80_FR_81554 80 FR 81305 - First ECA Midstream LLC; Notice of Application

80 FR 81305 - First ECA Midstream LLC; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 249 (December 29, 2015)

Page Range81305-81306
FR Document2015-32692

Federal Register, Volume 80 Issue 249 (Tuesday, December 29, 2015)
[Federal Register Volume 80, Number 249 (Tuesday, December 29, 2015)]
[Notices]
[Pages 81305-81306]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-32692]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-35-000]


First ECA Midstream LLC; Notice of Application

    Take notice that on December 18, 2015, First ECA Midstream LLC 
(FECAM), filed an application pursuant to section 7(c) of the Natural 
Gas Act (NGA), and Parts 157 and 284 of the Commission's Regulations, 
for a certificate of public convenience and necessity to own, operate 
as an interstate pipeline, and maintain an existing approximately 16 
mile, 4-16 inch diameter natural gas pipeline located in Clearfield and 
Elk Counties, Pennsylvania. Also, FECAM requests Blanket Certificates 
and Waivers of the tariff requirements, related accounting, and other 
regulatory requirements. The filing may also be viewed on the Web at 
http://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
[email protected] or call toll-free, (866) 208-3676 or TYY, 
(202) 502-8659.
    Any questions regarding this application should be directed to 
Benjamin M. Sullivan, First ECA Midstream LLC, 500 Corporate Landing, 
Charleston, West Virginia 25311, telephone (304) 925-6100, fax (304) 
925-3285, email: [email protected]; or Randall S. Rich, Pierce Atwood 
LLP, 900 17th Street NW., Suite 350, Washington, DC 20006, phone (202) 
530-6424, email: [email protected].
    The existing pipeline currently is used solely for the gathering of 
natural gas for delivery to the interstate pipeline system of Dominion 
Transmission, Inc. (DTI) and National Fuel Gas Supply Corporation 
(NFG). FECAM requests Commission's approval of using the pipeline for 
the purpose of transporting natural gas in interstate commerce. The 
existing pipeline not only will continue to deliver natural gas to DTI 
and NFG, but also will receive natural gas from DTI. The existing 
pipeline will transport certain of natural gas received from DTI to a 
power plant operated by NRG REMA LLC (REMA), in Shawville, 
Pennsylvania. FECAM will construct measurement and regulating 
facilities to receive gas from DTI and a tap for delivery gas to the 
power plant's line pursuant to the blanket certificate. FECAM, REMA, 
and their affiliates have entered into an agreement for the firm

[[Page 81306]]

transportation of 152,000 dekatherms per day of natural gas on the 
existing pipeline for an initial term of 10 years.
    Pursuant to Section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule will serve to 
notify federal and state agencies of the timing for the completion of 
all necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 5 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    Motions to intervene, protests and comments may be filed 
electronically via the Internet in lieu of paper; see, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. The Commission strongly encourages 
electronic filings.
    Comment Date: 5:00 p.m. Eastern Time on January 12, 2016. .

    Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-32692 Filed 12-28-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices                                            81305

