhouse on the west bank of the river; (3) 
two turbine-generator units with a combined capacity of 6.0 megawatts 
(MW); (4) a 280-foot-long, 64-foot-wide tailrace; (5) a 40-foot-long by 
40-foot-wide substation; (6) a 3,511-foot-long, 12.5-kilovolt (kV), 
overhead transmission line to connect the project substation to an 
existing distribution line; and (7) appurtenant facilities.
    The proposed Morgantown Lock and Dam Hydroelectric Project would be 
located at RM 102.0 on the Monongahela River and consist of the 
following new facilities: (1) A 100-foot-long, 64-foot-wide intake 
channel located downstream of the Corps' 6th spillway gate on the east 
side of the river; (2) a pair of spill gates totaling 60 feet wide 
located within the intake channel; (3) a 30-foot-long, 50-foot-high, 
64-foot-wide intake structure with 3-inch bar spacing trash racks; (4) 
a 120-foot-long, 60-foot-high, 70-foot-wide reinforced concrete 
powerhouse; (5) two turbine-generator units with a combined capacity of 
5.0 MW; (6) a 170-foot-long, 90-foot-wide tailrace; (7) a 40-foot-long 
by 40-foot-wide substation; (8) a 2,162-foot-long, 12.5-kV, overhead 
transmission line to connect the project substation to an existing 
distribution line; and (9) appurtenant facilities.
    The proposed Point Marion Lock and Dam Hydroelectric Project would 
be located at RM 90.8 on the Monongahela River and consist of the 
following new facilities: (1) A 280-foot-long, 70-foot-wide intake 
channel directing flow to a 30-foot-long, 50-foot-high, 70-foot-wide 
intake structure with 3-inch bar spacing trash racks; (2) a 120-foot-
long, 60-foot-high, 70-foot-wide reinforced concrete powerhouse on the 
east bank of the river; (3) two turbine-generator units with a combined 
capacity of 5.0 MW; (4) a 215-foot-long, 84-foot-wide tailrace; (5) a 
40-foot-long by 40-foot-wide substation; (6) a 3,325-foot-long, 69-kV, 
overhead transmission line to connect the project substation to an 
existing substation; and (7) appurtenant facilities.
    The proposed Grays Landing Lock and Dam Hydroelectric Project would 
be located at RM 82.0 on the Monongahela River and consist of the 
following new facilities: (1) A 300-foot-long, 130-foot-wide intake 
channel directing flow to a 100-foot-long, 84-foot-wide intake 
structure with 3-inch bar spacing trash racks; (2) a 576-foot-long, 
2.5-foot-high adjustable crest gate on top of the existing dam crest; 
(3) a 150-foot-long, 75-foot-high, 90-foot-wide reinforced concrete 
powerhouse on the west bank of the river; (4) two turbine-generator 
units with a combined capacity of 12.0 MW; (5) a 250-foot-long, 84-
foot-wide tailrace; (6) a 40-foot-long by 40-foot-wide substation; (7) 
a 9,965-foot-long, 69-kV, overhead transmission line to connect the 
project substation to an existing distribution line; and (8) 
appurtenant facilities.
    The proposed Maxwell Lock and Dam Hydroelectric Project would be 
located at RM 61.2 on the Monongahela River and consist of the 
following new facilities: (1) A 130-foot-long, 85-foot-wide intake 
channel located immediately downstream of the Corps' 5th spillway gate 
on the east side of the river; (2) a pair of spill gates totaling 84 
feet wide located within the proposed intake channel; (3) a 100-foot-
long, 70-foot-high, 85-foot-wide intake structure with 3-inch bar 
spacing trash racks; (4) a 150-foot-long, 70-foot-high, 90-foot-wide 
reinforced concrete powerhouse; (5) two turbine-generator units with a 
combined capacity of 13.0 MW; (6) a 160-foot-long, 120-foot-wide 
tailrace; (7) a 40-foot-long by 40-foot-wide substation; (8) a 350-
foot-long, 69/138-kV, overhead transmission line to connect the project 
substation to an existing distribution line; and (9) appurtenant 
facilities.
    The proposed Monongahela Lock and Dam Number Four (Charleroi) 
Hydroelectric Project would be located at RM 41.5 on the Monongahela 
River

[[Page 79880]]

and consist of the following new facilities: (1) A 140-foot-long, 90-
foot-wide intake channel located immediately downstream of the Corps' 
5th spillway gate on the west side of the river; (2) a pair of spill 
gates totaling 84 feet wide located within the proposed intake channel; 
(3) a 100-foot-long, 65-foot-high, 90-foot-wide intake structure with 
3-inch bar spacing trash racks; (4) a 150-foot-long, 70-foot-high, 90-
foot-wide reinforced concrete powerhouse; (5) two turbine-generator 
units with a combined capacity of 12.0 MW; (6) a 210-foot-long, 130-
foot-wide tailrace; (7) a 40-foot-long by 40-foot-wide substation; (8) 
a 45-foot-long, 69-kV, overhead transmission line to connect the 
project substation to an existing distribution line; and (9) 
appurtenant facilities.
    The proposed Allegheny Lock and Dam Number Two Hydroelectric 
Project would be located at RM 6.7 on the Allegheny River and consist 
of the following new facilities: (1) A 170-foot-wide, 120-foot-long, 
70-foot-high intake structure with two 5-inch bar spacing trash racks; 
(2) two 45-foot-wide, 40-foot-high spillway bays; (3) an 1,100-foot-
long, 2.5-foot-high adjustable crest gate on top of the existing dam 
crest; (4) a 170-foot-wide by 180-foot-long powerhouse along the east 
side of the river; (5) three Kaplan turbine-generator units with a 
combined installed capacity of 17.0 MW; (6) a 50-foot-wide by 60-foot-
long substation; (7) a 1,265-foot-long, single overhead, 69-kV, 
overhead transmission line to connect the project substation to an 
existing distribution line owned by Duquesne Light Company; and (8) 
appurtenant facilities. The average annual generation would be 81,950 
MWh annually.
    The proposed Emsworth Locks and Dam Hydroelectric Project would be 
located at RM 6.2 on the Ohio River and would consist of the following 
new facilities: (1) A 205-foot-long, 180-foot-wide intake channel 
directing flow to a 30-foot-long, 63.5-foot-high, 180-foot-wide intake 
structure with 5-inch bar spacing trash racks; (2) a 180-foot-long, 77-
foot-high, 180-foot-wide reinforced concrete powerhouse on the south 
bank of the river; (3) four turbine-generator units with a combined 
capacity of 24 MW; (4) a 380-foot-long, 280-foot-wide tailrace; (5) a 
50-foot-long by 60-foot-wide substation; (6) a 1,893-foot-long, 69-kV, 
overhead transmission line to connect the project substation to an 
existing substation; and (7) appurtenant facilities. The average annual 
generation would be 101,300 MWh.
    The proposed Emsworth Back Channel Dam Hydroelectric Project would 
be located at RM 6.8 on the Ohio River and consist of the following new 
facilities: (1) A 100-foot-long, 165-foot-wide intake channel directing 
flow to a 32-foot-long, 63.5-foot-high, 90-foot-wide intake structure 
with 5-inch bar spacing trash racks; (2) a 150-foot-long, 77-foot-high, 
90-foot-wide reinforced concrete powerhouse on the north bank of the 
river; (3) two turbine-generator units with a combined capacity of 12.0 
MW; (4) a 190-foot-long, 105-foot-wide tailrace; (5) a 50-foot-long by 
60-foot-wide substation; (6) a 3,758-foot-long, 69-kV, overhead 
transmission line to connect the project substation to an existing 
substation; and (7) appurtenant facilities. The average annual 
generation would be 53,500 MWh.
    The proposed Montgomery Locks and Dam Hydroelectric Project would 
be located at RM 31.7 on the Ohio River and consist of the following 
new facilities: (1) A 340-foot-long, 205-foot-wide intake channel 
directing flow to a 150-foot-long, 90-foot-high, 205-foot-wide intake 
structure with 5-inch bar spacing trash racks; (2) a 315-foot-long, 
105-foot-high, 205-foot-wide reinforced concrete powerhouse on the 
north bank of the river; (3) three turbine-generator units with a 
combined capacity of 42 MW; (4) a 280-foot-long, 210-foot-wide 
tailrace; (5) a 50-foot-long by 60-foot-wide substation; (6) a 392-
foot-long, 69-kV, overhead transmission line to connect the project 
substation to an existing distribution line; and (7) appurtenant 
facilities. The average annual generation would be 194,370 MWh.
    The applicants propose to operate each of the ten projects in a 
``run-of-river'' mode using flows made available by the Corps. The 
proposed projects would not change existing flow releases or water 
surface elevations upstream or downstream of the proposed projects.
    m. A copy of each application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. Copies are also available for inspection and 
reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b), and 385.2010.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to these or other pending projects. For assistance, contact 
FERC Online Support.
    n. Public notice of the filing of the initial development 
applications, which has already been given, established the due date 
for filing competing applications or notices of intent. Under the 
Commission's regulations, any competing development application must be 
filed in response to and in compliance with public notice of the 
initial development application. No competing applications or notices 
of intent may be filed in response to this notice.
    o. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.

    Dated: December 17, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-32272 Filed 12-22-15; 8:45 am]
BILLING CODE 6717-01-P



                                              79878                       Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Notices

                                              in the Commission’s public record for                     project should submit an original and                                                                            Project No.
                                              this proceeding or the issuance of a                      two copies of their comments to the
                                              Notice of Schedule for Environmental                      Secretary of the Commission.                                     FFP Missouri 12, LLC ................           13755–002
                                              Review will serve to notify federal and                   Environmental commentors will be                                 FFP Missouri 5, LLC ..................          13757–002
                                              state agencies of the timing for the                      placed on the Commission’s                                       FFP Missouri 6, LLC ..................          13761–002
                                              completion of all necessary reviews, and                  environmental mailing list, will receive                         Solia 6 Hydroelectric, LLC ..........           13768–002
                                              the subsequent need to complete all                       copies of the environmental documents,
                                              federal authorizations within 90 days of                  and will be notified of meetings                                    Take notice that the following
                                              the date of issuance of the Commission                    associated with the Commission’s                                 hydroelectric applications have been
                                              staff’s EA.                                               environmental review process.                                    filed with the Commission and are
                                                 There are two ways to become                           Environmental commentors will not be                             available for public inspection.
                                              involved in the Commission’s review of                    required to serve copies of filed                                   a. Type of Application: Original Major
                                              this project. First, any person wishing to                documents on all other parties.                                  License.
                                              obtain legal status by becoming a party                   However, the non-party commentors                                   b. Project Nos.: 13753–002; 13762–
                                              to the proceedings for this project                       will not receive copies of all documents                         002; 13771–002; 13763–002; 13766–002;
                                              should, on or before the comment date                     filed by other parties or issued by the                          13767–002; 13755–002; 13757–002;
                                              stated below file with the Federal                        Commission (except for the mailing of                            13761–002; 13768–002.
                                              Energy Regulatory Commission, 888                         environmental documents issued by the                               c. Date filed: P–13753, P–13762, P–
                                              First Street NE., Washington, DC 20426,                   Commission) and will not have the right                          13771, P–13763, and P–13766 were filed
                                              a motion to intervene in accordance                       to seek court review of the                                      on February 27, 2014; P–13755 was filed
                                              with the requirements of the                              Commission’s final order.                                        on February 3, 2014; P–13757, P–13761,
                                              Commission’s Rules of Practice and                           The Commission strongly encourages                            and P–13768 were filed on March 14,
                                              Procedure (18 CFR 385.214 or 385.211)                     electronic filings of comments, protests                         2014.
                                              and the Regulations under the NGA (18                     and interventions in lieu of paper using                            d. Applicants: FFP Missouri 16, LLC;
                                              CFR 157.10). A person obtaining party                     the ‘‘eFiling’’ link at http://                                  FFP Missouri 15, LLC; Solia 8
                                              status will be placed on the service list                 www.ferc.gov. Persons unable to file                             Hydroelectric, LLC; FFP Missouri 13,
                                              maintained by the Secretary of the                        electronically should submit an original                         LLC; Solia 5 Hydroelectric, LLC; Solia 4
                                              Commission and will receive copies of                     and five copies of the protest or                                Hydroelectric, LLC; FFP Missouri 12,
                                              all documents filed by the applicant and                  intervention to the Federal Energy                               LLC; FFP Missouri 5, LLC; FFP Missouri
                                              by all other parties. A party must submit                 Regulatory Commission, 888 First Street                          6, LLC, and; Solia 6 Hydroelectric, LLC.
                                              seven copies of filings made in the                       NE., Washington, DC 20426.                                       All applicants are subsidiaries of FFP
                                              proceeding with the Commission and                           Comment Date: January 7, 2015.                                New Hydro, LLC.
                                              must mail a copy to the applicant and                       Dated: December 17, 2015.                                         e. Name of Projects: Opekiska Lock
                                              to every other party. Only parties to the                 Nathaniel J. Davis, Sr.,
                                                                                                                                                                         and Dam Hydroelectric Project;
                                              proceeding can ask for court review of                                                                                     Morgantown Lock and Dam
                                                                                                        Deputy Secretary.
                                              Commission orders in the proceeding.                                                                                       Hydroelectric Project; Point Marion
                                                                                                        [FR Doc. 2015–32275 Filed 12–22–15; 8:45 am]
                                                 However, a person does not have to                                                                                      Lock and Dam Hydroelectric Project;
                                                                                                        BILLING CODE 6717–01–P
                                              intervene in order to have comments                                                                                        Grays Landing Lock and Dam
                                              considered. The second way to                                                                                              Hydroelectric Project; Maxwell Lock
                                              participate is by filing with the                                                                                          and Dam Hydroelectric Project;
                                                                                                        DEPARTMENT OF ENERGY
                                              Secretary of the Commission, as soon as                                                                                    Monongahela Lock and Dam Number
                                              possible, an original and two copies of                   Federal Energy Regulatory                                        Four Hydroelectric Project; Allegheny
                                              comments in support of or in opposition                   Commission                                                       Lock and Dam Number Two
                                              to this project. The Commission will                                                                                       Hydroelectric Project; Emsworth Locks
                                              consider these comments in                                Notice of Application Ready for                                  and Dam Hydroelectric Project;
                                              determining the appropriate action to be                  Environmental Analysis and Soliciting                            Emsworth Back Channel Hydroelectric
                                              taken, but the filing of a comment alone                  Comments, Recommendations, Terms                                 Project; Montgomery Hydroelectric
                                              will not serve to make the filer a party                  and Conditions, and Prescriptions                                Project.
                                              to the proceeding. The Commission’s                                                                                           f. Location: The proposed projects
                                              rules require that persons filing                                                                       Project No.        would be located at U.S. Army Corps of
                                              comments in opposition to the project                                                                                      Engineers’ (Corps) dams on the
                                                                                                        FFP Missouri 16, LLC ................         13753–002          Monongahela, Allegheny, and Ohio
                                              provide copies of their protests only to                  FFP Missouri 15, LLC ................         13762–002
                                              the party or parties directly involved in                 Solia 8 Hydroelectric, LLC ..........         13771–002          rivers as described in the table below.
                                              the protest.                                              FFP Missouri 13, LLC ................         13763–002          The projects would occupy
                                                 Persons who wish to comment only                       Solia 5 Hydroelectric, LLC ..........         13766–002          approximately 41.2 acres of federal land
                                              on the environmental review of this                       Solia 4 Hydroelectric, LLC ..........         13767–002          managed by the Corps.

                                                                                                                                                                                                                       Federal land
                                                                                                                                                                                                                         used by
                                                 Project No.                          Projects                             County and state                                         City/town                             project
                                                                                                                                                                                                                         (acres)

                                              P–13753 ...........      Opekiska Lock and Dam ..............     Monongalia, WV ............................       Between Fairmont and Morgan-                                  * 4.5
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                                                                                    town.
                                              P–13762    ...........   Morgantown Lock and Dam ..........       Monongalia, WV ............................       Morgantown ..................................                   1.0
                                              P–13771    ...........   Point Marion Lock and Dam .........      Fayette, PA ...................................   Point Marion ..................................                 1.4
                                              P–13763    ...........   Grays Landing Lock and Dam ......        Greene, PA ...................................    Near Masontown ...........................                  * 12.0
                                              P–13766    ...........   Maxwell Lock and Dam ................    Washington, PA ............................       Downstream of Fredericktown ......                            * 1.0
                                              P–13767    ...........   Monongahela Lock and Dam                 Washington, PA ............................       Charleroi ........................................            * 1.0
                                                                         Number Four.



                                         VerDate Sep<11>2014     19:13 Dec 22, 2015   Jkt 238001   PO 00000   Frm 00062    Fmt 4703     Sfmt 4703     E:\FR\FM\23DEN1.SGM           23DEN1


                                                                       Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Notices                                                                 79879

                                                                                                                                                                                                               Federal land
                                                                                                                                                                                                                 used by
                                                 Project No.                        Projects                             County and state                                       City/town                         project
                                                                                                                                                                                                                 (acres)

                                              P–13755 ...........   Allegheny Lock and Dam Number             Allegheny, PA ...............................     Borough of Sharpsburg .................                  3.2
                                                                      Two.
                                              P–13757 ...........   Emsworth Locks and Dam ............       Allegheny, PA ...............................     Neville Township ...........................             9.7
                                              P–13761 ...........   Emsworth Back Channel Dam ......          Allegheny, PA ...............................     Neville Township ...........................             2.3
                                              P–13768 ...........   Montgomery Locks & Dam ...........        Beaver, PA ....................................   Borough of Industry ......................               5.1
                                                 * Value is estimated from exhibit G.


                                                 g. Filed Pursuant to: Federal Power                  most upstream project at river mile (RM)                        (5) a 40-foot-long by 40-foot-wide
                                              Act 16 U.S.C. 791(a)–825(r).                            115.4 on the Monongahela River and                              substation; (6) a 3,325-foot-long, 69-kV,
                                                 h. Applicant Contact: Kellie Doherty,                would consist of the following new                              overhead transmission line to connect
                                              Vice President—Environmental, Rye                       facilities: (1) A 180-foot-long, 95-foot-                       the project substation to an existing
                                              Development, LLC, 745 Atlantic Ave,                     wide intake channel directing flow to a                         substation; and (7) appurtenant
                                              8th Floor, Boston, MA 02111 or at                       30-foot-long, 50-foot-high, 70-foot-wide                        facilities.
                                              (781)856–2030.                                          intake structure with 3-inch bar spacing                           The proposed Grays Landing Lock
                                                 i. FERC Contact: Nicholas Ettema,                    trash racks; (2) a 120-foot-long, 60-foot-                      and Dam Hydroelectric Project would be
                                              (202) 502–6565 or nicholas.ettema@                      high, 70-foot-wide reinforced concrete                          located at RM 82.0 on the Monongahela
                                              ferc.gov.                                               powerhouse on the west bank of the                              River and consist of the following new
                                                 j. Deadline for filing comments,                     river; (3) two turbine-generator units                          facilities: (1) A 300-foot-long, 130-foot-
                                              recommendations, terms and                              with a combined capacity of 6.0                                 wide intake channel directing flow to a
                                              conditions, and prescriptions: 60 days                  megawatts (MW); (4) a 280-foot-long, 64-                        100-foot-long, 84-foot-wide intake
                                              from the issuance date of this notice;                  foot-wide tailrace; (5) a 40-foot-long by                       structure with 3-inch bar spacing trash
                                              reply comments are due 105 days from                    40-foot-wide substation; (6) a 3,511-foot-                      racks; (2) a 576-foot-long, 2.5-foot-high
                                              the issuance date of this notice.                       long, 12.5-kilovolt (kV), overhead                              adjustable crest gate on top of the
                                                 The Commission strongly encourages                   transmission line to connect the project                        existing dam crest; (3) a 150-foot-long,
                                              electronic filing. Please file comments,                substation to an existing distribution                          75-foot-high, 90-foot-wide reinforced
                                              recommendations, terms and
                                                                                                      line; and (7) appurtenant facilities.                           concrete powerhouse on the west bank
                                              conditions, and prescriptions using the
                                                                                                         The proposed Morgantown Lock and                             of the river; (4) two turbine-generator
                                              Commission’s eFiling system at http://
                                                                                                      Dam Hydroelectric Project would be                              units with a combined capacity of 12.0
                                              www.ferc.gov/docs-filing/efiling.asp.
                                                                                                      located at RM 102.0 on the                                      MW; (5) a 250-foot-long, 84-foot-wide
                                              Commenters can submit brief comments
                                                                                                      Monongahela River and consist of the                            tailrace; (6) a 40-foot-long by 40-foot-
                                              up to 6,000 characters, without prior
                                                                                                      following new facilities: (1) A 100-foot-                       wide substation; (7) a 9,965-foot-long,
                                              registration, using the eComment system
                                                                                                      long, 64-foot-wide intake channel                               69-kV, overhead transmission line to
                                              at http://www.ferc.gov/docs-filing/
                                                                                                      located downstream of the Corps’ 6th                            connect the project substation to an
                                              ecomment.asp. You must include your
                                              name and contact information at the end                 spillway gate on the east side of the                           existing distribution line; and (8)
                                              of your comments. For assistance,                       river; (2) a pair of spill gates totaling 60                    appurtenant facilities.
                                              please contact FERC Online Support at                   feet wide located within the intake                                The proposed Maxwell Lock and Dam
                                              FERCOnlineSupport@ferc.gov, (866)                       channel; (3) a 30-foot-long, 50-foot-high,                      Hydroelectric Project would be located
                                              208–3676 (toll free), or (202) 502–8659                 64-foot-wide intake structure with 3-                           at RM 61.2 on the Monongahela River
                                              (TTY). In lieu of electronic filing, please             inch bar spacing trash racks; (4) a 120-                        and consist of the following new
                                              send a paper copy to: Secretary, Federal                foot-long, 60-foot-high, 70-foot-wide                           facilities: (1) A 130-foot-long, 85-foot-
                                              Energy Regulatory Commission, 888                       reinforced concrete powerhouse; (5) two                         wide intake channel located
                                              First Street NE., Washington, DC 20426.                 turbine-generator units with a combined                         immediately downstream of the Corps’
                                              The first page of any filing should                     capacity of 5.0 MW; (6) a 170-foot-long,                        5th spillway gate on the east side of the
                                              include the applicable project name(s)                  90-foot-wide tailrace; (7) a 40-foot-long                       river; (2) a pair of spill gates totaling 84
                                              and docket number(s) (e.g., Opekiska                    by 40-foot-wide substation; (8) a 2,162-                        feet wide located within the proposed
                                              Lock and Dam P–13753–002).                              foot-long, 12.5-kV, overhead                                    intake channel; (3) a 100-foot-long, 70-
                                                 The Commission’s Rules of Practice                   transmission line to connect the project                        foot-high, 85-foot-wide intake structure
                                              and Procedures require all intervenors                  substation to an existing distribution                          with 3-inch bar spacing trash racks; (4)
                                              filing documents with the Commission                    line; and (9) appurtenant facilities.                           a 150-foot-long, 70-foot-high, 90-foot-
                                              to serve a copy of that document on                        The proposed Point Marion Lock and                           wide reinforced concrete powerhouse;
                                              each person on the official service list                Dam Hydroelectric Project would be                              (5) two turbine-generator units with a
                                              for the project. Further, if an intervenor              located at RM 90.8 on the Monongahela                           combined capacity of 13.0 MW; (6) a
                                              files comments or documents with the                    River and consist of the following new                          160-foot-long, 120-foot-wide tailrace; (7)
                                              Commission relating to the merits of an                 facilities: (1) A 280-foot-long, 70-foot-                       a 40-foot-long by 40-foot-wide
                                              issue that may affect the responsibilities              wide intake channel directing flow to a                         substation; (8) a 350-foot-long, 69/138-
                                              of a particular resource agency, they                   30-foot-long, 50-foot-high, 70-foot-wide                        kV, overhead transmission line to
tkelley on DSK3SPTVN1PROD with NOTICES




                                              must also serve a copy of the document                  intake structure with 3-inch bar spacing                        connect the project substation to an
                                              on that resource agency.                                trash racks; (2) a 120-foot-long, 60-foot-                      existing distribution line; and (9)
                                                 k. These applications have been                      high, 70-foot-wide reinforced concrete                          appurtenant facilities.
                                              accepted, and are ready for                             powerhouse on the east bank of the                                 The proposed Monongahela Lock and
                                              environmental analysis at this time.                    river; (3) two turbine-generator units                          Dam Number Four (Charleroi)
                                                 l. The proposed Opekiska Lock and                    with a combined capacity of 5.0 MW; (4)                         Hydroelectric Project would be located
                                              Dam Hydroelectric Project would be the                  a 215-foot-long, 84-foot-wide tailrace;                         at RM 41.5 on the Monongahela River


                                         VerDate Sep<11>2014   18:05 Dec 22, 2015   Jkt 238001   PO 00000   Frm 00063    Fmt 4703     Sfmt 4703     E:\FR\FM\23DEN1.SGM         23DEN1


                                              79880                    Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Notices

                                              and consist of the following new                        River and consist of the following new                the name, address, and telephone
                                              facilities: (1) A 140-foot-long, 90-foot-               facilities: (1) A 100-foot-long, 165-foot-            number of the person submitting the
                                              wide intake channel located                             wide intake channel directing flow to a               filing; and (4) otherwise comply with
                                              immediately downstream of the Corps’                    32-foot-long, 63.5-foot-high, 90-foot-                the requirements of 18 CFR 385.2001
                                              5th spillway gate on the west side of the               wide intake structure with 5-inch bar                 through 385.2005. All comments,
                                              river; (2) a pair of spill gates totaling 84            spacing trash racks; (2) a 150-foot-long,             recommendations, terms and conditions
                                              feet wide located within the proposed                   77-foot-high, 90-foot-wide reinforced                 or prescriptions must set forth their
                                              intake channel; (3) a 100-foot-long, 65-                concrete powerhouse on the north bank                 evidentiary basis and otherwise comply
                                              foot-high, 90-foot-wide intake structure                of the river; (3) two turbine-generator               with the requirements of 18 CFR 4.34(b).
                                              with 3-inch bar spacing trash racks; (4)                units with a combined capacity of 12.0                Agencies may obtain copies of the
                                              a 150-foot-long, 70-foot-high, 90-foot-                 MW; (4) a 190-foot-long, 105-foot-wide                application directly from the applicant.
                                              wide reinforced concrete powerhouse;                    tailrace; (5) a 50-foot-long by 60-foot-              Each filing must be accompanied by
                                              (5) two turbine-generator units with a                  wide substation; (6) a 3,758-foot-long,               proof of service on all persons listed on
                                              combined capacity of 12.0 MW; (6) a                     69-kV, overhead transmission line to                  the service list prepared by the
                                              210-foot-long, 130-foot-wide tailrace; (7)              connect the project substation to an                  Commission in this proceeding, in
                                              a 40-foot-long by 40-foot-wide                          existing substation; and (7) appurtenant              accordance with 18 CFR 4.34(b), and
                                              substation; (8) a 45-foot-long, 69-kV,                  facilities. The average annual generation             385.2010.
                                              overhead transmission line to connect                   would be 53,500 MWh.                                     You may also register online at
                                              the project substation to an existing                      The proposed Montgomery Locks and                  http://www.ferc.gov/docs-filing/
                                              distribution line; and (9) appurtenant                  Dam Hydroelectric Project would be                    esubscription.asp to be notified via
                                              facilities.                                             located at RM 31.7 on the Ohio River                  email of new filings and issuances
                                                 The proposed Allegheny Lock and                      and consist of the following new                      related to these or other pending
                                              Dam Number Two Hydroelectric Project                    facilities: (1) A 340-foot-long, 205-foot-            projects. For assistance, contact FERC
                                              would be located at RM 6.7 on the                       wide intake channel directing flow to a               Online Support.
                                              Allegheny River and consist of the                      150-foot-long, 90-foot-high, 205-foot-                   n. Public notice of the filing of the
                                              following new facilities: (1) A 170-foot-               wide intake structure with 5-inch bar                 initial development applications, which
                                              wide, 120-foot-long, 70-foot-high intake                spacing trash racks; (2) a 315-foot-long,             has already been given, established the
                                              structure with two 5-inch bar spacing                   105-foot-high, 205-foot-wide reinforced               due date for filing competing
                                              trash racks; (2) two 45-foot-wide, 40-                  concrete powerhouse on the north bank                 applications or notices of intent. Under
                                              foot-high spillway bays; (3) an 1,100-                  of the river; (3) three turbine-generator             the Commission’s regulations, any
                                              foot-long, 2.5-foot-high adjustable crest               units with a combined capacity of 42                  competing development application
                                              gate on top of the existing dam crest; (4)              MW; (4) a 280-foot-long, 210-foot-wide                must be filed in response to and in
                                              a 170-foot-wide by 180-foot-long                        tailrace; (5) a 50-foot-long by 60-foot-              compliance with public notice of the
                                              powerhouse along the east side of the                   wide substation; (6) a 392-foot-long, 69-             initial development application. No
                                              river; (5) three Kaplan turbine-generator               kV, overhead transmission line to                     competing applications or notices of
                                              units with a combined installed                         connect the project substation to an                  intent may be filed in response to this
                                              capacity of 17.0 MW; (6) a 50-foot-wide                 existing distribution line; and (7)                   notice.
                                              by 60-foot-long substation; (7) a 1,265-                appurtenant facilities. The average                      o. A license applicant must file no
                                              foot-long, single overhead, 69-kV,                      annual generation would be 194,370                    later than 60 days following the date of
                                              overhead transmission line to connect                   MWh.
                                                                                                                                                            issuance of this notice: (1) A copy of the
                                              the project substation to an existing                      The applicants propose to operate
                                                                                                                                                            water quality certification; (2) a copy of
                                              distribution line owned by Duquesne                     each of the ten projects in a ‘‘run-of-
                                                                                                      river’’ mode using flows made available               the request for certification, including
                                              Light Company; and (8) appurtenant
                                                                                                      by the Corps. The proposed projects                   proof of the date on which the certifying
                                              facilities. The average annual generation
                                                                                                      would not change existing flow releases               agency received the request; or (3)
                                              would be 81,950 MWh annually.
                                                 The proposed Emsworth Locks and                      or water surface elevations upstream or               evidence of waiver of water quality
                                              Dam Hydroelectric Project would be                      downstream of the proposed projects.                  certification.
                                              located at RM 6.2 on the Ohio River and                    m. A copy of each application is                     Dated: December 17, 2015.
                                              would consist of the following new                      available for review at the Commission                Nathaniel J. Davis, Sr.,
                                              facilities: (1) A 205-foot-long, 180-foot-              in the Public Reference Room or may be                Deputy Secretary.
                                              wide intake channel directing flow to a                 viewed on the Commission’s Web site at                [FR Doc. 2015–32272 Filed 12–22–15; 8:45 am]
                                              30-foot-long, 63.5-foot-high, 180-foot-                 http://www.ferc.gov using the                         BILLING CODE 6717–01–P
                                              wide intake structure with 5-inch bar                   ‘‘eLibrary’’ link. Enter the docket
                                              spacing trash racks; (2) a 180-foot-long,               number excluding the last three digits in
                                              77-foot-high, 180-foot-wide reinforced                  the docket number field to access the                 DEPARTMENT OF ENERGY
                                              concrete powerhouse on the south bank                   document. For assistance, contact FERC
                                              of the river; (3) four turbine-generator                Online Support. Copies are also                       Federal Energy Regulatory
                                              units with a combined capacity of 24                    available for inspection and                          Commission
                                              MW; (4) a 380-foot-long, 280-foot-wide                  reproduction at the address in item h
                                                                                                                                                            [Docket No. CP16–32–000]
                                              tailrace; (5) a 50-foot-long by 60-foot-                above.
                                              wide substation; (6) a 1,893-foot-long,                    All filings must (1) bear in all capital           Williams Field Services—Gulf Coast
                                              69-kV, overhead transmission line to                    letters the title ‘‘COMMENTS,’’ ‘‘REPLY               Company LP; Notice of Petition for
tkelley on DSK3SPTVN1PROD with NOTICES




                                              connect the project substation to an                    COMMENTS,’’                                           Declaratory Order
                                              existing substation; and (7) appurtenant                ‘‘RECOMMENDATIONS,’’ ‘‘TERMS
                                              facilities. The average annual generation               AND CONDITIONS,’’ or                                    Take notice that on December 11,
                                              would be 101,300 MWh.                                   ‘‘PRESCRIPTIONS;’’ (2) set forth in the               2015, and supplemented on December
                                                 The proposed Emsworth Back                           heading the name of the applicant and                 16, 2015, pursuant to section 207(a)(2)
                                              Channel Dam Hydroelectric Project                       the project number of the application to              of the Federal Energy Regulatory
                                              would be located at RM 6.8 on the Ohio                  which the filing responds; (3) furnish                Commission’s (Commission) Rules of


                                         VerDate Sep<11>2014   18:05 Dec 22, 2015   Jkt 238001   PO 00000   Frm 00064   Fmt 4703   Sfmt 4703   E:\FR\FM\23DEN1.SGM   23DEN1



Document Created: 2018-03-02 09:21:35
Document Modified: 2018-03-02 09:21:35
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106: