81_FR_15351 81 FR 15296 - Grand River Dam Authority; Notice of Request To Reduce Comment Period From 60 to 30 Days on Draft Amendment Application and Soliciting Comments, Motions To Intervene, and Protests

81 FR 15296 - Grand River Dam Authority; Notice of Request To Reduce Comment Period From 60 to 30 Days on Draft Amendment Application and Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 55 (March 22, 2016)

Page Range15296-15297
FR Document2016-06370

Federal Register, Volume 81 Issue 55 (Tuesday, March 22, 2016)
[Federal Register Volume 81, Number 55 (Tuesday, March 22, 2016)]
[Notices]
[Pages 15296-15297]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-06370]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1494-433]


Grand River Dam Authority; Notice of Request To Reduce Comment 
Period From 60 to 30 Days on Draft Amendment Application and Soliciting 
Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Request to reduce the comment period from 60 
to 30 days for a draft amendment application to permanently modify the 
reservoir elevation rule curve under Article 401 of the project 
license.
    b. Project No: 1494-433.
    c. Date Filed: March 15, 2016.
    d. Applicant: Grand River Dam Authority (GRDA).
    e. Name of Project: Pensacola Hydroelectric Project.
    f. Location: The project is located on the Grand River in Craig, 
Delaware, Mayes, and Ottawa Counties, Oklahoma.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Tamara Jahnke, Grand River Dam Authority, 226 
West Dwain Willis Ave, P.O. Box 409, Vinita, OK 74301; telephone (918) 
256-5545.
    i. FERC Contact: B. Peter Yarrington, telephone (202) 502-6129 and 
email [email protected]; or Linda Stewart, telephone (202) 502-
6680 and email linda.stewart@ferc.
    j. Deadline for filing comments, motions to intervene, and protests 
is 15 days from the issuance date of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file comments 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include the 
project number (P-1494-433).
    k. Description of Request: On March 15, 2016, GRDA filed with the 
Commission: (1) A draft amendment application to permanently modify the 
reservoir elevation rule curve under Article 401 of the Pensacola 
Project for Grand Lake O' the Cherokees, (2) a request for a temporary 
variance contained in the draft amendment application, and (3) a waiver 
request to reduce from 60 to 30 days the comment period for resource 
agencies, Indian tribes, and other stakeholders to provide comments on 
the draft amendment application mentioned above. The Commission's 
regulations at 4.38(a)(7) require GRDA to provide resource agencies, 
Indian tribes, and other stakeholders 60 days to provide comments on 
the above draft amendment application. GRDA requests Commission 
approval of a 30-day comment period instead to expedite the 
Commission's review of any final application filed with the Commission.
    This notice solicits comments, motions to intervene, and protests 
on GRDA's request to reduce the comment period from 60 to 30 days as 
discussed above. Comments on the draft application and temporary 
variance request contained in the draft application should be filed 
directly with

[[Page 15297]]

GRDA in accordance with instructions in the draft application.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at http://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS,'' ``PROTEST,'' or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the proposed amendment. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: March 16, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-06370 Filed 3-21-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    15296                         Federal Register / Vol. 81, No. 55 / Tuesday, March 22, 2016 / Notices

                                                    and high-level radioactive waste and                    included at the end of your response to                  h. Applicant Contact: Tamara Jahnke,
                                                    requested comments by June 15, 2016.                    this IPC as ‘‘Additional Comments.’’                  Grand River Dam Authority, 226 West
                                                    DOE is extending the comment period                       DOE would appreciate early input in                 Dwain Willis Ave, P.O. Box 409, Vinita,
                                                    to July 31, 2016.                                       order to identify initial interest and                OK 74301; telephone (918) 256–5545.
                                                    DATES: DOE is extending the comment                     concerns, as well as any early                           i. FERC Contact: B. Peter Yarrington,
                                                    period for the ‘‘Invitation for Public                  opportunities. Amended or revised                     telephone (202) 502–6129 and email
                                                    Comment to Inform the Design of a                       inputs from commenters are also                       peter.yarrington@ferc.gov; or Linda
                                                    Consent-Based Siting Process for                        welcome throughout the comment                        Stewart, telephone (202) 502–6680 and
                                                    Nuclear Waste Storage and Disposal                      period to help DOE develop this                       email linda.stewart@ferc.
                                                    Facilities’’ to July 31, 2016.                          process. Comments received after the                     j. Deadline for filing comments,
                                                    ADDRESSES: You may submit questions                     closing date will be considered as the                motions to intervene, and protests is 15
                                                    or comments by any of the following                     planning process progresses; however,                 days from the issuance date of this
                                                    methods:                                                the DOE is only able to ensure                        notice by the Commission. The
                                                      Email: Responses may be provided by                   consideration of comments received on                 Commission strongly encourages
                                                    email to consentbasedsiting@                            or before the closing date as the initial             electronic filing. Please file comments
                                                    hq.doe.gov. Please include ‘‘Response to                phase of the consent based siting                     using the Commission’s eFiling system
                                                    IPC’’ in the subject line.                              process is developed. Subsequent                      at http://www.ferc.gov/docs-filing/
                                                      Mail: Responses may be provided by                    comments and input will also be                       efiling.asp. Commenters can submit
                                                    mail to the following address: U.S.                     welcome as DOE views this as a core                   brief comments up to 6,000 characters,
                                                    Department of Energy, Office of Nuclear                 component of a phased and adaptive                    without prior registration, using the
                                                    Energy, Response to IPC, 1000                           consent-based siting process.                         eComment system at http://
                                                    Independence Ave. SW., Washington,                        Privacy Act: Data collected via the                 www.ferc.gov/docs-filing/
                                                    DC 20585.                                               mechanisms listed above will not be                   ecomment.asp. You must include your
                                                      Fax: Responses may be faxed to 202–                   protected from the public view in any                 name and contact information at the end
                                                    586–0544. Please include ‘‘Response to                  way.                                                  of your comments. For assistance,
                                                    IPC’’ on the fax cover page.                              Issued in Washington, DC, on March 9,               please contact FERC Online Support at
                                                      Online: Responses will be accepted                    2016.                                                 FERCOnlineSupport@ferc.gov, (866)
                                                    online at www.regulations.gov.                          Andrew Richards,                                      208–3676 (toll free), or (202) 502–8659
                                                    FOR FURTHER INFORMATION CONTACT:                        Chief of Staff, Office of Nuclear Energy,             (TTY). In lieu of electronic filing, please
                                                    Requests for further information should                 Department of Energy.                                 send a paper copy to: Secretary, Federal
                                                    be sent to consentbasedsiting@                          [FR Doc. 2016–05797 Filed 3–21–16; 8:45 am]           Energy Regulatory Commission, 888
                                                    hq.doe.gov. Please include ‘‘Question on                BILLING CODE 6450–01–P
                                                                                                                                                                  First Street NE., Washington, DC 20426.
                                                    IPC’’ in the subject line.                                                                                    The first page of any filing should
                                                    SUPPLEMENTARY INFORMATION:
                                                                                                                                                                  include the project number (P–1494–
                                                                                                            DEPARTMENT OF ENERGY                                  433).
                                                    Submitting Comments                                                                                              k. Description of Request: On March
                                                      Instructions: Submit comments via                     Federal Energy Regulatory                             15, 2016, GRDA filed with the
                                                    any of the mechanisms set forth in the                  Commission                                            Commission: (1) A draft amendment
                                                    ADDRESSES section above. Respondents                                                                          application to permanently modify the
                                                                                                            [Project No. 1494–433]                                reservoir elevation rule curve under
                                                    are requested to provide the following
                                                    information at the beginning of their                                                                         Article 401 of the Pensacola Project for
                                                                                                            Grand River Dam Authority; Notice of
                                                    response to this IPC:                                                                                         Grand Lake O’ the Cherokees, (2) a
                                                                                                            Request To Reduce Comment Period
                                                      State, tribal, community, organization,                                                                     request for a temporary variance
                                                                                                            From 60 to 30 Days on Draft
                                                    public or individual name;                                                                                    contained in the draft amendment
                                                                                                            Amendment Application and Soliciting
                                                      State, tribal, community, organization,                                                                     application, and (3) a waiver request to
                                                                                                            Comments, Motions To Intervene, and
                                                    public or individual point of contact;                                                                        reduce from 60 to 30 days the comment
                                                                                                            Protests
                                                    and                                                                                                           period for resource agencies, Indian
                                                      Point of contact’s address, phone                       Take notice that the following                      tribes, and other stakeholders to provide
                                                    number, and email address.                              hydroelectric application has been filed              comments on the draft amendment
                                                      If an email or phone number is                        with the Commission and is available                  application mentioned above. The
                                                    included, it will allow the DOE to                      for public inspection:                                Commission’s regulations at 4.38(a)(7)
                                                    contact the commenter if questions or                     a. Application Type: Request to                     require GRDA to provide resource
                                                    clarifications arise. No responses will be              reduce the comment period from 60 to                  agencies, Indian tribes, and other
                                                    provided to commenters in regards to                    30 days for a draft amendment                         stakeholders 60 days to provide
                                                    the disposition of their comments. All                  application to permanently modify the                 comments on the above draft
                                                    comments will be officially recorded                    reservoir elevation rule curve under                  amendment application. GRDA requests
                                                    without change or edit, including any                   Article 401 of the project license.                   Commission approval of a 30-day
                                                    personal information provided. Personal                   b. Project No: 1494–433.                            comment period instead to expedite the
                                                    information (other than name) will be                     c. Date Filed: March 15, 2016.                      Commission’s review of any final
                                                    protected from public disclosure upon                     d. Applicant: Grand River Dam                       application filed with the Commission.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    request.                                                Authority (GRDA).                                        This notice solicits comments,
                                                      Please identify your comments as                        e. Name of Project: Pensacola                       motions to intervene, and protests on
                                                    responding to a specific question posed                 Hydroelectric Project.                                GRDA’s request to reduce the comment
                                                    in the Invitation for Public Comment, if                  f. Location: The project is located on              period from 60 to 30 days as discussed
                                                    possible. Respondents may answer as                     the Grand River in Craig, Delaware,                   above. Comments on the draft
                                                    many or as few questions as they wish.                  Mayes, and Ottawa Counties, Oklahoma.                 application and temporary variance
                                                    Any additional comments that do not                       g. Filed Pursuant to: Federal Power                 request contained in the draft
                                                    address a particular question should be                 Act, 16 U.S.C. 791(a)–825(r).                         application should be filed directly with


                                               VerDate Sep<11>2014   17:34 Mar 21, 2016   Jkt 238001   PO 00000   Frm 00077   Fmt 4703   Sfmt 4703   E:\FR\FM\22MRN1.SGM   22MRN1


                                                                                  Federal Register / Vol. 81, No. 55 / Tuesday, March 22, 2016 / Notices                                          15297

                                                    GRDA in accordance with instructions                    the applicant. A copy of any protest or                  Accession Number: 20160316–5063.
                                                    in the draft application.                               motion to intervene must be served                       Comments Due: 5 p.m. ET 4/6/16.
                                                       l. Locations of the Application: A                   upon each representative of the                          Take notice that the Commission
                                                    copy of the application is available for                applicant specified in the particular                 received the following exempt
                                                    inspection and reproduction at the                      application. If an intervener files                   wholesale generator filings:
                                                    Commission’s Public Reference Room,                     comments or documents with the                           Docket Numbers: EG16–74–000.
                                                    located at 888 First Street NE., Room                   Commission relating to the merits of an                  Applicants: Ninnescah Wind Energy,
                                                    2A, Washington, DC 20426, or by calling                 issue that may affect the responsibilities            LLC.
                                                    (202) 502–8371. This filing may also be                 of a particular resource agency, they                    Description: Notice of Self-
                                                    viewed on the Commission’s Web site at                  must also serve a copy of the document                Certification of Exempt Wholesale
                                                    http://www.ferc.gov/docs-filing/                        on that resource agency. A copy of all                Generator Status of Ninnescah Wind
                                                    elibrary.asp. Enter the docket number                   other filings in reference to this                    Energy, LLC.
                                                    excluding the last three digits in the                  application must be accompanied by                       Filed Date: 3/15/16.
                                                    docket number field to access the                       proof of service on all persons listed in                Accession Number: 20160315–5140.
                                                    document. You may also register online                  the service list prepared by the                         Comments Due: 5 p.m. ET 4/5/16.
                                                    at http://www.ferc.gov/docs-filing/                     Commission in this proceeding, in
                                                    esubscription.asp to be notified via                                                                             Take notice that the Commission
                                                                                                            accordance with 18 CFR 4.34(b) and                    received the following electric rate
                                                    email of new filings and issuances                      385.2010.
                                                    related to this or other pending projects.                                                                    filings:
                                                                                                              Dated: March 16, 2016.                                 Docket Numbers: ER14–474–006.
                                                    For assistance, call 1–866–208–3676 or
                                                    email FERCOnlineSupport@ferc.gov, for                   Nathaniel J. Davis, Sr.,                                 Applicants: Sempra Generation, LLC.
                                                    TTY, call (202) 502–8659. A copy is also                Deputy Secretary.                                        Description: Notice of Non-Material
                                                    available for inspection and                            [FR Doc. 2016–06370 Filed 3–21–16; 8:45 am]           Change in Status of Sempra Generation,
                                                    reproduction at the address in item (h)                 BILLING CODE 6717–01–P                                LLC.
                                                    above.                                                                                                           Filed Date: 3/15/16.
                                                       m. Individuals desiring to be included                                                                        Accession Number: 20160315–5159.
                                                    on the Commission’s mailing list should                 DEPARTMENT OF ENERGY                                     Comments Due: 5 p.m. ET 4/5/16.
                                                    so indicate by writing to the Secretary                                                                          Docket Numbers: ER15–1905–003.
                                                    of the Commission.                                      Federal Energy Regulatory                                Applicants: Amazon Energy, LLC.
                                                       n. Comments, Protests, or Motions to                 Commission                                               Description: Compliance filing:
                                                    Intervene: Anyone may submit                                                                                  Amazon Energy, LLC Tariff Amendment
                                                    comments, a protest, or a motion to                     Combined Notice of Filings #2
                                                                                                                                                                  to be effective 3/16/2016.
                                                    intervene in accordance with the                           Take notice that the Commission                       Filed Date: 3/15/16.
                                                    requirements of Rules of Practice and                   received the following electric corporate                Accession Number: 20160315–5000.
                                                    Procedure, 18 CFR 385.210, .211, .214.                  filings:                                                 Comments Due: 5 p.m. ET 4/5/16.
                                                    In determining the appropriate action to                                                                         Docket Numbers: ER16–207–002.
                                                                                                               Docket Numbers: EC16–70–000.
                                                    take, the Commission will consider all                                                                           Applicants: Dynegy Oakland, LLC.
                                                                                                               Applicants: Portsmouth Genco, LLC,
                                                    protests or other comments filed, but                                                                            Description: Tariff Amendment:
                                                                                                            Virginia Renewable Power—
                                                    only those who file a motion to                                                                               Settlement Agreement and Request for
                                                                                                            Portsmouth, LLC.
                                                    intervene in accordance with the                                                                              Expedited Treatment to be effective 1/1/
                                                                                                               Description: Supplement to February
                                                    Commission’s Rules may become a                                                                               2016.
                                                                                                            12, 2016 Application for Authorization
                                                    party to the proceeding. Any comments,                                                                           Filed Date: 3/14/16.
                                                                                                            for Disposition of Jurisdictional
                                                    protests, or motions to intervene must                                                                           Accession Number: 20160314–5227.
                                                                                                            Facilities of Portsmouth Genco, LLC, et
                                                    be received on or before the specified                                                                           Comments Due: 5 p.m. ET 4/4/16.
                                                                                                            al.
                                                    comment date for the particular
                                                                                                               Filed Date: 3/16/16.                                  Docket Numbers: ER16–895–001.
                                                    application.
                                                       o. Filing and Service of Responsive                     Accession Number: 20160316–5133.                      Applicants: RDAF Energy Solutions,
                                                    Documents: Any filing must (1) bear in                     Comments Due: 5 p.m. ET 3/28/16.                   LLC.
                                                    all capital letters the title                              Docket Numbers: EC16–84–000.                          Description: Tariff Amendment:
                                                    ‘‘COMMENTS,’’ ‘‘PROTEST,’’ or                              Applicants: Kingbird Solar A, LLC,                 Amendment of RDAF Baseline Filing
                                                    ‘‘MOTION TO INTERVENE’’ as                              Kingbird Solar B, LLC.                                For MBR Authority and Granting
                                                    applicable; (2) set forth in the heading                   Description: Supplement to March 1,                Waivers to be effective 3/15/2016.
                                                    the name of the applicant and the                       2016 Application for Authorization                       Filed Date: 3/15/16.
                                                    project number of the application to                    Under Section 203 of the Federal Power                   Accession Number: 20160315–5073.
                                                    which the filing responds; (3) furnish                  Act of Kingbird Solar A, LLC, et al.                     Comments Due: 5 p.m. ET 4/5/16.
                                                    the name, address, and telephone                           Filed Date: 3/16/16.                                  Docket Numbers: ER16–904–001.
                                                    number of the person protesting or                         Accession Number: 20160316–5135.                      Applicants: Smith Creek Hydro, LLC.
                                                    intervening; and (4) otherwise comply                      Comments Due: 5 p.m. ET 3/28/16.                      Description: Amendment to February
                                                    with the requirements of 18 CFR                            Docket Numbers: EC16–87–000.                       5, 2016 and March 4, 2016 Smith Creek
                                                    385.2001 through 385.2005. All                             Applicants: Judith Gap Energy LLC,                 Hydro, LLC tariff filings.
                                                    comments, motions to intervene, or                      Spring Canyon Energy LLC, Wolverine                      Filed Date: 3/16/16.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    protests must set forth their evidentiary               Creek Energy LLC, Wolverine Creek                        Accession Number: 20160316–5076.
                                                    basis and otherwise comply with the                     Goshen Interconnection LLC.                              Comments Due: 5 p.m. ET 3/23/16.
                                                    requirements of 18 CFR 4.34(b). All                        Description: Application for                          Docket Numbers: ER16–1129–001.
                                                    comments, motions to intervene, or                      Authorization under Section 203 of the                   Applicants: VPI Enterprises, Inc.
                                                    protests should relate to project works                 Federal Power Act and Request for                        Description: Tariff Amendment:
                                                    which are the subject of the proposed                   Waivers and Expedited Action of Judith                Supplement to Application for Order
                                                    amendment. Agencies may obtain                          Gap Energy LLC, et al.                                Accepting Initial Market-Based Rate
                                                    copies of the application directly from                    Filed Date: 3/16/16.                               Tariff to be effective 3/11/2016.


                                               VerDate Sep<11>2014   17:34 Mar 21, 2016   Jkt 238001   PO 00000   Frm 00078   Fmt 4703   Sfmt 4703   E:\FR\FM\22MRN1.SGM   22MRN1



Document Created: 2018-02-02 15:15:43
Document Modified: 2018-02-02 15:15:43
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 15296 