81_FR_20064 81 FR 19998 - Operator Licensing Examination Standards for Power Reactors

81 FR 19998 - Operator Licensing Examination Standards for Power Reactors

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 81, Issue 66 (April 6, 2016)

Page Range19998-19999
FR Document2016-07907

On February 5, 2016, the U.S. Nuclear Regulatory Commission (NRC) published draft NUREG-1021, Revision 11, ``Operator Licensing Examination Standards for Power Reactors'' for public comment. The public comment period was originally scheduled to close on March 21, 2016. On March 3, 2016, the comment period was extended to April 5, 2016. On March 18, 2016, the NRC posted three updated sections of Examination Standards (ES) in NUREG-1021 that reflect three additional changes that the NRC proposes to incorporate into Revision 11. The public comment period closed on April 5, 2016. The NRC has decided to reopen the public comment period to allow more time for members of the public to develop and submit comments on Revision 11.

Federal Register, Volume 81 Issue 66 (Wednesday, April 6, 2016)
[Federal Register Volume 81, Number 66 (Wednesday, April 6, 2016)]
[Notices]
[Pages 19998-19999]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-07907]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2016-0006]


Operator Licensing Examination Standards for Power Reactors

AGENCY: Nuclear Regulatory Commission.

ACTION: Draft NUREG; additional changes and reopen comment period.

-----------------------------------------------------------------------

SUMMARY: On February 5, 2016, the U.S. Nuclear Regulatory Commission 
(NRC) published draft NUREG-1021, Revision 11, ``Operator Licensing 
Examination Standards for Power Reactors'' for public comment. The 
public comment period was originally scheduled to close on March 21, 
2016. On March 3, 2016, the comment period was extended to April 5, 
2016. On March 18, 2016, the NRC posted three updated sections of 
Examination Standards (ES) in NUREG-1021 that reflect three additional 
changes that the NRC proposes to incorporate into Revision 11. The 
public comment period closed on April 5, 2016. The NRC has decided to 
reopen the public comment period to allow more time for members of the 
public to develop and submit comments on Revision 11.

DATES: The extended public comment period that ended on April 5, 2016 
has been reopened for comments requested in the document published on 
March 3, 2016 (81 FR 11302), including comments on the additional 
sections of NUREG-1021 posted on March 18, 2016. Comments should be 
filed no later than May 6, 2016. Comments received after this date will 
be considered if it is practical to do so, but the NRC staff is able to 
ensure consideration only for comments received on or before this date.

ADDRESSES: You may submit comments by any of the following methods 
(unless this document describes a different method for submitting 
comments on a specific subject):
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2016-0006. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individuals listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     Mail comments to: Cindy Bladey, Office of Administration, 
Mail Stop: OWFN-12-H08, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Maurin Scheetz, telephone: 301-415-
2758; email: [email protected]; or Timothy Kolb, telephone: 301-
415-0783; email: [email protected]. Both are staff of the Office of 
Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2016-0006 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2016-0006.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
draft NUREG is available in ADAMS under Accession No. ML16028A409. The 
updated sections are available in ADAMS under Accession Nos. 
ML16077A223, ML16077A225, and ML16077A227 for ES-205, ES-501, and ES-
502, respectively.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2016-0006 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC posts all comment submissions at http://www.regulations.gov as well as entering the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Discussion

    On February 5, 2016 (81 FR 6301), the NRC published draft NUREG-
1021, Revision 11, ``Operator Licensing Examination Standards for Power 
Reactors'' for public comment. The comment period was extended on March 
3, 2016 (81 FR 11302). The extended public comment period closed on 
April 5, 2016. The NRC has decided

[[Page 19999]]

to reopen the public comment period until May 6, 2016 because three 
additional changes are proposed for incorporation into the NUREG: (1) 
Reducing the number of times per year the NRC offers the Generic 
Fundamentals Examination; (2) eliminating the informal review process; 
and (3) extending the post-exam comment period. These changes are 
reflected in updated sections ES-205, Procedures for Administering the 
Generic Fundamentals Examination Program; ES-501, Initial Post 
Examination Activities; and ES-502, Denials of Applications. These 
sections are available for review in the supporting documents section 
of Docket ID NRC-2016-0006. Specifically, starting in 2017, the NRC 
proposes to reduce the number of times per year that it offers the 
Generic Fundamentals Examination from four times per year to two times 
per year. The NRC proposes to discontinue the informal review process, 
the practice of performing informal staff reviews of proposed license 
denials at the request of an applicant. Applicants whose license 
applications are denied will retain hearing rights under Title 10 of 
the Code of Federal Regulations 2.103(b)(2). Finally, the NRC proposes 
to extend the post exam comment period to allow the NRC and the 
facility licensee sufficient time to consider all post exam comments 
for both the written examination and the operating test. These changes 
are currently before the Commission for vote as part of the Project AIM 
re-baselining effort (SECY-16-0009) (ADAMS Accession No. ML16028A189). 
The NRC presented these changes to the nuclear industry at the Nuclear 
Energy Institute's National Operator Licensing Workshop on February 9, 
2016 and during a panel session at the NRC's Regulatory Information 
Conference on March 9, 2016. Furthermore, a public meeting was held on 
March 31, 2016 in Rockville, Maryland, to discuss the scope of these 
additional changes.

    Dated at Rockville, Maryland, this 31 day of March, 2016.

    For the Nuclear Regulatory Commission.
Maurin Scheetz,
Acting Chief, Operator Licensing and Training Branch, Division of 
Inspection and Regional Support, Office of Nuclear Reactor Regulation.
[FR Doc. 2016-07907 Filed 4-5-16; 8:45 am]
 BILLING CODE 7590-01-P



                                                    19998                         Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Notices

                                                    resources) is minimized, collection                     changes that the NRC proposes to                         • Federal Rulemaking Web site: Go to
                                                    instruments are clearly understood, and                 incorporate into Revision 11. The public              http://www.regulations.gov and search
                                                    the impact of collection requirements on                comment period closed on April 5,                     for Docket ID NRC–2016–0006.
                                                    respondents can be properly assessed.                   2016. The NRC has decided to reopen                      • NRC’s Agencywide Documents
                                                       Currently, the Wage and Hour                         the public comment period to allow                    Access and Management System
                                                    Division is soliciting comments                         more time for members of the public to                (ADAMS): You may obtain publicly-
                                                    concerning its analysis that the                        develop and submit comments on                        available documents online in the
                                                    Department’s proposed rule, published                   Revision 11.                                          ADAMS Public Documents collection at
                                                    on February 25, 2016 at 81 FR 9592, if                  DATES: The extended public comment                    http://www.nrc.gov/reading-rm/
                                                    finalized as proposed, would create a                   period that ended on April 5, 2016 has                adams.html. To begin the search, select
                                                    slight paperwork burden associated                      been reopened for comments requested                  ‘‘ADAMS Public Documents’’ and then
                                                    with ICR 1235–0021 but would not                        in the document published on March 3,                 select ‘‘Begin Web-based ADAMS
                                                    create a paperwork burden on the                        2016 (81 FR 11302), including                         Search.’’ For problems with ADAMS,
                                                    regulated community of the information                  comments on the additional sections of                please contact the NRC’s Public
                                                    collection provisions contained in ICR                  NUREG–1021 posted on March 18,                        Document Room (PDR) reference staff at
                                                    1235–0018. Additionally, the                            2016. Comments should be filed no later               1–800–397–4209, 301–415–4737, or by
                                                    Department seeks comments on its                        than May 6, 2016. Comments received                   email to pdr.resource@nrc.gov. The draft
                                                    analysis that this NPRM, if finalized as                after this date will be considered if it is           NUREG is available in ADAMS under
                                                    proposed, would create a new                            practical to do so, but the NRC staff is              Accession No. ML16028A409. The
                                                    paperwork burden on the regulated                       able to ensure consideration only for                 updated sections are available in
                                                    community as described in the new                       comments received on or before this                   ADAMS under Accession Nos.
                                                    information collection provisions                       date.                                                 ML16077A223, ML16077A225, and
                                                    contained in ICR 1235–0NEW. While                       ADDRESSES: You may submit comments
                                                                                                                                                                  ML16077A227 for ES–205, ES–501, and
                                                    much of the information provided to                     by any of the following methods (unless               ES–502, respectively.
                                                    OMB in support of the information                                                                                • NRC’s PDR: You may examine and
                                                                                                            this document describes a different
                                                    collection request appears in the                                                                             purchase copies of public documents at
                                                                                                            method for submitting comments on a
                                                    preamble, interested parties may obtain                 specific subject):                                    the NRC’s PDR, O1–F21, One White
                                                    a copy of the full supporting statements                   • Federal Rulemaking Web site: Go to               Flint North, 11555 Rockville Pike,
                                                    for ICR 1235–0018, ICR 1235–0021, and                   http://www.regulations.gov and search                 Rockville, Maryland 20852.
                                                    ICR 1235–0NEW by sending a written                      for Docket ID NRC–2016–0006. Address                  B. Submitting Comments
                                                    request to the email address or mail                    questions about NRC dockets to Carol
                                                    address shown in the ADDRESSES section                                                                          Please include Docket ID NRC–2016–
                                                                                                            Gallagher; telephone: 301–415–3463;
                                                    at the beginning of this notice or by                                                                         0006 in your comment submission.
                                                                                                            email: Carol.Gallagher@nrc.gov. For                     The NRC cautions you not to include
                                                    calling the telephone number listed in                  technical questions, contact the
                                                    the FOR FURTHER INFORMATION CONTACT                                                                           identifying or contact information that
                                                                                                            individuals listed in the FOR FURTHER                 you do not want to be publicly
                                                    section of this notice.                                 INFORMATION CONTACT section of this
                                                                                                                                                                  disclosed in your comment submission.
                                                    Mary Ziegler,                                           document.                                             The NRC posts all comment
                                                                                                               • Mail comments to: Cindy Bladey,
                                                    Assistant Administrator for Policy, Wage and                                                                  submissions at http://
                                                                                                            Office of Administration, Mail Stop:
                                                    Hour Division.                                                                                                www.regulations.gov as well as entering
                                                                                                            OWFN–12–H08, U.S. Nuclear
                                                    [FR Doc. 2016–07889 Filed 4–5–16; 8:45 am]
                                                                                                            Regulatory Commission, Washington,                    the comment submissions into ADAMS.
                                                    BILLING CODE 4510–27–P
                                                                                                            DC 20555–0001.                                        The NRC does not routinely edit
                                                                                                               For additional direction on obtaining              comment submissions to remove
                                                                                                            information and submitting comments,                  identifying or contact information.
                                                    NUCLEAR REGULATORY                                      see ‘‘Obtaining Information and                         If you are requesting or aggregating
                                                    COMMISSION                                              Submitting Comments’’ in the                          comments from other persons for
                                                                                                            SUPPLEMENTARY INFORMATION section of
                                                                                                                                                                  submission to the NRC, then you should
                                                    [NRC–2016–0006]                                                                                               inform those persons not to include
                                                                                                            this document.
                                                                                                                                                                  identifying or contact information that
                                                    Operator Licensing Examination                          FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                                  they do not want to be publicly
                                                    Standards for Power Reactors                            Maurin Scheetz, telephone: 301–415–
                                                                                                                                                                  disclosed in their comment submission.
                                                                                                            2758; email: Maurin.Scheetz@nrc.gov;
                                                    AGENCY: Nuclear Regulatory                                                                                    Your request should state that the NRC
                                                                                                            or Timothy Kolb, telephone: 301–415–
                                                    Commission.                                                                                                   does not routinely edit comment
                                                                                                            0783; email: Timothy.Kolb@nrc.gov.
                                                    ACTION: Draft NUREG; additional                                                                               submissions to remove such information
                                                                                                            Both are staff of the Office of Nuclear
                                                    changes and reopen comment period.                      Reactor Regulation, U.S. Nuclear                      before making the comment
                                                                                                            Regulatory Commission, Washington,                    submissions available to the public or
                                                    SUMMARY:   On February 5, 2016, the U.S.                                                                      entering the comment submissions into
                                                    Nuclear Regulatory Commission (NRC)                     DC 20555–0001.
                                                                                                                                                                  ADAMS.
                                                    published draft NUREG–1021, Revision                    SUPPLEMENTARY INFORMATION:
                                                    11, ‘‘Operator Licensing Examination                                                                          II. Discussion
                                                                                                            I. Obtaining Information and
                                                    Standards for Power Reactors’’ for                                                                               On February 5, 2016 (81 FR 6301), the
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                            Submitting Comments
                                                    public comment. The public comment                                                                            NRC published draft NUREG–1021,
                                                    period was originally scheduled to close                A. Obtaining Information                              Revision 11, ‘‘Operator Licensing
                                                    on March 21, 2016. On March 3, 2016,                      Please refer to Docket ID NRC–2016–                 Examination Standards for Power
                                                    the comment period was extended to                      0006 when contacting the NRC about                    Reactors’’ for public comment. The
                                                    April 5, 2016. On March 18, 2016, the                   the availability of information for this              comment period was extended on
                                                    NRC posted three updated sections of                    action. You may obtain publicly-                      March 3, 2016 (81 FR 11302). The
                                                    Examination Standards (ES) in NUREG–                    available information related to this                 extended public comment period closed
                                                    1021 that reflect three additional                      action by any of the following methods:               on April 5, 2016. The NRC has decided


                                               VerDate Sep<11>2014   17:54 Apr 05, 2016   Jkt 238001   PO 00000   Frm 00048   Fmt 4703   Sfmt 4703   E:\FR\FM\06APN1.SGM   06APN1


                                                                                  Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Notices                                            19999

                                                    to reopen the public comment period                     NUCLEAR REGULATORY                                    please contact the NRC’s Public
                                                    until May 6, 2016 because three                         COMMISSION                                            Document Room (PDR) reference staff at
                                                    additional changes are proposed for                                                                           1–800–397–4209, 301–415–4737, or by
                                                                                                            [Docket Nos. 52–027 and 52–028; NRC–
                                                    incorporation into the NUREG: (1)                       2008–0441]
                                                                                                                                                                  email to pdr.resource@nrc.gov. The
                                                    Reducing the number of times per year                                                                         ADAMS accession number for each
                                                    the NRC offers the Generic                              Virgil C. Summer Nuclear Station,                     document referenced (if it is available in
                                                    Fundamentals Examination; (2)                           Units 2 and 3; South Carolina Electric                ADAMS) is provided the first time that
                                                    eliminating the informal review process;                and Gas; Reconciliation of Tier 1 Valve               it is mentioned in the SUPPLEMENTARY
                                                    and (3) extending the post-exam                         Differences                                           INFORMATION section.
                                                    comment period. These changes are                                                                                • NRC’s PDR: You may examine and
                                                                                                            AGENCY:  Nuclear Regulatory                           purchase copies of public documents at
                                                    reflected in updated sections ES–205,                   Commission.                                           the NRC’s PDR, Room O1–F21, One
                                                    Procedures for Administering the
                                                                                                            ACTION: Exemption and combined                        White Flint North, 11555 Rockville
                                                    Generic Fundamentals Examination
                                                                                                            license amendment; issuance.                          Pike, Rockville, Maryland 20852.
                                                    Program; ES–501, Initial Post
                                                                                                                                                                  FOR FURTHER INFORMATION CONTACT:
                                                    Examination Activities; and ES–502,                     SUMMARY:   The U.S. Nuclear Regulatory                Billy Gleaves, Office of New Reactors,
                                                    Denials of Applications. These sections                 Commission (NRC) is granting an                       U.S. Nuclear Regulatory Commission,
                                                    are available for review in the                         exemption from certain Tier 1                         Washington, DC 20555–0001; telephone:
                                                    supporting documents section of Docket                  information in the generic design                     301–415–5848; email: Bill.Gleaves@
                                                    ID NRC–2016–0006. Specifically,                         control document (DCD) and issuing                    nrc.gov.
                                                    starting in 2017, the NRC proposes to                   License Amendment No. 31 to
                                                                                                            combined licenses (COL), NPF–93 and                   SUPPLEMENTARY INFORMATION:
                                                    reduce the number of times per year that
                                                    it offers the Generic Fundamentals                      NPF–94. The COLs were issued to South                 I. Introduction
                                                    Examination from four times per year to                 Carolina Electric and Gas (SCE&G) and
                                                                                                            South Carolina Public Service Authority                  The NRC is granting an exemption
                                                    two times per year. The NRC proposes                                                                          from Section III.B of appendix D,
                                                    to discontinue the informal review                      (Santee Cooper) (the licensee), for
                                                                                                            construction and operation of the Virgil              ‘‘Design Certification Rule for the
                                                    process, the practice of performing                                                                           AP1000,’’ to part 52 of title 10 of the
                                                    informal staff reviews of proposed                      C. Summer Nuclear Station (VCSNS),
                                                                                                            Units 2 and 3 located in Fairfield                    Code of Federal Regulations (10 CFR),
                                                    license denials at the request of an                                                                          and issuing License Amendment No. 31
                                                                                                            County, South Carolina. The granting of
                                                    applicant. Applicants whose license                                                                           to COLs, NPF–93 and NPF–94, to the
                                                                                                            the exemption allows the changes to
                                                    applications are denied will retain                                                                           licensee. The exemption is required by
                                                                                                            Tier 1 information and promotes
                                                    hearing rights under Title 10 of the Code                                                                     paragraph A.4 of Section VIII,
                                                                                                            consistency with the VCSNS updated
                                                    of Federal Regulations 2.103(b)(2).                     final safety analysis report (UFSAR) Tier             ‘‘Processes for Changes and
                                                    Finally, the NRC proposes to extend the                 2 information. Because the acceptability              Departures,’’ appendix D to 10 CFR part
                                                    post exam comment period to allow the                   of the exemption was determined in                    52 for changes to generic DCD Tier 1
                                                    NRC and the facility licensee sufficient                part by the acceptability of the                      information. Specifically, with the
                                                    time to consider all post exam                          amendment, the exemption and                          requested amendment, the licensee
                                                    comments for both the written                           amendment are being issued                            sought to make changes to Tier 1 tables
                                                    examination and the operating test.                     concurrently.                                         and promote consistency with the
                                                    These changes are currently before the                                                                        UFSAR Tier 2 information. The request
                                                                                                            DATES:   April 6, 2016.                               for the amendment and exemption were
                                                    Commission for vote as part of the
                                                    Project AIM re-baselining effort (SECY–                 ADDRESSES:   Please refer to Docket ID                submitted by letter dated February 7,
                                                    16–0009) (ADAMS Accession No.                           NRC–2008–0441 when contacting the                     2013 (ADAMS Accession No.
                                                                                                            NRC about the availability of                         ML13042A005), and supplemented by
                                                    ML16028A189). The NRC presented
                                                                                                            information regarding this document.                  letters dated July 19, 2013, November
                                                    these changes to the nuclear industry at
                                                                                                            You may obtain publicly-available                     21, 2013, February 6, 2014, February 20,
                                                    the Nuclear Energy Institute’s National
                                                                                                            information related to this action by the             2014, May 12, 2014, September 22,
                                                    Operator Licensing Workshop on                          following methods:                                    2014, and November 19, 2014 (ADAMS
                                                    February 9, 2016 and during a panel                        • Federal Rulemaking Web site: Go to               Accession Nos. ML13205A148,
                                                    session at the NRC’s Regulatory                         http://www.regulations.gov and search                 ML13329A723, ML14041A095,
                                                    Information Conference on March 9,                      for Docket ID NRC–2008–0441. Address                  ML14052A379, ML14133A488,
                                                    2016. Furthermore, a public meeting                     questions about NRC dockets to Carol                  ML14266A014, and ML14323A333,
                                                    was held on March 31, 2016 in                           Gallagher; telephone: 301–415–3463;                   respectively).
                                                    Rockville, Maryland, to discuss the                     email: Carol.Gallagher@nrc.gov. For                      Part of the justification for granting
                                                    scope of these additional changes.                      technical questions, contact the                      the exemption was provided by the
                                                      Dated at Rockville, Maryland, this 31 day             individual listed in the FOR FURTHER                  review of the amendment. Because the
                                                    of March, 2016.                                         INFORMATION CONTACT section of this                   exemption is necessary in order to issue
                                                      For the Nuclear Regulatory Commission.
                                                                                                            document.                                             the requested license amendment, the
                                                                                                               • NRC’s Agencywide Documents                       NRC granted the exemption and issued
                                                    Maurin Scheetz,                                         Access and Management System                          the amendment concurrently, rather
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    Acting Chief, Operator Licensing and                    (ADAMS): You may obtain publicly-                     than in sequence. This included issuing
                                                    Training Branch, Division of Inspection and             available documents online in the                     a combined safety evaluation containing
                                                    Regional Support, Office of Nuclear Reactor             ADAMS Public Documents collection at                  the NRC staff’s review of both the
                                                    Regulation.                                             http://www.nrc.gov/reading-rm/                        exemption request and the license
                                                    [FR Doc. 2016–07907 Filed 4–5–16; 8:45 am]              adams.html. To begin the search, select               amendment. The exemption met all
                                                    BILLING CODE 7590–01–P                                  ‘‘ADAMS Public Documents’’ and then                   applicable regulatory criteria set forth in
                                                                                                            select ‘‘Begin Web-based ADAMS                        10 CFR 50.12, 10 CFR 52.7, and 10 CFR
                                                                                                            Search.’’ For problems with ADAMS,                    52.63(b)(1) of appendix D to 10 CFR part


                                               VerDate Sep<11>2014   17:54 Apr 05, 2016   Jkt 238001   PO 00000   Frm 00049   Fmt 4703   Sfmt 4703   E:\FR\FM\06APN1.SGM   06APN1



Document Created: 2018-02-07 13:51:35
Document Modified: 2018-02-07 13:51:35
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDraft NUREG; additional changes and reopen comment period.
DatesThe extended public comment period that ended on April 5, 2016 has been reopened for comments requested in the document published on March 3, 2016 (81 FR 11302), including comments on the additional sections of NUREG-1021 posted on March 18, 2016. Comments should be filed no later than May 6, 2016. Comments received after this date will be considered if it is practical to do so, but the NRC staff is able to ensure consideration only for comments received on or before this date.
ContactMaurin Scheetz, telephone: 301-415- 2758; email: [email protected]; or Timothy Kolb, telephone: 301- 415-0783; email: [email protected] Both are staff of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation81 FR 19998 