81_FR_2099 81 FR 2089 - Drawbridge Operation Regulation; Lake Washington Ship Canal, Seattle, WA

81 FR 2089 - Drawbridge Operation Regulation; Lake Washington Ship Canal, Seattle, WA

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 81, Issue 10 (January 15, 2016)

Page Range2089-2090
FR Document2016-00654

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Montlake Bridge across the Lake Washington Ship Canal, mile 5.2, at Seattle, WA. The deviation is necessary to allow the bridge to operate in single leaf mode during day light hours, and a full closure (both bascule leafs in the closed-to- navigation position) during night time hours while work crews replace bridge decking. This deviation allows a single leaf opening with a one hour advance notice during the day, and remains in the closed-to- navigation position at night.

Federal Register, Volume 81 Issue 10 (Friday, January 15, 2016)
[Federal Register Volume 81, Number 10 (Friday, January 15, 2016)]
[Rules and Regulations]
[Pages 2089-2090]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-00654]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2016-0021]


Drawbridge Operation Regulation; Lake Washington Ship Canal, 
Seattle, WA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Montlake Bridge across the Lake 
Washington Ship Canal, mile 5.2, at Seattle, WA. The deviation is 
necessary to allow the bridge to operate in single leaf mode during day 
light hours, and a full closure (both bascule leafs in the closed-to-
navigation position) during night time hours while work crews replace 
bridge decking. This deviation allows a single leaf opening with a one 
hour advance notice during the day, and remains in the closed-to-
navigation position at night.

DATES: This deviation is effective from 6 a.m. on February 27, 2016 to 
6 p.m. on February 28, 2016.

ADDRESSES: The docket for this deviation, [USCG-2016-0021] is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Steven Fischer, Bridge 
Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, 
email [email protected].

SUPPLEMENTARY INFORMATION: Washington Department of Transportation has 
requested a temporary deviation from the operating schedule for the 
Montlake Bridge across the Lake Washington Ship Canal, at mile 5.2, at 
Seattle, WA. The deviation is necessary to accommodate work crews 
conducting timely bridge deck repairs.
    The Montlake Bridge in the closed position provides 30 feet of 
vertical clearance throughout the navigation channel, and 46 feet of 
vertical clearance throughout the center 60 feet of the bridge; 
vertical clearance references to the Mean Water Level of Lake 
Washington. When half the span is open with a single leaf, 46 feet of 
vertical clearance will be reduced

[[Page 2090]]

throughout the center to 30 feet of the bridge.
    To facilitate this event, the north half of the bridge span, or 
single leaf, will open with at least a one hour advance notice provided 
to the bridge operator from 6 a.m. to 6 p.m. on February 27, 2016. From 
6 p.m. on February 27, 2016 to 5 a.m. on February 28, 2016, the 
Montlake Bridge span will remain in the closed-to-navigation position, 
or full closure. Then, from 5 a.m. to 6 p.m. on February 28, 2016, the 
north half of the bridge span will open with at least a one hour 
advance notice to the bridge operator. The normal operating schedule 
for the Montlake Bridge operates in accordance with 33 CFR 117.1051(e).
    The deviation period is from 6 a.m. on February 27, 2016 to 6 p.m. 
on February 27, 2016 (north single leaf opening if a one hour notice is 
given); from 6 p.m. on February 27, 2016 to 5 a.m. on February 28, 2016 
(remain in the closed-to-navigation position); from 5 a.m. on February 
28, 2016 to 6 p.m. on February 28, 2016 (north single leaf opening if a 
one hour notice is given).
    Waterway usage on the Lake Washington Ship Canal ranges from 
commercial tug and barge to small pleasure craft. Vessels able to pass 
through the bridge in the closed-to-navigation position may do so at 
any time. The bridge will be able to open for emergency vessels in 
route to a call when an hour notice is given to the bridge operator, 
and a single leaf opening will be provided. The Lake Washington Ship 
Canal has no immediate alternate route for vessels to pass. The Coast 
Guard will also inform the users of the waterways through our Local and 
Broadcast Notices to Mariners of the change in operating schedule for 
the bridge so that vessels can arrange their transits to minimize any 
impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the designated 
time period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: January 11, 2016.
Steven M Fischer,
Bridge Administrator, Thirteenth Coast Guard District.
[FR Doc. 2016-00654 Filed 1-14-16; 8:45 am]
BILLING CODE 9110-04-P



                                                              Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Rules and Regulations                                                     2089

                                           the assumptions can reflect current                       Because no general notice of proposed                       PART 4022—BENEFITS PAYABLE IN
                                           market conditions as accurately as                      rulemaking is required for this                               TERMINATED SINGLE-EMPLOYER
                                           possible.                                               amendment, the Regulatory Flexibility                         PLANS
                                              Because of the need to provide                       Act of 1980 does not apply. See 5 U.S.C.
                                           immediate guidance for the payment of                   601(2).                                                       ■ 1. The authority citation for part 4022
                                           benefits under plans with valuation                                                                                   continues to read as follows:
                                           dates during February 2016, PBGC finds                  List of Subjects in 29 CFR Part 4022
                                                                                                                                                                   Authority: 29 U.S.C. 1302, 1322, 1322b,
                                           that good cause exists for making the                     Employee benefit plans, Pension                             1341(c)(3)(D), and 1344.
                                           assumptions set forth in this                           insurance, Pensions, Reporting and                            ■ 2. In appendix B to part 4022, Rate Set
                                           amendment effective less than 30 days                   recordkeeping requirements.                                   268, as set forth below, is added to the
                                           after publication.                                                                                                    table.
                                              PBGC has determined that this action                   In consideration of the foregoing, 29
                                           is not a ‘‘significant regulatory action’’              CFR part 4022 is amended as follows:                          Appendix B to Part 4022—Lump Sum
                                           under the criteria set forth in Executive                                                                             Interest Rates For PBGC Payments
                                           Order 12866.                                                                                                          *      *     *       *        *

                                                                For plans with a valuation                                                                     Deferred annuities
                                                                                                     Immediate
                                                                          date                                                                                     (percent)
                                               Rate set                                             annuity rate
                                                                                                      (percent)
                                                               On or after           Before                                     i1                    i2                i3                n1           n2


                                                       *                     *                         *                          *                        *                      *                *

                                                 268             2–1–16             3–1–16                 1.25                4.00                 4.00              4.00                7            8



                                           ■ 3. In appendix C to part 4022, Rate Set               Appendix C to Part 4022—Lump Sum
                                           268, as set forth below, is added to the                Interest Rates For Private-Sector
                                           table.                                                  Payments
                                                                                                   *        *      *       *          *

                                                                For plans with a valuation                                                                     Deferred annuities
                                                                                                     Immediate
                                                                          date                                                                                     (percent)
                                               Rate set                                             annuity rate
                                                                                                      (percent)
                                                               On or after           Before                                     i1                    i2                i3                n1           n2


                                                       *                     *                         *                          *                        *                      *                *

                                                 268             2–1–16             3–1–16                 1.25                4.00                 4.00              4.00                7            8



                                             Issued in Washington, DC, on this 11th day            schedule that governs the Montlake                            deviation, call or email Mr. Steven
                                           of January 2016.                                        Bridge across the Lake Washington Ship                        Fischer, Bridge Administrator,
                                           Philip R. Hertz,                                        Canal, mile 5.2, at Seattle, WA. The                          Thirteenth Coast Guard District;
                                           Deputy General Counsel, Pension Benefit                 deviation is necessary to allow the                           telephone 206–220–7282, email d13-pf-
                                           Guaranty Corporation.                                   bridge to operate in single leaf mode                         d13bridges@uscg.mil.
                                           [FR Doc. 2016–00725 Filed 1–14–16; 8:45 am]             during day light hours, and a full
                                                                                                   closure (both bascule leafs in the closed-                    SUPPLEMENTARY INFORMATION:
                                           BILLING CODE 7709–02–P
                                                                                                   to-navigation position) during night                          Washington Department of
                                                                                                   time hours while work crews replace                           Transportation has requested a
                                           DEPARTMENT OF HOMELAND                                  bridge decking. This deviation allows a                       temporary deviation from the operating
                                           SECURITY                                                single leaf opening with a one hour                           schedule for the Montlake Bridge across
                                                                                                   advance notice during the day, and                            the Lake Washington Ship Canal, at
                                           Coast Guard                                             remains in the closed-to-navigation                           mile 5.2, at Seattle, WA. The deviation
                                                                                                   position at night.                                            is necessary to accommodate work
                                           33 CFR Part 117                                         DATES: This deviation is effective from                       crews conducting timely bridge deck
                                           [Docket No. USCG–2016–0021]                             6 a.m. on February 27, 2016 to 6 p.m.                         repairs.
                                                                                                   on February 28, 2016.                                            The Montlake Bridge in the closed
                                           Drawbridge Operation Regulation;                        ADDRESSES: The docket for this                                position provides 30 feet of vertical
                                           Lake Washington Ship Canal, Seattle,                    deviation, [USCG–2016–0021] is                                clearance throughout the navigation
                                           WA                                                      available at http://www.regulations.gov.                      channel, and 46 feet of vertical
Lhorne on DSK5TPTVN1PROD with RULES




                                           AGENCY: Coast Guard, DHS.                               Type the docket number in the                                 clearance throughout the center 60 feet
                                                                                                   ‘‘SEARCH’’ box and click ‘‘SEARCH.’’                          of the bridge; vertical clearance
                                           ACTION:Notice of deviation from
                                                                                                   Click on Open Docket Folder on the line                       references to the Mean Water Level of
                                           drawbridge regulation.
                                                                                                   associated with this deviation.                               Lake Washington. When half the span is
                                           SUMMARY: The Coast Guard has issued a                   FOR FURTHER INFORMATION CONTACT: If                           open with a single leaf, 46 feet of
                                           temporary deviation from the operating                  you have questions on this temporary                          vertical clearance will be reduced


                                      VerDate Sep<11>2014   15:13 Jan 14, 2016   Jkt 238001   PO 00000     Frm 00023   Fmt 4700       Sfmt 4700   E:\FR\FM\15JAR1.SGM   15JAR1


                                           2090               Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Rules and Regulations

                                           throughout the center to 30 feet of the                 ENVIRONMENTAL PROTECTION                               Development Branch, 11201 Renner
                                           bridge.                                                 AGENCY                                                 Boulevard, Lenexa, Kansas 66219 at
                                              To facilitate this event, the north half                                                                    913–551–7991 or by email at
                                                                                                   40 CFR Parts 52 and 70                                 krabbe.stephen@epa.gov.
                                           of the bridge span, or single leaf, will
                                           open with at least a one hour advance                   [EPA–R07–OAR–2015–0790; FRL–9941–03-                   SUPPLEMENTARY INFORMATION:
                                           notice provided to the bridge operator                  Region 7]                                              Throughout this document ‘‘we,’’ ‘‘us,’’
                                           from 6 a.m. to 6 p.m. on February 27,                                                                          or ‘‘our’’ refer to EPA. This section
                                                                                                   Approval of Missouri’s Air Quality                     provides additional information by
                                           2016. From 6 p.m. on February 27, 2016
                                                                                                   Implementation Plans; Reporting                        addressing the following:
                                           to 5 a.m. on February 28, 2016, the
                                                                                                   Emission Data, Emission Fees and                       I. What is being addressed in this document?
                                           Montlake Bridge span will remain in the                 Process Information
                                           closed-to-navigation position, or full                                                                         II. Have the requirements for approval of a
                                                                                                                                                               SIP revision been met?
                                           closure. Then, from 5 a.m. to 6 p.m. on                 AGENCY: Environmental Protection
                                                                                                                                                          III. What action is EPA taking?
                                           February 28, 2016, the north half of the                Agency (EPA).
                                           bridge span will open with at least a one               ACTION: Direct final rule.                             I. What is being addressed in this
                                           hour advance notice to the bridge                                                                              document?
                                           operator. The normal operating                          SUMMARY:    Environmental Protection
                                                                                                   Agency (EPA) is taking direct final                       EPA is taking direct final action to
                                           schedule for the Montlake Bridge
                                                                                                   action to approve revisions to the                     approve the Operating Permits Program
                                           operates in accordance with 33 CFR
                                                                                                   Operating Permits Program for the State                revision submitted by the state of
                                           117.1051(e).                                                                                                   Missouri for 10 CSR 10–6.110,
                                                                                                   of Missouri submitted on March 16,
                                              The deviation period is from 6 a.m. on               2015. These revisions update the                       ‘‘Reporting Emission Data, Emission
                                           February 27, 2016 to 6 p.m. on February                 emissions fee for permitted sources as                 Fees, and Process Information,’’ on
                                           27, 2016 (north single leaf opening if a                set by Missouri Statute from $40 to $48                March 16, 2015. Section (3)(A) revised
                                           one hour notice is given); from 6 p.m.                  per ton of air pollution emitted                       the emission fees section, which is
                                           on February 27, 2016 to 5 a.m. on                       annually, effective January 1, 2016.                   approved under the Operating Permits
                                           February 28, 2016 (remain in the closed-                DATES: This direct final rule will be                  Program only, and updates the
                                           to-navigation position); from 5 a.m. on                 effective March 15, 2016, without                      emissions fee for permitted sources as
                                           February 28, 2016 to 6 p.m. on February                 further notice, unless EPA receives                    set by Missouri Statute from $40 to $48
                                           28, 2016 (north single leaf opening if a                adverse comment by February 16, 2016.                  per ton of air pollution emitted
                                           one hour notice is given).                              If EPA receives adverse comment, we                    annually, effective January 1, 2016, as
                                                                                                   will publish a timely withdrawal of the                set by Missouri statute.
                                              Waterway usage on the Lake
                                           Washington Ship Canal ranges from                       direct final rule in the Federal Register              II. Have the requirements for approval
                                           commercial tug and barge to small                       informing the public that the rule will                of an operating permits program been
                                           pleasure craft. Vessels able to pass                    not take effect.                                       met?
                                           through the bridge in the closed-to-                    ADDRESSES: Submit your comments,                         The state submission has met the
                                           navigation position may do so at any                    identified by Docket ID No. EPA–R07–                   public notice requirements for SIP
                                           time. The bridge will be able to open for               OAR–2015–0790, to http://                              submissions in accordance with 40 CFR
                                           emergency vessels in route to a call                    www.regulations.gov. Follow the online                 51.102. The submission also satisfied
                                           when an hour notice is given to the                     instructions for submitting comments.                  the completeness criteria of 40 CFR part
                                           bridge operator, and a single leaf                      Once submitted, comments cannot be                     51, appendix V. In addition, the revision
                                           opening will be provided. The Lake                      edited or removed from Regulations.gov.                meets the substantive SIP requirements
                                           Washington Ship Canal has no                            EPA may publish any comment received                   of the Clean Air Act (CAA), including
                                                                                                   to its public docket. Do not submit                    section 110 and implementing
                                           immediate alternate route for vessels to
                                                                                                   electronically any information you                     regulations.
                                           pass. The Coast Guard will also inform
                                                                                                   consider to be Confidential Business
                                           the users of the waterways through our                  Information (CBI) or other information                 III. What action is EPA taking?
                                           Local and Broadcast Notices to Mariners                 whose disclosure is restricted by statute.
                                           of the change in operating schedule for                                                                           We are publishing this direct final
                                                                                                   Multimedia submissions (audio, video,                  rule without a prior proposed rule
                                           the bridge so that vessels can arrange                  etc.) must be accompanied by a written                 because we view this as a
                                           their transits to minimize any impact                   comment. The written comment is                        noncontroversial action and anticipate
                                           caused by the temporary deviation.                      considered the official comment and                    no adverse comment. However, in the
                                              In accordance with 33 CFR 117.35(e),                 should include discussion of all points                ‘‘Proposed Rules’’ section of this
                                           the drawbridge must return to its regular               you wish to make. EPA will generally                   Federal Register, we are publishing a
                                           operating schedule immediately at the                   not consider comments or comment                       separate document that will serve as the
                                           end of the designated time period. This                 contents located outside of the primary                proposed rule to this Operating Permits
                                           deviation from the operating regulations                submission (i.e. on the web, cloud, or                 Fee revision if adverse comments are
                                           is authorized under 33 CFR 117.35.                      other file sharing system). For                        received on this direct final rule. We
                                                                                                   additional submission methods, the full                will not institute a second comment
                                             Dated: January 11, 2016.                              EPA public comment policy,                             period on this action. Any parties
                                           Steven M Fischer,                                       information about CBI or multimedia                    interested in commenting must do so at
                                           Bridge Administrator, Thirteenth Coast Guard            submissions, and general guidance on                   this time. For further information about
Lhorne on DSK5TPTVN1PROD with RULES




                                           District.                                               making effective comments, please visit                commenting on this rule, see the
                                           [FR Doc. 2016–00654 Filed 1–14–16; 8:45 am]             http://www2.epa.gov/dockets/                           ADDRESSES section of this document. If
                                           BILLING CODE 9110–04–P                                  commenting-epa-dockets.                                EPA receives adverse comment, we will
                                                                                                   FOR FURTHER INFORMATION CONTACT:                       publish a timely withdrawal in the
                                                                                                   Stephen Krabbe, Environmental                          Federal Register informing the public
                                                                                                   Protection Agency, Air Planning and                    that this direct final rule will not take


                                      VerDate Sep<11>2014   15:13 Jan 14, 2016   Jkt 238001   PO 00000   Frm 00024   Fmt 4700   Sfmt 4700   E:\FR\FM\15JAR1.SGM   15JAR1



Document Created: 2018-02-02 12:32:18
Document Modified: 2018-02-02 12:32:18
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 6 a.m. on February 27, 2016 to 6 p.m. on February 28, 2016.
ContactIf you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email [email protected]
FR Citation81 FR 2089 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR