In compliance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) Humboldt River Field Office, Winnemucca, Nevada intends to prepare an Environmental Impact Statement (EIS) to analyze the potential impacts of approving an expansion to the existing gold mining operation in Humboldt County, Nevada. This notice is announcing the beginning of the scoping process to solicit public comments and identify issues to be considered in the EIS. The notice also serves to initiate public consultation, as required under the National Historic Preservation Act.

Federal Register, Volume 81 Issue 43 (Friday, March 4, 2016)
[Federal Register Volume 81, Number 43 (Friday, March 4, 2016)]
[Notices]
[Pages 11586-11587]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-04806]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Land Management

[LLNVW00000.L5110000.GN0000.LVEMF1504350.15X MO#4500088392]


Notice of Intent To Prepare an Environmental Impact Statement for 
the Proposed Marigold Mine Plan of Operations--Mackay Optimization 
Project Amendment, Humboldt County, NV

AGENCY: Bureau of Land Management, Interior.

ACTION: Notice of Intent.

-----------------------------------------------------------------------

SUMMARY: In compliance with the National Environmental Policy Act of 
1969, as amended (NEPA), and the Federal Land Policy and Management Act 
of 1976, as amended, the Bureau of Land Management (BLM) Humboldt River 
Field Office, Winnemucca, Nevada intends to prepare an Environmental 
Impact Statement (EIS) to analyze the potential impacts of approving an 
expansion to the existing gold mining operation in Humboldt County, 
Nevada. This notice is announcing the beginning of the scoping process 
to solicit public comments and identify issues to be considered in the 
EIS. The notice also serves to initiate public consultation, as 
required under the National Historic Preservation Act.

DATES: This notice initiates the public scoping process for the EIS. 
Comments on issues may be submitted in writing until April 4, 2016. The 
date(s) and location(s) of any scoping meetings will be announced at 
least 15 days in advance through local media, newspapers, and the BLM 
Web site at: http://www.blm.gov/nv/st/en/fo/

[[Page 11587]]

wfo.html. In order to be included in the Draft EIS, all comments must 
be received prior to the close of the 30-day scoping period or 15 days 
after the last public meeting, whichever is later. We will provide 
additional opportunities for public participation upon publication of 
the Draft EIS.

ADDRESSES: You may submit comments related to the Marigold Mine--Mackay 
Optimization Project by any of the following methods:
     Web site: http://www.blm.gov/nv/st/en/fo/wfo.html
     Email: [email protected]. Include Marigold Mine EIS Comments 
in the subject line.
     Fax: 775-623-1503.
     Mail: BLM Winnemucca District, Humboldt River Field 
Office, 5100 E. Winnemucca Blvd., Winnemucca, NV 89445.
    Documents pertinent to this proposal may be examined at the 
Humboldt River Field Office.

FOR FURTHER INFORMATION CONTACT: Jeanette Black, telephone 775-623-
1500; address BLM Winnemucca District, Humboldt River Field Office, 
5100 E. Winnemucca Blvd., Winnemucca, NV 89445; email [email protected]. 
Contact Ms. Black to have your name added to our mailing list. Persons 
who use a telecommunications device for the deaf (TDD) may call the 
Federal Information Relay Service (FIRS) at 1-800-877-8339 to contact 
the above individual during normal business hours. The FIRS is 
available 24 hours a day, 7 days a week, to leave a message or question 
with the above individual. You will receive a reply during normal 
business hours.

SUPPLEMENTARY INFORMATION: The applicant, Marigold Mining Company, a 
wholly-owned subsidiary of Silver Standard Resources Inc., has 
requested to modify its approved Plan of Operations by expanding its 
operations at the existing Marigold Mine, which is located adjacent to 
Battle Mountain approximately 35 miles southeast of Winnemucca, 
Humboldt County, Nevada; and 13 miles northwest of Battle Mountain, 
Lander County, Nevada. The mine is currently authorized up to a 
disturbance of 5,720 acres (approximately 3,275 acres of private land 
and 2,445 acres of public land), which was permitted under a series of 
Environmental Impact Statements and Environmental Assessments from July 
1988 through October 2013.
    The proposed action is for the BLM to approve as proposed the 
company's changes to its Plan of Operations. The proposed changes 
presented under this Plan of Operations modification would encompass 
1,893 acres of new disturbance (approximately 843 acres of public land 
and 1,050 acres of private land), and include a re-classification of 
the type of authorized disturbance of approximately 706 acres of which 
306 acres are public land and 400 acres are private land. If approved, 
the proposed modification would increase the mine life by up to 10 
years. All proposed disturbance would be within the existing approved 
Plan boundary and includes the following: Combine four of the existing 
and authorized open pits (Target 1, Target 2, Target 3, and East Hill) 
to become a single open pit to be renamed the Mackay Pit; combine the 
existing and approved Terry Zone and Section 8 Pits to become the 
Mackay North Pit; increase the size of the authorized Section 5 North 
Pit; dewater the Mackay Pit and Mackay North Pit at a rate of up to 
6,000 gallons per minute (gpm) with an average rate of about 1,500 to 
2,000 gpm; construct and operate six rapid infiltration basins (RIBs); 
construct and operate new production, dewatering, and monitoring wells 
with associated roads, power, and pipelines; create one new waste rock 
storage area (WRSA) (Section 5 North) and expand the Northeast and 
Northwest Expansion WRSAs; construct heap leach processing pad (HLP) 
cells 22, 23, and 24; construct new process ponds on existing 
disturbance; construct two new carbon column trains on existing 
disturbance; relocate the county road called Buffalo Valley Road to 
accommodate the mine changes; re-establish a private land access road 
to land holdings in Section 30; relocate the existing 120-kV power line 
(right-of-way held by NV Energy); and move the planned location of the 
authorized but not yet constructed utility corridor.
    The purpose of the public scoping process is to determine relevant 
issues that will influence the scope of the environmental analysis, 
including alternatives, and guide the process for developing the EIS. 
At present, the BLM has identified the following preliminary issues: 
(a) The formation of a pit lake after completion of mining activities, 
and ensuring that there is neither degradation of waters of the state 
nor undue or unnecessary degradation of public lands; (b) potential 
impacts to wildlife habitat; and (c) potential impacts to cultural 
sites. Application of mitigation hierarchy strategies will be addressed 
for on-site, regional, and compensatory mitigation appropriate to the 
types of impacts and resource objectives.
    The BLM will utilize and coordinate the NEPA scoping process to 
help fulfill the public involvement process under the National Historic 
Preservation Act (54 U.S.C. 306108) as provided in 36 CFR 800.2(d)(3). 
The information about historic and cultural resources within the area 
potentially affected by the proposed action will assist the BLM in 
identifying and evaluating impacts to such resources in the context of 
both NEPA and the NHPA.
    The BLM will consult with Indian tribes on a government-to-
government basis in accordance with Executive Order 13175, Secretarial 
Order 3317, and other policies. Tribal concerns, including but not 
limited to, impacts on Indian trust assets and potential impacts to 
cultural resources, will be given due consideration. Federal, State, 
and local agencies, along with tribes and other stakeholders that may 
be interested in or affected by the proposed Marigold Mine Plan of 
Operations--Mackay Optimization Project that the BLM is evaluating, are 
invited to participate in the scoping process and, if eligible, may 
request or be requested by the BLM to participate in the development of 
the environmental analysis as a cooperating agency.
    Before including your address, phone number, email address, or 
other personal identifying information in your comment, you should be 
aware that your entire comment--including your personal identifying 
information--may be made publicly available at any time. While you can 
ask us in your comment to withhold your personal identifying 
information from public review, we cannot guarantee that we will be 
able to do so.

    Authority:  40 CFR 1501.7.

Stephen Sappington,
Field Manager, Humboldt River Field Office.
[FR Doc. 2016-04806 Filed 3-3-16; 8:45 am]
 BILLING CODE 4310-HC-P



                                                  11586                           Federal Register / Vol. 81, No. 43 / Friday, March 4, 2016 / Notices

                                                  DEPARTMENT OF THE INTERIOR                              recommends policy, coordinates and                    those who wished to speak but could
                                                                                                          reviews management actions, and                       not be accommodated on the agenda,
                                                  Fish and Wildlife Service                               provides organizational budget                        may submit written statements to
                                                  [FWS–R8–FHC–2016–N029;                                  oversight.                                            Elizabeth Hadley up to 7 days after the
                                                  FXFR1334088TWG0W4–123–FF08EACT00]                                                                             meeting.
                                                                                                          Meeting Agenda
                                                                                                            The TAMWG will hold a concurrent                    Meeting Minutes
                                                  Trinity River Adaptive Management
                                                  Working Group; Public Meeting                           meeting with the Trinity River Science                  Summary minutes of the meeting will
                                                                                                          Symposium/Decision Support System                     be maintained by Elizabeth Hadley (see
                                                  AGENCY:   Fish and Wildlife Service,                    workshop. The goal workshop is to                     FOR FURTHER INFORMATION CONTACT). The
                                                  Interior.                                               advance the development and use of a                  minutes will be available for public
                                                  ACTION: Notice.                                         decision support system for the Trinity               inspection within 14 days after the
                                                                                                          River Restoration Program (TRRP).                     meeting, and will be posted on the
                                                  SUMMARY:   We, the U.S. Fish and                          The workshop will consist of oral                   TAMWG Web site at http://
                                                  Wildlife Service, announce a public                     presentations and panel discussions                   www.fws.gov/arcata.
                                                  meeting of the Trinity River Adaptive                   related to four key elements:                           Dated: February 29, 2016.
                                                  Management Working Group (TAMWG).                         (1) Providing background on DSS and
                                                  The TAMWG is a Federal advisory                                                                               Joseph C. Polos,
                                                                                                          example applications,
                                                  committee that affords stakeholders the                   (2) Communicating the status of DSS                 Supervisory Fish Biologist, Arcata Fish and
                                                  opportunity to give policy, management,                                                                       Wildlife Office, Arcata, California.
                                                                                                          development for the TRRP and how it
                                                  and technical input concerning Trinity                  can be used in the near term to support               [FR Doc. 2016–04795 Filed 3–3–16; 8:45 am]
                                                  River (California) restoration efforts to               decision making,                                      BILLING CODE 4333–15–P
                                                  the Trinity Management Council (TMC).                     (3) Identifying and initiating an
                                                  The TMC interprets and recommends                       approach to resolve key organization
                                                  policy, coordinates and reviews                         and administrative challenges to DSS                  DEPARTMENT OF THE INTERIOR
                                                  management actions, and provides                        development, and                                      Bureau of Land Management
                                                  organizational budget oversight.                          (4) Initiating next steps recommended
                                                  DATES: Public meeting: TAMWG will                       by the Science Advisory Board for                     [LLNVW00000.L5110000.GN0000.LVEMF150
                                                                                                          implementation of a DSS, such as a                    4350.15X MO#4500088392]
                                                  meet from 8:30 a.m. to 5 p.m. Pacific
                                                  Time on Tuesday, March 29, 2016, and                    workplan, schedule, and identification
                                                                                                          of task leaders.                                      Notice of Intent To Prepare an
                                                  from 8:30 a.m. to 5 p.m. Pacific Time on                                                                      Environmental Impact Statement for
                                                  Wednesday, March 30, 2016, and from                       A detailed addendum will be posted
                                                                                                          on the TAMWG Web site (http://                        the Proposed Marigold Mine Plan of
                                                  9 a.m. to 12 p.m. Pacific Time on                                                                             Operations—Mackay Optimization
                                                  Thursday, March 31, 2016.                               www.fws.gov/arcata/fisheries/
                                                                                                          tamwg.html) when it is finalized.                     Project Amendment, Humboldt County,
                                                     Deadlines: For deadlines on                                                                                NV
                                                  submitting written material, please see                 Public Input
                                                  ‘‘Public Input’’ under SUPPLEMENTARY                                                                          AGENCY:   Bureau of Land Management,
                                                  INFORMATION.                                                                         You must contact         Interior.
                                                                                                                                       Elizabeth Hadley         ACTION: Notice of Intent.
                                                  ADDRESSES: The meeting will be held at                                               (FOR FURTHER
                                                  the Trinity Alps Performing Art Center,                 If you wish to               INFORMATION              SUMMARY:   In compliance with the
                                                  101 Arbuckle Court, Weaverville, CA                                                  CONTACT) no later        National Environmental Policy Act of
                                                  96093.                                                                               than
                                                                                                                                                                1969, as amended (NEPA), and the
                                                  FOR FURTHER INFORMATION CONTACT:                        Submit written infor-        March 22, 2016.          Federal Land Policy and Management
                                                  Joseph C. Polos, by mail at U.S. Fish and                 mation or questions                                 Act of 1976, as amended, the Bureau of
                                                  Wildlife Service, 1655 Heindon Road,                      for the TAMWG to                                    Land Management (BLM) Humboldt
                                                  Arcata, CA 95521; by telephone at 707–                    consider during the                                 River Field Office, Winnemucca,
                                                  822–7201; or by email at joe_polos@                       meeting.                                            Nevada intends to prepare an
                                                  fws.gov; or Elizabeth W. Hadley,                                                                              Environmental Impact Statement (EIS)
                                                  Redding Electric Utility, by mail at 777                Submitting Written Information or                     to analyze the potential impacts of
                                                  Cypress Avenue, Redding, CA 96001; by                   Questions                                             approving an expansion to the existing
                                                  telephone at 530–339–7308 or by email                      Interested members of the public may               gold mining operation in Humboldt
                                                  at ehadley@reupower.com. Individuals                    submit relevant information or                        County, Nevada. This notice is
                                                  with a disability may request an                        questions for the TAMWG to consider                   announcing the beginning of the
                                                  accommodation by sending an email to                    during the meeting. Written statements                scoping process to solicit public
                                                  either point of contact.                                must be received by the date listed in                comments and identify issues to be
                                                  SUPPLEMENTARY INFORMATION: In                           ‘‘Public Input,’’ so that the information             considered in the EIS. The notice also
                                                  accordance with the requirements of the                 may be available to the TAMWG for                     serves to initiate public consultation, as
                                                  Federal Advisory Committee Act, 5                       their consideration prior to this meeting.            required under the National Historic
                                                  U.S.C. App., we announce that the                       Written statements must be supplied to                Preservation Act.
                                                  Trinity River Adaptive Management                       Elizabeth Hadley in one of the following              DATES: This notice initiates the public
                                                                                                          formats: One hard copy with original                  scoping process for the EIS. Comments
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  Working Group will hold a meeting.
                                                                                                          signature, one electronic copy with                   on issues may be submitted in writing
                                                  Background                                              original signature, and one electronic                until April 4, 2016. The date(s) and
                                                    The TAMWG affords stakeholders the                    copy via email (acceptable file formats               location(s) of any scoping meetings will
                                                  opportunity to give policy, management,                 are Adobe Acrobat PDF, MS Word,                       be announced at least 15 days in
                                                  and technical input concerning Trinity                  PowerPoint, or rich text file).                       advance through local media,
                                                  River (California) restoration efforts to                  Registered speakers who wish to                    newspapers, and the BLM Web site at:
                                                  the TMC. The TMC interprets and                         expand on their oral statements, or                   http://www.blm.gov/nv/st/en/fo/


