81_FR_11597 81 FR 11554 - Ever Better Hydro Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

81 FR 11554 - Ever Better Hydro Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 43 (March 4, 2016)

Page Range11554-11554
FR Document2016-04697

Federal Register, Volume 81 Issue 43 (Friday, March 4, 2016)
[Federal Register Volume 81, Number 43 (Friday, March 4, 2016)]
[Notices]
[Page 11554]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-04697]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14755-000]


Ever Better Hydro Power, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On February 16, 2016, Ever Better Hydro Power, LLC, filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Pittsfield Mill Dam Hydroelectric Project (Pittsfield Project or 
project) to be located on Suncook River, in the town of Pittsfield, in 
Merrimack County, New Hampshire. The sole purpose of a preliminary 
permit, if issued, is to grant the permit holder priority to file a 
license application during the permit term. A preliminary permit does 
not authorize the permit holder to perform any land-disturbing 
activities or otherwise enter upon lands or waters owned by others 
without the owners' express permission.
    The proposed project would consist of the following: (1) An 
existing 21-foot-high, 470-foot-long concrete and stone dam with a 150-
foot-long ogee spillway, two 4.5-foot-wide, 7-foot-high stoplog bays, 
and two 6.25-foot-wide, 7.66-foot-high outlet gates; (2) an existing 
20-acre impoundment with a normal storage capacity of 112 acre-feet at 
spillway crest elevation of about 474.5 feet national geodetic vertical 
datum (NGVD '29); (3) an existing gated intake structure and forebay 
leading to an existing 200-foot-long, 9-foot-diameter steel penstock; 
(4) an existing brick building housing a 415 kilowatt (kW) turbine-
generator, along with a control panel and switchgear; (5) a new 75-
foot-long, 13.8-kilovolt (kV) transmission line connecting the 
generator to Public Service Company of New Hampshire's existing 
distribution system; and (6) appurtenant facilities. The estimated 
annual generation of the proposed Pittsfield Project would be about 
1,400 megawatt-hours. The existing dam is owned by New Hampshire 
Department of Environmental Services.
    Applicant Contact: Mr. Douglas Troy, 5 Main Street, Pittsfield, NH 
03263; phone: (603) 435-3598.
    FERC Contact: John Ramer; phone: (202) 502-8969 or email: 
[email protected].
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14755-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14755) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: February 25, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-04697 Filed 3-3-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                  11554                           Federal Register / Vol. 81, No. 43 / Friday, March 4, 2016 / Notices

                                                  appropriate action to be taken, but will                license application during the permit                 The first page of any filing should
                                                  not serve to make protestants parties to                term. A preliminary permit does not                   include docket number P–14755–000.
                                                  the proceeding. Any person wishing to                   authorize the permit holder to perform                   More information about this project,
                                                  become a party must file a notice of                    any land-disturbing activities or                     including a copy of the application, can
                                                  intervention or motion to intervene, as                 otherwise enter upon lands or waters                  be viewed or printed on the ‘‘eLibrary’’
                                                  appropriate. Such notices, motions, or                  owned by others without the owners’                   link of Commission’s Web site at http://
                                                  protests must be filed on or before the                 express permission.                                   www.ferc.gov/docs-filing/elibrary.asp.
                                                  comment date. On or before the                             The proposed project would consist of              Enter the docket number (P–14755) in
                                                  comment date, it is not necessary to                    the following: (1) An existing 21-foot-               the docket number field to access the
                                                  serve motions to intervene or protests                  high, 470-foot-long concrete and stone                document. For assistance, contact FERC
                                                  on persons other than the Applicant.                    dam with a 150-foot-long ogee spillway,               Online Support.
                                                     The Commission encourages                            two 4.5-foot-wide, 7-foot-high stoplog
                                                                                                                                                                  Dated: February 25, 2016.
                                                  electronic submission of protests and                   bays, and two 6.25-foot-wide, 7.66-foot-
                                                                                                                                                                Nathaniel J. Davis, Sr.,
                                                  interventions in lieu of paper using the                high outlet gates; (2) an existing 20-acre
                                                                                                          impoundment with a normal storage                     Deputy Secretary.
                                                  ‘‘eFiling’’ link at http://www.ferc.gov.
                                                                                                          capacity of 112 acre-feet at spillway                 [FR Doc. 2016–04697 Filed 3–3–16; 8:45 am]
                                                  Persons unable to file electronically
                                                  should submit an original and 5 copies                  crest elevation of about 474.5 feet                   BILLING CODE 6717–01–P

                                                  of the protest or intervention to the                   national geodetic vertical datum (NGVD
                                                  Federal Energy Regulatory Commission,                   ’29); (3) an existing gated intake
                                                                                                          structure and forebay leading to an                   DEPARTMENT OF ENERGY
                                                  888 First Street NE., Washington, DC
                                                  20426.                                                  existing 200-foot-long, 9-foot-diameter
                                                                                                          steel penstock; (4) an existing brick                 Federal Energy Regulatory
                                                     This filing is accessible on-line at                                                                       Commission
                                                  http://www.ferc.gov, using the                          building housing a 415 kilowatt (kW)
                                                  ‘‘eLibrary’’ link and is available for                  turbine-generator, along with a control               [Project No. 12532–006]
                                                  electronic review in the Commission’s                   panel and switchgear; (5) a new 75-foot-
                                                  Public Reference Room in Washington,                    long, 13.8-kilovolt (kV) transmission                 Pine Creek Mine, LLC; Notice of
                                                  DC. There is an ‘‘eSubscription’’ link on               line connecting the generator to Public               Application Tendered for Filing With
                                                  the Web site that enables subscribers to                Service Company of New Hampshire’s                    the Commission and Establishing
                                                  receive email notification when a                       existing distribution system; and (6)                 Procedural Schedule for Licensing and
                                                  document is added to a subscribed                       appurtenant facilities. The estimated                 Deadline for Submission of Final
                                                  docket(s). For assistance with any FERC                 annual generation of the proposed                     Amendments
                                                  Online service, please email                            Pittsfield Project would be about 1,400
                                                                                                                                                                  Take notice that the following
                                                  FERCOnlineSupport@ferc.gov, or call                     megawatt-hours. The existing dam is
                                                                                                                                                                hydroelectric application has been filed
                                                  (866) 208–3676 (toll free). For TTY, call               owned by New Hampshire Department
                                                                                                                                                                with the Commission and is available
                                                  (202) 502–8659.                                         of Environmental Services.
                                                                                                             Applicant Contact: Mr. Douglas Troy,               for public inspection.
                                                     Comment Date: 5:00 p.m. Eastern                                                                              a. Type of Application: New Minor
                                                                                                          5 Main Street, Pittsfield, NH 03263;
                                                  Time on March 10, 2016.                                                                                       License.
                                                                                                          phone: (603) 435–3598.
                                                    Dated: February 25, 2016.                                FERC Contact: John Ramer; phone:                     b. Project No.: 12532–006.
                                                  Nathaniel J. Davis, Sr.,                                (202) 502–8969 or email: john.ramer@                    c. Date Filed: February 12, 2016
                                                  Deputy Secretary.                                       ferc.gov.                                               d. Applicant: Pine Creek Mine, LLC
                                                  [FR Doc. 2016–04694 Filed 3–3–16; 8:45 am]                 Deadline for filing comments, motions                e. Name of Project: Pine Creek Mine
                                                  BILLING CODE 6717–01–P
                                                                                                          to intervene, competing applications                  Tunnel Hydroelectric Project
                                                                                                          (without notices of intent), or notices of              f. Location: The project is located at
                                                                                                          intent to file competing applications: 60             Pine Creek Mine adjacent to Morgan and
                                                  DEPARTMENT OF ENERGY                                    days from the issuance of this notice.                Pine Creeks in Inyo County California.
                                                                                                          Competing applications and notices of                 The project’s mine access tunnel, mine
                                                  Federal Energy Regulatory                               intent must meet the requirements of 18               plug, mine water storage cavity,
                                                  Commission                                              CFR 4.36.                                             penstock, generator, and most of its
                                                                                                             The Commission strongly encourages                 primary transmission line would be
                                                  [Project No. 14755–000]                                 electronic filing. Please file comments,              located under Federal land managed by
                                                  Ever Better Hydro Power, LLC; Notice                    motions to intervene, notices of intent,              the United States Forest Service.
                                                  of Preliminary Permit Application                       and competing applications using the                    g. Filed Pursuant to: Federal Power
                                                  Accepted for Filing and Soliciting                      Commission’s eFiling system at http://                Act, 16 U.S.C. 791(a)–825(r)
                                                  Comments, Motions To Intervene, and                     www.ferc.gov/docs-filing/efiling.asp.                   h. Applicant Contacts: Craig N.
                                                  Competing Applications                                  Commenters can submit brief comments                  Rossell, Member, Pine Creek Mine LLC,
                                                                                                          up to 6,000 characters, without prior                 228 West Bonita Avenue Claremont,
                                                    On February 16, 2016, Ever Better                     registration, using the eComment system               California 91711, (909) 482–1000; Lynn
                                                  Hydro Power, LLC, filed an application                  at http://www.ferc.gov/docs-filing/                   Goodfellow, 9050 Pine Creek Road,
                                                  for a preliminary permit, pursuant to                   ecomment.asp. You must include your                   Bishop, California 93514 (760) 387–
                                                  section 4(f) of the Federal Power Act                   name and contact information at the end               2076.
                                                  (FPA), proposing to study the feasibility               of your comments. For assistance,                       i. FERC Contact: Joseph Hassell, (202)
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  of the Pittsfield Mill Dam Hydroelectric                please contact FERC Online Support at                 502–8079 or joseph.hassell@ferc.gov.
                                                  Project (Pittsfield Project or project) to              FERCOnlineSupport@ferc.gov, (866)                       j. This application is not ready for
                                                  be located on Suncook River, in the                     208–3676 (toll free), or (202) 502–8659               environmental analysis at this time.
                                                  town of Pittsfield, in Merrimack County,                (TTY). In lieu of electronic filing, please             k. The Project Description: The
                                                  New Hampshire. The sole purpose of a                    send a paper copy to: Secretary, Federal              proposed Pine Creek Tunnel
                                                  preliminary permit, if issued, is to grant              Energy Regulatory Commission, 888                     Hydroelectric Project would include: (1)
                                                  the permit holder priority to file a                    First Street NE., Washington, DC 20426.               The existing Pine Creek Mine site, mine


                                             VerDate Sep<11>2014   15:22 Mar 03, 2016   Jkt 238001   PO 00000   Frm 00047   Fmt 4703   Sfmt 4703   E:\FR\FM\04MRN1.SGM   04MRN1



Document Created: 2018-02-02 15:05:52
Document Modified: 2018-02-02 15:05:52
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 11554 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR