81_FR_12872 81 FR 12824 - Drawbridge Operation Regulation; Barnegat Bay, Seaside Heights, NJ

81 FR 12824 - Drawbridge Operation Regulation; Barnegat Bay, Seaside Heights, NJ

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 81, Issue 48 (March 11, 2016)

Page Range12824-12824
FR Document2016-05549

The Coast Guard has issued a temporary deviation from the operating schedule that governs the S37 Bridge across the Barnegat Bay, mile 14.1, New Jersey Intracoastal Waterway, at Seaside Heights, NJ. This deviation is necessary to perform bridge maintenance and repairs. This deviation allows the bridge to remain in the closed-to-navigation position.

Federal Register, Volume 81 Issue 48 (Friday, March 11, 2016)
[Federal Register Volume 81, Number 48 (Friday, March 11, 2016)]
[Rules and Regulations]
[Page 12824]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-05549]



[[Page 12824]]

-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2016-0126]


Drawbridge Operation Regulation; Barnegat Bay, Seaside Heights, 
NJ

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the S37 Bridge across the Barnegat Bay, 
mile 14.1, New Jersey Intracoastal Waterway, at Seaside Heights, NJ. 
This deviation is necessary to perform bridge maintenance and repairs. 
This deviation allows the bridge to remain in the closed-to-navigation 
position.

DATES: This deviation is effective from 8 p.m. on March 31, 2016 to 8 
p.m. on April 17, 2016.

ADDRESSES: The docket for this deviation, [USCG-2016-0126] is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Hal R. Pitts, Bridge 
Administration Branch Fifth District, Coast Guard, telephone 757-398-
6222, email [email protected].

SUPPLEMENTARY INFORMATION: The New Jersey Department of Transportation, 
that owns and operates the S37 Bridge, has requested a temporary 
deviation from the current operating regulations to continue performing 
a maintenance and repair project on the bridge that commenced at 8 a.m. 
on December 1, 2015 and was scheduled to cease at 8 p.m. on March 31, 
2016. The bridge is a bascule draw bridge and has a vertical clearance 
in the closed position of 30 feet above mean high water.
    The current operating schedule as set out in 33 CFR 117.733(c) 
allows the bridge to remain in the closed-to- navigation position from 
8 a.m. December 1, 2015 until 8 p.m. March 31, 2016. Under this 
temporary deviation, the bridge will continue to remain in the closed-
to-navigation position from 8 p.m. on March 31, 2016 to 8 p.m. on April 
17, 2016.
    The Barnegat Bay on the New Jersey Intracoastal Waterway is used by 
a variety of vessels including small government and public vessels, 
small commercial vessels, and recreational vessels. The Coast Guard has 
carefully considered the nature and volume of vessel traffic on the 
waterway in publishing this temporary deviation.
    Vessels able to safely pass through the bridge in the closed 
position may do so at any time. The bridge will not be able to open for 
emergencies and there is no immediate alternate route for vessels to 
pass. The Coast Guard will also inform the users of the waterways 
through our Local and Broadcast Notices to Mariners of the change in 
operating schedule for the bridge so that vessel operators can arrange 
their transit to minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: March 8, 2016.
Hal R. Pitts,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2016-05549 Filed 3-10-16; 8:45 am]
BILLING CODE 9110-04-P



                                                  12824               Federal Register / Vol. 81, No. 48 / Friday, March 11, 2016 / Rules and Regulations

                                                  DEPARTMENT OF HOMELAND                                  commercial vessels, and recreational                  Click on Open Docket Folder on the line
                                                  SECURITY                                                vessels. The Coast Guard has carefully                associated with this deviation.
                                                                                                          considered the nature and volume of                   FOR FURTHER INFORMATION CONTACT: If
                                                  Coast Guard                                             vessel traffic on the waterway in                     you have questions on this temporary
                                                                                                          publishing this temporary deviation.                  deviation, call or email Mr. Hal R. Pitts,
                                                  33 CFR Part 117                                            Vessels able to safely pass through the            Bridge Administration Branch Fifth
                                                  [Docket No. USCG–2016–0126]                             bridge in the closed position may do so               District, Coast Guard, telephone 757–
                                                                                                          at any time. The bridge will not be able              398–6222, email Hal.R.Pitts@uscg.mil.
                                                  Drawbridge Operation Regulation;                        to open for emergencies and there is no               SUPPLEMENTARY INFORMATION: The
                                                  Barnegat Bay, Seaside Heights, NJ                       immediate alternate route for vessels to              United States Army Corps of Engineers,
                                                                                                          pass. The Coast Guard will also inform                Norfolk District Office, that owns and
                                                  AGENCY: Coast Guard, DHS.                               the users of the waterways through our                operates the S165 (North Landing Road)
                                                  ACTION:Notice of deviation from                         Local and Broadcast Notices to Mariners               Bridge, has requested a temporary
                                                  drawbridge regulation.                                  of the change in operating schedule for               deviation from the current operating
                                                                                                          the bridge so that vessel operators can               regulations to perform emergency
                                                  SUMMARY:   The Coast Guard has issued a
                                                                                                          arrange their transit to minimize any                 repairs to the south swing span of the
                                                  temporary deviation from the operating
                                                                                                          impact caused by the temporary                        bridge due to damage sustained as a
                                                  schedule that governs the S37 Bridge
                                                                                                          deviation.                                            result of a vessel allision with the
                                                  across the Barnegat Bay, mile 14.1, New                    In accordance with 33 CFR 117.35(e),
                                                  Jersey Intracoastal Waterway, at Seaside                                                                      bridge. The bridge is a double swing
                                                                                                          the drawbridge must return to its regular             draw bridge and has a vertical clearance
                                                  Heights, NJ. This deviation is necessary                operating schedule immediately at the
                                                  to perform bridge maintenance and                                                                             in the closed position of 6 feet above
                                                                                                          end of the effective period of this                   mean high water.
                                                  repairs. This deviation allows the bridge               temporary deviation. This deviation
                                                  to remain in the closed-to-navigation                                                                            The current operating schedule is set
                                                                                                          from the operating regulations is                     out in 33 CFR 117.1021. Under this
                                                  position.                                               authorized under 33 CFR 117.35.                       temporary deviation, the north span of
                                                  DATES:  This deviation is effective from                  Dated: March 8, 2016.                               the bridge will open-to-navigation on
                                                  8 p.m. on March 31, 2016 to 8 p.m. on                                                                         the hour and half hour, upon request,
                                                                                                          Hal R. Pitts,
                                                  April 17, 2016.                                                                                               from 6 a.m. to 7 p.m., and on demand
                                                                                                          Bridge Program Manager, Fifth Coast Guard
                                                  ADDRESSES: The docket for this                          District.                                             from 7 p.m. to 6 a.m. The North and
                                                  deviation, [USCG–2016–0126] is                          [FR Doc. 2016–05549 Filed 3–10–16; 8:45 am]           South spans of the bridge will open to
                                                  available at http://www.regulations.gov.                                                                      navigation concurrently, with the south
                                                                                                          BILLING CODE 9110–04–P
                                                  Type the docket number in the                                                                                 span only opening partially due to
                                                  ‘‘SEARCH’’ box and click ‘‘SEARCH’’.                                                                          damage, upon request, for scheduled
                                                  Click on Open Docket Folder on the line                 DEPARTMENT OF HOMELAND                                openings at 10 a.m., noon and 2 p.m.,
                                                  associated with this deviation.                         SECURITY                                              Monday through Friday. The horizontal
                                                  FOR FURTHER INFORMATION CONTACT: If                                                                           clearance of the bridge with the south
                                                  you have questions on this temporary                    Coast Guard                                           span closed-to-navigation is 38 feet and
                                                  deviation, call or email Mr. Hal R. Pitts,                                                                    the horizontal clearance of the bridge
                                                  Bridge Administration Branch Fifth                      33 CFR Part 117                                       with the south span partially open-to-
                                                  District, Coast Guard, telephone 757–                                                                         navigation is 70 feet.
                                                                                                          [Docket No. USCG–2016–0181]
                                                  398–6222, email Hal.R.Pitts@uscg.mil.                                                                            The North Landing River is used by
                                                  SUPPLEMENTARY INFORMATION: The New                      Drawbridge Operation Regulation;                      a variety of vessels including small U.
                                                  Jersey Department of Transportation,                    North Landing River, Chesapeake, VA                   S. government and public vessels, small
                                                  that owns and operates the S37 Bridge,                                                                        commercial vessels, tug and barge, and
                                                  has requested a temporary deviation                     AGENCY: Coast Guard, DHS.                             recreational vessels. The Coast Guard
                                                  from the current operating regulations to               ACTION:Notice of deviation from                       has carefully considered the nature and
                                                  continue performing a maintenance and                   drawbridge regulation.                                volume of vessel traffic on the waterway
                                                  repair project on the bridge that                                                                             in publishing this temporary deviation.
                                                  commenced at 8 a.m. on December 1,                      SUMMARY:   The Coast Guard has issued a                  During the closure times there will be
                                                  2015 and was scheduled to cease at 8                    temporary deviation from the operating                limited opportunity for vessels able to
                                                  p.m. on March 31, 2016. The bridge is                   schedule that governs the S165 (North                 safely pass through the bridge in the
                                                  a bascule draw bridge and has a vertical                Landing Road) Bridge across the North                 closed position to do so. Vessels able to
                                                  clearance in the closed position of 30                  Landing River, mile 20.2, at Chesapeake,              safely pass through the bridge in the
                                                  feet above mean high water.                             VA. This deviation is necessary to                    closed position may do so, after
                                                     The current operating schedule as set                perform emergency bridge repairs. This                receiving confirmation from the bridge
                                                  out in 33 CFR 117.733(c) allows the                     deviation allows the bridge to remain in              tender that it is safe to transit through
                                                  bridge to remain in the closed-to-                      the closed-to-navigation position.                    the bridge. The north span of the bridge
                                                  navigation position from 8 a.m.                         DATES: This deviation is effective                    will be able to open for emergencies.
                                                  December 1, 2015 until 8 p.m. March                     without actual notice from March 11,                  The Coast Guard will also inform the
                                                  31, 2016. Under this temporary                          2016 through 6 p.m. on June 30, 2016.                 users of the waterways through our
asabaliauskas on DSK3SPTVN1PROD with RULES




                                                  deviation, the bridge will continue to                  For the purposes of enforcement, actual               Local and Broadcast Notices to Mariners
                                                  remain in the closed-to-navigation                      notice will be used from March 8, 2016                of the change in operating schedule for
                                                  position from 8 p.m. on March 31, 2016                  at 8:45 a.m., until March 11, 2016.                   the bridge so that vessel operators can
                                                  to 8 p.m. on April 17, 2016.                            ADDRESSES: The docket for this                        arrange their transit to minimize any
                                                     The Barnegat Bay on the New Jersey                   deviation, [USCG–2016–0181] is                        impact caused by the temporary
                                                  Intracoastal Waterway is used by a                      available at http://www.regulations.gov.              deviation.
                                                  variety of vessels including small                      Type the docket number in the                            In accordance with 33 CFR 117.35(e),
                                                  government and public vessels, small                    ‘‘SEARCH’’ box and click ‘‘SEARCH’’.                  the drawbridge must return to its regular


                                             VerDate Sep<11>2014   15:58 Mar 10, 2016   Jkt 238001   PO 00000   Frm 00030   Fmt 4700   Sfmt 4700   E:\FR\FM\11MRR1.SGM   11MRR1



Document Created: 2016-03-11 01:51:23
Document Modified: 2016-03-11 01:51:23
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 8 p.m. on March 31, 2016 to 8 p.m. on April 17, 2016.
ContactIf you have questions on this temporary deviation, call or email Mr. Hal R. Pitts, Bridge Administration Branch Fifth District, Coast Guard, telephone 757-398- 6222, email [email protected]
FR Citation81 FR 12824 