81_FR_15462 81 FR 15407 - Notice of Proposed Buy America Waiver for Steel Excavator With a Continuous Wield Platform

81 FR 15407 - Notice of Proposed Buy America Waiver for Steel Excavator With a Continuous Wield Platform

DEPARTMENT OF TRANSPORTATION
Federal Transit Administration

Federal Register Volume 81, Issue 55 (March 22, 2016)

Page Range15407-15408
FR Document2016-06417

The Federal Transit Administration (FTA) received a request from the Metro North Railroad (MNR) for a Buy America non-availability waiver for the procurement of a steel excavator with a continuous wield platform (CWP). MNR seeks to procure a CWP to clear the right-of-way after storms and thereby enabling the timely resumption of passenger train service. MNR seeks a waiver for the requirement that final assembly take place in the United States because there is no domestic manufacturer available to produce the equipment. 49 U.S.C. 5323(j)(2) and 49 CFR 661.7(c)(2). In accordance with 49 U.S.C. 5323(j)(3)(A), FTA is providing notice of the non-availability waiver request and seeks public comment before deciding whether to grant the request. If granted, the waiver would apply to a one-time procurement only for the specific equipment identified in the waiver request.

Federal Register, Volume 81 Issue 55 (Tuesday, March 22, 2016)
[Federal Register Volume 81, Number 55 (Tuesday, March 22, 2016)]
[Notices]
[Pages 15407-15408]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-06417]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Transit Administration

[Docket No. FTA-2016-0006]


Notice of Proposed Buy America Waiver for Steel Excavator With a 
Continuous Wield Platform

AGENCY: Federal Transit Administration, DOT.

ACTION: Notice of proposed Buy America waiver and request for comment.

-----------------------------------------------------------------------

SUMMARY: The Federal Transit Administration (FTA) received a request 
from the Metro North Railroad (MNR) for a Buy America non-availability 
waiver for the procurement of a steel excavator with a continuous wield 
platform (CWP). MNR seeks to procure a CWP to clear the right-of-way 
after storms and thereby enabling the timely resumption of passenger 
train service. MNR seeks a waiver for the requirement that final 
assembly take place in the United States because there is no domestic 
manufacturer available to produce the equipment. 49 U.S.C. 5323(j)(2) 
and 49 CFR 661.7(c)(2). In accordance with 49 U.S.C. 5323(j)(3)(A), FTA 
is providing notice of the non-availability waiver request and seeks 
public comment before deciding whether to grant the request. If 
granted, the waiver would apply to a one-time procurement only for the 
specific equipment identified in the waiver request.

DATES: Comments must be received by March 29, 2016. Late-filed comments 
will be considered to the extent practicable.

ADDRESSES: Please submit your comments by one of the following means, 
identifying your submissions by docket number FTA-2016-0006:
    1. Web site: http://www.regulations.gov. Follow the instructions 
for submitting comments on the U.S. Government electronic docket site.
    2. Fax: (202) 493-2251.
    3. Mail: U.S. Department of Transportation, 1200 New Jersey Avenue 
SE., Docket Operations, M-30, West Building, Ground Floor, Room W12-
140, Washington, DC 20590-0001.
    4. Hand Delivery: U.S. Department of Transportation, 1200 New 
Jersey Avenue SE., Docket Operations, M-30,

[[Page 15408]]

West Building, Ground Floor, Room W12-140, Washington, DC 20590-0001 
between 9 a.m. and 5 p.m., Monday through Friday, except Federal 
holidays.
    Instructions: All submissions must make reference to the ``Federal 
Transit Administration'' and include docket number FTA-2016-0006. Due 
to the security procedures in effect since October 2011, mail received 
through the U.S. Postal Service may be subject to delays. Parties 
making submissions responsive to this notice should consider using an 
express mail firm to ensure the prompt filing of any submissions not 
filed electronically or by hand. Note that all submissions received, 
including any personal information therein, will be posted without 
change or alteration to http://www.regulations.gov. For more 
information, you may review DOT's complete Privacy Act Statement in the 
Federal Register published April 11, 2000 (65 FR 19477), or you may 
visit http://www.regulations.gov.

FOR FURTHER INFORMATION CONTACT: Laura Ames, FTA Attorney-Advisor, at 
(202) 366-2743 or [email protected].

SUPPLEMENTARY INFORMATION: The purpose of this notice is to provide 
notice and seek public comment on whether the FTA should grant a non-
availability waiver to the Metro North Railroad (MNR) for the 
procurement of a steel excavator with a continuous wield platform 
(CWP). On May 13, 2015, Metro requested a Buy America waiver for the 
CWP because the only responsive bidder to its solicitation was a 
Canadian manufacturer. While 77% of the content of the material would 
be domestic origin, the CWP would be assembled in Canada. 49 U.S.C. 
5323(j)(2)(A); 49 CFR 661.7(c).
    By way of background, MNR operates commuter rail service spanning 
787 track miles. Metro North has a large length of track along the 
shore line and flooding along the line can occur regularly at many of 
these locations. The risk of flooding can be reduced by keeping 
drainage infrastructure, clear of debris. Specialized equipment such as 
the CWP can quickly clear the right of way after storms enabling the 
resumption of passenger train service. After Hurricane Sandy, MNR 
leased a CWP, but given limited availability as well as the higher cost 
of leasing, MNR believes that purchase of the CWP is necessary to 
ensure that it will be available to expedite service restoration and 
was provided funding to purchase such equipment from FTA through the 
Section 5324 Emergency Relief Funds allocated for Superstorm Sandy.
    A CWP is a train that consists of several platform suitable for 
holding/hauling and picking up or distributing a variety of materials, 
such as rocks, riprap, dirt or debris. The equipment is similar to a 
excavator which has an articulated arm, with the main difference being 
that it rides on rails and sits on a connected platform where it can 
dump or pick up material from in order to perform its functions. The 
main tasks the MNR uses the CWP for is shoreline stabilization/
restoration and for removing debris from the right-of-way after storms.
    MNR prepared and advertised a solicitation for the CWP on January 
9, 2015. Bids were due and opened on February 5, 2015. The solicitation 
was advertised in local newspapers, the New York State Contract Report 
and the MTA Metro-North Web site. A single bid was submitted by BRRI, a 
Canadian firm. BRRI submitted a Certificate of Non-Compliance because 
the final assembly of the equipment would take place in Canada, 
although content of the material used would be 77% domestic origin. The 
total gross sum of the bid submitted is $3,930,000.00.
    MNR states that it received ``No Bid'' response forms from seven 
vendors and that MNR contacted the vendors to determine why they did 
not submit bids. The responses from the vendors varied from ``not 
interested in selling'' to ``could not meet the requested bid due 
date.'' MNR then performed an internet search to for American made 
excavators with no results. MNR states that it then reached out to 
Herzog Railroad Services, Inc. and Dymax Rail and was told by both that 
they do not have the CWP in their fleet. Finally, MNR also contacted 
the National Institute of Statistics and Technology (NIST) to determine 
if there had been any research performed to identify U.S. manufacturers 
for this equipment. To date NIST has not conducted any supplier 
scouting or analyses for the item.
    On August 15, 2015, FTA contacted MNR, noting that one of the No-
Reponse bidders, Mecfor Inc. (Mecfor), stated that it could not meet 
the request bid due date but that it was not clear if Mecfor could meet 
FTA's Buy America requirements since it is a Canadian Firm. FTA asked 
MNR to contact Mecfor to confirm whether it had the CWP that would meet 
FTA's Buy America requirements. On August 25, 2015, MNR provided FTA 
Mecfor's response. Mecfor stated that more than 60% of the main 
componeents would be American made and that assembly of the CWP would 
be sub-contracted in the USA; however, Mecfor also declined for the 
second time an invitiation to re-bid stating that the company's 
workload was overbooked. Due to the fact that MNR did not receive a 
responsive bid for a CWP produced in the U.S. nor could it identify any 
potential bidders through research and outreach, MNR seeks a non-
availability waiver of the Buy America requirements for final assembly 
pursuant to 49 U.S.C. 5323 (j)(2)(B).
    With certain exceptions, FTA's Buy America requirements prevent FTA 
from obligating an amount that may be appropriated to carry out its 
program for a project unless ``the steel, iron, and manufactured goods 
used in the project are produced in the United States.'' 49 U.S.C. 
5323(j)(1). A manufactured product is considered produced in the United 
States if: (1) All of the manufacturing processes for the product take 
place in the United States; and (2) all of the components of the 
product are of U.S. origin. A component is considered of U.S. origin if 
it is manufactured in the United States, regardless of the origin of 
its subcomponents. 49 CFR 661.5(d). If, however, FTA determines that 
``the steel, iron, and goods produced in the United States are not 
produced in a sufficient and reasonably available amount or are not of 
a satisfactory quality,'' then FTA may issue a waiver (non-availability 
waiver). 49 U.S.C. 5323(j)(2)(B); 49 CFR 661.7(c).
    MNR is requesting a Buy America non-availability waiver for the 
requirement that final assembly occur in the United States in order to 
procure a CWP for its shoreline stabilization/restoration and for 
removing debris from the right-of-way after storms.
    The purpose of this notice is to publish MNR's request and seek 
public comment from all interested parties in accordance with 49 U.S.C. 
5323(j)(3)(A). Comments will help FTA understand completely the facts 
surrounding the request, including the merits of the request. A full 
copy of the request has been placed in docket number FTA-2016-0006.

    Issued on March 16, 2016.
Dana Nifosi,
Deputy Chief Counsel.
[FR Doc. 2016-06417 Filed 3-21-16; 8:45 am]
BILLING CODE 4910-57-P



                                                                                  Federal Register / Vol. 81, No. 55 / Tuesday, March 22, 2016 / Notices                                                  15407

                                                    notice and seek public comment on                       automated control train system would                    Issued on March 16, 2016.
                                                    whether the FTA should grant a Buy                      need to certify the switch’s performance              Dana Nifosi,
                                                    America non-availability waiver for the                 in order to ensure it could be safely                 Deputy Chief Counsel.
                                                    Detroit Transportation Corporation                      used with the existing guideway switch                [FR Doc. 2016–06375 Filed 3–21–16; 8:45 am]
                                                    (DTC) for the procurement of                            machines. Moreover, DTC believes there                BILLING CODE 4910–57–P
                                                    replacement special trackwork turnout                   is inadequate competition for the project
                                                    switch components. On July 13, 2015,                    and needs to move forward with this
                                                    DTC requested a Buy America waiver                      important maintenance project. Thus,                  DEPARTMENT OF TRANSPORTATION
                                                    for the switch because it is not produced               DTC is seeking a Buy America non-
                                                    in the United States in sufficiently and                availability waiver under 49 CFR                      Federal Transit Administration
                                                    reasonably available quantities or of a                 661.7(c)(1) for the switch.                           [Docket No. FTA–2016–0006]
                                                    satisfactory quality. 49 U.S.C.
                                                    5323(j)(2)(A); 49 CFR 661.7(c).                            With certain exceptions, FTA’s Buy
                                                                                                                                                                  Notice of Proposed Buy America
                                                       By way of background, DTC is the                     America requirements prevent FTA
                                                                                                                                                                  Waiver for Steel Excavator With a
                                                    owner and operator of the Detroit                       from obligating an amount that may be
                                                                                                                                                                  Continuous Wield Platform
                                                    People Mover, which is the largest                      appropriated to carry out its program for
                                                    municipal rail system in Michigan. It is                a project unless ‘‘the steel, iron, and               AGENCY:   Federal Transit Administration,
                                                    a fully automated light rail system that                manufactured goods used in the project                DOT.
                                                    operates twelve (12) rail cars between                  are produced in the United States.’’ 49               ACTION: Notice of proposed Buy America
                                                    thirteen (13) passenger stations on an                  U.S.C. 5323(j)(1). A manufactured                     waiver and request for comment.
                                                    elevated single track in a 2.9 mile loop                product is considered produced in the
                                                    in Detroit’s central business district. In              United States if: (1) All of the                      SUMMARY:    The Federal Transit
                                                    March 2015, DTC solicited bids to                       manufacturing processes for the product               Administration (FTA) received a request
                                                    procure special trackwork switch point                  take place in the United States; and (2)              from the Metro North Railroad (MNR)
                                                    for Turnout 3, which is located adjacent                all of the components of the product are              for a Buy America non-availability
                                                    to the Maintenance Facility Building                    of U.S. origin. A component is                        waiver for the procurement of a steel
                                                    and provides access to the building. The                                                                      excavator with a continuous wield
                                                                                                            considered of U.S. origin if it is
                                                    special trackwork of concern was                                                                              platform (CWP). MNR seeks to procure
                                                                                                            manufactured in the United States,
                                                    originally procured from Germany (by                                                                          a CWP to clear the right-of-way after
                                                                                                            regardless of the origin of its
                                                    Krupp Stahl AG) and is of European                                                                            storms and thereby enabling the timely
                                                                                                            subcomponents. 49 CFR 661.5(d). If,                   resumption of passenger train service.
                                                    standards, using AREMA 115RE rail
                                                                                                            however, FTA determines that ‘‘the                    MNR seeks a waiver for the requirement
                                                    throughout the turnout with special
                                                    60E1A1 (formerly Zu-160) track point                    steel, iron, and goods produced in the                that final assembly take place in the
                                                    section. The project includes replacing                 United States are not produced in a                   United States because there is no
                                                    stock rails that connect the switch point               sufficient and reasonably available                   domestic manufacturer available to
                                                    section to the original running rails, as               amount or are not of a satisfactory                   produce the equipment. 49 U.S.C.
                                                    well as rubber pads; both the rails and                 quality,’’ then FTA may issue a waiver                5323(j)(2) and 49 CFR 661.7(c)(2). In
                                                    pads will be sourced domestically. The                  (non-availability waiver). 49 U.S.C.                  accordance with 49 U.S.C. 5323(j)(3)(A),
                                                    waiver only applies to the switch                       5323(j)(2)(B); 49 CFR 661.7(c). Under 49              FTA is providing notice of the non-
                                                    component of the project.                               CFR 661.7(c)(1), ‘‘It will be presumed                availability waiver request and seeks
                                                       DTC issued the first RFP in March                    that the conditions exist to grant this               public comment before deciding
                                                    2015 to thirteen (13) companies:                        non-availability waiver if no responsive              whether to grant the request. If granted,
                                                    Atlantic Track & Turnout Co.; LB Foster                 and responsible bid is received offering              the waiver would apply to a one-time
                                                    Co.; Cleveland Track Materials                          an item produced in the United States.’’              procurement only for the specific
                                                    (Vossioh); Progress Rail Services Corp.;                In addition, ‘‘If the Secretary denies an             equipment identified in the waiver
                                                    Unitrac Railroad Materials, Inc.; London                application for a waiver . . . the                    request.
                                                    Trackwork, Inc.; Skelton; Voestalpine                   Secretary shall provide to the applicant
                                                    Nortrak, Inc.; RailWorks Projects, Inc.;                                                                      DATES:  Comments must be received by
                                                                                                            a written certification that—the steel,               March 29, 2016. Late-filed comments
                                                    All American Track; Construction Data                   iron, or manufactured goods, as
                                                    Company; IntegriCo Composites; and                                                                            will be considered to the extent
                                                                                                            applicable, (referred to in this                      practicable.
                                                    Delta Railroad Construction, Inc. DTC                   subparagraph as the ‘item’) is produced
                                                    received no responses. It contacted all                 in the United States in a sufficient and              ADDRESSES:   Please submit your
                                                    the companies, and reissued the RFP in                  reasonably available amount; (i) the                  comments by one of the following
                                                    May 2015 to six (6) firms that expressed                item produced in the United States is of              means, identifying your submissions by
                                                    an interest in the project. From this RFP,              a satisfactory quality; and (ii) includes             docket number FTA–2016–0006:
                                                    DTC only received one proposal, from                    a list of known manufacturers in the                    1. Web site: http://
                                                    Delta Railroad Construction, Inc. (Delta).              United States from which the item can                 www.regulations.gov. Follow the
                                                    Delta, however, cannot comply with                      be obtained.’’ 49 U.S.C. 5323(j)(6).                  instructions for submitting comments
                                                    Buy America requirements because the                                                                          on the U.S. Government electronic
                                                    only manufacturer of the switch is a                       The purpose of this notice is to                   docket site.
                                                    German company. To change the                           publish DTC’s request and seek public                   2. Fax: (202) 493–2251.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    manufacturer, Delta would need to re-                   comment from all interested parties in                  3. Mail: U.S. Department of
                                                    engineer the switch and modify the                      accordance with 49 U.S.C. 5323(j)(3)(A).              Transportation, 1200 New Jersey
                                                    ‘‘frog’’ section and guideway elements;                 Comments will help FTA understand                     Avenue SE., Docket Operations, M–30,
                                                    this design would need to be certified.                 completely the facts surrounding the                  West Building, Ground Floor, Room
                                                    Delta would then need to locate a                       request, including the merits of the                  W12–140, Washington, DC 20590–0001.
                                                    domestic source to manufacture the re-                  request. A full copy of the request has                 4. Hand Delivery: U.S. Department of
                                                    engineered switch. Upon installation,                   been placed in docket number FTA–                     Transportation, 1200 New Jersey
                                                    the proprietary software designer of the                2016–0005.                                            Avenue SE., Docket Operations, M–30,


                                               VerDate Sep<11>2014   17:34 Mar 21, 2016   Jkt 238001   PO 00000   Frm 00188   Fmt 4703   Sfmt 4703   E:\FR\FM\22MRN1.SGM   22MRN1


                                                    15408                         Federal Register / Vol. 81, No. 55 / Tuesday, March 22, 2016 / Notices

                                                    West Building, Ground Floor, Room                          A CWP is a train that consists of                  second time an invitiation to re-bid
                                                    W12–140, Washington, DC 20590–0001                      several platform suitable for holding/                stating that the company’s workload
                                                    between 9 a.m. and 5 p.m., Monday                       hauling and picking up or distributing                was overbooked. Due to the fact that
                                                    through Friday, except Federal holidays.                a variety of materials, such as rocks,                MNR did not receive a responsive bid
                                                      Instructions: All submissions must                    riprap, dirt or debris. The equipment is              for a CWP produced in the U.S. nor
                                                    make reference to the ‘‘Federal Transit                 similar to a excavator which has an                   could it identify any potential bidders
                                                    Administration’’ and include docket                     articulated arm, with the main                        through research and outreach, MNR
                                                    number FTA–2016–0006. Due to the                        difference being that it rides on rails and           seeks a non-availability waiver of the
                                                    security procedures in effect since                     sits on a connected platform where it                 Buy America requirements for final
                                                    October 2011, mail received through the                 can dump or pick up material from in
                                                                                                                                                                  assembly pursuant to 49 U.S.C. 5323
                                                    U.S. Postal Service may be subject to                   order to perform its functions. The main
                                                                                                                                                                  (j)(2)(B).
                                                    delays. Parties making submissions                      tasks the MNR uses the CWP for is
                                                                                                            shoreline stabilization/restoration and                  With certain exceptions, FTA’s Buy
                                                    responsive to this notice should
                                                    consider using an express mail firm to                  for removing debris from the right-of-                America requirements prevent FTA
                                                    ensure the prompt filing of any                         way after storms.                                     from obligating an amount that may be
                                                    submissions not filed electronically or                    MNR prepared and advertised a                      appropriated to carry out its program for
                                                    by hand. Note that all submissions                      solicitation for the CWP on January 9,                a project unless ‘‘the steel, iron, and
                                                    received, including any personal                        2015. Bids were due and opened on                     manufactured goods used in the project
                                                                                                            February 5, 2015. The solicitation was                are produced in the United States.’’ 49
                                                    information therein, will be posted
                                                                                                            advertised in local newspapers, the New               U.S.C. 5323(j)(1). A manufactured
                                                    without change or alteration to http://
                                                                                                            York State Contract Report and the MTA                product is considered produced in the
                                                    www.regulations.gov. For more
                                                                                                            Metro-North Web site. A single bid was                United States if: (1) All of the
                                                    information, you may review DOT’s
                                                                                                            submitted by BRRI, a Canadian firm.                   manufacturing processes for the product
                                                    complete Privacy Act Statement in the
                                                                                                            BRRI submitted a Certificate of Non-
                                                    Federal Register published April 11,                                                                          take place in the United States; and (2)
                                                                                                            Compliance because the final assembly
                                                    2000 (65 FR 19477), or you may visit                                                                          all of the components of the product are
                                                                                                            of the equipment would take place in
                                                    http://www.regulations.gov.                                                                                   of U.S. origin. A component is
                                                                                                            Canada, although content of the material
                                                    FOR FURTHER INFORMATION CONTACT:                        used would be 77% domestic origin.                    considered of U.S. origin if it is
                                                    Laura Ames, FTA Attorney-Advisor, at                    The total gross sum of the bid submitted              manufactured in the United States,
                                                    (202) 366–2743 or laura.ames@dot.gov.                   is $3,930,000.00.                                     regardless of the origin of its
                                                                                                               MNR states that it received ‘‘No Bid’’             subcomponents. 49 CFR 661.5(d). If,
                                                    SUPPLEMENTARY INFORMATION:      The                                                                           however, FTA determines that ‘‘the
                                                                                                            response forms from seven vendors and
                                                    purpose of this notice is to provide
                                                                                                            that MNR contacted the vendors to                     steel, iron, and goods produced in the
                                                    notice and seek public comment on
                                                                                                            determine why they did not submit                     United States are not produced in a
                                                    whether the FTA should grant a non-
                                                                                                            bids. The responses from the vendors                  sufficient and reasonably available
                                                    availability waiver to the Metro North
                                                                                                            varied from ‘‘not interested in selling’’             amount or are not of a satisfactory
                                                    Railroad (MNR) for the procurement of
                                                                                                            to ‘‘could not meet the requested bid                 quality,’’ then FTA may issue a waiver
                                                    a steel excavator with a continuous
                                                                                                            due date.’’ MNR then performed an                     (non-availability waiver). 49 U.S.C.
                                                    wield platform (CWP). On May 13,
                                                                                                            internet search to for American made                  5323(j)(2)(B); 49 CFR 661.7(c).
                                                    2015, Metro requested a Buy America
                                                                                                            excavators with no results. MNR states
                                                    waiver for the CWP because the only                                                                              MNR is requesting a Buy America
                                                                                                            that it then reached out to Herzog
                                                    responsive bidder to its solicitation was               Railroad Services, Inc. and Dymax Rail                non-availability waiver for the
                                                    a Canadian manufacturer. While 77% of                   and was told by both that they do not                 requirement that final assembly occur in
                                                    the content of the material would be                    have the CWP in their fleet. Finally,                 the United States in order to procure a
                                                    domestic origin, the CWP would be                       MNR also contacted the National                       CWP for its shoreline stabilization/
                                                    assembled in Canada. 49 U.S.C.                          Institute of Statistics and Technology                restoration and for removing debris from
                                                    5323(j)(2)(A); 49 CFR 661.7(c).                         (NIST) to determine if there had been                 the right-of-way after storms.
                                                       By way of background, MNR operates                   any research performed to identify U.S.                  The purpose of this notice is to
                                                    commuter rail service spanning 787                      manufacturers for this equipment. To                  publish MNR’s request and seek public
                                                    track miles. Metro North has a large                    date NIST has not conducted any                       comment from all interested parties in
                                                    length of track along the shore line and                supplier scouting or analyses for the                 accordance with 49 U.S.C. 5323(j)(3)(A).
                                                    flooding along the line can occur                       item.
                                                    regularly at many of these locations. The                                                                     Comments will help FTA understand
                                                                                                               On August 15, 2015, FTA contacted
                                                    risk of flooding can be reduced by                                                                            completely the facts surrounding the
                                                                                                            MNR, noting that one of the No-Reponse
                                                    keeping drainage infrastructure, clear of               bidders, Mecfor Inc. (Mecfor), stated                 request, including the merits of the
                                                    debris. Specialized equipment such as                   that it could not meet the request bid                request. A full copy of the request has
                                                    the CWP can quickly clear the right of                  due date but that it was not clear if                 been placed in docket number FTA–
                                                    way after storms enabling the                           Mecfor could meet FTA’s Buy America                   2016–0006.
                                                    resumption of passenger train service.                  requirements since it is a Canadian                     Issued on March 16, 2016.
                                                    After Hurricane Sandy, MNR leased a                     Firm. FTA asked MNR to contact Mecfor                 Dana Nifosi,
                                                    CWP, but given limited availability as                  to confirm whether it had the CWP that
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                                                                                  Deputy Chief Counsel.
                                                    well as the higher cost of leasing, MNR                 would meet FTA’s Buy America
                                                                                                                                                                  [FR Doc. 2016–06417 Filed 3–21–16; 8:45 am]
                                                    believes that purchase of the CWP is                    requirements. On August 25, 2015, MNR
                                                    necessary to ensure that it will be                     provided FTA Mecfor’s response.                       BILLING CODE 4910–57–P

                                                    available to expedite service restoration               Mecfor stated that more than 60% of the
                                                    and was provided funding to purchase                    main componeents would be American
                                                    such equipment from FTA through the                     made and that assembly of the CWP
                                                    Section 5324 Emergency Relief Funds                     would be sub-contracted in the USA;
                                                    allocated for Superstorm Sandy.                         however, Mecfor also declined for the


                                               VerDate Sep<11>2014   17:34 Mar 21, 2016   Jkt 238001   PO 00000   Frm 00189   Fmt 4703   Sfmt 9990   E:\FR\FM\22MRN1.SGM   22MRN1



Document Created: 2018-02-02 15:15:19
Document Modified: 2018-02-02 15:15:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of proposed Buy America waiver and request for comment.
DatesComments must be received by March 29, 2016. Late-filed comments will be considered to the extent practicable.
ContactLaura Ames, FTA Attorney-Advisor, at (202) 366-2743 or [email protected]
FR Citation81 FR 15407 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR