81_FR_10322 81 FR 10283 - Mitigation Strategies for Beyond-Design-Basis External Events

81 FR 10283 - Mitigation Strategies for Beyond-Design-Basis External Events

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 81, Issue 39 (February 29, 2016)

Page Range10283-10284
FR Document2016-04353

The U.S. Nuclear Regulatory Commission (NRC) is issuing the final Japan Lessons-Learned Division Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, Revision 1, ``Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.'' This JLD-ISG provides guidance and clarification to assist nuclear power reactor licensees with the identification of measures needed to comply with requirements to mitigate challenges to key safety functions. These requirements are contained in Order EA-12-049, ``Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.''

Federal Register, Volume 81 Issue 39 (Monday, February 29, 2016)
[Federal Register Volume 81, Number 39 (Monday, February 29, 2016)]
[Notices]
[Pages 10283-10284]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-04353]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2012-0068]


Mitigation Strategies for Beyond-Design-Basis External Events

AGENCY: Nuclear Regulatory Commission.

ACTION: Interim staff guidance; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing the 
final Japan Lessons-Learned Division Interim Staff Guidance (JLD-ISG), 
JLD-ISG-2012-01, Revision 1, ``Compliance with Order EA-12-049, Order 
Modifying Licenses with Regard to Requirements for Mitigation 
Strategies for Beyond-Design-Basis External Events.'' This JLD-ISG 
provides guidance and clarification to assist nuclear power reactor 
licensees with the identification of measures needed to comply with 
requirements to mitigate challenges to key safety functions. These 
requirements are contained in Order EA-12-049, ``Order Modifying 
Licenses with Regard to Requirements for Mitigation Strategies for 
Beyond-Design-Basis External Events.''

DATES: This guidance is effective on February 29, 2016.

ADDRESSES: Please refer to Docket ID NRC-2012-0068 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2012-0068. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
JLD-ISG-2012-01, Revision 1 is available in ADAMS under Accession No. 
ML15357A163.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.
     NRC's Interim Staff Guidance Web site: http://www.nrc.gov/reading-rm/doc-collections/isg/japan-lessons-learned.html.

FOR FURTHER INFORMATION CONTACT: Eric Bowman, Office of Nuclear Reactor 
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-2963; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Background Information

    The original interim staff guidance (ISG), Final Japan Lessons-
Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-
2012-01, ``Compliance with Order EA-12-049, Order Modifying Licenses 
with Regard to Requirements for Mitigation Strategies for Beyond-
Design-Basis External Events,'' (ADAMS Accession No. ML12229A174) was 
issued to describe to the public methods acceptable to the NRC for 
complying with Order EA-12-049, ``Order Modifying Licenses with Regard 
to Requirements for Mitigation Strategies for Beyond-Design-Basis 
External Events'' (Order EA-12-049), issued March 12, 2012 (ADAMS 
Accession No. ML12054A736). This ISG endorsed the methodologies 
described in the industry guidance document, Nuclear Energy Institute 
(NEI) 12-06, ``Diverse and Flexible Coping Strategies (FLEX) 
Implementation Guide'' (NEI 12-06), Revision 0 (ADAMS Accession No. 
ML12242A378) submitted on August 21, 2012. The staff is now issuing 
Revision 1 to JLD-ISG-2012-01. This revision incorporates the NRC's 
review strategy described in COMSECY 14-0037, ``Integration of 
Mitigating Strategies for Beyond-Design Basis External Events and the 
Reevaluation of Flooding Hazards'' (ADAMS Accession No. ML14238A616) 
and endorses NEI 12-06, Revision 2 (ADAMS Accession No. ML16005A625).
    The NRC issued Order EA-12-049 following evaluation of the Japan 
earthquake and tsunami, and resulting nuclear accident, at the 
Fukushima Dai-ichi nuclear power plant in March 2011. Order EA-12-049 
requires all licensees and construction permit holders to develop a 
three-phase approach for mitigating beyond-design-basis external 
events. The initial phase requires the use of installed equipment and 
resources to maintain or restore core cooling, containment, and spent 
fuel pool cooling. The transition phase requires providing sufficient, 
portable, onsite equipment and consumables to maintain or restore these 
functions until they can be accomplished with resources brought from 
off site. The final phase requires obtaining sufficient offsite 
resources to sustain those functions indefinitely. Order EA-12-049 also 
specified that the NRC would issue final interim staff guidance in 
August 2012, to provide additional details on an acceptable approach 
for complying with Order EA-12-049.
    The original version of this ISG which endorsed the original NEI 
12-06 was issued on August 29, 2012. The NRC staff revised this ISG in 
order to incorporate acceptable alternative approaches to compliance 
proposed by licensees and after clarifying its position on the 
interdependency of the Mitigating Strategies responses and the 
responses to the seismic and flooding reevaluations. The staff's 
clarified position was addressed in COMSECY-14-0037. This revised 
guidance will be publicly available and used by members of the industry 
to help develop their responses to Order EA-12-049, including impacts 
of the reevaluated seismic and flooding information, and by the NRC 
staff in its reviews of the

[[Page 10284]]

licensees' strategies. On November 10, 2015 (80 FR 69702), the NRC 
requested public comments on draft JLD-ISG-12-01, Revision 1. The NRC 
staff received comments from four stakeholders which were considered in 
the development of the final JLD-ISG-12-01, Revision 1. The questions, 
comments, and staff resolutions of those comments are contained in 
``NRC Responses to Public Comments: Revision to Japan Lessons-Learned 
Division Interim Staff Guidance JLD-ISG-2012-01: Compliance with Order 
EA-12-049, Order Modifying Licenses with Regard to Requirements for 
Mitigation Strategies for Beyond-Design-Basis External Events'' (ADAMS 
Accession No. ML15357A142).

II. Congressional Review Act

    This ISG revision is a rule as defined in the Congressional Review 
Act (5 U.S.C. 801-808). However, the Office of Management and Budget 
has not found it to be a major rule as defined in the Congressional 
Review Act.

III. Backfitting and Issue Finality

    This ISG provides guidance on an acceptable method for implementing 
the requirements contained in Order EA-12-049. Licensees may 
voluntarily use the guidance in JLD-ISG-2012-01, Revision 1 to 
demonstrate compliance with Order EA-12-049. Methods or solutions that 
differ from those described in this ISG may be deemed acceptable if 
they provide sufficient basis and information for the NRC to verify 
that the proposed alternative demonstrates compliance with Order EA-12-
049. Issuance of this ISG does not constitute backfitting as defined in 
title 10 of the Code of Federal Regulations (10 CFR) 50.109, 
``Backfitting'' (the Backfit Rule), and is not otherwise inconsistent 
with the issue finality provisions in 10 CFR part 52, ``Licenses, 
Certifications, and Approvals for Nuclear Power Plants.''

    Dated at Rockville, Maryland, this 22 day of February 2016.

    For The Nuclear Regulatory Commission.
Jack R. Davis,
Director, Japan Lessons-Learned Division, Office of Nuclear Reactor 
Regulation.
[FR Doc. 2016-04353 Filed 2-26-16; 8:45 am]
 BILLING CODE 7590-01-P



                                                                                 Federal Register / Vol. 81, No. 39 / Monday, February 29, 2016 / Notices                                            10283

                                                       The NRC Commission Meeting                           DATES:   This guidance is effective on                Requirements for Mitigation Strategies
                                                    Schedule can be found on the Internet                   February 29, 2016.                                    for Beyond-Design-Basis External
                                                    at:http://www.nrc.gov/public-involve/                   ADDRESSES: Please refer to Docket ID                  Events’’ (Order EA–12–049), issued
                                                    public-meetings/schedule.html.                          NRC–2012–0068 when contacting the                     March 12, 2012 (ADAMS Accession No.
                                                       The NRC provides reasonable                          NRC about the availability of                         ML12054A736). This ISG endorsed the
                                                    accommodation to individuals with                       information regarding this document.                  methodologies described in the industry
                                                    disabilities where appropriate. If you                  You may obtain publicly-available                     guidance document, Nuclear Energy
                                                    need a reasonable accommodation to                      information related to this document                  Institute (NEI) 12–06, ‘‘Diverse and
                                                    participate in these public meetings, or                using any of the following methods:                   Flexible Coping Strategies (FLEX)
                                                    need this meeting notice or the                            • Federal Rulemaking Web site: Go to               Implementation Guide’’ (NEI 12–06),
                                                    transcript or other information from the                http://www.regulations.gov and search                 Revision 0 (ADAMS Accession No.
                                                    public meetings in another format (e.g.                 for Docket ID NRC–2012–0068. Address                  ML12242A378) submitted on August 21,
                                                    braille, large print), please notify                    questions about NRC dockets to Carol                  2012. The staff is now issuing Revision
                                                    Kimberly Meyer, NRC Disability                          Gallagher; telephone: 301–415–3463;                   1 to JLD–ISG–2012–01. This revision
                                                    Program Manager, at 301–287–0739, by                    email: Carol.Gallagher@nrc.gov. For                   incorporates the NRC’s review strategy
                                                    videophone at 240–428–3217, or by                       technical questions, contact the                      described in COMSECY 14–0037,
                                                    email at Kimberly.Meyer-                                individual listed in the FOR FURTHER                  ‘‘Integration of Mitigating Strategies for
                                                    Chambers@nrc.gov. Determinations on                     INFORMATION CONTACT section of this                   Beyond-Design Basis External Events
                                                    requests for reasonable accommodation                   document.                                             and the Reevaluation of Flooding
                                                    will be made on a case-by-case basis.                      • NRC’s Agencywide Documents                       Hazards’’ (ADAMS Accession No.
                                                       Members of the public may request to                 Access and Management System                          ML14238A616) and endorses NEI 12–
                                                    receive this information electronically.                (ADAMS): You may obtain publicly-                     06, Revision 2 (ADAMS Accession No.
                                                    If you would like to be added to the                    available documents online in the                     ML16005A625).
                                                    distribution, please contact the Nuclear                ADAMS Public Documents collection at                     The NRC issued Order EA–12–049
                                                    Regulatory Commission, Office of the                    http://www.nrc.gov/reading-rm/                        following evaluation of the Japan
                                                    Secretary, Washington, DC 20555 (301–                   adams.html. To begin the search, select               earthquake and tsunami, and resulting
                                                    415–1969), or email                                     ‘‘ADAMS Public Documents’’ and then                   nuclear accident, at the Fukushima Dai-
                                                    Brenda.Akstulewicz@nrc.gov or                           select ‘‘Begin Web-based ADAMS                        ichi nuclear power plant in March 2011.
                                                    Patricia.Jimenez@nrc.gov.                               Search.’’ For problems with ADAMS,                    Order EA–12–049 requires all licensees
                                                                                                            please contact the NRC’s Public                       and construction permit holders to
                                                      Dated: February 25, 2016.                                                                                   develop a three-phase approach for
                                                    Denise McGovern,
                                                                                                            Document Room (PDR) reference staff at
                                                                                                            1–800–397–4209, 301–415–4737, or by                   mitigating beyond-design-basis external
                                                    Policy Coordinator, Office of the Secretary.
                                                                                                            email to pdr.resource@nrc.gov. The                    events. The initial phase requires the
                                                    [FR Doc. 2016–04478 Filed 2–25–16; 4:15 pm]
                                                                                                            JLD–ISG–2012–01, Revision 1 is                        use of installed equipment and
                                                    BILLING CODE 7590–01–P                                  available in ADAMS under Accession                    resources to maintain or restore core
                                                                                                            No. ML15357A163.                                      cooling, containment, and spent fuel
                                                                                                               • NRC’s PDR: You may examine and                   pool cooling. The transition phase
                                                    NUCLEAR REGULATORY                                      purchase copies of public documents at                requires providing sufficient, portable,
                                                    COMMISSION                                              the NRC’s PDR, Room O1–F21, One                       onsite equipment and consumables to
                                                                                                            White Flint North, 11555 Rockville                    maintain or restore these functions until
                                                    [NRC–2012–0068]                                         Pike, Rockville, Maryland 20852.                      they can be accomplished with
                                                                                                               • NRC’s Interim Staff Guidance Web                 resources brought from off site. The
                                                    Mitigation Strategies for Beyond-                       site: http://www.nrc.gov/reading-rm/                  final phase requires obtaining sufficient
                                                    Design-Basis External Events                            doc-collections/isg/japan-lessons-                    offsite resources to sustain those
                                                                                                            learned.html.                                         functions indefinitely. Order EA–12–
                                                    AGENCY:  Nuclear Regulatory                                                                                   049 also specified that the NRC would
                                                    Commission.                                             FOR FURTHER INFORMATION CONTACT: Eric                 issue final interim staff guidance in
                                                    ACTION: Interim staff guidance; issuance.               Bowman, Office of Nuclear Reactor                     August 2012, to provide additional
                                                                                                            Regulation, U.S. Nuclear Regulatory                   details on an acceptable approach for
                                                    SUMMARY:    The U.S. Nuclear Regulatory                 Commission, Washington, DC 20555–                     complying with Order EA–12–049.
                                                    Commission (NRC) is issuing the final                   0001; telephone: 301–415–2963; email:                    The original version of this ISG which
                                                    Japan Lessons-Learned Division Interim                  Eric.Bowman@nrc.gov.                                  endorsed the original NEI 12–06 was
                                                    Staff Guidance (JLD–ISG), JLD–ISG–                      SUPPLEMENTARY INFORMATION:                            issued on August 29, 2012. The NRC
                                                    2012–01, Revision 1, ‘‘Compliance with                                                                        staff revised this ISG in order to
                                                    Order EA–12–049, Order Modifying                        I. Background Information
                                                                                                                                                                  incorporate acceptable alternative
                                                    Licenses with Regard to Requirements                       The original interim staff guidance                approaches to compliance proposed by
                                                    for Mitigation Strategies for Beyond-                   (ISG), Final Japan Lessons-Learned                    licensees and after clarifying its position
                                                    Design-Basis External Events.’’ This                    Project Directorate Interim Staff                     on the interdependency of the
                                                    JLD–ISG provides guidance and                           Guidance (JLD–ISG), JLD–ISG–2012–01,                  Mitigating Strategies responses and the
                                                    clarification to assist nuclear power                   ‘‘Compliance with Order EA–12–049,                    responses to the seismic and flooding
                                                    reactor licensees with the identification               Order Modifying Licenses with Regard                  reevaluations. The staff’s clarified
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    of measures needed to comply with                       to Requirements for Mitigation                        position was addressed in COMSECY–
                                                    requirements to mitigate challenges to                  Strategies for Beyond-Design-Basis                    14–0037. This revised guidance will be
                                                    key safety functions. These                             External Events,’’ (ADAMS Accession                   publicly available and used by members
                                                    requirements are contained in Order                     No. ML12229A174) was issued to                        of the industry to help develop their
                                                    EA–12–049, ‘‘Order Modifying Licenses                   describe to the public methods                        responses to Order EA–12–049,
                                                    with Regard to Requirements for                         acceptable to the NRC for complying                   including impacts of the reevaluated
                                                    Mitigation Strategies for Beyond-Design-                with Order EA–12–049, ‘‘Order                         seismic and flooding information, and
                                                    Basis External Events.’’                                Modifying Licenses with Regard to                     by the NRC staff in its reviews of the


                                               VerDate Sep<11>2014   19:23 Feb 26, 2016   Jkt 238001   PO 00000   Frm 00079   Fmt 4703   Sfmt 4703   E:\FR\FM\29FEN1.SGM   29FEN1


                                                    10284                        Federal Register / Vol. 81, No. 39 / Monday, February 29, 2016 / Notices

                                                    licensees’ strategies. On November 10,                  Advisory Committee on Reactor                             552b(c)(2) and (6) to discuss
                                                    2015 (80 FR 69702), the NRC requested                   Safeguards (ACRS) will hold a meeting                     organizational and personnel
                                                    public comments on draft JLD–ISG–12–                    on March 3–5, 2016, 11545 Rockville                       matters that relate solely to internal
                                                    01, Revision 1. The NRC staff received                  Pike, Rockville, Maryland.                                personnel rules and practices of
                                                    comments from four stakeholders which                                                                             ACRS, and information the release
                                                                                                            Thursday, March 3, 2016, Conference                       of which would constitute a clearly
                                                    were considered in the development of
                                                                                                            Room T2–B1, 11545 Rockville Pike,                         unwarranted invasion of personal
                                                    the final JLD–ISG–12–01, Revision 1.
                                                                                                            Rockville, Maryland                                       privacy.]
                                                    The questions, comments, and staff
                                                    resolutions of those comments are                       8:30 a.m.—8:35 a.m.: Opening Remarks                  2:30 p.m.—2:45 p.m.: Reconciliation of
                                                    contained in ‘‘NRC Responses to Public                      by the ACRS Chairman (Open)—                          ACRS Comments and
                                                    Comments: Revision to Japan Lessons-                        The ACRS Chairman will make                           Recommendations (Open)—The
                                                    Learned Division Interim Staff Guidance                     opening remarks regarding the                         Committee will discuss the
                                                    JLD–ISG–2012–01: Compliance with                            conduct of the meeting.                               responses from the NRC Executive
                                                    Order EA–12–049, Order Modifying                        8:35 a.m.—10:30 a.m.: Non-Power                           Director for Operations to
                                                    Licenses with Regard to Requirements                        Production and Utilization                            comments and recommendations
                                                    for Mitigation Strategies for Beyond-                       Facilities (NPUF) Proposed License                    included in recent ACRS reports
                                                    Design-Basis External Events’’ (ADAMS                       Renewal Rulemaking (Open)—The                         and letters.
                                                    Accession No. ML15357A142).                                 Committee will hear presentations                 2:45 p.m.—6:00 p.m.: Preparation of
                                                                                                                by and hold discussions with                          ACRS Reports (Open)—The
                                                    II. Congressional Review Act                                representatives of the staff regarding                Committee will continue its
                                                       This ISG revision is a rule as defined                   the NPUF proposed license renewal                     discussion of proposed ACRS
                                                    in the Congressional Review Act (5                          rulemaking.                                           reports discussed during this
                                                    U.S.C. 801–808). However, the Office of                 10:45 a.m.—12:00 p.m.: Biennial Review                    meeting.
                                                    Management and Budget has not found                         and Evaluation of the NRC Safety
                                                                                                                                                                  Saturday, March 5, 2016, Conference
                                                    it to be a major rule as defined in the                     Research Program (Open)—The                       Room T2–B1, 11545 Rockville Pike,
                                                    Congressional Review Act.                                   Committee will hold a discussion                  Rockville, Maryland
                                                                                                                regarding the NRC Safety Research
                                                    III. Backfitting and Issue Finality                         Program.                                          8:30 a.m.—11:30 a.m.: Preparation of
                                                       This ISG provides guidance on an                     1:00 p.m.—3:00 p.m.: Group 2                               ACRS Reports (Open)—The
                                                    acceptable method for implementing the                      Fukushima Tier 2 and 3 Closure                         Committee will continue its
                                                    requirements contained in Order EA–                         Plans (Open)—The Committee will                        discussion of proposed ACRS
                                                    12–049. Licensees may voluntarily use                       hear presentations by and hold                         reports.
                                                    the guidance in JLD–ISG–2012–01,                            discussions with representatives of               11:30 a.m.—12:00 p.m.: Miscellaneous
                                                    Revision 1 to demonstrate compliance                        the staff regarding Group 2                            (Open)—The Committee will
                                                    with Order EA–12–049. Methods or                            Fukushima closure plans.                               continue its discussion related to
                                                    solutions that differ from those                        3:00 p.m.—6:00 p.m.: Preparation of                        the conduct of Committee activities
                                                    described in this ISG may be deemed                         ACRS Reports (Open)—The                                and specific issues that were not
                                                    acceptable if they provide sufficient                       Committee will discuss proposed                        completed during previous
                                                    basis and information for the NRC to                        ACRS reports on matters discussed                      meetings.
                                                    verify that the proposed alternative                        during this meeting.                                Procedures for the conduct of and
                                                    demonstrates compliance with Order                                                                            participation in ACRS meetings were
                                                                                                            Friday, March 4, 2016, Conference                     published in the Federal Register on
                                                    EA–12–049. Issuance of this ISG does                    Room T2–B1, 11545 Rockville Pike,
                                                    not constitute backfitting as defined in                                                                      October 21, 2015 (80 FR 63846). In
                                                                                                            Rockville, Maryland                                   accordance with those procedures, oral
                                                    title 10 of the Code of Federal
                                                    Regulations (10 CFR) 50.109,                            8:30 a.m.—9:45 a.m.: Preparation for                  or written views may be presented by
                                                    ‘‘Backfitting’’ (the Backfit Rule), and is                  Meeting with the Commission                       members of the public, including
                                                    not otherwise inconsistent with the                         (Open)—The Committee will                         representatives of the nuclear industry.
                                                    issue finality provisions in 10 CFR part                    prepare for the March Commission                  Persons desiring to make oral statements
                                                    52, ‘‘Licenses, Certifications, and                         Meeting.                                          should notify Quynh Nguyen, Cognizant
                                                    Approvals for Nuclear Power Plants.’’                   10:00 a.m.—12:00 p.m.: Meeting with                   ACRS Staff (Telephone: 301–415–5844,
                                                                                                                the Commission (Open)—The                         Email: Quynh.Nguyen@nrc.gov), 5 days
                                                      Dated at Rockville, Maryland, this 22 day                 Committee will discuss topics of                  before the meeting, if possible, so that
                                                    of February 2016.
                                                                                                                mutual interest with the                          appropriate arrangements can be made
                                                      For The Nuclear Regulatory Commission.
                                                                                                                Commission.                                       to allow necessary time during the
                                                    Jack R. Davis,                                          1:00 p.m.—2:30 p.m.: Future ACRS                      meeting for such statements. In view of
                                                    Director, Japan Lessons-Learned Division,                   Activities/Report of the Planning                 the possibility that the schedule for
                                                    Office of Nuclear Reactor Regulation.                       and Procedures Subcommittee                       ACRS meetings may be adjusted by the
                                                    [FR Doc. 2016–04353 Filed 2–26–16; 8:45 am]                 (Open/Closed)—The Committee                       Chairman as necessary to facilitate the
                                                    BILLING CODE 7590–01–P                                      will discuss the recommendations                  conduct of the meeting, persons
                                                                                                                of the Planning and Procedures                    planning to attend should check with
                                                                                                                Subcommittee regarding items                      the Cognizant ACRS staff if such
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    NUCLEAR REGULATORY                                          proposed for consideration by the                 rescheduling would result in major
                                                    COMMISSION                                                  Full Committee during future ACRS                 inconvenience.
                                                                                                                Meetings, and matters related to the                Thirty-five hard copies of each
                                                    Advisory Committee on Reactor
                                                                                                                conduct of ACRS business,                         presentation or handout should be
                                                    Safeguards; Notice of Meeting
                                                                                                                including anticipated workload and                provided 30 minutes before the meeting.
                                                      In accordance with the purposes of                        member assignments. [Note: A                      In addition, one electronic copy of each
                                                    Sections 29 and 182b of the Atomic                          portion of this meeting may be                    presentation should be emailed to the
                                                    Energy Act (42 U.S.C. 2039, 2232b), the                     closed pursuant to 5 U.S.C.                       Cognizant ACRS Staff one day before


                                               VerDate Sep<11>2014   19:23 Feb 26, 2016   Jkt 238001   PO 00000   Frm 00080   Fmt 4703   Sfmt 4703   E:\FR\FM\29FEN1.SGM   29FEN1



Document Created: 2016-02-27 02:05:21
Document Modified: 2016-02-27 02:05:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionInterim staff guidance; issuance.
DatesThis guidance is effective on February 29, 2016.
ContactEric Bowman, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001; telephone: 301-415-2963; email: [email protected]
FR Citation81 FR 10283 