80_FR_8156 80 FR 8126 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

80 FR 8126 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration

Federal Register Volume 80, Issue 30 (February 13, 2015)

Page Range8126-8130
FR Document2015-03063

The FAA publishes a monthly notice, as appropriate, of PFC approvals and disapprovals under the provisions of the Aviation Safety and Capacity Expansion Act of 1990 (title IX of the Omnibus Budget Reconciliation Act of 1990) (Pub. L. 101-508) and part 158 of the Federal Aviation Regulations (14 CFR part 158). This notice is published pursuant to paragraph d of Sec. 158.29.

Federal Register, Volume 80 Issue 30 (Friday, February 13, 2015)
[Federal Register Volume 80, Number 30 (Friday, February 13, 2015)]
[Notices]
[Pages 8126-8130]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-03063]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration


Notice of Passenger Facility Charge (PFC) Approvals and 
Disapprovals

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Monthly Notice of PFC Approvals and Disapprovals. In January 
2015, there were nine applications approved. This notice also includes 
information on two applications, one approved in May 2012 and the other 
disapproved in November 2014, inadvertently left off the May 2012 and 
November 2014 notices, respectively. Additionally, three approved 
amendments to previously approved applications are listed.

-----------------------------------------------------------------------

SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC 
approvals and disapprovals under the provisions of the Aviation Safety 
and Capacity Expansion Act of 1990 (title IX of the Omnibus Budget 
Reconciliation Act of 1990) (Pub. L. 101-508) and part 158 of the 
Federal Aviation Regulations (14 CFR part 158). This notice is 
published pursuant to paragraph d of Sec.  158.29.

PFC Application Disapproved

    Public Agency: The Pennsylvania State University, State College, 
Pennsylvania.
    Application Number: 15-06-C-00-UNV.
    Application type: Impose and use a PFC.

[[Page 8127]]

    Reason for Disapproval: The Centre County Airport Authority has 
exclusive control of the terminal complex at University Park Airport 
(UNV) while the Pennsylvania State University (PSU) has exclusive 
control of the airfield. The FAA has determined that both organizations 
operate independently of each other. Since the proposed PFC 
application, submitted by the PSU, included projects that would impact 
both airfield and terminal areas, the FAA concluded that the existing 
arrangement between the two entities contravenes the public agency's 
obligations under the PFC assurances, including requisite legal 
authority to impose a PFC to finance and carry out the proposed 
projects. Therefore, the FAA could not approve PSU's PFC application.
    Decision date: November 20, 2014.

FOR FURTHER INFORMATION CONTACT: Lori Ledebohm, Harrisburg Airports 
District Office, (717) 730-2835.

PFC Applications Approved

    Public Agency: Town of Islip, New York.
    Application Number: 12-07-C-00-ISP.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in this Decision: $6,492,764.
    Earliest Charge Effective Date: August 1, 2015.
    Estimated Charge Expiration Date: August 1, 2017.
    Class of Air Carriers Not Required To Collect PFC'S: Non-scheduled/
on demand air carriers filing FAA Form 1800-31.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Long Island MacArthur Airport (ISP).
    Brief Description of Projects Approved for Collection at ISP and 
Use at ISP:

Signage improvements.
Install miscellaneous navigational aids.
Construct parallel taxiway D.
Runway 24 centerline/touchdown zone/runway guard lights.
Glycol treatment plant preliminary engineering.
Rehabilitate portions of runway 06/24.
Re-cable portions of runway 06/24.
Sprinkler system, main terminal.
Acquire snow broom replacement.
Acquire airfield deicing vehicle.
Construct underground glycol treatment plant--engineering design only.
Aviation demand update.
Conduct wildlife hazard assessment study.
Taxiways B, D and A design.
Perform airport master plan update and geographic information system 
work.
Extend taxiway B from C/B3 to runway 33L and realign taxiway E between 
taxiway S and runway 33L.
Construct glycol containment and treatment system.
Replace airfield electrical vault design.
Replace security system hardware.
Purchase and install jet bridge.
PFC application development.
PFC program application/administrative costs.
Purchase snow removal equipment.
Purchase four patrol vehicles.
West apron rehabilitation.
West concourse airside baggage claim access road.
Purchase two runway and apron vacuum sweepers.
Passenger seating replacement.
Design general aviation customs and border protection facility.

    Brief Description of Projects Approved for Collection at ISP and 
Use at Bayport Aerodrome (23N):

Obstruction removal.
Design upgrade to airport perimeter fence.

    Brief Description of Projects Partially Approved for Collection at 
ISP and Use at ISP: Construct taxiway G from runway 06 to taxiway W.
    Determination: The application was submitted with project costs 
based on estimates. Before the FAA issued its PFC decision, the FAA 
became aware that the actual bid costs were less than the amount 
requested in the PFC application. Therefore, the FAA limited the PFC 
amount based on the actual bid costs.
    Construct new aircraft rescue and firefighting building design.
    Determination: The application was submitted with project costs 
based on estimates. Before the FAA issued its PFC decision, the FAA 
became aware that the actual bid costs were less than the amount 
requested in the PFC application. Therefore, the FAA limited the PFC 
amount based on the actual bid costs.
    Brief Description of project Partially Approved for Collection at 
ISP and Use at 23N: Replace existing perimeter fence including two 
gates.
    Determination: The application was submitted with project costs 
based on estimates. Before the FAA issued its PFC decision, the FAA 
became aware that the actual bid costs were less than the amount 
requested in the PFC application. Therefore, the FAA limited the PFC 
amount based on the actual bid costs.
    Brief Description of Project Partially Approved for Collection at 
ISP for Future Use at ISP: Design obstruction removal.
    Brief Description of Disapproved Projects:

Replace runway sprinkler pump station at 23N.
Design replacement sprinkler system at 23N.
Replace sprinkler system, phase I, at 23N.

    Determination: The FAA determined that these three projects were 
maintenance items and, thus, did not meet the requirements of Sec.  
158.15(b). Therefore, these projects were disapproved.
    Decision Date: May 11, 2012.

FOR FURTHER INFORMATION CONTACT: Andrew Brooks, New York Airports 
District Office, (516) 227-3816.
    Public Agency: Fort Wayne--Allen County Airport Authority, Fort 
Wayne, Indiana.
    Application Number: 15-04-C-00-FWA.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC REvenue Approved in This Decision: $4,055,000.
    Earliest Charge Effective Date: March 1, 2018.
    Estimated Charge Expiration Date: July 1, 2021.
    Class of Air Carriers Not Required To Collect PFC'S: Nonscheduled/
on-demand operators filing FAA Form 1800-31 that (1) by Federal 
regulation are not required to report passenger statistics to the 
Federal government and (2) enplane 10 or fewer passengers per flight 
that is operated from Fort Wayne International Airport (FWA).
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at FWA.
    Brief Description of Projects Approved for Collection and Use:

Replace jet bridge 5.
Upgrade public address system to digital.
Snow removal vehicle with plow and mid-mount broom attachments.
Snow removal vehicle with plow and mid-mount broom attachments.
Replace jet bridge 7.
High speed runway snow broom.
Commercial aircraft deicer.
Terminal building planning study.
Replace shared use infrastructure technology environment equipment.

    Decision Date: January 6, 2015.


[[Page 8128]]



FOR FURTHER INFORMATION CONTACT: Michael Brown, Chicago Airports 
District Office, (847) 294-7195.
    Public Agency: Bishop International Airport Authority, Flint, 
Michigan.
    Application Number: 14-02-C-00-FNT.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in This Decision: $11,859,545.
    Earliest Charge Effective Date: January 1, 2018.
    Estimated Charge Expiration Date: August 1, 2024.
    Class of Air Carriers Not Required To Collect PFC'S: Non-scheduled/
on demand air taxi operators filing FAA Form 1800-31.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Bishop International Airport.
    Brief Description of Projects Approved for Collection and Use:

Sand storage building.
Removal of runway 5/23.
Taxiway B construction.
Cargo apron rehabilitation and conversion to deicing pad.
Terminal improvements.
Terminal expansion.
Acquisition and installation of passenger boarding bridges.
Terminal apron rehabilitation.

    Decision Date: January 6, 2015.

FOR FURTHER INFORMATION CONTACT: Irene Porter, Detroit Airports 
District Office, (734) 229-2915.
    Public Agency: City of Pueblo, Colorado.
    Application Number: 15-03-C-00-PUB.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in This Decision: $833,789.
    Earliest Charge Effective Date: March 1, 2015.
    Estimated Charge Expiration Date: April 1, 2036.
    Class of Air Carriers Not Required To Collect PFC'S: None.
    Brief Description of Projects Approved for Collection and Use:

Rehabilitate runway 8L/26R and transition of crosswind runway 17/35.
Improve runway 8R/26L runway safety area.
Construct replacement training runway.
Rehabilitate general aviation parking apron.
Conduct wildlife hazard assessments.
Acquire aircraft rescue and firefighting vehicle.
Rehabilitate taxiway (portions of taxiways A and A9).
Rehabilitate taxiway D.
PFC administration fees.

    Decision Date: January 7, 2015.

FOR FURTHER INFORMATION CONTACT: Jesse Lyman, Denver Airports District 
Office, (303) 342-1262.
    Public Agency: City of New Orleans and New Orleans Aviation Board, 
New Orleans, Louisiana.
    Application Number: 14-11-C-00-MSY.
    Application Type: Impose and use a PFC.
    PFC Level: $3.00.
    Total PFC Revenue Approved in This Decision: $400,733,236.
    Earliest Charge Effective Date: February 1, 2026.
    Estimated Charge Expiration Date: September 1, 2043.
    Class of Air carriers Not Required To Collect PFC'S: On-demand air 
taxi/commercial operations.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Louis Armstrong New Orleans International Airport.
    Brief Description of Projects Approved for Collection and Use at a 
$4.50 PFC Level:

Airfield electrical design and construction.
Perimeter fencing replacement construction.
Airfield pavement rehabilitation design and construction.

    Brief Description of Projects Approved for Collection and Use at a 
$3.00 PFC Level:

Land use and development study.
Long term development feasibility study.
Drainage pumping station design and construction.
    Brief Description of Projects Partially Approved for Collection and 
Use at a $3.00 PFC Level: Airfield pavement condition study.
    Determination: The FAA reviewed the scope of the project and found 
that the following work elements do not meet the requirements of Sec.  
158.15(b). Therefore, PFC revenue cannot be used on these elements: (1) 
Micro Paver software (or an approved equal); (2) onsite training to 
airport staff; and (3) preparing an airfield signage plan showing the 
plan location of the airfield signs, depicting sign type, style, size, 
model, etc.
    Long term planning study.
    Determination: The FAA reviewed the supporting documentation and 
found that the documentation supported only $6,801,500 in total project 
costs and not the $7,551,500 amount shown in the PFC application.
    Long term development program--terminal design and construction.
    Determination: The FAA partially approved this project for two 
reasons. (1) The FAA reviewed the scope of the project and found that 
the following work elements did not meet the requirements of Sec.  
158.15(b): airport administration (operations offices), baggage service 
offices, airline ticket offices, Transportation Security Administration 
offices, loading dock, storage, police station, central baggage 
inspection system equipment (build out and equipment), and escalation 
and contingency fees. (2) The public agency did not include a letter 
from Customs and Border Control certifying that the Federal Inspection 
Services (FIS) facility is sized to the staffing levels that will be 
provided. Therefore, the FAA was not able to verify that the space 
requested was the minimum necessary as required in Table N-5 (1) of FAA 
Order 5100.38D, Airport Improvement Program (AIP) Handbook, (September 
30, 2014). Therefore, PFC revenue cannot be used on items relating to 
the FIS facility.
    Long term development program--airside design and construction.
    Determination: The FAA reviewed the scope of the project and found 
that the use of PFC revenue for contingencies does not meet the 
requirements of Sec.  158.15(b). Therefore, the public agency may not 
use PFC revenue for contingencies.
    Long term development program--landside design and construction.
    Determination: The FAA reviewed the scope of the project and found 
that the following work elements do not meet the requirements of Sec.  
158.15(b). Therefore, the public agency may not use PFC revenue on the 
following elements: contingencies; parking structure(s); hotel 
infrastructure; access roads (off-airport); landscaping within site 
development; surface parking; and utilities.
    Brief Description of Disapproved Project: Access road improvements, 
design and construction.
    Determination: Table P-3(a)(6) of FAA Order 5100.38D, AIP Handbook, 
(September 30, 2014), requires that eligible access roads must 
exclusively serve airport traffic. This means that an access road that 
serves both airport traffic and non-airport traffic cannot be prorated. 
In mixed use situations of

[[Page 8129]]

airport/non-airport use, only the portion of the road that is beyond 
the non-airport access point is eligible. In this case, the proposed 
road is not beyond the non-airport access point and, therefore, the 
road is not PFC-eligible.
    Brief Description of Withdrawn Project: Airfield lighting vault.
    Date of Withdrawal: September 3, 2014.
    Decision Date: January 9, 2015.

FOR FURTHER INFORMATION CONTACT: Bill Bell, Louisiana/New Mexico 
Airports Development Office, (817) 222-5664.
    Public Agency: City of Albany, Georgia.
    Application Number: 15-07-C-00-ABY.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in This Decision: $105,777.
    Earliest Charge Effective Date: April 1, 2015.
    Estimated Charge Expiration Date: June 1, 2016.
    Class of Air Carriers Not Required To Collect PFC'S: Air taxi/
commercial operators filing FAA Form 1800-31 and operating at Southwest 
Georgia Regional Airport (ABY).
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at ABY.
    Brief Description of Projects Approved for Collection and Use:

Wildlife hazard assessment.
Commercial apron expansion.

    Brief Description of Project Partially Approved for Collection and 
Use: Communications building (new equipment shelter).
    Determination: The FAA determined that only the demolition of the 
old terminal building and relocation of the FAA communications 
equipment were PFC eligible.
    Decision Date: January 12, 2015.

FOR FURTHER INFORMATION CONTACT: Parks Preston, Atlanta Airports 
District Office, (404) 305-7149.
    Public Agency: Des Moines Airport Authority, Des Moines, Iowa.
    Application Number: 15-14-C-00-DSM.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in This Decision: $6,865,187.
    Earliest Charge Effective Date: December 1, 2020.
    Estimated Charge Expiration Date: April 1, 2022.
    Class of Air Carriers Not Required To Collect PFC'S: Air taxi/
commercial operators filing FAA Form 1800-31.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Des Moines International Airport.
    Brief Description of Projects Approved for Collection and Use:

Pre-conditioned air units affixed to boarding bridges.
Terminal area concept plan.
Terminal capacity improvement project.
Aircraft rescue and firefighting vehicle.
Aircraft rescue and firefighting building communication upgrade.
Aircraft rescue and firefighting road construction.
Runway 13/31 reconstruction.

    Decision Date: January 15, 2015.

FOR FURTHER INFORMATION CONTACT: Sheila Bridges, Central Region 
Airports Division, (816) 329-2638.
    Public Agency: Spokane Airport Board, Spokane, Washington.
    Application Number: 15-10-C-00-GEG.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in This Decision: $15,036,120.
    Earliest Charge Effective Date: July 1, 2015.
    Estimated Charge Expiration Date: July 1, 2018.
    Class of Air Carriers Not Required To Collect PFC'S: None.
    Brief Description of Projects Approved for Collection and Use:

Terminal area plan (planning study).
Airfield perimeter security enhancement.
Replacement of flight information display systems and related flight 
announcement systems.
Terminal access control enhancements.
Glycol recovery solution design.
Elevator replacement.
PFC application and administration fees.

    Brief Description of Withdrawn Projects:

Aircraft rescue and firefighting vehicle replacement.
Land acquisition.

    Date of Withdrawal: December 5, 2014.
    Decision Date: January 16, 2015.

FOR FURTHER INFORMATION CONTACT: Andrew Edstrom, Seattle Airports 
District Office, (425) 227-2641.
    Public Agency: Hall County Airport Authority, Grand Island, 
Nebraska.
    Application Number: 15-04-C-00-GRI.
    Application Type: Impose and use a PFC.
    PFC level: $4.50.
    Total PFC Revenue Approved in This Decision: $3,711,558.
    Earliest Charge Effective Date: May 1, 2016.
    Estimated Charge Expiration Date: March 1, 2031.
    Class of Air Carriers Not Required To Collect PFC'S: None.
    Brief Description of Projects Approved for Collection and Use:

Terminal area master plan.
Conduct environmental assessment.
Improve terminal building--phase 1, engineering services.
Improve terminal building--phase 2, construction.

    Decision Date: January 20, 2015.

FOR FURTHER INFORMATION CONTACT: Sheila Bridges, Central Region 
Airports Division, (816) 329-2638.
    Public Agency: City of Eugene, Oregon.
    Application Number: 15-12-C-00-EUG.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved in This Decision: $5,422,230.
    Earliest Charge Effective Date: June 1, 2015.
    Estimated Charge Expiration Date: January 1, 2019.
    Class of Air Carriers Not Required To Collect PFC'S: Nonscheduled/
on-demand air carriers filing FAA Form 1800-31.
    Determination: Approved. Based on information submitted in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at Eugene Airport--Mahlon Sweet Field.
    Brief Description of Projects Approved for Collection and Use:

Access control upgrade and installation.
B-3 ramp rehabilitation.
Terminal roof replacement.
Gate A1 jet bridge.
PFC administration costs.

    Decision Date: January 23, 2015.

FOR FURTHER INFORMATION CONTACT: Andrew Edstrom, Seattle Airports 
District Office, (425) 227-2641.

[[Page 8130]]



                                           Amendments to PFC Approvals
----------------------------------------------------------------------------------------------------------------
                                                                                     Original         Amended
                                     Amendment       Original         Amended        estimated       estimated
   Amendment No., city, state      approved date   approved net    approved net    charge  exp.    charge  exp.
                                                    PFC revenue     PFC revenue        date            date
----------------------------------------------------------------------------------------------------------------
08-09-C-03-STL, St. Louis, MO...        01/07/15    $758,497,059    $747,211,611        10/01/26        04/01/26
08-04-C-01-HLN, Helena, MT......        01/07/15         893,513         893,476        07/01/17        02/01/16
12-04-C-01-TWF, Twin Falls, ID..        01/15/15         543,523         556,066        06/01/16        06/01/17
----------------------------------------------------------------------------------------------------------------


    Issued in Washington, DC on February 9, 2015.
Joe Hebert,
Manager, Financial Analysis and Passenger Facility Charge Branch.
[FR Doc. 2015-03063 Filed 2-12-15; 8:45 am]
BILLING CODE 4910-13-P



                                              8126                          Federal Register / Vol. 80, No. 30 / Friday, February 13, 2015 / Notices

                                              DEPARTMENT OF TRANSPORTATION                            • Date and Place of Next Meetings                     • Review of Selective Calling (SELCAL)
                                                                                                      • Adjourn                                                Action Items
                                              Federal Aviation Administration                            Attendance is open to the interested               • Review SC–232 Completion Schedule
                                                                                                      public but limited to space availability.             • Review of Draft MOPS
                                              Third Meeting: RTCA Special
                                                                                                      With the approval of the chairman,                    • Continue Drafting MOPS
                                              Committee 230, Airborne Weather                                                                               • Other Business.
                                                                                                      members of the public may present oral                • Date and Place of Next Meetings
                                              Detection Systems Committee
                                                                                                      statements at the meeting. Persons                    • Adjourn
                                              AGENCY: Federal Aviation                                wishing to present statements or obtain                  Attendance is open to the interested
                                              Administration (FAA), U.S. Department                   information should contact the person                 public but limited to space availability.
                                              of Transportation (DOT).                                listed in the FOR FURTHER INFORMATION                 With the approval of the chairman,
                                              ACTION: Meeting Notice of RTCA Special                  CONTACT section. Members of the public
                                                                                                                                                            members of the public may present oral
                                              Committee 230, Airborne Weather                         may present a written statement to the                statements at the meeting. Persons
                                              Detection Systems Committee.                            committee at any time.                                wishing to present statements or obtain
                                                                                                        Issued in Washington, DC, on February 10,           information should contact the person
                                              SUMMARY:   The FAA is issuing this notice               2015.                                                 listed in the FOR FURTHER INFORMATION
                                              to advise the public of the third meeting               Mohannad Dawoud,                                      CONTACT section. Members of the public
                                              of the Airborne Weather Detection
                                                                                                      Management Analyst, NextGen, Program                  may present a written statement to the
                                              Systems Committee.                                      Oversight and Administration, Federal                 committee at any time.
                                              DATES: The meeting will be held March                   Aviation Administration.
                                              17–19 2015 from 9:00 a.m.–5:00 p.m. on                                                                          Issued in Washington, DC, on February 10,
                                                                                                      [FR Doc. 2015–03057 Filed 2–12–15; 8:45 am]           2015.
                                              March 17–18 and 9:00 a.m.–3:00 p.m.                     BILLING CODE 4910–13–P                                Mohannad Dawoud,
                                              on March 19.
                                                                                                                                                            Management Analyst, NextGen, Program
                                              ADDRESSES: The meeting will be held at
                                                                                                                                                            Oversight and Administration, Federal
                                              RTCA, Inc., 1150 18th Street NW., Suite                 DEPARTMENT OF TRANSPORTATION                          Aviation Administration.
                                              910, Washington, DC 20036.                                                                                    [FR Doc. 2015–03055 Filed 2–12–15; 8:45 am]
                                              FOR FURTHER INFORMATION CONTACT: The
                                                                                                      Federal Aviation Administration
                                                                                                                                                            BILLING CODE 4910–13–P
                                              RTCA Secretariat, 1150 18th Street NW.,                 Third Meeting: RTCA Special
                                              Suite 910, Washington, DC, 20036, or by                 Committee 232, Airborne Selective
                                              telephone at (202) 833–9339, fax at (202)               Calling Equipment                                     DEPARTMENT OF TRANSPORTATION
                                              833–9434, or Web site at http://
                                              www.rtca.org.                                           AGENCY:  Federal Aviation                             Federal Aviation Administration
                                              SUPPLEMENTARY INFORMATION:      Pursuant                Administration (FAA), Department of
                                                                                                      Transportation (DOT).                                 Notice of Passenger Facility Charge
                                              to section 10(a)(2) of the Federal                                                                            (PFC) Approvals and Disapprovals
                                              Advisory Committee Act (Pub. L. 92–                     ACTION: Meeting Notice of RTCA Special
                                              463, 5 U.S.C., App.), notice is hereby                  Committee 232, Airborne Selective                     AGENCY:  Federal Aviation
                                              given for a meeting of Special                          Calling Equipment.                                    Administration (FAA), DOT.
                                              Committee 230. The agenda will include                                                                        ACTION: Monthly Notice of PFC
                                                                                                      SUMMARY:   The FAA is issuing this notice             Approvals and Disapprovals. In January
                                              the following:
                                                                                                      to advise the public of the third meeting             2015, there were nine applications
                                              March 17                                                of RTCA Special Committee 232,                        approved. This notice also includes
                                              • Welcome/Introductions/                                Airborne Selective Calling Equipment.                 information on two applications, one
                                                Administrative Remarks                                DATES: The meeting will be held March                 approved in May 2012 and the other
                                              • Agenda Overview                                       4–5, 2015 from 9:00 a.m.–5:00 p.m.                    disapproved in November 2014,
                                              • Meeting #2 Minutes approval                           ADDRESSES: The meeting will be held at                inadvertently left off the May 2012 and
                                              • Discussion of activities with                         Novotel Paris Orly Rungis Hotel Rungis,               November 2014 notices, respectively.
                                                EUROCAE WG–95                                         France. Hosted by Rabah Bouda.                        Additionally, three approved
                                              • Discussion of draft modification of                   FOR FURTHER INFORMATION CONTACT: You                  amendments to previously approved
                                                SC–230 Terms of Reference to include                  may contact the RTCA Secretariat, 1150                applications are listed.
                                                modification to DO–213                                18th Street NW., Suite 910, Washington,
                                              • Review of General Requirements                        DC 20036, or by telephone at (202) 833–
                                                                                                                                                            SUMMARY:   The FAA publishes a monthly
                                                sections                                                                                                    notice, as appropriate, of PFC approvals
                                                                                                      9339, fax at (202) 833–9434, or Web site
                                              • Review of PWS sections                                http://www.rtca.org for directions.
                                                                                                                                                            and disapprovals under the provisions
                                                                                                                                                            of the Aviation Safety and Capacity
                                              March 18                                                SUPPLEMENTARY INFORMATION: Pursuant                   Expansion Act of 1990 (title IX of the
                                              •   Review of Turbulence sections                       to section 10(a)(2) of the Federal                    Omnibus Budget Reconciliation Act of
                                              •   Review of Test Procedures sections                  Advisory Committee Act (Pub. L. 92–                   1990) (Pub. L. 101–508) and part 158 of
                                              •   Review of Test Procedures sections                  463, 5 U.S.C., App.), notice is hereby                the Federal Aviation Regulations (14
                                              •   Review of Operational and Installed                 given for a meeting of Special                        CFR part 158). This notice is published
                                                  sections                                            Committee 232.                                        pursuant to paragraph d of § 158.29.
                                              March 19                                                March 4–5                                             PFC Application Disapproved
                                                                                                      • Welcome/Introductions/
tkelley on DSK3SPTVN1PROD with NOTICES




                                              • Review of Atmospheric Threat                                                                                  Public Agency: The Pennsylvania
                                                sections                                                Administrative Remarks                              State University, State College,
                                              • Discuss scope and content of DO–213                   • Agenda Overview                                     Pennsylvania.
                                                working group                                         • Review/Approval of Minutes from                       Application Number: 15–06–C–00–
                                              • Action Item Review                                      Plenary #2                                          UNV.
                                              • Other Actions                                         • Status of Other SELCAL Industry                       Application type: Impose and use a
                                              • FRAC Process Presentation                               Activities/Committees                               PFC.


                                         VerDate Sep<11>2014   21:56 Feb 12, 2015   Jkt 235001   PO 00000   Frm 00072   Fmt 4703   Sfmt 4703   E:\FR\FM\13FEN1.SGM   13FEN1


                                                                            Federal Register / Vol. 80, No. 30 / Friday, February 13, 2015 / Notices                                           8127

                                                Reason for Disapproval: The Centre                    Conduct wildlife hazard assessment                      Brief Description of Project Partially
                                              County Airport Authority has exclusive                     study.                                             Approved for Collection at ISP for
                                              control of the terminal complex at                      Taxiways B, D and A design.                           Future Use at ISP: Design obstruction
                                              University Park Airport (UNV) while the                 Perform airport master plan update and                removal.
                                              Pennsylvania State University (PSU) has                    geographic information system work.                  Brief Description of Disapproved
                                              exclusive control of the airfield. The                  Extend taxiway B from C/B3 to runway                  Projects:
                                              FAA has determined that both                               33L and realign taxiway E between                  Replace runway sprinkler pump station
                                              organizations operate independently of                     taxiway S and runway 33L.                            at 23N.
                                              each other. Since the proposed PFC                      Construct glycol containment and
                                                                                                                                                            Design replacement sprinkler system at
                                              application, submitted by the PSU,                         treatment system.
                                                                                                                                                              23N.
                                              included projects that would impact                     Replace airfield electrical vault design.
                                                                                                      Replace security system hardware.                     Replace sprinkler system, phase I, at
                                              both airfield and terminal areas, the                                                                           23N.
                                                                                                      Purchase and install jet bridge.
                                              FAA concluded that the existing                         PFC application development.
                                              arrangement between the two entities                                                                             Determination: The FAA determined
                                                                                                      PFC program application/administrative                that these three projects were
                                              contravenes the public agency’s                            costs.
                                              obligations under the PFC assurances,                                                                         maintenance items and, thus, did not
                                                                                                      Purchase snow removal equipment.                      meet the requirements of § 158.15(b).
                                              including requisite legal authority to                  Purchase four patrol vehicles.
                                              impose a PFC to finance and carry out                                                                         Therefore, these projects were
                                                                                                      West apron rehabilitation.                            disapproved.
                                              the proposed projects. Therefore, the                   West concourse airside baggage claim
                                              FAA could not approve PSU’s PFC                                                                                  Decision Date: May 11, 2012.
                                                                                                         access road.
                                              application.                                            Purchase two runway and apron                         FOR FURTHER INFORMATION CONTACT:
                                                Decision date: November 20, 2014.                        vacuum sweepers.                                   Andrew Brooks, New York Airports
                                              FOR FURTHER INFORMATION CONTACT: Lori                   Passenger seating replacement.                        District Office, (516) 227–3816.
                                              Ledebohm, Harrisburg Airports District                  Design general aviation customs and                      Public Agency: Fort Wayne—Allen
                                              Office, (717) 730–2835.                                    border protection facility.                        County Airport Authority, Fort Wayne,
                                                                                                         Brief Description of Projects Approved             Indiana.
                                              PFC Applications Approved                               for Collection at ISP and Use at Bayport                 Application Number: 15–04–C–00–
                                                 Public Agency: Town of Islip, New                    Aerodrome (23N):                                      FWA.
                                              York.                                                   Obstruction removal.                                     Application Type: Impose and use a
                                                 Application Number: 12–07–C–00–                      Design upgrade to airport perimeter                   PFC.
                                              ISP.                                                       fence.                                                PFC Level: $4.50.
                                                 Application Type: Impose and use a                                                                            Total PFC REvenue Approved in This
                                                                                                         Brief Description of Projects Partially            Decision: $4,055,000.
                                              PFC.                                                    Approved for Collection at ISP and Use
                                                 PFC Level: $4.50.                                                                                             Earliest Charge Effective Date: March
                                                                                                      at ISP: Construct taxiway G from                      1, 2018.
                                                 Total PFC Revenue Approved in this
                                                                                                      runway 06 to taxiway W.                                  Estimated Charge Expiration Date:
                                              Decision: $6,492,764.                                      Determination: The application was
                                                 Earliest Charge Effective Date: August                                                                     July 1, 2021.
                                                                                                      submitted with project costs based on                    Class of Air Carriers Not Required To
                                              1, 2015.                                                estimates. Before the FAA issued its
                                                 Estimated Charge Expiration Date:                                                                          Collect PFC’S: Nonscheduled/on-
                                                                                                      PFC decision, the FAA became aware                    demand operators filing FAA Form
                                              August 1, 2017.                                         that the actual bid costs were less than
                                                 Class of Air Carriers Not Required To                                                                      1800–31 that (1) by Federal regulation
                                                                                                      the amount requested in the PFC                       are not required to report passenger
                                              Collect PFC’S: Non-scheduled/on                         application. Therefore, the FAA limited
                                              demand air carriers filing FAA Form                                                                           statistics to the Federal government and
                                                                                                      the PFC amount based on the actual bid                (2) enplane 10 or fewer passengers per
                                              1800–31.                                                costs.
                                                 Determination: Approved. Based on                                                                          flight that is operated from Fort Wayne
                                                                                                         Construct new aircraft rescue and                  International Airport (FWA).
                                              information submitted in the public                     firefighting building design.
                                              agency’s application, the FAA has                                                                                Determination: Approved. Based on
                                                                                                         Determination: The application was
                                              determined that the approved class                                                                            information submitted in the public
                                                                                                      submitted with project costs based on
                                              accounts for less than 1 percent of the                                                                       agency’s application, the FAA has
                                                                                                      estimates. Before the FAA issued its
                                              total annual enplanements at Long                                                                             determined that the approved class
                                                                                                      PFC decision, the FAA became aware
                                              Island MacArthur Airport (ISP).                                                                               accounts for less than 1 percent of the
                                                                                                      that the actual bid costs were less than
                                                 Brief Description of Projects Approved                                                                     total annual enplanements at FWA.
                                                                                                      the amount requested in the PFC
                                              for Collection at ISP and Use at ISP:                                                                            Brief Description of Projects Approved
                                                                                                      application. Therefore, the FAA limited
                                              Signage improvements.                                                                                         for Collection and Use:
                                                                                                      the PFC amount based on the actual bid
                                              Install miscellaneous navigational aids.                costs.                                                Replace jet bridge 5.
                                              Construct parallel taxiway D.                              Brief Description of project Partially             Upgrade public address system to
                                              Runway 24 centerline/touchdown zone/                    Approved for Collection at ISP and Use                   digital.
                                                 runway guard lights.                                 at 23N: Replace existing perimeter fence              Snow removal vehicle with plow and
                                              Glycol treatment plant preliminary                      including two gates.                                     mid-mount broom attachments.
                                                 engineering.                                            Determination: The application was                 Snow removal vehicle with plow and
                                              Rehabilitate portions of runway 06/24.                  submitted with project costs based on                    mid-mount broom attachments.
                                                                                                                                                            Replace jet bridge 7.
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Re-cable portions of runway 06/24.                      estimates. Before the FAA issued its
                                              Sprinkler system, main terminal.                        PFC decision, the FAA became aware                    High speed runway snow broom.
                                              Acquire snow broom replacement.                         that the actual bid costs were less than              Commercial aircraft deicer.
                                              Acquire airfield deicing vehicle.                       the amount requested in the PFC                       Terminal building planning study.
                                              Construct underground glycol treatment                  application. Therefore, the FAA limited               Replace shared use infrastructure
                                                 plant—engineering design only.                       the PFC amount based on the actual bid                   technology environment equipment.
                                              Aviation demand update.                                 costs.                                                   Decision Date: January 6, 2015.


                                         VerDate Sep<11>2014   21:56 Feb 12, 2015   Jkt 235001   PO 00000   Frm 00073   Fmt 4703   Sfmt 4703   E:\FR\FM\13FEN1.SGM   13FEN1


                                              8128                          Federal Register / Vol. 80, No. 30 / Friday, February 13, 2015 / Notices

                                              FOR FURTHER INFORMATION CONTACT:                        Acquire aircraft rescue and firefighting                 Long term planning study.
                                              Michael Brown, Chicago Airports                           vehicle.                                               Determination: The FAA reviewed the
                                              District Office, (847) 294–7195.                        Rehabilitate taxiway (portions of                     supporting documentation and found
                                                 Public Agency: Bishop International                    taxiways A and A9).                                 that the documentation supported only
                                              Airport Authority, Flint, Michigan.                     Rehabilitate taxiway D.                               $6,801,500 in total project costs and not
                                                 Application Number: 14–02–C–00–                      PFC administration fees.                              the $7,551,500 amount shown in the
                                              FNT.                                                      Decision Date: January 7, 2015.                     PFC application.
                                                 Application Type: Impose and use a                   FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                               Long term development program—
                                              PFC.                                                    Jesse Lyman, Denver Airports District                 terminal design and construction.
                                                 PFC Level: $4.50.                                                                                             Determination: The FAA partially
                                                                                                      Office, (303) 342–1262.
                                                 Total PFC Revenue Approved in This                                                                         approved this project for two reasons.
                                                                                                        Public Agency: City of New Orleans
                                              Decision: $11,859,545.                                                                                        (1) The FAA reviewed the scope of the
                                                                                                      and New Orleans Aviation Board, New
                                                 Earliest Charge Effective Date: January                                                                    project and found that the following
                                                                                                      Orleans, Louisiana.
                                              1, 2018.                                                  Application Number: 14–11–C–00–                     work elements did not meet the
                                                 Estimated Charge Expiration Date:                    MSY.                                                  requirements of § 158.15(b): airport
                                              August 1, 2024.                                           Application Type: Impose and use a                  administration (operations offices),
                                                 Class of Air Carriers Not Required To                PFC.                                                  baggage service offices, airline ticket
                                              Collect PFC’S: Non-scheduled/on                           PFC Level: $3.00.                                   offices, Transportation Security
                                              demand air taxi operators filing FAA                      Total PFC Revenue Approved in This                  Administration offices, loading dock,
                                              Form 1800–31.                                           Decision: $400,733,236.                               storage, police station, central baggage
                                                 Determination: Approved. Based on                      Earliest Charge Effective Date:                     inspection system equipment (build out
                                              information submitted in the public                     February 1, 2026.                                     and equipment), and escalation and
                                              agency’s application, the FAA has                         Estimated Charge Expiration Date:                   contingency fees. (2) The public agency
                                              determined that the approved class                      September 1, 2043.                                    did not include a letter from Customs
                                              accounts for less than 1 percent of the                   Class of Air carriers Not Required To               and Border Control certifying that the
                                              total annual enplanements at Bishop                     Collect PFC’S: On-demand air taxi/                    Federal Inspection Services (FIS) facility
                                              International Airport.                                  commercial operations.                                is sized to the staffing levels that will be
                                                 Brief Description of Projects Approved                 Determination: Approved. Based on                   provided. Therefore, the FAA was not
                                              for Collection and Use:                                 information submitted in the public                   able to verify that the space requested
                                              Sand storage building.                                  agency’s application, the FAA has                     was the minimum necessary as required
                                              Removal of runway 5/23.                                 determined that the approved class                    in Table N–5 (1) of FAA Order
                                              Taxiway B construction.                                 accounts for less than 1 percent of the               5100.38D, Airport Improvement
                                              Cargo apron rehabilitation and                          total annual enplanements at Louis                    Program (AIP) Handbook, (September
                                                 conversion to deicing pad.                           Armstrong New Orleans International                   30, 2014). Therefore, PFC revenue
                                              Terminal improvements.                                  Airport.                                              cannot be used on items relating to the
                                              Terminal expansion.                                       Brief Description of Projects Approved              FIS facility.
                                              Acquisition and installation of                         for Collection and Use at a $4.50 PFC                    Long term development program—
                                                 passenger boarding bridges.                          Level:                                                airside design and construction.
                                              Terminal apron rehabilitation.                                                                                   Determination: The FAA reviewed the
                                                                                                      Airfield electrical design and
                                                                                                                                                            scope of the project and found that the
                                                 Decision Date: January 6, 2015.                        construction.
                                                                                                                                                            use of PFC revenue for contingencies
                                              FOR FURTHER INFORMATION CONTACT:                        Perimeter fencing replacement
                                                                                                                                                            does not meet the requirements of
                                              Irene Porter, Detroit Airports District                   construction.
                                                                                                                                                            § 158.15(b). Therefore, the public agency
                                              Office, (734) 229–2915.                                 Airfield pavement rehabilitation design
                                                                                                                                                            may not use PFC revenue for
                                                 Public Agency: City of Pueblo,                         and construction.
                                                                                                                                                            contingencies.
                                              Colorado.                                                 Brief Description of Projects Approved                 Long term development program—
                                                 Application Number: 15–03–C–00–                      for Collection and Use at a $3.00 PFC                 landside design and construction.
                                              PUB.                                                    Level:                                                   Determination: The FAA reviewed the
                                                 Application Type: Impose and use a                   Land use and development study.                       scope of the project and found that the
                                              PFC.                                                    Long term development feasibility                     following work elements do not meet
                                                 PFC Level: $4.50.                                      study.                                              the requirements of § 158.15(b).
                                                 Total PFC Revenue Approved in This                   Drainage pumping station design and                   Therefore, the public agency may not
                                              Decision: $833,789.                                       construction.                                       use PFC revenue on the following
                                                 Earliest Charge Effective Date: March                  Brief Description of Projects Partially             elements: contingencies; parking
                                              1, 2015.                                                Approved for Collection and Use at a                  structure(s); hotel infrastructure; access
                                                 Estimated Charge Expiration Date:                    $3.00 PFC Level: Airfield pavement                    roads (off-airport); landscaping within
                                              April 1, 2036.                                          condition study.                                      site development; surface parking; and
                                                 Class of Air Carriers Not Required To                  Determination: The FAA reviewed the                 utilities.
                                              Collect PFC’S: None.                                    scope of the project and found that the                  Brief Description of Disapproved
                                                 Brief Description of Projects Approved               following work elements do not meet                   Project: Access road improvements,
                                              for Collection and Use:                                 the requirements of § 158.15(b).                      design and construction.
                                              Rehabilitate runway 8L/26R and                          Therefore, PFC revenue cannot be used                    Determination: Table P–3(a)(6) of
tkelley on DSK3SPTVN1PROD with NOTICES




                                                 transition of crosswind runway 17/35.                on these elements: (1) Micro Paver                    FAA Order 5100.38D, AIP Handbook,
                                              Improve runway 8R/26L runway safety                     software (or an approved equal); (2)                  (September 30, 2014), requires that
                                                 area.                                                onsite training to airport staff; and (3)             eligible access roads must exclusively
                                              Construct replacement training runway.                  preparing an airfield signage plan                    serve airport traffic. This means that an
                                              Rehabilitate general aviation parking                   showing the plan location of the airfield             access road that serves both airport
                                                 apron.                                               signs, depicting sign type, style, size,              traffic and non-airport traffic cannot be
                                              Conduct wildlife hazard assessments.                    model, etc.                                           prorated. In mixed use situations of


                                         VerDate Sep<11>2014   21:56 Feb 12, 2015   Jkt 235001   PO 00000   Frm 00074   Fmt 4703   Sfmt 4703   E:\FR\FM\13FEN1.SGM   13FEN1


                                                                            Federal Register / Vol. 80, No. 30 / Friday, February 13, 2015 / Notices                                              8129

                                              airport/non-airport use, only the portion                 Estimated Charge Expiration Date:                     Public Agency: Hall County Airport
                                              of the road that is beyond the non-                     April 1, 2022.                                        Authority, Grand Island, Nebraska.
                                              airport access point is eligible. In this                 Class of Air Carriers Not Required To                 Application Number: 15–04–C–00–
                                              case, the proposed road is not beyond                   Collect PFC’S: Air taxi/commercial                    GRI.
                                              the non-airport access point and,                       operators filing FAA Form 1800–31.                      Application Type: Impose and use a
                                              therefore, the road is not PFC-eligible.                  Determination: Approved. Based on                   PFC.
                                                Brief Description of Withdrawn                        information submitted in the public
                                                                                                                                                              PFC level: $4.50.
                                              Project: Airfield lighting vault.                       agency’s application, the FAA has
                                                                                                      determined that the approved class                      Total PFC Revenue Approved in This
                                                Date of Withdrawal: September 3,                                                                            Decision: $3,711,558.
                                              2014.                                                   accounts for less than 1 percent of the
                                                Decision Date: January 9, 2015.                       total annual enplanements at Des                        Earliest Charge Effective Date: May 1,
                                                                                                      Moines International Airport.                         2016.
                                              FOR FURTHER INFORMATION CONTACT: Bill
                                                                                                        Brief Description of Projects Approved                Estimated Charge Expiration Date:
                                              Bell, Louisiana/New Mexico Airports
                                                                                                      for Collection and Use:                               March 1, 2031.
                                              Development Office, (817) 222–5664.
                                                Public Agency: City of Albany,                        Pre-conditioned air units affixed to                    Class of Air Carriers Not Required To
                                              Georgia.                                                  boarding bridges.                                   Collect PFC’S: None.
                                                Application Number: 15–07–C–00–                       Terminal area concept plan.                             Brief Description of Projects Approved
                                              ABY.                                                    Terminal capacity improvement project.                for Collection and Use:
                                                Application Type: Impose and use a                    Aircraft rescue and firefighting vehicle.
                                                                                                                                                            Terminal area master plan.
                                                                                                      Aircraft rescue and firefighting building
                                              PFC.                                                                                                          Conduct environmental assessment.
                                                                                                        communication upgrade.
                                                PFC Level: $4.50.                                     Aircraft rescue and firefighting road                 Improve terminal building—phase 1,
                                                Total PFC Revenue Approved in This                                                                            engineering services.
                                                                                                        construction.
                                              Decision: $105,777.                                     Runway 13/31 reconstruction.                          Improve terminal building—phase 2,
                                                Earliest Charge Effective Date: April 1,                                                                      construction.
                                                                                                        Decision Date: January 15, 2015.
                                              2015.
                                                Estimated Charge Expiration Date:                     FOR FURTHER INFORMATION CONTACT:                         Decision Date: January 20, 2015.
                                              June 1, 2016.                                           Sheila Bridges, Central Region Airports
                                                                                                                                                            FOR FURTHER INFORMATION CONTACT:
                                                Class of Air Carriers Not Required To                 Division, (816) 329–2638.
                                                                                                        Public Agency: Spokane Airport                      Sheila Bridges, Central Region Airports
                                              Collect PFC’S: Air taxi/commercial                                                                            Division, (816) 329–2638.
                                              operators filing FAA Form 1800–31 and                   Board, Spokane, Washington.
                                                                                                        Application Number: 15–10–C–00–                       Public Agency: City of Eugene,
                                              operating at Southwest Georgia Regional                                                                       Oregon.
                                              Airport (ABY).                                          GEG.
                                                                                                        Application Type: Impose and use a                    Application Number: 15–12–C–00–
                                                Determination: Approved. Based on                                                                           EUG.
                                                                                                      PFC.
                                              information submitted in the public                       PFC Level: $4.50.                                     Application Type: Impose and use a
                                              agency’s application, the FAA has                         Total PFC Revenue Approved in This                  PFC.
                                              determined that the approved class                      Decision: $15,036,120.
                                              accounts for less than 1 percent of the                                                                         PFC Level: $4.50.
                                                                                                        Earliest Charge Effective Date: July 1,               Total PFC Revenue Approved in This
                                              total annual enplanements at ABY.                       2015.
                                                Brief Description of Projects Approved                                                                      Decision: $5,422,230.
                                                                                                        Estimated Charge Expiration Date:
                                              for Collection and Use:                                 July 1, 2018.                                           Earliest Charge Effective Date: June 1,
                                              Wildlife hazard assessment.                               Class of Air Carriers Not Required To               2015.
                                              Commercial apron expansion.                             Collect PFC’S: None.                                    Estimated Charge Expiration Date:
                                                Brief Description of Project Partially                  Brief Description of Projects Approved              January 1, 2019.
                                              Approved for Collection and Use:                        for Collection and Use:                                 Class of Air Carriers Not Required To
                                              Communications building (new                            Terminal area plan (planning study).                  Collect PFC’S: Nonscheduled/on-
                                              equipment shelter).                                     Airfield perimeter security                           demand air carriers filing FAA Form
                                                Determination: The FAA determined                       enhancement.                                        1800–31.
                                              that only the demolition of the old                     Replacement of flight information                       Determination: Approved. Based on
                                              terminal building and relocation of the                   display systems and related flight                  information submitted in the public
                                              FAA communications equipment were                         announcement systems.                               agency’s application, the FAA has
                                              PFC eligible.                                           Terminal access control enhancements.                 determined that the approved class
                                                Decision Date: January 12, 2015.                      Glycol recovery solution design.                      accounts for less than 1 percent of the
                                                                                                      Elevator replacement.                                 total annual enplanements at Eugene
                                              FOR FURTHER INFORMATION CONTACT:                        PFC application and administration
                                              Parks Preston, Atlanta Airports District                                                                      Airport—Mahlon Sweet Field.
                                                                                                        fees.                                                 Brief Description of Projects Approved
                                              Office, (404) 305–7149.
                                                Public Agency: Des Moines Airport                       Brief Description of Withdrawn                      for Collection and Use:
                                              Authority, Des Moines, Iowa.                            Projects:                                             Access control upgrade and installation.
                                                Application Number: 15–14–C–00–                       Aircraft rescue and firefighting vehicle              B–3 ramp rehabilitation.
                                              DSM.                                                      replacement.                                        Terminal roof replacement.
                                                Application Type: Impose and use a                    Land acquisition.
                                                                                                                                                            Gate A1 jet bridge.
                                              PFC.                                                      Date of Withdrawal: December 5,
                                                                                                                                                            PFC administration costs.
tkelley on DSK3SPTVN1PROD with NOTICES




                                                PFC Level: $4.50.                                     2014.
                                                Total PFC Revenue Approved in This                      Decision Date: January 16, 2015.                      Decision Date: January 23, 2015.
                                              Decision: $6,865,187.                                   FOR FURTHER INFORMATION CONTACT:                      FOR FURTHER INFORMATION CONTACT:
                                                Earliest Charge Effective Date:                       Andrew Edstrom, Seattle Airports                      Andrew Edstrom, Seattle Airports
                                              December 1, 2020.                                       District Office, (425) 227–2641.                      District Office, (425) 227–2641.




                                         VerDate Sep<11>2014   21:56 Feb 12, 2015   Jkt 235001   PO 00000   Frm 00075   Fmt 4703   Sfmt 4703   E:\FR\FM\13FEN1.SGM   13FEN1


                                              8130                            Federal Register / Vol. 80, No. 30 / Friday, February 13, 2015 / Notices

                                                                                                           AMENDMENTS TO PFC APPROVALS
                                                                                                                                                                                 Original         Amended
                                                                                                                                            Original         Amended
                                                                                                                        Amendment                                               estimated         estimated
                                                                Amendment No., city, state                                                approved net      approved net
                                                                                                                       approved date                                             charge            charge
                                                                                                                                          PFC revenue       PFC revenue         exp. date         exp. date

                                              08–09–C–03–STL, St. Louis, MO ........................................        01/07/15       $758,497,059      $747,211,611          10/01/26          04/01/26
                                              08–04–C–01–HLN, Helena, MT ..........................................         01/07/15            893,513           893,476          07/01/17          02/01/16
                                              12–04–C–01–TWF, Twin Falls, ID ......................................         01/15/15            543,523           556,066          06/01/16          06/01/17



                                                Issued in Washington, DC on February 9,                 incorporated in a Federal-aid                           Dated: February 6, 2015.
                                              2015.                                                     construction project. The regulation also             Gregory G. Nadeau,
                                              Joe Hebert,                                               provides for a waiver of the Buy                      Acting Administrator, Federal Highway
                                              Manager, Financial Analysis and Passenger                 America requirements when the                         Administration.
                                              Facility Charge Branch.                                   application would be inconsistent with                [FR Doc. 2015–03031 Filed 2–12–15; 8:45 am]
                                              [FR Doc. 2015–03063 Filed 2–12–15; 8:45 am]               the public interest or when satisfactory              BILLING CODE 4910–22–P
                                              BILLING CODE 4910–13–P                                    quality domestic steel and iron products
                                                                                                        are not sufficiently available. This
                                                                                                        notice provides information regarding                 DEPARTMENT OF TRANSPORTATION
                                              DEPARTMENT OF TRANSPORTATION
                                                                                                        FHWA’s finding that a Buy America                     Federal Highway Administration
                                              Federal Highway Administration                            waiver is appropriate in procurement of
                                                                                                        non-domestic U–69 guard bars,                         Buy America Waiver Notification
                                              Buy America Waiver Notification                           manganese casting, turnout braces, and
                                                                                                                                                              AGENCY: Federal Highway
                                                                                                        weld kits for CREATE rail projects in
                                              AGENCY: Federal Highway                                                                                         Administration (FHWA), DOT.
                                              Administration (FHWA), DOT.                               Chicago, Illinois.
                                                                                                                                                              ACTION: Notice.
                                              ACTION: Notice.                                              In accordance with Division A,
                                                                                                        section 122 of the ‘‘Consolidated and                 SUMMARY:    This notice provides
                                              SUMMARY:    This notice provides                          Further Continuing Appropriations Act,                information regarding the FHWA’s
                                              information regarding FHWA’s finding                      2012’’ (Pub. L. 112–55), FHWA                         finding that a Buy America waiver is
                                              that a Buy America waiver is                              published a notice of intent to issue a               appropriate for the use of non-domestic
                                              appropriate for the use of non-domestic                   waiver on its Web site for non-domestic               4 in. and 12 in. trunnion mounted steel
                                              U–69 guard bars, manganese casting,                       U–69 guard bars, manganese casting,                   ball valves with maximum allowable
                                              turnout braces, and weld kits for                         turnout braces, and weld kits (http://                operating pressure of 60 psi as part of
                                              CREATE rail projects in Chicago,                          www.fhwa.dot.gov/construction/                        natural gas distribution facility involved
                                              Illinois.                                                                                                       in replacement of Kosciuszko Bridge
                                                                                                        contracts/waivers.cfm?id=103) on
                                              DATES: The effective date of the waiver                                                                         over Newton Creek in New York City,
                                                                                                        December 9, 2014. The FHWA received
                                              is February 17, 2015.                                                                                           NY.
                                                                                                        no comments in response to the
                                              FOR FURTHER INFORMATION CONTACT: For                      publication. During the 15-day comment                DATES: The effective date of the waiver
                                              questions about this notice, please                       period, FHWA conducted additional                     is February 17, 2015.
                                              contact Mr. Gerald Yakowenko, FHWA                        nationwide review to locate potential                 FOR FURTHER INFORMATION CONTACT: For
                                              Office of Program Administration, (202)                   domestic manufacturers of U–69 guard                  questions about this notice, please
                                              366–1562, or via email at                                 bars, manganese casting, turnout braces,              contact Mr. Gerald Yakowenko, FHWA
                                              gerald.yakowenko@dot.gov. For legal                       and weld kits. Based on all the                       Office of Program Administration, (202)
                                              questions, please contact Mr. Jomar                       information available to the agency,                  366–1562, or via email at
                                              Maldonado, FHWA Office of the Chief                       FHWA concludes that there are no                      gerald.yakowenko@dot.gov. For legal
                                              Counsel, (202) 366–1373, or via email at                                                                        questions, please contact Mr. Jomar
                                                                                                        domestic manufacturers of the U–69
                                              Jomar.Maldonado@dot.gov. Office hours                                                                           Maldonado, FHWA Office of the Chief
                                                                                                        guard bars, manganese casting, turnout
                                              for the FHWA are from 8:00 a.m. to 4:30                                                                         Counsel, (202) 366–1373, or via email at
                                              p.m., e.t., Monday through Friday,                        braces, and weld kits.
                                                                                                                                                              Jomar.Maldonado@dot.gov. Office hours
                                              except Federal holidays.                                     In accordance with the provisions of               for the FHWA are from 8:00 a.m. to 4:30
                                              SUPPLEMENTARY INFORMATION:                                section 117 of the SAFETEA–LU                         p.m., e.t., Monday through Friday,
                                                                                                        Technical Corrections Act of 2008 (Pub.               except Federal holidays.
                                              Electronic Access                                         L. 110–244, 122 Stat. 1572), FHWA is                  SUPPLEMENTARY INFORMATION:
                                                An electronic copy of this document                     providing this notice as its finding that
                                              may be downloaded from the Federal                        a waiver of Buy America requirements                  Electronic Access
                                              Register’s home page at: http://                          is appropriate. The FHWA invites                        An electronic copy of this document
                                              www.archives.gov and the Government                       public comment on this finding for an                 may be downloaded from the Federal
                                              Publishing Office’s database at: http://                  additional 15 days following the                      Register’s home page at: http://
                                              www.access.gpo.gov/nara.                                  effective date of the finding. Comments               www.archives.gov and the Government
tkelley on DSK3SPTVN1PROD with NOTICES




                                                                                                        may be submitted to FHWA’s Web site                   Publishing Office’s database at: http://
                                              Background
                                                                                                        via the link provided to the Illinois                 www.access.gpo.gov/nara.
                                                 The FHWA’s Buy America policy in
                                              23 CFR 635.410 requires a domestic                        waiver page noted above.                              Background
                                              manufacturing process for any steel or                      Authority: 23 U.S.C. 313; Pub. L. 110–161,            The FHWA’s Buy America policy in
                                              iron products (including protective                       23 CFR 635.410.                                       23 CFR 635.410 requires a domestic
                                              coatings) that are permanently                                                                                  manufacturing process for any steel or


                                         VerDate Sep<11>2014    21:56 Feb 12, 2015   Jkt 235001   PO 00000    Frm 00076   Fmt 4703   Sfmt 4703   E:\FR\FM\13FEN1.SGM   13FEN1



Document Created: 2015-12-18 13:18:12
Document Modified: 2015-12-18 13:18:12
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionMonthly Notice of PFC Approvals and Disapprovals. In January 2015, there were nine applications approved. This notice also includes information on two applications, one approved in May 2012 and the other disapproved in November 2014, inadvertently left off the May 2012 and November 2014 notices, respectively. Additionally, three approved amendments to previously approved applications are listed.
DatesNovember 20, 2014.
ContactLori Ledebohm, Harrisburg Airports District Office, (717) 730-2835.
FR Citation80 FR 8126 