80_FR_8332 80 FR 8301 - Commission Information Collection Activities (FERC-598 & FERC-716); Comment Request

80 FR 8301 - Commission Information Collection Activities (FERC-598 & FERC-716); Comment Request

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 80, Issue 31 (February 17, 2015)

Page Range8301-8302
FR Document2015-03146

In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3507(a)(1)(D), the Federal Energy Regulatory Commission (Commission or FERC) is submitting its information collections FERC-598 (Self-Certification for Entities Seeking Exempt Wholesale Generator Status or Foreign Utility Company Status) and FERC- 716 [Good Faith Requests for Transmission Service and Good Faith Responses by Transmitting Utilities Under Sections 211(a) and 213(a) of the Federal Power Act (FPA)] to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission previously issued a Notice in the Federal Register (79 FR 68424, 11/17/2014) requesting public comments. The Commission received no comments on either the FERC-598 or the FERC-716 and is making this notation in its submittal to OMB.

Federal Register, Volume 80 Issue 31 (Tuesday, February 17, 2015)
[Federal Register Volume 80, Number 31 (Tuesday, February 17, 2015)]
[Notices]
[Pages 8301-8302]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2015-03146]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC15-1-000]


Commission Information Collection Activities (FERC-598 & FERC-
716); Comment Request

AGENCY: Federal Energy Regulatory Commission, DOE.

ACTION: Comment request.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, 44 U.S.C. 3507(a)(1)(D), the Federal Energy Regulatory 
Commission (Commission or FERC) is submitting its information 
collections FERC-598 (Self-Certification for Entities Seeking Exempt 
Wholesale Generator Status or Foreign Utility Company Status) and FERC-
716 [Good Faith Requests for Transmission Service and Good Faith 
Responses by Transmitting Utilities Under Sections 211(a) and 213(a) of 
the Federal Power Act (FPA)] to the Office of Management and Budget 
(OMB) for review of the information collection requirements. Any 
interested person may file comments directly with OMB and should 
address a copy of those comments to the Commission as explained below. 
The Commission previously issued a Notice in the Federal Register (79 
FR 68424, 11/17/2014) requesting public comments. The Commission 
received no comments on either the FERC-598 or the FERC-716 and is 
making this notation in its submittal to OMB.

DATES: Comments on the collection of information are due by March 19, 
2015.

ADDRESSES: Comments filed with OMB, identified either by the OMB 
Control No. 1902-0166 (FERC-598) or 1902-0170 (FERC-716) should be sent 
via email to the Office of Information and Regulatory Affairs: 
[email protected]. Attention: Federal Energy Regulatory 
Commission Desk Officer. The Desk Officer may also be reached via 
telephone at 202-395-4718.
    A copy of the comments should also be sent to the Commission, in 
Docket No. IC15-1-000, by either of the following methods:
     eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], by telephone at (202) 502-8663, and by fax at 
(202) 273-0873.

SUPPLEMENTARY INFORMATION:
    Type of Request: Three-year extension of the information collection 
requirements for all collections described below with no changes to the 
current reporting requirements. Please note that each collection is 
distinct from the next.
    Comments: Comments are invited on: (1) Whether the collections of 
information are necessary for the proper performance of the functions 
of the Commission, including whether the information will have 
practical utility; (2) the accuracy of the agency's estimates of the 
burden and cost of the collections of information, including the 
validity of the methodology and assumptions used; (3) ways to enhance 
the quality, utility and clarity of the information collections; and 
(4) ways to minimize the burden of the collections of information on 
those who are to respond, including the use of automated collection 
techniques or other forms of information technology.

FERC-598 (Self-Certification for Entities Seeking Exempt Wholesale 
Generator Status or Foreign Utility Company Status)

    OMB Control No.: 1902-0166.
    Abstract: The Commission uses the data in the FERC-598 information 
collection to implement the statutory provisions of Title XII, 
subchapter F of the Energy Policy Act of 2005 (EPAct 2005).\1\
---------------------------------------------------------------------------

    \1\ Energy Policy Act of 2005, Public Law 109-58, 119 Stat. 594 
(2005).
---------------------------------------------------------------------------

    EPAct 2005 repealed the Public Utility Holding Company Act of 1935 
(PUHCA 1935) in its entirety, and adopted in its place the Public 
Utility Holding Company Act of 2005 (PUHCA 2005). This change enabled 
the Commission to exempt from the requirements of PUHCA 2005 the 
holding companies that hold responsibility over wholesale generators 
from PUHCA 2005 on a case-by-case basis. The Commission amended its 
regulations (in Order No. 667 \2\) to add procedures for self-
certification by entities seeking exempt wholesale generator (EWG) and 
Foreign Utility Company (FUCO) status. This self-certification is 
similar to the process available to entities that seek qualifying 
facility status.
---------------------------------------------------------------------------

    \2\ Repeal of the Public Utility Holding Company Act of 1935 and 
Enactment of the Public Utility Holding Company Act of 2005, 70 FR 
75592 (2005), order on rehearing, Order 667-A, 71 FR 28446 (2006), 
order on rehearing, Order 667-B, 71 FR 42750 (2006), order on 
rehearing, Order 667-C, 118 FERC 61133 (2007).
---------------------------------------------------------------------------

    An EWG is a ``person engaged directly, or indirectly through one or 
more affiliates . . . and exclusively in the business of owning or 
operating, or both owning and operating, all or part of one or more 
eligible facilities and selling electric energy at wholesale.'' \3\ A 
FUCO is a company that ``owns or operates facilities that are not 
located in any state and that are used for the generation, 
transmission, or distribution of electric energy for sale or the 
distribution at retail of natural or manufactured gas for heat, light, 
or power, if such company: (1) Derives no part of its income, directly 
or indirectly, from the generation, transmission, or distribution of 
electric energy for sale or the distribution at retail of natural or 
manufactured gas for heat, light, or power, within the United States; 
and (2) neither the company nor any of its subsidiary companies is a 
public-utility company operating in the United States.''
---------------------------------------------------------------------------

    \3\ 18 CFR 366.1.
---------------------------------------------------------------------------

    An EWG, FUCO, or its representative seeking to self-certify its 
status must file with the Commission a notice of self-certification 
demonstrating that it satisfies the definition of EWG or FUCO. In the 
case of EWGs, the person filing a notice of self-certification must 
also file a copy of the notice of self-certification with the state 
regulatory authority of the state in which the facility is located and 
that person must also represent to the Commission in its

[[Page 8302]]

submission that it has filed a copy of the notice with the appropriate 
state regulatory authority.\4\
---------------------------------------------------------------------------

    \4\ 18 CFR 366.7.
---------------------------------------------------------------------------

    Submission of the information collected by FERC-598 is necessary 
for the Commission to carry out its responsibilities under EPAct 
2005.\5\ The Commission implements its responsibilities through the 
Code of Federal Regulations (CFR) Title 18 Part 366. These filing 
requirements are mandatory for entities seeking to self-certify their 
EWG or FUCO status.
---------------------------------------------------------------------------

    \5\ 42 U.S.C. 16451 et seq.
---------------------------------------------------------------------------

    Type of Respondent: EWGs and FUCOs.
    Estimate of Annual Burden: The Commission estimates the annual 
public reporting burden for the information collection as:

                 FERC-598 (Self-Certification for Entities Seeking Exempt Wholesale Generator Status or Foreign Utility Company Status)
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                            Annual number of                      Average burden &     Total annual
                                            Number of        responses per     Total number of   cost per response    burden hours &        Cost per
                                           respondents         respondent         responses             \6\         total annual cost     respondent $
                                                      (1)                (2)      (1)*(2) = (3)                (4)      (3)*(4) = (5)          (5) / (1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
EWGs/FUCOs............................                102                  1                102                  6                612               $423
                                                                                                              $423            $43,146
--------------------------------------------------------------------------------------------------------------------------------------------------------
\6\ The estimates for cost per response are derived using the following formula: Average Burden Hours per Response.
* $70.50 per Hour = Average Cost per Response. The cost per hour figure is the FERC average salary plus benefits. Subject matter experts found that
  industry employment costs closely resemble FERC's regarding the FERC-598 information collection.

FERC-716, [Good Faith Requests for Transmission Service and Good Faith 
Responses by Transmitting Utilities Under Sections 211(a) and 213(a) of 
the Federal Power Act (FPA) \7\]
---------------------------------------------------------------------------

    \7\ Previously titled ``Transmission Services (Good Faith 
Request, Response by Transmitting Utility, and Application) under 
Sections 211 and 213a of the Federal Power Act''.
---------------------------------------------------------------------------

    OMB Control No.: 1902-0170.
    Abstract: The Commission uses the information collected under the 
requirements of FERC-716 to implement the statutory provisions of 
Sections 211 and Section 213 of the Federal Power Act as amended and 
added by the Energy Policy Act 1992. FERC-716 also includes the 
requirement to file a Section 211 request if the negotiations between 
the transmission requestor and the transmitting utility are 
unsuccessful. For the initial process, the information is not filed 
with the Commission. However, the request and response may be analyzed 
as a part of a Section 211 action. The Commission may order 
transmission services under the authority of FPA 211.
    The Commission's regulations in the Code of Federal Regulations 
(CFR), 18 CFR 2.20, provide standards by which the Commission 
determines if and when a valid good faith request for transmission has 
been made under section 211 of the FPA. By developing the standards, 
the Commission sought to encourage an open exchange of data with a 
reasonable degree of specificity and completeness between the party 
requesting transmission services and the transmitting utility. As a 
result, 18 CFR 2.20 identifies 12 components of a good faith estimate 
and 5 components of a reply to a good faith request.
    Type of Respondent: Transmission Requestors and Transmitting 
Utilities.
    Estimate of Annual Burden: The Commission estimates the annual 
public reporting burden for the information collection as:
---------------------------------------------------------------------------

    \8\ The estimates for cost per response are derived using the 
following formula: Average Burden Hours per Response * $70.50 per 
Hour = Average Cost per Response. The cost per hour figure is the 
FERC average salary plus benefits. Subject matter experts found that 
industry employment costs closely resemble FERC's regarding the 
FERC-716 information collection.

    FERC-716 (Good Faith Requests for Transmission Service and Good Faith Responses by Transmitting Utilities Under Sections 211(a) and 213(a) of the
                                                                Federal Power Act (FPA))
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                              Average      Total annual
                                                             Number of    Annual  number   Total number     burden and     burden hours      Cost per
                                                            respondents    of  responses   of responses      cost per        and total    respondent ($)
                                                                          per respondent                   response \8\     annual cost
                                                                     (1)             (2)     (1)*(2)=(3)             (4)     (3)*(4)=(5)         (5)/(1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Information exchange between parties....................               3               1               3             100             300            7050
                                                                                                                   $7050         $21,150
Application submitted to FERC if parties' negotiations                 3               1               3             2.5             7.5          176.25
 are unsuccessful.......................................                                                         $176.25         $528.75
                                                         -----------------------------------------------------------------------------------------------
    Total...............................................  ..............  ..............               6  ..............           307.5        7,226.25
                                                                                                                              $21,678.75
--------------------------------------------------------------------------------------------------------------------------------------------------------


    Dated: February 11, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-03146 Filed 2-13-15; 8:45 am]
BILLING CODE 6717-01-P



                                                                          Federal Register / Vol. 80, No. 31 / Tuesday, February 17, 2015 / Notices                                                    8301

                                              the collection of information on those                  No. IC15–1–000, by either of the                      the Energy Policy Act of 2005 (EPAct
                                              who are to respond, including the use                   following methods:                                    2005).1
                                              of automated collection techniques or                      • eFiling at Commission’s Web site:                   EPAct 2005 repealed the Public
                                              other forms of information technology.                  http://www.ferc.gov/docs-filing/                      Utility Holding Company Act of 1935
                                                Dated: February 9, 2015.                              efiling.asp.                                          (PUHCA 1935) in its entirety, and
                                                                                                                                                            adopted in its place the Public Utility
                                              Kimberly D. Bose,                                          • Mail/Hand Delivery/Courier:                      Holding Company Act of 2005 (PUHCA
                                              Secretary.                                              Federal Energy Regulatory Commission,                 2005). This change enabled the
                                              [FR Doc. 2015–03106 Filed 2–13–15; 8:45 am]             Secretary of the Commission, 888 First                Commission to exempt from the
                                              BILLING CODE 6717–01–P                                  Street NE., Washington, DC 20426.                     requirements of PUHCA 2005 the
                                                                                                         Instructions: All submissions must be              holding companies that hold
                                                                                                      formatted and filed in accordance with                responsibility over wholesale generators
                                              DEPARTMENT OF ENERGY                                    submission guidelines at: http://                     from PUHCA 2005 on a case-by-case
                                                                                                      www.ferc.gov/help/submission-                         basis. The Commission amended its
                                              Federal Energy Regulatory
                                                                                                      guide.asp. For user assistance contact                regulations (in Order No. 667 2) to add
                                              Commission
                                                                                                      FERC Online Support by email at                       procedures for self-certification by
                                              [Docket No. IC15–1–000]                                 ferconlinesupport@ferc.gov, or by phone               entities seeking exempt wholesale
                                                                                                      at: (866) 208–3676 (toll-free), or (202)              generator (EWG) and Foreign Utility
                                              Commission Information Collection                       502–8659 for TTY.                                     Company (FUCO) status. This self-
                                              Activities (FERC–598 & FERC–716);                                                                             certification is similar to the process
                                                                                                         Docket: Users interested in receiving
                                              Comment Request                                                                                               available to entities that seek qualifying
                                                                                                      automatic notification of activity in this
                                              AGENCY:  Federal Energy Regulatory                      docket or in viewing/downloading                      facility status.
                                              Commission, DOE.                                        comments and issuances in this docket                    An EWG is a ‘‘person engaged
                                              ACTION: Comment request.                                may do so at http://www.ferc.gov/docs-                directly, or indirectly through one or
                                                                                                      filing/docs-filing.asp.                               more affiliates . . . and exclusively in
                                              SUMMARY:   In compliance with the                                                                             the business of owning or operating, or
                                                                                                      FOR FURTHER INFORMATION CONTACT:                      both owning and operating, all or part
                                              requirements of the Paperwork
                                              Reduction Act of 1995, 44 U.S.C.                        Ellen Brown may be reached by email                   of one or more eligible facilities and
                                              3507(a)(1)(D), the Federal Energy                       at DataClearance@FERC.gov, by                         selling electric energy at wholesale.’’ 3 A
                                              Regulatory Commission (Commission or                    telephone at (202) 502–8663, and by fax               FUCO is a company that ‘‘owns or
                                              FERC) is submitting its information                     at (202) 273–0873.                                    operates facilities that are not located in
                                              collections FERC–598 (Self-Certification                SUPPLEMENTARY INFORMATION:                            any state and that are used for the
                                              for Entities Seeking Exempt Wholesale                     Type of Request: Three-year extension               generation, transmission, or distribution
                                              Generator Status or Foreign Utility                     of the information collection                         of electric energy for sale or the
                                              Company Status) and FERC–716 [Good                      requirements for all collections                      distribution at retail of natural or
                                              Faith Requests for Transmission Service                 described below with no changes to the                manufactured gas for heat, light, or
                                              and Good Faith Responses by                             current reporting requirements. Please                power, if such company: (1) Derives no
                                              Transmitting Utilities Under Sections                   note that each collection is distinct from            part of its income, directly or indirectly,
                                              211(a) and 213(a) of the Federal Power                  the next.                                             from the generation, transmission, or
                                              Act (FPA)] to the Office of Management                                                                        distribution of electric energy for sale or
                                              and Budget (OMB) for review of the                        Comments: Comments are invited on:                  the distribution at retail of natural or
                                              information collection requirements.                    (1) Whether the collections of                        manufactured gas for heat, light, or
                                              Any interested person may file                          information are necessary for the proper              power, within the United States; and (2)
                                              comments directly with OMB and                          performance of the functions of the                   neither the company nor any of its
                                              should address a copy of those                          Commission, including whether the                     subsidiary companies is a public-utility
                                              comments to the Commission as                           information will have practical utility;              company operating in the United
                                              explained below. The Commission                         (2) the accuracy of the agency’s                      States.’’
                                              previously issued a Notice in the                       estimates of the burden and cost of the                  An EWG, FUCO, or its representative
                                              Federal Register (79 FR 68424, 11/17/                   collections of information, including the             seeking to self-certify its status must file
                                              2014) requesting public comments. The                   validity of the methodology and                       with the Commission a notice of self-
                                              Commission received no comments on                      assumptions used; (3) ways to enhance                 certification demonstrating that it
                                              either the FERC–598 or the FERC–716                     the quality, utility and clarity of the               satisfies the definition of EWG or FUCO.
                                              and is making this notation in its                      information collections; and (4) ways to              In the case of EWGs, the person filing
                                              submittal to OMB.                                       minimize the burden of the collections                a notice of self-certification must also
                                                                                                      of information on those who are to                    file a copy of the notice of self-
                                              DATES: Comments on the collection of
                                                                                                      respond, including the use of automated               certification with the state regulatory
                                              information are due by March 19, 2015.
                                                                                                      collection techniques or other forms of               authority of the state in which the
                                              ADDRESSES: Comments filed with OMB,                     information technology.
                                              identified either by the OMB Control                                                                          facility is located and that person must
                                              No. 1902–0166 (FERC–598) or 1902–                       FERC–598 (Self-Certification for                      also represent to the Commission in its
                                              0170 (FERC–716) should be sent via                      Entities Seeking Exempt Wholesale
                                                                                                                                                              1 Energy Policy Act of 2005, Public Law 109–58,
                                              email to the Office of Information and                  Generator Status or Foreign Utility
                                                                                                                                                            119 Stat. 594 (2005).
tkelley on DSK3SPTVN1PROD with NOTICES




                                              Regulatory Affairs: oira_submission@                    Company Status)                                         2 Repeal of the Public Utility Holding Company

                                              omb.gov. Attention: Federal Energy                                                                            Act of 1935 and Enactment of the Public Utility
                                                                                                        OMB Control No.: 1902–0166.                         Holding Company Act of 2005, 70 FR 75592 (2005),
                                              Regulatory Commission Desk Officer.
                                              The Desk Officer may also be reached                      Abstract: The Commission uses the                   order on rehearing, Order 667–A, 71 FR 28446
                                                                                                      data in the FERC–598 information                      (2006), order on rehearing, Order 667–B, 71 FR
                                              via telephone at 202–395–4718.                                                                                42750 (2006), order on rehearing, Order 667–C, 118
                                                 A copy of the comments should also                   collection to implement the statutory                 FERC 61133 (2007).
                                              be sent to the Commission, in Docket                    provisions of Title XII, subchapter F of                3 18 CFR 366.1.




                                         VerDate Sep<11>2014   16:51 Feb 13, 2015   Jkt 235001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\17FEN1.SGM   17FEN1


                                              8302                                 Federal Register / Vol. 80, No. 31 / Tuesday, February 17, 2015 / Notices

                                              submission that it has filed a copy of the                              Commission implements its                                                    Type of Respondent: EWGs and
                                              notice with the appropriate state                                       responsibilities through the Code of                                       FUCOs.
                                              regulatory authority.4                                                  Federal Regulations (CFR) Title 18 Part                                      Estimate of Annual Burden: The
                                                Submission of the information                                         366. These filing requirements are                                         Commission estimates the annual public
                                              collected by FERC–598 is necessary for                                  mandatory for entities seeking to self-                                    reporting burden for the information
                                              the Commission to carry out its                                         certify their EWG or FUCO status.
                                              responsibilities under EPAct 2005.5 The                                                                                                            collection as:

                                               FERC–598 (SELF-CERTIFICATION FOR ENTITIES SEEKING EXEMPT WHOLESALE GENERATOR STATUS OR FOREIGN UTILITY
                                                                                           COMPANY STATUS)
                                                                                                              Annual number of                                                 Average burden                   Total annual             Cost per
                                                                                  Number of                                                        Total number of
                                                                                                               responses per                                                     & cost per                    burden hours &           respondent
                                                                                 respondents                                                         responses
                                                                                                                 respondent                                                      response 6                   total annual cost              $

                                                                                        (1)                             (2)                           (1)*(2) = (3)                    (4)                        (3)*(4) = (5)          (5) ÷ (1)

                                              EWGs/FUCOs ......                                    102                                   1                              102                        6                          612                    $423
                                                                                                                                                                                                $423                      $43,146
                                                6 The estimates for cost per response are derived using the following formula: Average Burden Hours per Response.
                                                * $70.50 per Hour = Average Cost per Response. The cost per hour figure is the FERC average salary plus benefits. Subject matter experts
                                              found that industry employment costs closely resemble FERC’s regarding the FERC–598 information collection.


                                              FERC–716, [Good Faith Requests for                                      if the negotiations between the                                            section 211 of the FPA. By developing
                                              Transmission Service and Good Faith                                     transmission requestor and the                                             the standards, the Commission sought to
                                              Responses by Transmitting Utilities                                     transmitting utility are unsuccessful.                                     encourage an open exchange of data
                                              Under Sections 211(a) and 213(a) of the                                 For the initial process, the information                                   with a reasonable degree of specificity
                                              Federal Power Act (FPA) 7]                                              is not filed with the Commission.                                          and completeness between the party
                                                                                                                      However, the request and response may                                      requesting transmission services and the
                                                OMB Control No.: 1902–0170.                                           be analyzed as a part of a Section 211                                     transmitting utility. As a result, 18 CFR
                                                Abstract: The Commission uses the                                     action. The Commission may order                                           2.20 identifies 12 components of a good
                                              information collected under the                                         transmission services under the                                            faith estimate and 5 components of a
                                              requirements of FERC–716 to                                             authority of FPA 211.                                                      reply to a good faith request.
                                              implement the statutory provisions of                                      The Commission’s regulations in the                                        Type of Respondent: Transmission
                                              Sections 211 and Section 213 of the                                     Code of Federal Regulations (CFR), 18                                      Requestors and Transmitting Utilities.
                                              Federal Power Act as amended and                                        CFR 2.20, provide standards by which                                          Estimate of Annual Burden: The
                                              added by the Energy Policy Act 1992.                                    the Commission determines if and when                                      Commission estimates the annual public
                                              FERC–716 also includes the                                              a valid good faith request for                                             reporting burden for the information
                                              requirement to file a Section 211 request                               transmission has been made under                                           collection as:

                                                  FERC–716 (GOOD FAITH REQUESTS FOR TRANSMISSION SERVICE AND GOOD FAITH RESPONSES BY TRANSMITTING
                                                             UTILITIES UNDER SECTIONS 211(a) AND 213(a) OF THE FEDERAL POWER ACT (FPA))
                                                                                                                                                 Annual                                         Average                 Total annual      Cost per
                                                                                                                Number of                       number of               Total number           burden and               burden hours     respondent
                                                                                                               respondents                   responses per              of responses            cost per                  and total          ($)
                                                                                                                                               respondent                                      response 8                annual cost

                                                                                                                       (1)                            (2)                (1)*(2)=(3)                  (4)                (3)*(4)=(5)       (5)÷(1)

                                              Information exchange between parties ....                                             3                             1                    3                    100                   300                7050
                                                                                                                                                                                                          $7050               $21,150
                                              Application submitted to FERC if parties’
                                                negotiations are unsuccessful ..............                                        3                             1                    3                   2.5                    7.5           176.25
                                                                                                                                                                                                       $176.25                $528.75

                                                   Total ..................................................   ........................       ........................                  6     ........................          307.5          7,226.25
                                                                                                                                                                                                                          $21,678.75


                                                Dated: February 11, 2015.
                                              Kimberly D. Bose,
                                              Secretary.
                                              [FR Doc. 2015–03146 Filed 2–13–15; 8:45 am]
tkelley on DSK3SPTVN1PROD with NOTICES




                                              BILLING CODE 6717–01–P


                                                4 18 CFR 366.7.                                                       and Application) under Sections 211 and 213a of                            Response. The cost per hour figure is the FERC
                                                5 42 U.S.C. 16451 et seq.                                             the Federal Power Act’’.                                                   average salary plus benefits. Subject matter experts
                                                7 Previously titled ‘‘Transmission Services (Good
                                                                                                                        8 The estimates for cost per response are derived                        found that industry employment costs closely
                                                                                                                      using the following formula: Average Burden Hours                          resemble FERC’s regarding the FERC–716
                                              Faith Request, Response by Transmitting Utility,
                                                                                                                      per Response * $70.50 per Hour = Average Cost per                          information collection.



                                         VerDate Sep<11>2014       16:51 Feb 13, 2015         Jkt 235001      PO 00000        Frm 00018           Fmt 4703       Sfmt 9990    E:\FR\FM\17FEN1.SGM            17FEN1



Document Created: 2015-12-18 13:19:14
Document Modified: 2015-12-18 13:19:14
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionComment request.
DatesComments on the collection of information are due by March 19, 2015.
ContactEllen Brown may be reached by email at [email protected], by telephone at (202) 502-8663, and by fax at (202) 273-0873.
FR Citation80 FR 8301 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR