81_FR_11599 81 FR 11556 - Central Valley Project, California-Oregon Transmission Project, Pacific Alternating Current Intertie, Third-Party Transmission Service; and Information on the Path 15 Transmission Upgrade-Rate Order No. WAPA-173

81 FR 11556 - Central Valley Project, California-Oregon Transmission Project, Pacific Alternating Current Intertie, Third-Party Transmission Service; and Information on the Path 15 Transmission Upgrade-Rate Order No. WAPA-173

DEPARTMENT OF ENERGY
Western Area Power Administration

Federal Register Volume 81, Issue 43 (March 4, 2016)

Page Range11556-11557
FR Document2016-04876

The Western Area Power Administration (Western) extends, on an interim basis, the existing Central Valley Project power, transmission, and ancillary services formula rates; California-Oregon Transmission Project transmission formula rate; Pacific Alternating Current Intertie transmission formula rate; and third-party transmission service formula rate. This action extends Rate Schedules CV-F13, CPP-2, CV-T3, CV-NWT5, COTP-T3, PACI-T3, CV-TPT7, CV-UUP1, CV-SPR4, CV-SUR4, CV-RFS4, CV-EID4, and CV-GID1 through September 30, 2019. The interim rates will be in effect until the Federal Energy Regulatory Commission (FERC) places the formula rates into effect on a final basis or until superseded.

Federal Register, Volume 81 Issue 43 (Friday, March 4, 2016)
[Federal Register Volume 81, Number 43 (Friday, March 4, 2016)]
[Notices]
[Pages 11556-11557]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-04876]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Western Area Power Administration


Central Valley Project, California-Oregon Transmission Project, 
Pacific Alternating Current Intertie, Third-Party Transmission Service; 
and Information on the Path 15 Transmission Upgrade-Rate Order No. 
WAPA-173

AGENCY:  Western Area Power Administration, DOE.

ACTION: Notice of Extension and Rate Order for Sierra Nevada Region's 
Power, Transmission, and Ancillary Services Formula Rates.

-----------------------------------------------------------------------

SUMMARY: The Western Area Power Administration (Western) extends, on an 
interim basis, the existing Central Valley Project power, transmission, 
and ancillary services formula rates; California-Oregon Transmission 
Project transmission formula rate; Pacific Alternating Current Intertie 
transmission formula rate; and third-party transmission service formula 
rate. This action extends Rate Schedules CV-F13, CPP-2, CV-T3, CV-NWT5, 
COTP-T3, PACI-T3, CV-TPT7, CV-UUP1, CV-SPR4, CV-SUR4, CV-RFS4, CV-EID4, 
and CV-GID1 through September 30, 2019. The interim rates will be in 
effect until the Federal Energy Regulatory Commission (FERC) places the 
formula rates into effect on a final basis or until superseded.

DATES: This action is effective October 1, 2016.

FOR FURTHER INFORMATION CONTACT: Mr. Subhash Paluru, Regional Manager, 
Sierra Nevada Region, Western Area Power Administration, 114 Parkshore 
Drive, Folsom, CA 95630-4710, telephone (916) 353-4418, email 
[email protected]; or Ms. Regina Rieger, Rates Manager, Sierra Nevada 
Region, Western Area Power Administration, 114 Parkshore Drive, Folsom, 
CA 95630-4710, telephone (916) 353-4629, email [email protected].

SUPPLEMENTARY INFORMATION: On August 25, 2015, Western published a 
notice in the Federal Register \1\ in which Western proposed to extend, 
without adjustment, the existing Central Valley Project power, 
transmission, and ancillary services formula rates; California-Oregon 
Transmission Project transmission formula rate; Pacific Alternating 
Current Intertie transmission formula rate; and third-party 
transmission service formula rate. Western proposed to extend Rate 
Schedules CV-F13, CPP-2, CV-T3, CV-NWT5, COTP-T3, PACI-T3, CV-TPT7, CV-
UUP1, CV-SPR4, CV-SUR4, CV-RFS4, CV-EID4, and CV-GID1 through September 
30, 2019. As part of the notice, Western provided a 30-day comment 
period ending on September 24, 2015. Western received three comments, 
each in support of the three-year rate extension. Formula rates 
previously confirmed and approved by FERC, for which no adjustment is 
contemplated, may be extended by the Deputy Secretary on an interim 
basis, following notice of proposed extension at least 30 days before 
expiration.\2\
---------------------------------------------------------------------------

    \1\ See 80 FR 51556 (August 25, 2015).
    \2\ See 10 CFR 903.23(a).
---------------------------------------------------------------------------

    By Delegation Order No. 00-037.00A, effective October 25, 2013, the 
Secretary of Energy delegated: (1) The authority to develop power and 
transmission rates to Western's Administrator; (2) the authority to 
confirm, approve, and place such rates into effect on an interim basis 
to the Deputy Secretary of Energy; and (3) the authority to confirm, 
approve, and place into effect on a final basis, to remand, or to 
disapprove such rates to FERC. This extension is issued under the 
Delegation Order and DOE rate extension procedures at 10 CFR 903.23(a).
    FERC confirmed and approved Rate Order No. WAPA-156,\3\ Rate 
Schedules CV-F13, CPP-2, CV-T3, CV-NWT5, COTP-T3, PACI-T3, CV-TPT7, CV-
UUP1, CV-SPR4, CV-SUR4, CV-RFS4, CV-EID4, and CV-GID1, for five years. 
These formula rates expire on September 30, 2016. The rates and revenue 
requirements resulting from the approved formula rate methodologies are 
recalculated each year, based on updated financial and operational 
data. The existing formula rates provide sufficient revenue to repay 
all annual expenses, including interest expense, and to repay capital 
investments within the allowable periods, thus ensuring repayment 
within the cost recovery criteria set forth in DOE Order RA 6120.2.
---------------------------------------------------------------------------

    \3\ See U. S. Dept. of Energy, Western Area Power Admin., Docket 
No. EF11-9-000, 137 FERC ] 62,201 (2011).
---------------------------------------------------------------------------

    Upon consideration of Western's proposal and the comments received, 
I hereby approve, on an interim basis, Rate Order No. WAPA-173, which 
extends, without adjustment, the existing power, transmission, and 
ancillary service formula rates in the above Rate Schedules through

[[Page 11557]]

September 30, 2019. Rate Order No. WAPA-173 will be submitted to FERC 
---------------------------------------------------------------------------
for confirmation and approval on a final basis.

    Dated: February 26, 2016.
Elizabeth Sherwood-Randall,
Deputy Secretary of Energy.

DEPARTMENT OF ENERGY

Deputy Secretary

    In the Matter of: Western Area Power Administration Extension of 
Formula Rates for the Central Valley Project, California-Oregon 
Transmission Project, Pacific Alternating Current Intertie, and 
Third-Party Transmission Service; and Information on the Path 15 
Transmission Upgrade, Rate Order No. WAPA-173.

Order Confirming, Approving, And Placing The Central Valley Project, 
California-Oregon Transmission Project, Pacific Alternating Current 
Intertie, And Third-Party Transmission Service Formula Rates Into 
Effect On An Interim Basis

    These rates were established in accordance with section 302 of the 
Department of Energy (DOE) Organization Act (42 U.S.C. 7152). This Act 
transferred to and vested in the Secretary of Energy the power 
marketing functions of the Secretary of the Department of the Interior 
and the Bureau of Reclamation under the Reclamation Act of 1902 (Ch. 
1093, 32 Stat. 388), as amended and supplemented by subsequent laws, 
particularly section 9(c) of the Reclamation Project Act of 1939 (43 
U.S.C. 485h(c)), section 5 of the Flood Control Act of 1944 (16 U.S.C. 
825s), and other acts that specifically apply to the project involved.
    By Delegation Order No. 00-037.00A, effective October 25, 2013, the 
Secretary of Energy delegated: (1) The authority to develop power and 
transmission rates to the Administrator of the Western Area Power 
Administration (Western); (2) the authority to confirm, approve, and 
place such rates into effect on an interim basis to the Deputy 
Secretary of Energy; and (3) the authority to confirm, approve, and 
place into effect on a final basis, to remand, or to disapprove such 
rates to the Federal Energy Regulatory Commission (FERC). This 
extension is issued pursuant to the Delegation Order and DOE rate 
extension procedures at 10 CFR 903.23(a).

Background

    On December 2, 2011, FERC confirmed and approved the existing 
formula rates, Rate Order No. WAPA-156,\1\ Rate Schedules CV-F13, CPP-
2, CV-T3, CV-NWT5, COTP-T3, PACI-T3, CV-TPT7, CV-UUP1, CV-SPR4, CV-
SUR4, CV-RFS4, CV-EID4, and CV-GID1. FERC approved the rates for five 
years through September 30, 2016. On August 25, 2015, Western published 
a notice in the Federal Register proposing to extend the existing 
formula Rate Schedules for three years, without adjustment.\2\ In 
accordance with 10 CFR 903.23(a), Western provided for a consultation 
and comment period that ended on September 24, 2015. Western received 
three comments, each in support of the three-year rate extension.
---------------------------------------------------------------------------

    \1\ See U.S. Dept. of Energy, Western Area Power Admin., Docket 
No. EF11-9-000, 137 FERC ] 62,201 (2011).
    \2\ See 80 FR 51556 (August 25, 2015).
---------------------------------------------------------------------------

Discussion

    The power, transmission, and ancillary service formula rates, Rate 
Schedules CV-F13, CPP-2, CV-T3, CV-NWT5, COTP-T3, PACI-T3, CV-TPT7, CV-
UUP1, CV-SPR4, CV-SUR4, CV-RFS4, CV-EID4, and CV-GID1, approved under 
Rate Order No. WAPA-156, expire on September 30, 2016. The existing 
formula rate methodologies are recalculated at least annually and 
provide adequate revenue to recover annual expenses, including interest 
expense, and repay capital investments within allowable time periods, 
thus ensuring repayment within the cost recovery criteria set forth in 
DOE Order RA 6120.2.
    Rate Order No. WAPA-173 extends, without adjustment, the existing 
formula Rate Schedules CV-F13, CPP-2, CV-T3, CV-NWT5, COTP-T3, PACI-T3, 
CV-TPT7, CV-UUP1, CV-SPR4, CV-SUR4, CV-RFS4, CV-EID4, and CV-GID1 
through September 30, 2019, thereby continuing to ensure project 
repayment within the cost recovery criteria.


Order

    In view of the above and under the authority delegated to me, I 
hereby extend, on an interim basis, the existing power, transmission, 
and ancillary services formula Rate Schedules CV-F13, CPP-2, CV-T3, CV-
NWT5, COTP-T3, PACI-T3, CV-TPT7, CV-UUP1, CV-SPR4, CV-SUR4, CV-RFS4, 
CV-EID4, and CV-GID1. Rate Order No. WAPA-173 extends, without 
adjustment, the existing formula rates through September 30, 2019. The 
formula rates shall be in effect on an interim basis, pending FERC's 
confirmation and approval of this extension or substitute rate on a 
final basis.

Dated: February 26, 2016.

Elizabeth Sherwood-Randall,
Deputy Secretary of Energy.

[FR Doc. 2016-04876 Filed 3-3-16; 8:45 am]
BILLING CODE 6450-01-P



                                                  11556                           Federal Register / Vol. 81, No. 43 / Friday, March 4, 2016 / Notices

                                                     Filed Date: 2/25/16.                                   Dated: February 25, 2016.                             transmission formula rate; Pacific
                                                     Accession Number: 20160225–5144.                     Nathaniel J. Davis, Sr.,                                Alternating Current Intertie
                                                     Comments Due: 5 p.m. ET 3/17/16.                     Deputy Secretary.                                       transmission formula rate; and third-
                                                     Docket Numbers: ER16–1004–000.                       [FR Doc. 2016–04693 Filed 3–3–16; 8:45 am]              party transmission service formula rate.
                                                     Applicants: Roundtop Energy LLC.                     BILLING CODE 6717–01–P                                  Western proposed to extend Rate
                                                     Description: Compliance filing:                                                                              Schedules CV–F13, CPP–2, CV–T3, CV–
                                                  Roundtop Energys Reactive Power                                                                                 NWT5, COTP–T3, PACI–T3, CV–TPT7,
                                                  Filing to be effective 4/1/2016.                        DEPARTMENT OF ENERGY                                    CV–UUP1, CV–SPR4, CV–SUR4, CV–
                                                     Filed Date: 2/25/16.                                                                                         RFS4, CV–EID4, and CV–GID1 through
                                                     Accession Number: 20160225–5177.                     Western Area Power Administration                       September 30, 2019. As part of the
                                                     Comments Due: 5 p.m. ET 3/17/16.                                                                             notice, Western provided a 30-day
                                                                                                          Central Valley Project, California-                     comment period ending on September
                                                     Docket Numbers: ER16–1005–000.                       Oregon Transmission Project, Pacific
                                                     Applicants: RE Mustang LLC.                                                                                  24, 2015. Western received three
                                                                                                          Alternating Current Intertie, Third-Party               comments, each in support of the three-
                                                     Description: § 205(d) Rate Filing:                   Transmission Service; and Information
                                                  Mustang Shared Facilities Agreement to                                                                          year rate extension. Formula rates
                                                                                                          on the Path 15 Transmission Upgrade-                    previously confirmed and approved by
                                                  be effective 4/25/2016.                                 Rate Order No. WAPA–173
                                                     Filed Date: 2/25/16.                                                                                         FERC, for which no adjustment is
                                                     Accession Number: 20160225–5182.                     AGENCY:  Western Area Power                             contemplated, may be extended by the
                                                     Comments Due: 5 p.m. ET 3/17/16.                     Administration, DOE.                                    Deputy Secretary on an interim basis,
                                                                                                          ACTION: Notice of Extension and Rate                    following notice of proposed extension
                                                     Docket Numbers: ER16–1006–000.
                                                                                                          Order for Sierra Nevada Region’s Power,                 at least 30 days before expiration.2
                                                     Applicants: RE Mustang LLC.
                                                                                                          Transmission, and Ancillary Services                       By Delegation Order No. 00–037.00A,
                                                     Description: § 205(d) Rate Filing:
                                                                                                          Formula Rates.                                          effective October 25, 2013, the Secretary
                                                  Mustang LGIA Co Tenancy Agreement
                                                                                                                                                                  of Energy delegated: (1) The authority to
                                                  to be effective 4/25/2016.
                                                                                                          SUMMARY:   The Western Area Power                       develop power and transmission rates to
                                                     Filed Date: 2/25/16.
                                                                                                          Administration (Western) extends, on                    Western’s Administrator; (2) the
                                                     Accession Number: 20160225–5183.
                                                                                                          an interim basis, the existing Central                  authority to confirm, approve, and place
                                                     Comments Due: 5 p.m. ET 3/17/16.
                                                                                                          Valley Project power, transmission, and                 such rates into effect on an interim basis
                                                     Docket Numbers: ER16–1007–000.                       ancillary services formula rates;                       to the Deputy Secretary of Energy; and
                                                     Applicants: Amazon Energy, LLC.                      California-Oregon Transmission Project                  (3) the authority to confirm, approve,
                                                     Description: § 205(d) Rate Filing:                   transmission formula rate; Pacific                      and place into effect on a final basis, to
                                                  Amazon Energy, LLC Notice of                            Alternating Current Intertie                            remand, or to disapprove such rates to
                                                  Succession to be effective 2/26/2016.                   transmission formula rate; and third-                   FERC. This extension is issued under
                                                     Filed Date: 2/25/16.                                 party transmission service formula rate.                the Delegation Order and DOE rate
                                                     Accession Number: 20160225–5185.                     This action extends Rate Schedules CV–                  extension procedures at 10 CFR
                                                     Comments Due: 5 p.m. ET 3/17/16.                     F13, CPP–2, CV–T3, CV–NWT5, COTP–                       903.23(a).
                                                     Take notice that the Commission                      T3, PACI–T3, CV–TPT7, CV–UUP1, CV–                         FERC confirmed and approved Rate
                                                  received the following public utility                   SPR4, CV–SUR4, CV–RFS4, CV–EID4,                        Order No. WAPA–156,3 Rate Schedules
                                                  holding company filings:                                and CV–GID1 through September 30,                       CV–F13, CPP–2, CV–T3, CV–NWT5,
                                                     Docket Numbers: PH16–5–000.                          2019. The interim rates will be in effect               COTP–T3, PACI–T3, CV–TPT7, CV–
                                                     Applicants: Gaz Metro inc.                           until the Federal Energy Regulatory                     UUP1, CV–SPR4, CV–SUR4, CV–RFS4,
                                                     Description: Gaz Metro inc. FERC 65–                 Commission (FERC) places the formula                    CV–EID4, and CV–GID1, for five years.
                                                  B Waiver Notification.                                  rates into effect on a final basis or until             These formula rates expire on
                                                     Filed Date: 2/24/16.                                 superseded.                                             September 30, 2016. The rates and
                                                     Accession Number: 20160224–5150.                     DATES: This action is effective October                 revenue requirements resulting from the
                                                     Comments Due: 5 p.m. ET 3/16/16.                     1, 2016.                                                approved formula rate methodologies
                                                     The filings are accessible in the                    FOR FURTHER INFORMATION CONTACT: Mr.                    are recalculated each year, based on
                                                  Commission’s eLibrary system by                         Subhash Paluru, Regional Manager,                       updated financial and operational data.
                                                  clicking on the links or querying the                   Sierra Nevada Region, Western Area                      The existing formula rates provide
                                                  docket number.                                          Power Administration, 114 Parkshore                     sufficient revenue to repay all annual
                                                     Any person desiring to intervene or                  Drive, Folsom, CA 95630–4710,                           expenses, including interest expense,
                                                  protest in any of the above proceedings                 telephone (916) 353–4418, email                         and to repay capital investments within
                                                  must file in accordance with Rules 211                  paluru@wapa.gov; or Ms. Regina Rieger,                  the allowable periods, thus ensuring
                                                  and 214 of the Commission’s                             Rates Manager, Sierra Nevada Region,                    repayment within the cost recovery
                                                  Regulations (18 CFR 385.211 and                         Western Area Power Administration,                      criteria set forth in DOE Order RA
                                                  385.214) on or before 5:00 p.m. Eastern                 114 Parkshore Drive, Folsom, CA                         6120.2.
                                                  time on the specified comment date.                     95630–4710, telephone (916) 353–4629,                      Upon consideration of Western’s
                                                  Protests may be considered, but                         email rieger@wapa.gov.                                  proposal and the comments received, I
                                                  intervention is necessary to become a                                                                           hereby approve, on an interim basis,
                                                                                                          SUPPLEMENTARY INFORMATION: On August
                                                  party to the proceeding.                                                                                        Rate Order No. WAPA–173, which
                                                                                                          25, 2015, Western published a notice in
                                                     eFiling is encouraged. More detailed                                                                         extends, without adjustment, the
                                                                                                          the Federal Register 1 in which Western
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  information relating to filing                                                                                  existing power, transmission, and
                                                                                                          proposed to extend, without adjustment,
                                                  requirements, interventions, protests,                                                                          ancillary service formula rates in the
                                                                                                          the existing Central Valley Project
                                                  service, and qualifying facilities filings                                                                      above Rate Schedules through
                                                                                                          power, transmission, and ancillary
                                                  can be found at: http://www.ferc.gov/                   services formula rates; California-                       2 See10 CFR 903.23(a).
                                                  docs-filing/efiling/filing-req.pdf. For                 Oregon Transmission Project                               3 SeeU. S. Dept. of Energy, Western Area Power
                                                  other information, call (866) 208–3676                                                                          Admin., Docket No. EF11–9–000, 137 FERC
                                                  (toll free). For TTY, call (202) 502–8659.                1 See   80 FR 51556 (August 25, 2015).                ¶ 62,201 (2011).



                                             VerDate Sep<11>2014   15:22 Mar 03, 2016   Jkt 238001   PO 00000   Frm 00049    Fmt 4703   Sfmt 4703    E:\FR\FM\04MRN1.SGM    04MRN1


                                                                                  Federal Register / Vol. 81, No. 43 / Friday, March 4, 2016 / Notices                                                  11557

                                                  September 30, 2019. Rate Order No.                      156,1 Rate Schedules CV–F13, CPP–2,                   Dated: February 26, 2016.
                                                  WAPA–173 will be submitted to FERC                      CV–T3, CV–NWT5, COTP–T3, PACI–                        Elizabeth Sherwood-Randall,
                                                  for confirmation and approval on a final                T3, CV–TPT7, CV–UUP1, CV–SPR4,                        Deputy Secretary of Energy.
                                                  basis.                                                  CV–SUR4, CV–RFS4, CV–EID4, and                        [FR Doc. 2016–04876 Filed 3–3–16; 8:45 am]
                                                    Dated: February 26, 2016.                             CV–GID1. FERC approved the rates for                  BILLING CODE 6450–01–P
                                                                                                          five years through September 30, 2016.
                                                  Elizabeth Sherwood-Randall,
                                                                                                          On August 25, 2015, Western published
                                                  Deputy Secretary of Energy.                             a notice in the Federal Register                      ENVIRONMENTAL PROTECTION
                                                  DEPARTMENT OF ENERGY                                    proposing to extend the existing formula              AGENCY
                                                                                                          Rate Schedules for three years, without
                                                  Deputy Secretary                                        adjustment.2 In accordance with 10 CFR                [ER–FRL–9025–8]
                                                    In the Matter of: Western Area Power                  903.23(a), Western provided for a
                                                                                                                                                                Environmental Impact Statements;
                                                  Administration Extension of Formula Rates               consultation and comment period that
                                                                                                                                                                Notice of Availability
                                                  for the Central Valley Project, California-             ended on September 24, 2015. Western
                                                  Oregon Transmission Project, Pacific                    received three comments, each in                        Responsible Agency: Office of Federal
                                                  Alternating Current Intertie, and Third-Party           support of the three-year rate extension.             Activities, General Information (202)
                                                  Transmission Service; and Information on                Discussion                                            564–7146 or http://www2.epa.gov/nepa.
                                                  the Path 15 Transmission Upgrade, Rate                                                                        Weekly receipt of Environmental Impact
                                                  Order No. WAPA–173.                                        The power, transmission, and                         Statements (EISs)
                                                                                                          ancillary service formula rates, Rate                 Filed 02/22/2016 Through 02/26/2016,
                                                  Order Confirming, Approving, And                        Schedules CV–F13, CPP–2, CV–T3, CV–
                                                  Placing The Central Valley Project,                                                                           Pursuant to 40 CFR 1506.9.
                                                                                                          NWT5, COTP–T3, PACI–T3, CV–TPT7,
                                                  California-Oregon Transmission                          CV–UUP1, CV–SPR4, CV–SUR4, CV–                        Notice
                                                  Project, Pacific Alternating Current                    RFS4, CV–EID4, and CV–GID1,                             Section 309(a) of the Clean Air Act
                                                  Intertie, And Third-Party Transmission                  approved under Rate Order No. WAPA–                   requires that EPA make public its
                                                  Service Formula Rates Into Effect On                    156, expire on September 30, 2016. The                comments on EISs issued by other
                                                  An Interim Basis                                        existing formula rate methodologies are               Federal agencies. EPA’s comment letters
                                                                                                          recalculated at least annually and                    on EISs are available at: https://
                                                     These rates were established in
                                                                                                          provide adequate revenue to recover                   cdxnodengn.epa.gov/cdx-nepa-public/
                                                  accordance with section 302 of the
                                                                                                          annual expenses, including interest                   action/eis/search.
                                                  Department of Energy (DOE)
                                                                                                          expense, and repay capital investments                EIS No. 20160047, Final Supplement,
                                                  Organization Act (42 U.S.C. 7152). This
                                                                                                          within allowable time periods, thus                     NNSA, TN, Production of Tritium in
                                                  Act transferred to and vested in the
                                                                                                          ensuring repayment within the cost                      a Commercial Light Water Reactor,
                                                  Secretary of Energy the power marketing
                                                                                                          recovery criteria set forth in DOE Order                Review Period Ends: 04/04/2016,
                                                  functions of the Secretary of the
                                                                                                          RA 6120.2.                                              Contact: Curtis Chambellan 505–845–
                                                  Department of the Interior and the
                                                                                                             Rate Order No. WAPA–173 extends,                     5073.
                                                  Bureau of Reclamation under the
                                                                                                          without adjustment, the existing                      EIS No. 20160048, Final, USAF, AK,
                                                  Reclamation Act of 1902 (Ch. 1093, 32
                                                                                                          formula Rate Schedules CV–F13, CPP–                     United States Air Force F–35A
                                                  Stat. 388), as amended and
                                                                                                          2, CV–T3, CV–NWT5, COTP–T3, PACI–                       Operational Beddown-Pacific, Review
                                                  supplemented by subsequent laws,
                                                                                                          T3, CV–TPT7, CV–UUP1, CV–SPR4,                          Period Ends: 04/04/2016, Contact:
                                                  particularly section 9(c) of the
                                                                                                          CV–SUR4, CV–RFS4, CV–EID4, and                          Toni Ristau 907–377–2116.
                                                  Reclamation Project Act of 1939 (43
                                                                                                          CV–GID1 through September 30, 2019,                   EIS No. 20160049, Final, DOE, NM,
                                                  U.S.C. 485h(c)), section 5 of the Flood
                                                                                                          thereby continuing to ensure project                    Disposal of Greater-than-Class-C
                                                  Control Act of 1944 (16 U.S.C. 825s),
                                                                                                          repayment within the cost recovery                      (GTCC) Low-Level Radioactive Waste
                                                  and other acts that specifically apply to
                                                                                                          criteria.                                               and GTCC-Like Waste, Review Period
                                                  the project involved.
                                                     By Delegation Order No. 00–037.00A,                                                                          Ends: 04/04/2016, Contact: Theresa J.
                                                  effective October 25, 2013, the Secretary               Order                                                   Kliczewski 202–586–3301.
                                                                                                                                                                EIS No. 20160050, Final, USFS, CA, Jess
                                                  of Energy delegated: (1) The authority to                 In view of the above and under the
                                                                                                                                                                  Project, Review Period Ends: 04/04/
                                                  develop power and transmission rates to                 authority delegated to me, I hereby
                                                                                                                                                                  2016, Contact: Danika Carlson 530–
                                                  the Administrator of the Western Area                   extend, on an interim basis, the existing
                                                                                                                                                                  468–1225.
                                                  Power Administration (Western); (2) the                 power, transmission, and ancillary                    EIS No. 20160051, Draft, DOC, PRO,
                                                  authority to confirm, approve, and place                services formula Rate Schedules CV–                     Programmatic—Nationwide Public
                                                  such rates into effect on an interim basis              F13, CPP–2, CV–T3, CV–NWT5, COTP–                       Safety Broadband Network for the
                                                  to the Deputy Secretary of Energy; and                  T3, PACI–T3, CV–TPT7, CV–UUP1, CV–                      Non-Contiguous United States,
                                                  (3) the authority to confirm, approve,                  SPR4, CV–SUR4, CV–RFS4, CV–EID4,                        Comment Period Ends: 05/03/2016,
                                                  and place into effect on a final basis, to              and CV–GID1. Rate Order No. WAPA–                       Contact: Amanda Pereira 571–665–
                                                  remand, or to disapprove such rates to                  173 extends, without adjustment, the                    6141.
                                                  the Federal Energy Regulatory                           existing formula rates through                        EIS No. 20160052, Final, USACE, CA,
                                                  Commission (FERC). This extension is                    September 30, 2019. The formula rates                   Cordova Hills, Review Period Ends:
                                                  issued pursuant to the Delegation Order                 shall be in effect on an interim basis,                 04/04/2016, Contact: Lisa M. Gibson
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  and DOE rate extension procedures at                    pending FERC’s confirmation and                         916–557–5288.
                                                  10 CFR 903.23(a).                                       approval of this extension or substitute              EIS No. 20160053, Final Supplement,
                                                                                                          rate on a final basis.                                  TVA, TN, Adoption—Production of
                                                  Background
                                                                                                            1 See U.S. Dept. of Energy, Western Area Power
                                                                                                                                                                  Tritium in a Commercial Light Water
                                                    On December 2, 2011, FERC                                                                                     Reactor, Contact: Charles P. Nicholson
                                                                                                          Admin., Docket No. EF11–9–000, 137 FERC
                                                  confirmed and approved the existing                     ¶ 62,201 (2011).                                        865–632–3582. The Tennessee Valley
                                                  formula rates, Rate Order No. WAPA–                       2 See 80 FR 51556 (August 25, 2015).                  Authority is adopting the U.S.


                                             VerDate Sep<11>2014   15:22 Mar 03, 2016   Jkt 238001   PO 00000   Frm 00050   Fmt 4703   Sfmt 4703   E:\FR\FM\04MRN1.SGM   04MRN1



Document Created: 2018-02-02 15:05:53
Document Modified: 2018-02-02 15:05:53
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Extension and Rate Order for Sierra Nevada Region's Power, Transmission, and Ancillary Services Formula Rates.
DatesThis action is effective October 1, 2016.
ContactMr. Subhash Paluru, Regional Manager, Sierra Nevada Region, Western Area Power Administration, 114 Parkshore Drive, Folsom, CA 95630-4710, telephone (916) 353-4418, email [email protected]; or Ms. Regina Rieger, Rates Manager, Sierra Nevada Region, Western Area Power Administration, 114 Parkshore Drive, Folsom, CA 95630-4710, telephone (916) 353-4629, email [email protected]
FR Citation81 FR 11556 