81_FR_2216 81 FR 2206 - Cameron LNG, LLC; Notice of Schedule for Environmental Review of the Cameron LNG Terminal Expansion Project

81 FR 2206 - Cameron LNG, LLC; Notice of Schedule for Environmental Review of the Cameron LNG Terminal Expansion Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 10 (January 15, 2016)

Page Range2206-2206
FR Document2016-00703

Federal Register, Volume 81 Issue 10 (Friday, January 15, 2016)
[Federal Register Volume 81, Number 10 (Friday, January 15, 2016)]
[Notices]
[Page 2206]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-00703]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-560-000]


Cameron LNG, LLC; Notice of Schedule for Environmental Review of 
the Cameron LNG Terminal Expansion Project

    On September 28, 2015, Cameron LNG, LLC filed an application in 
Docket No. CP15-560-000 requesting Authorization pursuant to section 3 
of the Natural Gas Act to construct and operate certain liquefied 
natural gas (LNG) facilities at the existing Cameron LNG Terminal. The 
proposed project is known as the Cameron LNG Terminal Expansion Project 
(Project), and would increase the terminal's capability to liquefy 
natural gas for export by 515 billion cubic feet per year.
    On October 13, 2015, the Federal Energy Regulatory Commission 
(Commission or FERC) issued its Notice of Application for the Project. 
Among other things, that notice alerted agencies issuing federal 
authorizations of the requirement to complete all necessary reviews and 
to reach a final decision on a request for a federal authorization 
within 90 days of the date of issuance of the Commission staff's 
Environmental Assessment (EA) for the Project. This instant notice 
identifies the FERC staff's planned schedule for the completion of the 
EA for the Project.

Schedule for Environmental Review

Issuance of EA--February 12, 2016
90-day Federal Authorization Decision Deadline--May 12, 2016

    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
Project's progress.

Project Description

    Cameron LNG, LLC's Project would add an additional LNG storage tank 
(Tank 5) and two new systems to liquefy natural gas (Trains 4 and 5) to 
its existing LNG Terminal in Cameron and Calcasieu Parishes, Louisiana. 
No construction would occur outside of the existing terminal and no new 
shipping is proposed as a result of this Project.

Background

    On June 18, 2015, the Commission issued a Notice of Intent to 
Prepare an Environmental Assessment for the Planned Cameron LNG 
Expansion Project and Request for Comments on Environmental Issues 
(NOI). The NOI was issued during the pre-filing review of the Project 
in Docket No. PF15-13-000 and was sent to affected landowners; federal, 
state, and local government agencies; elected officials; environmental 
and public interest groups; Native American tribes; other interested 
parties; and local libraries and newspapers. In response to the NOI, 
the Commission received comments from the U.S. Environmental Protection 
Agency (EPA). The primary issues raised by the EPA are alternatives, 
groundwater and water impacts, wildlife and habitat impacts, air 
quality, hazardous materials, tribal and state historic preservation 
office consultation, and environmental justice.
    The U.S. Department of Transportation and U.S. Department of Energy 
are cooperating agencies in the preparation of the EA.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC Web site (www.ferc.gov). Using the ``eLibrary'' link, select 
``General Search'' from the eLibrary menu, enter the selected date 
range and ``Docket Number'' excluding the last three digits (i.e., 
CP15-560), and follow the instructions. For assistance with access to 
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC 
Web site also provides access to the texts of formal documents issued 
by the Commission, such as orders, notices, and rule makings.

    Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-00703 Filed 1-14-16; 8:45 am]
BILLING CODE 6717-01-P



                                                  2206                            Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Notices

                                                           Milestone                    Target date       Schedule for Environmental Review                      site (www.ferc.gov). Using the
                                                                                                          Issuance of EA—February 12, 2016                       ‘‘eLibrary’’ link, select ‘‘General Search’’
                                                  Notice of Acceptance/No-         February 2016.
                                                                                                          90-day Federal Authorization Decision                  from the eLibrary menu, enter the
                                                     tice of Ready for Envi-                                                                                     selected date range and ‘‘Docket
                                                     ronmental Analysis.                                     Deadline—May 12, 2016
                                                                                                                                                                 Number’’ excluding the last three digits
                                                  Filing of recommendations,       April 2016.               If a schedule change becomes                        (i.e., CP15–560), and follow the
                                                     preliminary terms and                                necessary, additional notice will be                   instructions. For assistance with access
                                                     conditions, and fishway                              provided so that the relevant agencies
                                                     prescriptions.                                                                                              to eLibrary, the helpline can be reached
                                                                                                          are kept informed of the Project’s                     at (866) 208–3676, TTY (202) 502–8659,
                                                  Commission issues EA ......      August 2016.           progress.
                                                  Comments on EA ..............    September                                                                     or at FERCOnlineSupport@ferc.gov. The
                                                                                     2016.                Project Description                                    eLibrary link on the FERC Web site also
                                                  Modified Terms and Condi-        November 2016.
                                                                                                             Cameron LNG, LLC’s Project would                    provides access to the texts of formal
                                                    tions.                                                                                                       documents issued by the Commission,
                                                  Commission Issues Final          February 2017.         add an additional LNG storage tank
                                                                                                          (Tank 5) and two new systems to liquefy                such as orders, notices, and rule
                                                    EA, if necessary.                                                                                            makings.
                                                                                                          natural gas (Trains 4 and 5) to its
                                                                                                          existing LNG Terminal in Cameron and                     Dated: January 11, 2016.
                                                    o. Final amendments to the
                                                  application must be filed with the                      Calcasieu Parishes, Louisiana. No                      Nathaniel J. Davis, Sr.,
                                                  Commission no later than 30 days from                   construction would occur outside of the                Deputy Secretary.
                                                  the issuance date of the notice of ready                existing terminal and no new shipping                  [FR Doc. 2016–00703 Filed 1–14–16; 8:45 am]
                                                  for environmental analysis.                             is proposed as a result of this Project.               BILLING CODE 6717–01–P

                                                    Dated: January 11, 2016.                              Background
                                                  Nathaniel J. Davis, Sr.,                                   On June 18, 2015, the Commission                    DEPARTMENT OF ENERGY
                                                  Deputy Secretary.                                       issued a Notice of Intent to Prepare an
                                                  [FR Doc. 2016–00710 Filed 1–14–16; 8:45 am]             Environmental Assessment for the                       Federal Energy Regulatory
                                                  BILLING CODE 6717–01–P                                  Planned Cameron LNG Expansion                          Commission
                                                                                                          Project and Request for Comments on
                                                                                                          Environmental Issues (NOI). The NOI                    Combined Notice of Filings #2
                                                  DEPARTMENT OF ENERGY                                    was issued during the pre-filing review                   Take notice that the Commission
                                                                                                          of the Project in Docket No. PF15–13–                  received the following exempt
                                                  Federal Energy Regulatory                               000 and was sent to affected
                                                  Commission                                                                                                     wholesale generator filings:
                                                                                                          landowners; federal, state, and local
                                                                                                                                                                    Docket Numbers: EG16–36–000.
                                                                                                          government agencies; elected officials;
                                                                                                                                                                    Applicants: Kingbird Solar A, LLC.
                                                  [Docket No. CP15–560–000]                               environmental and public interest
                                                                                                                                                                    Description: Notice of Self-
                                                                                                          groups; Native American tribes; other
                                                  Cameron LNG, LLC; Notice of                                                                                    Certification of Exempt Wholesale
                                                                                                          interested parties; and local libraries
                                                  Schedule for Environmental Review of                                                                           Generator Status of Kingbird Solar A,
                                                                                                          and newspapers. In response to the NOI,
                                                  the Cameron LNG Terminal Expansion                                                                             LLC.
                                                                                                          the Commission received comments
                                                  Project                                                                                                           Filed Date: 1/11/16.
                                                                                                          from the U.S. Environmental Protection                    Accession Number: 20160111–5267.
                                                                                                          Agency (EPA). The primary issues                          Comments Due: 5 p.m. ET 2/1/16.
                                                     On September 28, 2015, Cameron                       raised by the EPA are alternatives,
                                                  LNG, LLC filed an application in Docket                 groundwater and water impacts,                            Docket Numbers: EG16–37–000.
                                                  No. CP15–560–000 requesting                             wildlife and habitat impacts, air quality,                Applicants: Kingbird Solar B, LLC.
                                                  Authorization pursuant to section 3 of                  hazardous materials, tribal and state                     Description: Notice of Self-
                                                  the Natural Gas Act to construct and                    historic preservation office consultation,             Certification of Exempt Wholesale
                                                  operate certain liquefied natural gas                   and environmental justice.                             Generator Status of Kingbird Solar B,
                                                  (LNG) facilities at the existing Cameron                   The U.S. Department of                              LLC.
                                                  LNG Terminal. The proposed project is                                                                             Filed Date: 1/11/16.
                                                                                                          Transportation and U.S. Department of
                                                  known as the Cameron LNG Terminal                                                                                 Accession Number: 20160111–5271.
                                                                                                          Energy are cooperating agencies in the
                                                  Expansion Project (Project), and would                                                                            Comments Due: 5 p.m. ET 2/1/16.
                                                                                                          preparation of the EA.
                                                  increase the terminal’s capability to                                                                             Take notice that the Commission
                                                  liquefy natural gas for export by 515                   Additional Information                                 received the following electric rate
                                                  billion cubic feet per year.                               In order to receive notification of the             filings:
                                                     On October 13, 2015, the Federal                     issuance of the EA and to keep track of                   Docket Numbers: ER16–38–001.
                                                  Energy Regulatory Commission                            all formal issuances and submittals in                    Applicants: Kingbird Solar A, LLC.
                                                  (Commission or FERC) issued its Notice                  specific dockets, the Commission offers                   Description: Compliance filing:
                                                  of Application for the Project. Among                   a free service called eSubscription. This              Application for Initial Market-Based
                                                  other things, that notice alerted agencies              can reduce the amount of time you                      Rate Tariff and Granting Certain
                                                  issuing federal authorizations of the                   spend researching proceedings by                       Waivers to be effective 1/12/2016.
                                                  requirement to complete all necessary                   automatically providing you with                          Filed Date: 1/11/16.
                                                                                                                                                                    Accession Number: 20160111–5265.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  reviews and to reach a final decision on                notification of these filings, document
                                                  a request for a federal authorization                   summaries, and direct links to the                        Comments Due: 5 p.m. ET 2/1/16.
                                                  within 90 days of the date of issuance                  documents. Go to www.ferc.gov/docs-                       Docket Numbers: ER16–705–001.
                                                  of the Commission staff’s Environmental                 filing/esubscription.asp.                                 Applicants: RE Garland LLC.
                                                  Assessment (EA) for the Project. This                      Additional information about the                       Description: Tariff Amendment:
                                                  instant notice identifies the FERC staff’s              Project is available from the                          Amendment to Application and Initial
                                                  planned schedule for the completion of                  Commission’s Office of External Affairs                Tariff Filing to be effective 2/12/2016.
                                                  the EA for the Project.                                 at (866) 208–FERC or on the FERC Web                      Filed Date: 1/11/16.


                                             VerDate Sep<11>2014   20:01 Jan 14, 2016   Jkt 238001   PO 00000   Frm 00047   Fmt 4703   Sfmt 4703   E:\FR\FM\15JAN1.SGM   15JAN1



Document Created: 2018-02-02 12:32:20
Document Modified: 2018-02-02 12:32:20
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 2206 

2025 Federal Register | Disclaimer | Privacy Policy