80_FR_81553 80 FR 81304 - Pelzer Hydro Company, LLC; Consolidated Hydro Southeast, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments

80 FR 81304 - Pelzer Hydro Company, LLC; Consolidated Hydro Southeast, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 249 (December 29, 2015)

Page Range81304-81305
FR Document2015-32697

Federal Register, Volume 80 Issue 249 (Tuesday, December 29, 2015)
[Federal Register Volume 80, Number 249 (Tuesday, December 29, 2015)]
[Notices]
[Pages 81304-81305]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-32697]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 10253-032]


Pelzer Hydro Company, LLC; Consolidated Hydro Southeast, LLC; 
Notice of Application Tendered for Filing With the Commission and 
Soliciting Additional Study Requests and Establishing Procedural 
Schedule for Relicensing and a Deadline for Submission of Final 
Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Minor New License.

[[Page 81305]]

    b. Project No.: P-10253-032.
    c. Date filed: November 30, 2015.
    d. Applicant: Pelzer Hydro Company, LLC and Consolidated Hydro 
Southeast, LLC.
    e. Name of Project: Lower Pelzer Hydroelectric Project.
    f. Location: On the Saluda River, in Anderson and Greenville 
Counties, South Carolina. The project does not occupy lands of the 
United States.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)--825(r).
    h. Applicant Contact: Beth E. Harris, P.E., Regional Operations 
Manager, Enel Green Power North America, Inc., 11 Anderson St., 
Piedmont, SC 29674; (864) 846-0042; [email protected]
    i. FERC Contact: Sean Murphy, (202) 502-6145 or 
[email protected].
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See, 94 FERC ] 
61,076 (2001).
    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: January 29, 2016
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support 
at [email protected], (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). In lieu of electronic filing, please send a paper copy 
to: Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE., Washington, DC 20426. The first page of any filing should include 
docket number P-10253-032.
    m. The application is not ready for environmental analysis at this 
time.
    n. The Lower Pelzer Hydroelectric Project consists of: (a) a 
granite masonry dam with 310-foot-long overflow spillway section 
surmounted with four-foot-high flashboards, a 40-foot-long non-overflow 
section incorporating two gates and openings, a 110-foot-long 
powerhouse, and a 236-foot-long non-overflow section; (b) a reservoir 
with a surface area of 80 acres and a storage capacity of 400 acre-feet 
at an elevation of 693 feet m.s.l.; (c) a 600 foot-long tailrace; (d) 
four 750-kVA synchronous generators and a 300-kVA synchronous generator 
for a total generating capacity of 3,300 kW; (e) 3.3-kVA generator 
leads; (f) a 3-mile-long 3.3-kVA overhead transmission line; and (g) 
appurtenant facilities.
    o. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    p. Procedural schedule and final amendments: The application will 
be processed according to the following preliminary Hydro Licensing 
Schedule. Revisions to the schedule will be made as appropriate.

Issue Notice of Acceptance............  August 2016.
Issue Scoping Document 1 for comments.  October 2016.
Comments on Scoping Document 1due.....  December 2016.
Issue Scoping Document 2..............  February 2017.
Issue notice of ready for               March 2017.
 environmental analysis.
Commission issues EA..................  October 2017.
Comments on EA due....................  November 2017.
Commission issues final EA............  January 2018.
 

    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-32697 Filed 12-28-15; 8:45 am]
 BILLING CODE 6717-01-P



                                                    81304                        Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices

                                                      (7) Annual Estimated Number of                             The Commission encourages                            the Commission’s Rules of Practice and
                                                    Burden Hours: 14,266; and                                 electronic submission of protests and                   Procedure (18 CFR 385.211, 385.214).
                                                      (8) Annual Estimated Reporting and                      interventions in lieu of paper using the                Protests will be considered by the
                                                    Recordkeeping Cost Burden: There are                      ‘‘eFiling’’ link at http://www.ferc.gov.                Commission in determining the
                                                    no additional costs associated with the                   Persons unable to file electronically                   appropriate action to be taken, but will
                                                    surveys other than the burden hours.                      should submit an original and 5 copies                  not serve to make protestants parties to
                                                    The information is maintained in the                      of the protest or intervention to the                   the proceeding. Any person wishing to
                                                    normal course of business. The cost of                    Federal Energy Regulatory Commission,                   become a party must file a notice of
                                                    burden hours to the respondents is                        888 First Street NE., Washington, DC                    intervention or motion to intervene, as
                                                    estimated to be $1,026,724 (14,266                        20426.                                                  appropriate. The Respondent’s answer
                                                    burden hours times $71.97 per hour).                         This filing is accessible on-line at                 and all interventions, or protests must
                                                    Therefore, other than the cost of burden                  http://www.ferc.gov, using the                          be filed on or before the comment date.
                                                    hours, FE estimates that there are no                     ‘‘eLibrary’’ link and is available for                  The Respondent’s answer, motions to
                                                    additional costs for generating,                          electronic review in the Commission’s                   intervene, and protests must be served
                                                    maintaining and providing the                             Public Reference Room in Washington,                    on the Complainants.
                                                    information.                                              DC. There is an ‘‘eSubscription’’ link on                  The Commission encourages
                                                      Statutory Authority: Section 13(b) of the               the Web site that enables subscribers to                electronic submission of protests and
                                                    Federal Energy Administration Act of 1974,                receive email notification when a                       interventions in lieu of paper using the
                                                    Public Law 93–275, codified at 15 U.S.C.                  document is added to a subscribed                       ‘‘eFiling’’ link at http://www.ferc.gov.
                                                    772(b) and Section 3 of the Natural Gas Act               docket(s). For assistance with any FERC                 Persons unable to file electronically
                                                    of 1938, codified at 15 U.S.C. 717b.                      Online service, please email                            should submit an original and 5 copies
                                                      Issued in Washington, DC, on December                   FERCOnlineSupport@ferc.gov, or call                     of the protest or intervention to the
                                                    22, 2015.                                                 (866) 208–3676 (toll free). For TTY, call               Federal Energy Regulatory Commission,
                                                    Nanda Srinivasan,                                         (202) 502–8659.                                         888 First Street NE., Washington, DC
                                                    Director, Office of Survey Development and                   Comment Date: 5:00 p.m. Eastern                      20426.
                                                    Statistical Integration, U.S. Energy                      Time on January 11, 2016.                                  This filing is accessible on-line at
                                                    Information Administration.                                                                                       http://www.ferc.gov, using the
                                                                                                                Dated: December 22, 2015.                             ‘‘eLibrary’’ link and is available for
                                                    [FR Doc. 2015–32721 Filed 12–28–15; 8:45 am]
                                                                                                              Nathaniel J. Davis, Sr.,                                electronic review in the Commission’s
                                                    BILLING CODE 6450–01–P
                                                                                                              Deputy Secretary.                                       Public Reference Room in Washington,
                                                                                                              [FR Doc. 2015–32695 Filed 12–28–15; 8:45 am]            DC There is an ‘‘eSubscription’’ link on
                                                    DEPARTMENT OF ENERGY                                      BILLING CODE 6717–01–P                                  the Web site that enables subscribers to
                                                                                                                                                                      receive email notification when a
                                                    Federal Energy Regulatory                                                                                         document is added to a subscribed
                                                    Commission                                                DEPARTMENT OF ENERGY                                    docket(s). For assistance with any FERC
                                                    [Docket No. ID–7551–002]
                                                                                                                                                                      Online service, please email
                                                                                                              Federal Energy Regulatory                               FERCOnlineSupport@ferc.gov, or call
                                                    Zapalac, Will; Notice of Filing                           Commission                                              (866) 208–3676 (toll free). For TTY, call
                                                                                                              [Docket No. EL16–22–000]                                (202) 502–8659.
                                                      Take notice that on December 21,                                                                                   Comment Date: 5:00 p.m. Eastern
                                                    2015, Will Zapalac submitted for filing,                  Lotus Energy Group, LLC v. ISO New                      Time on January 21, 2016.
                                                    an application for authority to hold                      England Inc.; Notice of Complaint                         Dated: December 22, 2015.
                                                    interlocking positions, pursuant to                                                                               Nathaniel J. Davis, Sr.,
                                                    section 305(b) of the Federal Power Act                     Take notice that on December 22,
                                                                                                                                                                      Deputy Secretary.
                                                    (FPA) 1 and Part 45 of the Federal                        2015, pursuant to Rule 206 1 of the
                                                                                                              Federal Energy Regulatory                               [FR Doc. 2015–32694 Filed 12–28–15; 8:45 am]
                                                    Energy Regulatory Commission’s
                                                    (Commission) 2 Rules of Practice and                      Commission’s (Commission) Rules of                      BILLING CODE 6717–01–P

                                                    Procedure.                                                Practice, Lotus Energy Group, LLC
                                                      Any person desiring to intervene or to                  (Complainant) filed a formal complaint
                                                                                                              against ISO New England Inc.                            DEPARTMENT OF ENERGY
                                                    protest this filing must file in
                                                    accordance with Rules 211 and 214 of                      (Respondent), alleging that                             Federal Energy Regulatory
                                                    the Commission’s Rules of Practice and                    Respondent’s application of existing                    Commission
                                                    Procedure (18 CFR 385.211, 385.214).                      New Resource Offer Floor Price rules to
                                                    Protests will be considered by the                        two merchant combustion turbine                         [Project No. 10253–032]
                                                    Commission in determining the                             generating facilities currently being
                                                                                                              developed by Complainant is unjust and                  Pelzer Hydro Company, LLC;
                                                    appropriate action to be taken, but will
                                                                                                              unreasonable.                                           Consolidated Hydro Southeast, LLC;
                                                    not serve to make protestants parties to                                                                          Notice of Application Tendered for
                                                    the proceeding. Any person wishing to                       Complainant certifies that copies of
                                                                                                                                                                      Filing With the Commission and
                                                    become a party must file a notice of                      the complaint were served on the
                                                                                                                                                                      Soliciting Additional Study Requests
                                                    intervention or motion to intervene, as                   contacts for Respondent as listed on the
                                                                                                                                                                      and Establishing Procedural Schedule
                                                                                                              Commission’s list of Corporate Officials.
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    appropriate. Such notices, motions, or                                                                            for Relicensing and a Deadline for
                                                    protests must be filed on or before the                   In addition, Complainant also served all
                                                                                                                                                                      Submission of Final Amendments
                                                    comment date. On or before the                            parties listed on the service list in
                                                    comment date, it is not necessary to                      Docket No. ER16–308–000.                                  Take notice that the following
                                                    serve motions to intervene or protests                      Any person desiring to intervene or to                hydroelectric application has been filed
                                                    on persons other than the Applicant.                      protest this filing must file in                        with the Commission and is available
                                                                                                              accordance with Rules 211 and 214 of                    for public inspection.
                                                      1 16   U.S.C. 825d(b) (2012).                                                                                     a. Type of Application: Minor New
                                                      2 18   CFR part 45 (2015).                                1 18   CFR 385.206 (2011).                            License.


                                               VerDate Sep<11>2014     19:17 Dec 28, 2015   Jkt 238001   PO 00000   Frm 00033    Fmt 4703    Sfmt 4703   E:\FR\FM\29DEN1.SGM   29DEN1


                                                                               Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices                                            81305

                                                       b. Project No.: P–10253–032.                            n. The Lower Pelzer Hydroelectric                  DEPARTMENT OF ENERGY
                                                       c. Date filed: November 30, 2015.                    Project consists of: (a) a granite masonry
                                                       d. Applicant: Pelzer Hydro Company,                  dam with 310-foot-long overflow                       Federal Energy Regulatory
                                                    LLC and Consolidated Hydro Southeast,                   spillway section surmounted with four-                Commission
                                                    LLC.                                                    foot-high flashboards, a 40-foot-long                 [Docket No. CP16–35–000]
                                                       e. Name of Project: Lower Pelzer                     non-overflow section incorporating two
                                                    Hydroelectric Project.                                  gates and openings, a 110-foot-long                   First ECA Midstream LLC; Notice of
                                                       f. Location: On the Saluda River, in                 powerhouse, and a 236-foot-long non-                  Application
                                                    Anderson and Greenville Counties,                       overflow section; (b) a reservoir with a
                                                    South Carolina. The project does not                    surface area of 80 acres and a storage                   Take notice that on December 18,
                                                    occupy lands of the United States.                      capacity of 400 acre-feet at an elevation             2015, First ECA Midstream LLC
                                                       g. Filed Pursuant to: Federal Power                  of 693 feet m.s.l.; (c) a 600 foot-long               (FECAM), filed an application pursuant
                                                    Act 16 U.S.C. 791 (a)—825(r).                           tailrace; (d) four 750-kVA synchronous                to section 7(c) of the Natural Gas Act
                                                       h. Applicant Contact: Beth E. Harris,                generators and a 300-kVA synchronous                  (NGA), and Parts 157 and 284 of the
                                                    P.E., Regional Operations Manager, Enel                 generator for a total generating capacity             Commission’s Regulations, for a
                                                    Green Power North America, Inc., 11                     of 3,300 kW; (e) 3.3-kVA generator                    certificate of public convenience and
                                                    Anderson St., Piedmont, SC 29674;                       leads; (f) a 3-mile-long 3.3-kVA                      necessity to own, operate as an
                                                    (864) 846–0042; Beth.Harris@Enel.com                    overhead transmission line; and (g)                   interstate pipeline, and maintain an
                                                       i. FERC Contact: Sean Murphy, (202)                  appurtenant facilities.                               existing approximately 16 mile, 4–16
                                                    502–6145 or sean.murphy@ferc.gov.                          o. A copy of the application is                    inch diameter natural gas pipeline
                                                       j. Cooperating agencies: Federal, state,             available for review at the Commission                located in Clearfield and Elk Counties,
                                                    local, and tribal agencies with                         in the Public Reference Room or may be                Pennsylvania. Also, FECAM requests
                                                    jurisdiction and/or special expertise                   viewed on the Commission’s Web site at                Blanket Certificates and Waivers of the
                                                    with respect to environmental issues                    http://www.ferc.gov using the                         tariff requirements, related accounting,
                                                    that wish to cooperate in the                           ‘‘eLibrary’’ link. Enter the docket                   and other regulatory requirements. The
                                                    preparation of the environmental                        number excluding the last three digits in             filing may also be viewed on the Web
                                                    document should follow the                              the docket number field to access the                 at http://www.ferc.gov using the
                                                    instructions for filing such requests                   document. For assistance, contact FERC                ‘‘eLibrary’’ link. Enter the docket
                                                    described in item l below. Cooperating                  Online Support. A copy is also available              number excluding the last three digits in
                                                    agencies should note the Commission’s                   for inspection and reproduction at the                the docket number field to access the
                                                    policy that agencies that cooperate in                  address in item h above.                              document. For assistance, contact FERC
                                                    the preparation of the environmental                       You may also register online at http://            at FERCOnlineSupport@ferc.gov or call
                                                    document cannot also intervene. See, 94                 www.ferc.gov/docs-filing/                             toll-free, (866) 208–3676 or TYY, (202)
                                                    FERC ¶ 61,076 (2001).                                   esubscription.asp to be notified via                  502–8659.
                                                       k. Pursuant to section 4.32(b)(7) of 18              email of new filings and issuances                       Any questions regarding this
                                                    CFR of the Commission’s regulations, if                 related to this or other pending projects.            application should be directed to
                                                    any resource agency, Indian Tribe, or                   For assistance, contact FERC Online                   Benjamin M. Sullivan, First ECA
                                                    person believes that an additional                      Support.                                              Midstream LLC, 500 Corporate Landing,
                                                    scientific study should be conducted in                    p. Procedural schedule and final                   Charleston, West Virginia 25311,
                                                    order to form an adequate factual basis                 amendments: The application will be                   telephone (304) 925–6100, fax (304)
                                                    for a complete analysis of the                          processed according to the following                  925–3285, email: bsullivan@eca.com; or
                                                    application on its merit, the resource                  preliminary Hydro Licensing Schedule.                 Randall S. Rich, Pierce Atwood LLP,
                                                    agency, Indian Tribe, or person must file               Revisions to the schedule will be made                900 17th Street NW., Suite 350,
                                                    a request for a study with the                          as appropriate.                                       Washington, DC 20006, phone (202)
                                                    Commission not later than 60 days from                  Issue Notice of Accept-        August 2016.
                                                                                                                                                                  530–6424, email: rrich@
                                                    the date of filing of the application, and                 ance.                                              pierceatwood.com.
                                                    serve a copy of the request on the                      Issue Scoping Docu-            October 2016.             The existing pipeline currently is
                                                    applicant.                                                 ment 1 for comments.                               used solely for the gathering of natural
                                                       l. Deadline for filing additional study              Comments on Scoping            December 2016.         gas for delivery to the interstate pipeline
                                                    requests and requests for cooperating                      Document 1due.                                     system of Dominion Transmission, Inc.
                                                    agency status: January 29, 2016                         Issue Scoping Docu-            February 2017.         (DTI) and National Fuel Gas Supply
                                                       The Commission strongly encourages                      ment 2.                                            Corporation (NFG). FECAM requests
                                                    electronic filing. Please file additional               Issue notice of ready          March 2017.            Commission’s approval of using the
                                                                                                               for environmental                                  pipeline for the purpose of transporting
                                                    study requests and requests for
                                                                                                               analysis.
                                                    cooperating agency status using the                     Commission issues EA           October 2017.          natural gas in interstate commerce. The
                                                    Commission’s eFiling system at http://                  Comments on EA due ..          November 2017.         existing pipeline not only will continue
                                                    www.ferc.gov/docs-filing/efiling.asp. For               Commission issues              January 2018.          to deliver natural gas to DTI and NFG,
                                                    assistance, please contact FERC Online                     final EA.                                          but also will receive natural gas from
                                                    Support at FERCOnlineSupport@                              Final amendments to the application                DTI. The existing pipeline will transport
                                                    ferc.gov, (866) 208–3676 (toll free), or                must be filed with the Commission no                  certain of natural gas received from DTI
                                                    (202) 502–8659 (TTY). In lieu of                                                                              to a power plant operated by NRG
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                            later than 30 days from the issuance
                                                    electronic filing, please send a paper                  date of the notice of ready for                       REMA LLC (REMA), in Shawville,
                                                    copy to: Secretary, Federal Energy                      environmental analysis.                               Pennsylvania. FECAM will construct
                                                    Regulatory Commission, 888 First Street                                                                       measurement and regulating facilities to
                                                    NE., Washington, DC 20426. The first                      Dated: December 22, 2015.                           receive gas from DTI and a tap for
                                                    page of any filing should include docket                Nathaniel J. Davis, Sr.,                              delivery gas to the power plant’s line
                                                    number P–10253–032.                                     Deputy Secretary.                                     pursuant to the blanket certificate.
                                                       m. The application is not ready for                  [FR Doc. 2015–32697 Filed 12–28–15; 8:45 am]          FECAM, REMA, and their affiliates have
                                                    environmental analysis at this time.                    BILLING CODE 6717–01–P                                entered into an agreement for the firm


                                               VerDate Sep<11>2014   19:17 Dec 28, 2015   Jkt 238001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\29DEN1.SGM   29DEN1



Document Created: 2015-12-29 10:15:16
Document Modified: 2015-12-29 10:15:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation80 FR 81304 

2025 Federal Register | Disclaimer | Privacy Policy