                                             VerDate Sep<11>2014   16:09 Mar 03, 2016   Jkt 238001   PO 00000   Frm 00079   Fmt 4703   Sfmt 4703   E:\FR\FM\04MRN1.SGM   04MRN1


                                                                                  Federal Register / Vol. 81, No. 43 / Friday, March 4, 2016 / Notices                                                  11587

                                                  wfo.html. In order to be included in the                Plan of Operations modification would                 the public involvement process under
                                                  Draft EIS, all comments must be                         encompass 1,893 acres of new                          the National Historic Preservation Act
                                                  received prior to the close of the 30-day               disturbance (approximately 843 acres of               (54 U.S.C. 306108) as provided in 36
                                                  scoping period or 15 days after the last                public land and 1,050 acres of private                CFR 800.2(d)(3). The information about
                                                  public meeting, whichever is later. We                  land), and include a re-classification of             historic and cultural resources within
                                                  will provide additional opportunities                   the type of authorized disturbance of                 the area potentially affected by the
                                                  for public participation upon                           approximately 706 acres of which 306                  proposed action will assist the BLM in
                                                  publication of the Draft EIS.                           acres are public land and 400 acres are               identifying and evaluating impacts to
                                                  ADDRESSES: You may submit comments                      private land. If approved, the proposed               such resources in the context of both
                                                  related to the Marigold Mine—Mackay                     modification would increase the mine                  NEPA and the NHPA.
                                                  Optimization Project by any of the                      life by up to 10 years. All proposed                     The BLM will consult with Indian
                                                  following methods:                                      disturbance would be within the                       tribes on a government-to-government
                                                     • Web site: http://www.blm.gov/nv/st/                existing approved Plan boundary and                   basis in accordance with Executive
                                                  en/fo/wfo.html                                          includes the following: Combine four of               Order 13175, Secretarial Order 3317,
                                                     • Email: wfoweb@blm.gov. Include                     the existing and authorized open pits                 and other policies. Tribal concerns,
                                                  Marigold Mine EIS Comments in the                       (Target 1, Target 2, Target 3, and East               including but not limited to, impacts on
                                                  subject line.                                           Hill) to become a single open pit to be               Indian trust assets and potential impacts
                                                     • Fax: 775–623–1503.                                 renamed the Mackay Pit; combine the                   to cultural resources, will be given due
                                                     • Mail: BLM Winnemucca District,                     existing and approved Terry Zone and                  consideration. Federal, State, and local
                                                  Humboldt River Field Office, 5100 E.                    Section 8 Pits to become the Mackay                   agencies, along with tribes and other
                                                  Winnemucca Blvd., Winnemucca, NV                        North Pit; increase the size of the                   stakeholders that may be interested in or
                                                  89445.                                                  authorized Section 5 North Pit; dewater               affected by the proposed Marigold Mine
                                                     Documents pertinent to this proposal                 the Mackay Pit and Mackay North Pit at                Plan of Operations—Mackay
                                                  may be examined at the Humboldt River                   a rate of up to 6,000 gallons per minute              Optimization Project that the BLM is
                                                  Field Office.                                           (gpm) with an average rate of about                   evaluating, are invited to participate in
                                                  FOR FURTHER INFORMATION CONTACT:                        1,500 to 2,000 gpm; construct and                     the scoping process and, if eligible, may
                                                  Jeanette Black, telephone 775–623–                      operate six rapid infiltration basins                 request or be requested by the BLM to
                                                  1500; address BLM Winnemucca                            (RIBs); construct and operate new                     participate in the development of the
                                                  District, Humboldt River Field Office,                  production, dewatering, and monitoring                environmental analysis as a cooperating
                                                  5100 E. Winnemucca Blvd.,                               wells with associated roads, power, and               agency.
                                                  Winnemucca, NV 89445; email jblack@                     pipelines; create one new waste rock                     Before including your address, phone
                                                  blm.gov. Contact Ms. Black to have your                 storage area (WRSA) (Section 5 North)                 number, email address, or other
                                                  name added to our mailing list. Persons                 and expand the Northeast and                          personal identifying information in your
                                                  who use a telecommunications device                     Northwest Expansion WRSAs; construct                  comment, you should be aware that
                                                  for the deaf (TDD) may call the Federal                 heap leach processing pad (HLP) cells                 your entire comment—including your
                                                  Information Relay Service (FIRS) at 1–                  22, 23, and 24; construct new process                 personal identifying information—may
                                                  800–877–8339 to contact the above                       ponds on existing disturbance; construct              be made publicly available at any time.
                                                                                                          two new carbon column trains on                       While you can ask us in your comment
                                                  individual during normal business
                                                                                                          existing disturbance; relocate the county             to withhold your personal identifying
                                                  hours. The FIRS is available 24 hours a
                                                                                                          road called Buffalo Valley Road to                    information from public review, we
                                                  day, 7 days a week, to leave a message
                                                                                                          accommodate the mine changes; re-                     cannot guarantee that we will be able to
                                                  or question with the above individual.
                                                                                                          establish a private land access road to               do so.
                                                  You will receive a reply during normal
                                                                                                          land holdings in Section 30; relocate the
                                                  business hours.                                                                                                 Authority: 40 CFR 1501.7.
                                                                                                          existing 120-kV power line (right-of-way
                                                  SUPPLEMENTARY INFORMATION: The                          held by NV Energy); and move the                      Stephen Sappington,
                                                  applicant, Marigold Mining Company, a                   planned location of the authorized but                Field Manager, Humboldt River Field Office.
                                                  wholly-owned subsidiary of Silver                       not yet constructed utility corridor.                 [FR Doc. 2016–04806 Filed 3–3–16; 8:45 am]
                                                  Standard Resources Inc., has requested                     The purpose of the public scoping
                                                  to modify its approved Plan of                                                                                BILLING CODE 4310–HC–P
                                                                                                          process is to determine relevant issues
                                                  Operations by expanding its operations                  that will influence the scope of the
                                                  at the existing Marigold Mine, which is                 environmental analysis, including
                                                  located adjacent to Battle Mountain                                                                           DEPARTMENT OF THE INTERIOR
                                                                                                          alternatives, and guide the process for
                                                  approximately 35 miles southeast of                     developing the EIS. At present, the BLM               Bureau of Land Management
                                                  Winnemucca, Humboldt County,                            has identified the following preliminary
                                                  Nevada; and 13 miles northwest of                       issues: (a) The formation of a pit lake               [LLCOS01000.L12200000.DP0000]
                                                  Battle Mountain, Lander County,                         after completion of mining activities,
                                                  Nevada. The mine is currently                                                                                 Notice of Intent To Amend the
                                                                                                          and ensuring that there is neither
                                                  authorized up to a disturbance of 5,720                                                                       Resource Management Plan for the
                                                                                                          degradation of waters of the state nor
                                                  acres (approximately 3,275 acres of                                                                           Tres Rios Field Office and Prepare an
                                                                                                          undue or unnecessary degradation of
                                                  private land and 2,445 acres of public                                                                        Associated Environmental
                                                                                                          public lands; (b) potential impacts to
                                                  land), which was permitted under a                                                                            Assessment, Colorado
                                                                                                          wildlife habitat; and (c) potential
                                                  series of Environmental Impact
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                                                                          impacts to cultural sites. Application of             AGENCY:   Bureau of Land Management,
                                                  Statements and Environmental                            mitigation hierarchy strategies will be               Interior.
                                                  Assessments from July 1988 through                      addressed for on-site, regional, and                  ACTION: Notice.
                                                  October 2013.                                           compensatory mitigation appropriate to
                                                     The proposed action is for the BLM to                the types of impacts and resource                     SUMMARY:  In compliance with the
                                                  approve as proposed the company’s                       objectives.                                           National Environmental Policy Act
                                                  changes to its Plan of Operations. The                     The BLM will utilize and coordinate                (NEPA) of 1969, as amended, and the
                                                  proposed changes presented under this                   the NEPA scoping process to help fulfill              Federal Land Policy and Management


                                             VerDate Sep<11>2014   15:22 Mar 03, 2016   Jkt 238001   PO 00000   Frm 00080   Fmt 4703   Sfmt 4703   E:\FR\FM\04MRN1.SGM   04MRN1



Document Created: 2018-02-02 15:05:18
Document Modified: 2018-02-02 15:05:18
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Intent.
DatesThis notice initiates the public scoping process for the EIS. Comments on issues may be submitted in writing until April 4, 2016. The date(s) and location(s) of any scoping meetings will be announced at least 15 days in advance through local media, newspapers, and the BLM Web site at: http://www.blm.gov/nv/st/en/fo/ wfo.html. In order to be included in the Draft EIS, all comments must be received prior to the close of the 30-day scoping period or 15 days after the last public meeting, whichever is later. We will provide additional opportunities for public participation upon publication of the Draft EIS.
ContactJeanette Black, telephone 775-623-
FR Citation81 FR 11586 