                                                       b. Project No.: P–10253–032.                            n. The Lower Pelzer Hydroelectric                  DEPARTMENT OF ENERGY
                                                       c. Date filed: November 30, 2015.                    Project consists of: (a) a granite masonry
                                                       d. Applicant: Pelzer Hydro Company,                  dam with 310-foot-long overflow                       Federal Energy Regulatory
                                                    LLC and Consolidated Hydro Southeast,                   spillway section surmounted with four-                Commission
                                                    LLC.                                                    foot-high flashboards, a 40-foot-long                 [Docket No. CP16–35–000]
                                                       e. Name of Project: Lower Pelzer                     non-overflow section incorporating two
                                                    Hydroelectric Project.                                  gates and openings, a 110-foot-long                   First ECA Midstream LLC; Notice of
                                                       f. Location: On the Saluda River, in                 powerhouse, and a 236-foot-long non-                  Application
                                                    Anderson and Greenville Counties,                       overflow section; (b) a reservoir with a
                                                    South Carolina. The project does not                    surface area of 80 acres and a storage                   Take notice that on December 18,
                                                    occupy lands of the United States.                      capacity of 400 acre-feet at an elevation             2015, First ECA Midstream LLC
                                                       g. Filed Pursuant to: Federal Power                  of 693 feet m.s.l.; (c) a 600 foot-long               (FECAM), filed an application pursuant
                                                    Act 16 U.S.C. 791 (a)—825(r).                           tailrace; (d) four 750-kVA synchronous                to section 7(c) of the Natural Gas Act
                                                       h. Applicant Contact: Beth E. Harris,                generators and a 300-kVA synchronous                  (NGA), and Parts 157 and 284 of the
                                                    P.E., Regional Operations Manager, Enel                 generator for a total generating capacity             Commission’s Regulations, for a
                                                    Green Power North America, Inc., 11                     of 3,300 kW; (e) 3.3-kVA generator                    certificate of public convenience and
                                                    Anderson St., Piedmont, SC 29674;                       leads; (f) a 3-mile-long 3.3-kVA                      necessity to own, operate as an
                                                    (864) 846–0042; Beth.Harris@Enel.com                    overhead transmission line; and (g)                   interstate pipeline, and maintain an
                                                       i. FERC Contact: Sean Murphy, (202)                  appurtenant facilities.                               existing approximately 16 mile, 4–16
                                                    502–6145 or sean.murphy@ferc.gov.                          o. A copy of the application is                    inch diameter natural gas pipeline
                                                       j. Cooperating agencies: Federal, state,             available for review at the Commission                located in Clearfield and Elk Counties,
                                                    local, and tribal agencies with                         in the Public Reference Room or may be                Pennsylvania. Also, FECAM requests
                                                    jurisdiction and/or special expertise                   viewed on the Commission’s Web site at                Blanket Certificates and Waivers of the
                                                    with respect to environmental issues                    http://www.ferc.gov using the                         tariff requirements, related accounting,
                                                    that wish to cooperate in the                           ‘‘eLibrary’’ link. Enter the docket                   and other regulatory requirements. The
                                                    preparation of the environmental                        number excluding the last three digits in             filing may also be viewed on the Web
                                                    document should follow the                              the docket number field to access the                 at http://www.ferc.gov using the
                                                    instructions for filing such requests                   document. For assistance, contact FERC                ‘‘eLibrary’’ link. Enter the docket
                                                    described in item l below. Cooperating                  Online Support. A copy is also available              number excluding the last three digits in
                                                    agencies should note the Commission’s                   for inspection and reproduction at the                the docket number field to access the
                                                    policy that agencies that cooperate in                  address in item h above.                              document. For assistance, contact FERC
                                                    the preparation of the environmental                       You may also register online at http://            at FERCOnlineSupport@ferc.gov or call
                                                    document cannot also intervene. See, 94                 www.ferc.gov/docs-filing/                             toll-free, (866) 208–3676 or TYY, (202)
                                                    FERC ¶ 61,076 (2001).                                   esubscription.asp to be notified via                  502–8659.
                                                       k. Pursuant to section 4.32(b)(7) of 18              email of new filings and issuances                       Any questions regarding this
                                                    CFR of the Commission’s regulations, if                 related to this or other pending projects.            application should be directed to
                                                    any resource agency, Indian Tribe, or                   For assistance, contact FERC Online                   Benjamin M. Sullivan, First ECA
                                                    person believes that an additional                      Support.                                              Midstream LLC, 500 Corporate Landing,
                                                    scientific study should be conducted in                    p. Procedural schedule and final                   Charleston, West Virginia 25311,
                                                    order to form an adequate factual basis                 amendments: The application will be                   telephone (304) 925–6100, fax (304)
                                                    for a complete analysis of the                          processed according to the following                  925–3285, email: bsullivan@eca.com; or
                                                    application on its merit, the resource                  preliminary Hydro Licensing Schedule.                 Randall S. Rich, Pierce Atwood LLP,
                                                    agency, Indian Tribe, or person must file               Revisions to the schedule will be made                900 17th Street NW., Suite 350,
                                                    a request for a study with the                          as appropriate.                                       Washington, DC 20006, phone (202)
                                                    Commission not later than 60 days from                  Issue Notice of Accept-        August 2016.
                                                                                                                                                                  530–6424, email: rrich@
                                                    the date of filing of the application, and                 ance.                                              pierceatwood.com.
                                                    serve a copy of the request on the                      Issue Scoping Docu-            October 2016.             The existing pipeline currently is
                                                    applicant.                                                 ment 1 for comments.                               used solely for the gathering of natural
                                                       l. Deadline for filing additional study              Comments on Scoping            December 2016.         gas for delivery to the interstate pipeline
                                                    requests and requests for cooperating                      Document 1due.                                     system of Dominion Transmission, Inc.
                                                    agency status: January 29, 2016                         Issue Scoping Docu-            February 2017.         (DTI) and National Fuel Gas Supply
                                                       The Commission strongly encourages                      ment 2.                                            Corporation (NFG). FECAM requests
                                                    electronic filing. Please file additional               Issue notice of ready          March 2017.            Commission’s approval of using the
                                                                                                               for environmental                                  pipeline for the purpose of transporting
                                                    study requests and requests for
                                                                                                               analysis.
                                                    cooperating agency status using the                     Commission issues EA           October 2017.          natural gas in interstate commerce. The
                                                    Commission’s eFiling system at http://                  Comments on EA due ..          November 2017.         existing pipeline not only will continue
                                                    www.ferc.gov/docs-filing/efiling.asp. For               Commission issues              January 2018.          to deliver natural gas to DTI and NFG,
                                                    assistance, please contact FERC Online                     final EA.                                          but also will receive natural gas from
                                                    Support at FERCOnlineSupport@                              Final amendments to the application                DTI. The existing pipeline will transport
                                                    ferc.gov, (866) 208–3676 (toll free), or                must be filed with the Commission no                  certain of natural gas received from DTI
                                                    (202) 502–8659 (TTY). In lieu of                                                                              to a power plant operated by NRG
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                            later than 30 days from the issuance
                                                    electronic filing, please send a paper                  date of the notice of ready for                       REMA LLC (REMA), in Shawville,
                                                    copy to: Secretary, Federal Energy                      environmental analysis.                               Pennsylvania. FECAM will construct
                                                    Regulatory Commission, 888 First Street                                                                       measurement and regulating facilities to
                                                    NE., Washington, DC 20426. The first                      Dated: December 22, 2015.                           receive gas from DTI and a tap for
                                                    page of any filing should include docket                Nathaniel J. Davis, Sr.,                              delivery gas to the power plant’s line
                                                    number P–10253–032.                                     Deputy Secretary.                                     pursuant to the blanket certificate.
                                                       m. The application is not ready for                  [FR Doc. 2015–32697 Filed 12–28–15; 8:45 am]          FECAM, REMA, and their affiliates have
                                                    environmental analysis at this time.                    BILLING CODE 6717–01–P                                entered into an agreement for the firm


                                               VerDate Sep<11>2014   19:17 Dec 28, 2015   Jkt 238001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\29DEN1.SGM   29DEN1


                                                    81306                      Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices

                                                    transportation of 152,000 dekatherms                    the party or parties directly involved in                e. Name of Project: Upper Pelzer
                                                    per day of natural gas on the existing                  the protest.                                          Hydroelectric Project.
                                                    pipeline for an initial term of 10 years.                  Persons who wish to comment only                      f. Location: On the Saluda River, in
                                                       Pursuant to Section 157.9 of the                     on the environmental review of this                   Anderson and Greenville Counties,
                                                    Commission’s rules, 18 CFR 157.9,                       project should submit an original and                 South Carolina. The project does not
                                                    within 90 days of this Notice the                       two copies of their comments to the                   occupy lands of the United States.
                                                    Commission staff will either: Complete                  Secretary of the Commission.                             g. Filed Pursuant to: Federal Power
                                                    its environmental assessment (EA) and                   Environmental commenters will be                      Act 16 U.S.C. 791(a)–825(r).
                                                    place it into the Commission’s public                   placed on the Commission’s                               h. Applicant Contact: Beth E. Harris,
                                                    record (eLibrary) for this proceeding, or               environmental mailing list, will receive              P.E., Regional Operations Manager, Enel
                                                    issue a Notice of Schedule for                          copies of the environmental documents,                Green Power North America, Inc., 11
                                                    Environmental Review. If a Notice of                    and will be notified of meetings                      Anderson St., Piedmont, SC 29674;
                                                    Schedule for Environmental Review is                    associated with the Commission’s                      (864) 846–0042; Beth.Harris@Enel.com.
                                                    issued, it will indicate, among other                   environmental review process.                            i. FERC Contact: Sean Murphy, (202)
                                                    milestones, the anticipated date for the                Environmental commenters will not be                  502–6145 or sean.murphy@ferc.gov.
                                                    Commission staff’s issuance of the final                required to serve copies of filed                        j. Cooperating agencies: Federal, state,
                                                    environmental impact statement (FEIS)                   documents on all other parties.                       local, and tribal agencies with
                                                    or EA for this proposal. The filing of the              However, the non-party commenters                     jurisdiction and/or special expertise
                                                    EA in the Commission’s public record                    will not receive copies of all documents              with respect to environmental issues
                                                    for this proceeding or the issuance of a                filed by other parties or issued by the               that wish to cooperate in the
                                                    Notice of Schedule will serve to notify                 Commission (except for the mailing of                 preparation of the environmental
                                                    federal and state agencies of the timing                environmental documents issued by the                 document should follow the
                                                    for the completion of all necessary                     Commission) and will not have the right               instructions for filing such requests
                                                    reviews, and the subsequent need to                     to seek court review of the                           described in item l below. Cooperating
                                                    complete all federal authorizations                     Commission’s final order.                             agencies should note the Commission’s
                                                    within 90 days of the date of issuance                     Motions to intervene, protests and                 policy that agencies that cooperate in
                                                    of the Commission staff’s FEIS or EA.                   comments may be filed electronically                  the preparation of the environmental
                                                       There are two ways to become                         via the Internet in lieu of paper; see, 18            document cannot also intervene. See, 94
                                                    involved in the Commission’s review of                  CFR 385.2001(a)(1)(iii) and the                       FERC ¶ 61,076 (2001).
                                                    this project. First, any person wishing to                                                                       k. Pursuant to section 4.32(b)(7) of 18
                                                                                                            instructions on the Commission’s Web
                                                    obtain legal status by becoming a party                                                                       CFR of the Commission’s regulations, if
                                                                                                            site under the ‘‘e-Filing’’ link. The
                                                    to the proceedings for this project                                                                           any resource agency, Indian Tribe, or
                                                                                                            Commission strongly encourages
                                                    should, on or before the comment date                                                                         person believes that an additional
                                                                                                            electronic filings.
                                                    stated below, file with the Federal                                                                           scientific study should be conducted in
                                                                                                               Comment Date: 5:00 p.m. Eastern
                                                    Energy Regulatory Commission, 888                                                                             order to form an adequate factual basis
                                                                                                            Time on January 12, 2016. .
                                                    First Street NE., Washington, DC 20426,                                                                       for a complete analysis of the
                                                    a motion to intervene in accordance                       Dated: December 22, 2015.                           application on its merit, the resource
                                                    with the requirements of the                            Nathaniel J. Davis, Sr.,                              agency, Indian Tribe, or person must file
                                                    Commission’s Rules of Practice and                      Deputy Secretary.                                     a request for a study with the
                                                    Procedure (18 CFR 385.214 or 385.211)                   [FR Doc. 2015–32692 Filed 12–28–15; 8:45 am]          Commission not later than 60 days from
                                                    and the Regulations under the NGA (18                   BILLING CODE 6717–01–P                                the date of filing of the application, and
                                                    CFR 157.10). A person obtaining party                                                                         serve a copy of the request on the
                                                    status will be placed on the service list                                                                     applicant.
                                                    maintained by the Secretary of the                      DEPARTMENT OF ENERGY                                     l. Deadline for filing additional study
                                                    Commission and will receive copies of                                                                         requests and requests for cooperating
                                                    all documents filed by the applicant and                Federal Energy Regulatory                             agency status: January 29, 2016.
                                                    by all other parties. A party must submit               Commission                                               The Commission strongly encourages
                                                    5 copies of filings made with the                       [Project No. 10254–026]
                                                                                                                                                                  electronic filing. Please file additional
                                                    Commission and must mail a copy to                                                                            study requests and requests for
                                                    the applicant and to every other party in               Pelzer Hydro Company, LLC;                            cooperating agency status using the
                                                    the proceeding. Only parties to the                     Consolidated Hydro Southeast, LLC;                    Commission’s eFiling system at http://
                                                    proceeding can ask for court review of                  Notice of Application Tendered for                    www.ferc.gov/docs-filing/efiling.asp. For
                                                    Commission orders in the proceeding.                    Filing With the Commission and                        assistance, please contact FERC Online
                                                       However, a person does not have to                   Soliciting Additional Study Requests                  Support at FERCOnlineSupport@
                                                    intervene in order to have comments                     and Establishing Procedural Schedule                  ferc.gov, (866) 208–3676 (toll free), or
                                                    considered. The second way to                           for Relicensing and a Deadline for                    (202) 502–8659 (TTY). In lieu of
                                                    participate is by filing with the                       Submission of Final Amendments                        electronic filing, please send a paper
                                                    Secretary of the Commission, as soon as                                                                       copy to: Secretary, Federal Energy
                                                    possible, an original and two copies of                   Take notice that the following                      Regulatory Commission, 888 First Street
                                                    comments in support of or in opposition                 hydroelectric application has been filed              NE., Washington, DC 20426. The first
                                                    to this project. The Commission will                    with the Commission and is available
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                                                                                                                                  page of any filing should include docket
                                                    consider these comments in                              for public inspection.                                number P–10254–026.
                                                    determining the appropriate action to be                  a. Type of Application: Minor New                      m. The application is not ready for
                                                    taken, but the filing of a comment alone                License.                                              environmental analysis at this time.
                                                    will not serve to make the filer a party                  b. Project No.: P–10254–026.                           n. The Upper Pelzer Hydroelectric
                                                    to the proceeding. The Commission’s                       c. Date filed: November 30, 2015.                   Project consists of: (a) A granite
                                                    rules require that persons filing                         d. Applicant: Pelzer Hydro Company,                 masonry dam composed of a 150-foot-
                                                    comments in opposition to the project                   LLC and Consolidated Hydro Southeast,                 long non-overflow section, a 280-foot-
                                                    provide copies of their protests only to                LLC.                                                  long overflow spillway section


                                               VerDate Sep<11>2014   19:17 Dec 28, 2015   Jkt 238001   PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:\FR\FM\29DEN1.SGM   29DEN1



Document Created: 2015-12-29 10:15:52
Document Modified: 2015-12-29 10:15:52
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on January 12, 2016. .
FR Citation80 FR 81305 