81_FR_21933 81 FR 21862 - Availability of Final NPDES General Permit for Stormwater Discharges From Small Municipal Separate Storm Sewer Systems in Massachusetts

81 FR 21862 - Availability of Final NPDES General Permit for Stormwater Discharges From Small Municipal Separate Storm Sewer Systems in Massachusetts

ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 81, Issue 71 (April 13, 2016)

Page Range21862-21863
FR Document2016-08503

The Director of the Office of Ecosystem Protection, EPA-- Region 1, is providing a notice of availability of the final National Pollutant Discharge Elimination System (NPDES) general permit for stormwater discharges from small Municipal Separate Storm Sewer systems (MS4s) to certain waters of the Commonwealth of Massachusetts. The final Massachusetts small MS4 general permit establishes Notice of Intent (NOI) requirements, prohibitions, and management practices for stormwater discharges from small MS4s in Massachusetts. The final Massachusetts small MS4 general permit reflects modifications to the draft small MS4 general permit released for comment on September 30, 2014 and replaces the 2003 small MS4 general permit for MS4 operators within the Commonwealth of Massachusetts.

Federal Register, Volume 81 Issue 71 (Wednesday, April 13, 2016)
[Federal Register Volume 81, Number 71 (Wednesday, April 13, 2016)]
[Notices]
[Pages 21862-21863]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-08503]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[FRL-9944-92-Region 1]


Availability of Final NPDES General Permit for Stormwater 
Discharges From Small Municipal Separate Storm Sewer Systems in 
Massachusetts

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of availability of final NPDES general permit.

-----------------------------------------------------------------------

SUMMARY: The Director of the Office of Ecosystem Protection, EPA--
Region 1, is providing a notice of availability of the final National 
Pollutant Discharge Elimination System (NPDES) general permit for 
stormwater discharges from small Municipal Separate Storm Sewer systems 
(MS4s) to certain waters of the Commonwealth of Massachusetts. The 
final Massachusetts small MS4 general permit establishes Notice of 
Intent (NOI) requirements, prohibitions, and management practices for 
stormwater discharges from small MS4s in Massachusetts. The final 
Massachusetts small MS4 general permit reflects modifications to the 
draft small MS4 general permit released for comment on September 30, 
2014 and replaces the 2003 small MS4 general permit for MS4 operators 
within the Commonwealth of Massachusetts.

DATES: The Massachusetts small MS4 general permit shall be effective on 
July 1, 2017 and will expire at midnight on June 30, 2022. In 
accordance with 40 CFR part 23, this permit shall be considered issued 
for the purpose of judicial review at 1:00 p.m. eastern standard time 
on April 27, 2016. Under section 509(b) of the Clean Water Act, 
judicial review of this general permit can be requested by filing a 
petition for review in the United States Court of Appeals within 120 
days after the permit is considered issued. Under section 509(b)(2) of 
the Clean Water Act, the requirements in this permit may not be 
challenged later in civil or criminal proceedings to enforce these 
requirements. In addition, this permit may not be challenged in other 
agency proceedings.

[[Page 21863]]


FOR FURTHER INFORMATION CONTACT: Newton Tedder, Stormwater and 
Construction Permits Section OEP 06-4, Environmental Protection Agency, 
5 Post Office Square--Suite 100, Boston, Massachusetts 02109-3912; 617-
918-1038; [email protected].

SUPPLEMENTARY INFORMATION: 

General Information

    EPA is reissuing three final NPDES permits for discharges of 
stormwater from small MS4s to certain waters within the Commonwealth of 
Massachusetts. The three general permits are:

MAR041000--Traditional cities and towns
MAR042000--Non-traditional state, federal, county, and other publicly 
owned MS4s
MAR043000--Non-traditional transportation MS4s

    While these are technically distinct permits, for convenience they 
have been grouped into a single document and this document refers to 
the ``permit'' in the singular. The final general permit, appendices 
and attachments, as well as response to comments on the draft permit 
and supplemental fact sheet information are available at http://www.epa.gov/region1/npdes/stormwater/MS4_MA.html.
    The conditions in the general permit are established pursuant to 
Clean Water Act (CWA) section 402(p)(3)(iii) to ensure that pollutant 
discharges from small MS4s are reduced to the Maximum Extent 
Practicable (MEP), protect water quality, and satisfy the appropriate 
requirements of the CWA. Further information on the requirements of the 
permit related to MEP and water quality may be found in EPA's Response 
to Comments document on the above Web site.
    EPA issued a final general permit to address stormwater discharges 
from small MS4s in Massachusetts and New Hampshire on May 1, 2003. The 
2003 general permit required small MS4 operators to develop and 
implement a Stormwater Management Program (SWMP) designed to control 
pollutants to the maximum extent practicable and protect water quality. 
This final general permit for Massachusetts MS4s builds on the 
requirements of the 2003 general permit. During 2010, EPA drafted two 
separate Small MS4 general permits to replace the 2003 Small MS4 permit 
for eligible operators located in Massachusetts; one for operators 
located in the North Coastal watershed and the other for those located 
in the Interstate, Merrimack and South Coastal watersheds. Based on 
comments and information gathered while developing responses, EPA 
modified the initial draft general permits and issued a draft permit 
covering all eligible operators in Massachusetts pursuant to 40 CFR 
124.6. EPA took public comments on this draft permit from September 30, 
2014 to February 27, 2015. EPA received over 150 unique written letters 
and oral comments on the draft permit. Concurrent with the release of 
the final permit and supplemental materials EPA will make available a 
Response to Comments received on the draft permit. The Response to 
Comments will be available on the EPA Web site listed above. Changes to 
the permit resulting from public comments include, but are not limited 
to: Reduction of certain reporting requirements and metrics, 
reorganization of certain requirements for clarity, and extension of 
deadlines for certain required tasks and reports within the permit.

Obtaining Authorization

    In order for a small MS4 operator to obtain authorization to 
discharge, it must submit a complete and accurate NOI containing the 
information in Appendix E of the general permit. The NOI must be 
submitted on or before September 29, 2017 (90 days from the effective 
date of the final permit). A small MS4 operator must meet the 
eligibility requirements of the general permit found in Part 1.2 and 
Part 1.9 prior to submission of its NOI. A small MS4 operator will be 
authorized to discharge under the permit upon receipt of written notice 
from EPA following a public notice of the submitted NOI. EPA will 
authorize the discharge, request additional information, or require the 
small MS4 to apply for an alternative permit or an individual permit. 
NOIs may be submitted electronically to EPA at 
[email protected] or sent via regular or overnight mail to: 
United States Environmental Protection Agency, Stormwater and 
Construction Permits Section OEP 06-1, 5 Post Office Square--Suite 100, 
Boston, Massachusetts 02109-3912. A copy of the NOI shall also be sent 
to MassDEP at the following address: Massachusetts Department of 
Environmental Protection, One Winter Street--5th Floor, Boston, 
Massachusetts 02108 ATTN: Frederick Civian, Stormwater Coordinator.

Other Legal Requirements

    In accordance with the Endangered Species Act (ESA), EPA has 
updated the provisions and necessary actions and documentation related 
to potential impacts to endangered species from discharges and related 
actions under the Massachusetts small MS4 general permit. EPA has 
obtained concurrence from the appropriate federal services (U.S. Fish 
and Wildlife Service and National Marine Fisheries Service) regarding 
the requirements of this general permit.
    In accordance with the National Historic Preservation Act, EPA has 
established provisions and documentation requirements for operators 
seeking coverage under the Massachusetts small MS4 general permit to 
ensure that discharges or actions taken under this permit will not 
adversely affect historic properties and places.

    Authority:  This action is being taken under the Clean Water 
Act, 33 U.S.C. 1251 et seq.

    Dated: April 4, 2016.
H. Curtis Spalding,
Regional Administrator, Region 1.
[FR Doc. 2016-08503 Filed 4-12-16; 8:45 am]
 BILLING CODE 6560-50-P



                                                    21862                        Federal Register / Vol. 81, No. 71 / Wednesday, April 13, 2016 / Notices

                                                    Yuba River, and Oregon Creek, in Yuba,                  DEPARTMENT OF ENERGY                                  FERCOnlineSupport@ferc.gov. or call
                                                    Sierra, and Nevada Counties, California.                                                                      (866) 208–3676 (toll free). For TTY, call
                                                                                                            Federal Energy Regulatory                             (202) 502–8659.
                                                       The license for Project No. 2246 was
                                                                                                            Commission                                              Dated: April 7, 2016.
                                                    issued for a period ending March 31,
                                                    2016. Section 15(a)(1) of the FPA, 16                   [Docket No. ER16–1354–000]                            Kimberly D. Bose,
                                                    U.S.C. 808(a)(1), requires the                                                                                Secretary.
                                                    Commission, at the expiration of a                      Live Oak Solar, LLC; Supplemental
                                                                                                                                                                  [FR Doc. 2016–08473 Filed 4–12–16; 8:45 am]
                                                    license term, to issue from year-to-year                Notice That Initial Market-Based Rate
                                                                                                                                                                  BILLING CODE 6717–01–P
                                                    an annual license to the then licensee                  Filing Includes Request for Blanket
                                                                                                            Section 204 Authorization
                                                    under the terms and conditions of the
                                                    prior license until a new license is                       This is a supplemental notice in the               ENVIRONMENTAL PROTECTION
                                                    issued, or the project is otherwise                     above-referenced proceeding of Grande                 AGENCY
                                                    disposed of as provided in section 15 or                Prairie Wind, LLC’s application for
                                                    any other applicable section of the FPA.                market-based rate authority, with an                  [FRL–9944–92–Region 1]
                                                    If the project’s prior license waived the               accompanying rate tariff, noting that
                                                    applicability of section 15 of the FPA,                 such application includes a request for               Availability of Final NPDES General
                                                    then, based on section 9(b) of the                      blanket authorization, under 18 CFR                   Permit for Stormwater Discharges
                                                    Administrative Procedure Act, 5 U.S.C.                  part 34, of future issuances of securities            From Small Municipal Separate Storm
                                                    558(c), and as set forth at 18 CFR                      and assumptions of liability.                         Sewer Systems in Massachusetts
                                                    16.21(a), if the licensee of such project                  Any person desiring to intervene or to
                                                                                                            protest should file with the Federal                  AGENCY: Environmental Protection
                                                    has filed an application for a subsequent                                                                     Agency (EPA).
                                                    license, the licensee may continue to                   Energy Regulatory Commission, 888
                                                                                                            First Street NE., Washington, DC 20426,               ACTION: Notice of availability of final
                                                    operate the project in accordance with                                                                        NPDES general permit.
                                                    the terms and conditions of the license                 in accordance with Rules 211 and 214
                                                    after the minor or minor part license                   of the Commission’s Rules of Practice
                                                                                                                                                                  SUMMARY:   The Director of the Office of
                                                    expires, until the Commission acts on                   and Procedure (18 CFR 385.211 and
                                                                                                                                                                  Ecosystem Protection, EPA—Region 1,
                                                    its application. If the licensee of such a              385.214). Anyone filing a motion to
                                                                                                                                                                  is providing a notice of availability of
                                                    project has not filed an application for                intervene or protest must serve a copy
                                                                                                                                                                  the final National Pollutant Discharge
                                                    a subsequent license, then it may be                    of that document on the Applicant.
                                                                                                               Notice is hereby given that the                    Elimination System (NPDES) general
                                                    required, pursuant to 18 CFR 16.21(b),                                                                        permit for stormwater discharges from
                                                                                                            deadline for filing protests with regard
                                                    to continue project operations until the                to the applicant’s request for blanket                small Municipal Separate Storm Sewer
                                                    Commission issues someone else a                        authorization, under 18 CFR part 34, of               systems (MS4s) to certain waters of the
                                                    license for the project or otherwise                    future issuances of securities and                    Commonwealth of Massachusetts. The
                                                    orders disposition of the project.                      assumptions of liability, is April 27,                final Massachusetts small MS4 general
                                                       If the project is subject to section 15              2016.                                                 permit establishes Notice of Intent (NOI)
                                                    of the FPA, notice is hereby given that                    The Commission encourages                          requirements, prohibitions, and
                                                    an annual license for Project No. 2246                  electronic submission of protests and                 management practices for stormwater
                                                    is issued to the licensee for a period                  interventions in lieu of paper, using the             discharges from small MS4s in
                                                                                                            FERC Online links at http://                          Massachusetts. The final Massachusetts
                                                    effective April 1, 2016 through March
                                                                                                            www.ferc.gov. To facilitate electronic                small MS4 general permit reflects
                                                    31, 2017 or until the issuance of a new
                                                                                                            service, persons with Internet access                 modifications to the draft small MS4
                                                    license for the project or other
                                                                                                            who will eFile a document and/or be                   general permit released for comment on
                                                    disposition under the FPA, whichever
                                                                                                            listed as a contact for an intervenor                 September 30, 2014 and replaces the
                                                    comes first. If issuance of a new license
                                                                                                            must create and validate an                           2003 small MS4 general permit for MS4
                                                    (or other disposition) does not take
                                                                                                            eRegistration account using the                       operators within the Commonwealth of
                                                    place on or before March 31, 2017,                                                                            Massachusetts.
                                                    notice is hereby given that, pursuant to                eRegistration link. Select the eFiling
                                                                                                            link to log on and submit the                         DATES: The Massachusetts small MS4
                                                    18 CFR 16.18(c), an annual license
                                                    under section 15(a)(1) of the FPA is                    intervention or protests.                             general permit shall be effective on July
                                                    renewed automatically without further                      Persons unable to file electronically              1, 2017 and will expire at midnight on
                                                                                                            should submit an original and 5 copies                June 30, 2022. In accordance with 40
                                                    order or notice by the Commission,
                                                                                                            of the intervention or protest to the                 CFR part 23, this permit shall be
                                                    unless the Commission orders
                                                                                                            Federal Energy Regulatory Commission,                 considered issued for the purpose of
                                                    otherwise.
                                                                                                            888 First Street NE., Washington, DC                  judicial review at 1:00 p.m. eastern
                                                       If the project is not subject to section             20426.                                                standard time on April 27, 2016. Under
                                                    15 of the FPA, notice is hereby given                      The filings in the above-referenced                section 509(b) of the Clean Water Act,
                                                    that the licensee, Yuba County Water                    proceeding are accessible in the                      judicial review of this general permit
                                                    Agency., is authorized to continue                      Commission’s eLibrary system by                       can be requested by filing a petition for
                                                    operation of the Yuba River Project,                    clicking on the appropriate link in the               review in the United States Court of
                                                    until such time as the Commission acts                  above list. They are also available for               Appeals within 120 days after the
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    on its application for a subsequent                     electronic review in the Commission’s                 permit is considered issued. Under
                                                    license.                                                Public Reference Room in Washington,                  section 509(b)(2) of the Clean Water Act,
                                                      Dated: March 7, 2016.                                 DC. There is an eSubscription link on                 the requirements in this permit may not
                                                                                                            the Web site that enables subscribers to              be challenged later in civil or criminal
                                                    Kimberly D. Bose,
                                                                                                            receive email notification when a                     proceedings to enforce these
                                                    Secretary.                                              document is added to a subscribed                     requirements. In addition, this permit
                                                    [FR Doc. 2016–08475 Filed 4–12–16; 8:45 am]             docket(s). For assistance with any FERC               may not be challenged in other agency
                                                    BILLING CODE 6717–01–P                                  Online service, please email                          proceedings.


                                               VerDate Sep<11>2014   17:41 Apr 12, 2016   Jkt 238001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\13APN1.SGM   13APN1


                                                                                 Federal Register / Vol. 81, No. 71 / Wednesday, April 13, 2016 / Notices                                                 21863

                                                    FOR FURTHER INFORMATION CONTACT:                        information gathered while developing                 Massachusetts small MS4 general
                                                    Newton Tedder, Stormwater and                           responses, EPA modified the initial                   permit. EPA has obtained concurrence
                                                    Construction Permits Section OEP 06–4,                  draft general permits and issued a draft              from the appropriate federal services
                                                    Environmental Protection Agency, 5                      permit covering all eligible operators in             (U.S. Fish and Wildlife Service and
                                                    Post Office Square—Suite 100, Boston,                   Massachusetts pursuant to 40 CFR                      National Marine Fisheries Service)
                                                    Massachusetts 02109–3912; 617–918–                      124.6. EPA took public comments on                    regarding the requirements of this
                                                    1038; tedder.newton@epa.gov.                            this draft permit from September 30,                  general permit.
                                                    SUPPLEMENTARY INFORMATION:                              2014 to February 27, 2015. EPA received                  In accordance with the National
                                                                                                            over 150 unique written letters and oral              Historic Preservation Act, EPA has
                                                    General Information                                     comments on the draft permit.                         established provisions and
                                                       EPA is reissuing three final NPDES                   Concurrent with the release of the final              documentation requirements for
                                                    permits for discharges of stormwater                    permit and supplemental materials EPA                 operators seeking coverage under the
                                                    from small MS4s to certain waters                       will make available a Response to                     Massachusetts small MS4 general
                                                    within the Commonwealth of                              Comments received on the draft permit.                permit to ensure that discharges or
                                                    Massachusetts. The three general                        The Response to Comments will be                      actions taken under this permit will not
                                                    permits are:                                            available on the EPA Web site listed                  adversely affect historic properties and
                                                    MAR041000—Traditional cities and                        above. Changes to the permit resulting                places.
                                                       towns                                                from public comments include, but are                    Authority: This action is being taken
                                                    MAR042000—Non-traditional state,                        not limited to: Reduction of certain                  under the Clean Water Act, 33 U.S.C. 1251
                                                       federal, county, and other publicly                  reporting requirements and metrics,                   et seq.
                                                       owned MS4s                                           reorganization of certain requirements
                                                                                                                                                                    Dated: April 4, 2016.
                                                    MAR043000—Non-traditional                               for clarity, and extension of deadlines
                                                                                                            for certain required tasks and reports                H. Curtis Spalding,
                                                       transportation MS4s                                                                                        Regional Administrator, Region 1.
                                                                                                            within the permit.
                                                       While these are technically distinct                                                                       [FR Doc. 2016–08503 Filed 4–12–16; 8:45 am]
                                                    permits, for convenience they have been                 Obtaining Authorization
                                                                                                                                                                  BILLING CODE 6560–50–P
                                                    grouped into a single document and this                    In order for a small MS4 operator to
                                                    document refers to the ‘‘permit’’ in the                obtain authorization to discharge, it
                                                    singular. The final general permit,                     must submit a complete and accurate                   ENVIRONMENTAL PROTECTION
                                                    appendices and attachments, as well as                  NOI containing the information in                     AGENCY
                                                    response to comments on the draft                       Appendix E of the general permit. The
                                                    permit and supplemental fact sheet                                                                            [EPA–HQ–OW–2015–0335; FRL–9944–91–
                                                                                                            NOI must be submitted on or before                    OW]
                                                    information are available at http://                    September 29, 2017 (90 days from the
                                                    www.epa.gov/region1/npdes/                              effective date of the final permit). A                Extension of Public Comment Period
                                                    stormwater/MS4_MA.html.                                 small MS4 operator must meet the                      for the Draft EPA–USGS Technical
                                                       The conditions in the general permit                 eligibility requirements of the general               Report: Protecting Aquatic Life From
                                                    are established pursuant to Clean Water                 permit found in Part 1.2 and Part 1.9                 Effects of Hydrologic Alteration
                                                    Act (CWA) section 402(p)(3)(iii) to                     prior to submission of its NOI. A small
                                                    ensure that pollutant discharges from                   MS4 operator will be authorized to                    AGENCY: Environmental Protection
                                                    small MS4s are reduced to the                           discharge under the permit upon receipt               Agency (EPA).
                                                    Maximum Extent Practicable (MEP),                       of written notice from EPA following a                ACTION: Notice; extension of comment
                                                    protect water quality, and satisfy the                  public notice of the submitted NOI. EPA               period.
                                                    appropriate requirements of the CWA.                    will authorize the discharge, request
                                                    Further information on the requirements                 additional information, or require the                SUMMARY:   The Environmental Protection
                                                    of the permit related to MEP and water                  small MS4 to apply for an alternative                 Agency (EPA) is extending the comment
                                                    quality may be found in EPA’s Response                  permit or an individual permit. NOIs                  period for the draft technical report:
                                                    to Comments document on the above                       may be submitted electronically to EPA                Protecting Aquatic Life from Effects of
                                                    Web site.                                               at stormwater.reports@epa.gov or sent                 Hydrologic Alteration. In response to
                                                       EPA issued a final general permit to                 via regular or overnight mail to: United              stakeholder requests, the comment
                                                    address stormwater discharges from                      States Environmental Protection                       period will be extended for an
                                                    small MS4s in Massachusetts and New                     Agency, Stormwater and Construction                   additional 45 days, from May 3, 2016 to
                                                    Hampshire on May 1, 2003. The 2003                      Permits Section OEP 06–1, 5 Post Office               June 17, 2016.
                                                    general permit required small MS4                       Square—Suite 100, Boston,                             DATES: Comments must be received on
                                                    operators to develop and implement a                    Massachusetts 02109–3912. A copy of                   or before June 17, 2016.
                                                    Stormwater Management Program                           the NOI shall also be sent to MassDEP                 ADDRESSES: Submit your comments,
                                                    (SWMP) designed to control pollutants                   at the following address: Massachusetts               identified by Docket ID No. EPA–HQ–
                                                    to the maximum extent practicable and                   Department of Environmental                           OW–2015–0335, to the Federal
                                                    protect water quality. This final general               Protection, One Winter Street—5th                     eRulemaking Portal: http://
                                                    permit for Massachusetts MS4s builds                    Floor, Boston, Massachusetts 02108                    www.regulations.gov. Follow the online
                                                    on the requirements of the 2003 general                 ATTN: Frederick Civian, Stormwater                    instructions for submitting comments.
                                                    permit. During 2010, EPA drafted two                                                                          Once submitted, comments cannot be
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                            Coordinator.
                                                    separate Small MS4 general permits to                                                                         edited or withdrawn. EPA may publish
                                                    replace the 2003 Small MS4 permit for                   Other Legal Requirements                              any comment received to its public
                                                    eligible operators located in                             In accordance with the Endangered                   docket. Do not submit electronically any
                                                    Massachusetts; one for operators located                Species Act (ESA), EPA has updated the                information you consider to be
                                                    in the North Coastal watershed and the                  provisions and necessary actions and                  Confidential Business Information (CBI)
                                                    other for those located in the Interstate,              documentation related to potential                    or other information whose disclosure is
                                                    Merrimack and South Coastal                             impacts to endangered species from                    restricted by statute. Multimedia
                                                    watersheds. Based on comments and                       discharges and related actions under the              submissions (audio, video, etc.) must be


                                               VerDate Sep<11>2014   17:41 Apr 12, 2016   Jkt 238001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\13APN1.SGM   13APN1



Document Created: 2016-04-13 03:10:46
Document Modified: 2016-04-13 03:10:46
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability of final NPDES general permit.
DatesThe Massachusetts small MS4 general permit shall be effective on July 1, 2017 and will expire at midnight on June 30, 2022. In accordance with 40 CFR part 23, this permit shall be considered issued for the purpose of judicial review at 1:00 p.m. eastern standard time on April 27, 2016. Under section 509(b) of the Clean Water Act, judicial review of this general permit can be requested by filing a petition for review in the United States Court of Appeals within 120 days after the permit is considered issued. Under section 509(b)(2) of the Clean Water Act, the requirements in this permit may not be challenged later in civil or criminal proceedings to enforce these requirements. In addition, this permit may not be challenged in other agency proceedings.
ContactNewton Tedder, Stormwater and Construction Permits Section OEP 06-4, Environmental Protection Agency, 5 Post Office Square--Suite 100, Boston, Massachusetts 02109-3912; 617- 918-1038; [email protected]
FR Citation81 FR 21862 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR