DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 10 (January 15, 2016)

Page Range2207-2208
FR Document2016-00706

Federal Register, Volume 81 Issue 10 (Friday, January 15, 2016)
[Federal Register Volume 81, Number 10 (Friday, January 15, 2016)]
[Notices]
[Pages 2207-2208]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-00706]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2512-075]


Hawks Nest Hydro, LLC; Notice of Application Tendered for Filing 
With the Commission and Establishing Procedural Schedule for Licensing 
and Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2512-075.
    c. Date Filed: December 29, 2015.
    d. Applicant: Hawks Nest Hydro, LLC (Hawks Nest Hydro).
    e. Name of Project: Hawks Nest Hydroelectric Project.
    f. Location: The existing project is located on the New River, in 
Fayette County, West Virginia. The project does not occupy any federal 
lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Steven Murphy, Manager, Licensing, Brookfield 
Renewable Energy Group, 33 West 1st Street South, Fulton, New York 
13069; Telephone (315) 598-6130.
    i. FERC Contact: Monir Chowdhury, (202) 502-6736 or 
[email protected].
    j. This application is not ready for environmental analysis at this 
time.
    k. Project Description: The existing Hawks Nest Hydroelectric 
Project consists of: (1) A 948-foot-long concrete gravity dam with a 
crest elevation of 795.0 feet National Geodetic Vertical Datum of 1929 
(NGVD29); (2) 14 ogee-type spillway bays extending almost the entire 
length of the dam, each with a 25-foot-high by 50-foot-wide Stoney-type 
steel lift gate and separated by a 9-foot-wide concrete pier; (3) a 
243-acre reservoir with a gross storage capacity of 7,323 acre-feet at 
a normal pool elevation of 819.9 feet NGVD29; (4) an intake structure 
located at the right shoreline (looking downstream) of the reservoir 
just upstream of the dam and consisting of a 110-foot-wide by 50-foot-
high trashrack structure and a Stoney-type 42-foot-high by 50-foot-wide 
bulkhead intake gate that sits back approximately 50 feet from the 
opening where the trashrack is located; (5) a 16,240-foot-long tunnel 
that runs along the right side of the river to convey water from the 
intake to the powerhouse downstream of the New River; (6) a 600-foot-
long by 170-foot-wide surge basin located at a point on the tunnel 
approximately 60 percent of the distance from the intake to the 
powerhouse; (7) a 116-foot-diameter and 56-foot-high differential surge 
tank located at the downstream end of the tunnel and before the 
powerhouse; (8) a 210-foot-long by 74.5-foot-wide powerhouse containing 
four turbine-generator units, each with a rated capacity of 
approximately 25.5 megawatts; (9) two parallel approximately 5.5-mile-
long, 69-kilovolt transmission lines; and (10) appurtenant facilities.
    Hawks Nest Hydro operates the project in a run-of-river mode. The 
existing license (Article 402) requires that the project release a 
continuous minimum flow of 100 cubic feet per second into the bypassed 
reach between the dam and the powerhouse. Hawks Nest Hydro proposes to 
continue run-of-river operation and a modified minimum flow schedule 
for the bypassed reach. The project generates an annual average of 
544,253 megawatt-hours.
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at http://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC Online Support at [email protected] 
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural Schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule may be made as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready     February 2016.
 for Environmental Analysis.
Filing of recommendations, preliminary   April 2016.
 terms and conditions, and fishway
 prescriptions.
Commission issues EA...................  August 2016.
Comments on EA.........................  September 2016.

[[Page 2208]]

 
Modified Terms and Conditions..........  November 2016.
Commission Issues Final EA, if           February 2017.
 necessary.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-00706 Filed 1-14-16; 8:45 am]
BILLING CODE 6717-01-P



                                                                                 Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Notices                                                   2207

                                                     Accession Number: 20160111–5311.                     DEPARTMENT OF ENERGY                                   located at a point on the tunnel
                                                     Comments Due: 5 p.m. ET 2/1/16.                                                                             approximately 60 percent of the
                                                                                                          Federal Energy Regulatory                              distance from the intake to the
                                                     Docket Numbers: ER16–706–001.
                                                                                                          Commission                                             powerhouse; (7) a 116-foot-diameter and
                                                     Applicants: RE Garland A LLC.
                                                                                                          [Project No. 2512–075]                                 56-foot-high differential surge tank
                                                     Description: Tariff Amendment:                                                                              located at the downstream end of the
                                                  Amendment to Application and Initial                                                                           tunnel and before the powerhouse; (8) a
                                                  Tariff Filing to be effective 2/12/2016.                Hawks Nest Hydro, LLC; Notice of
                                                                                                          Application Tendered for Filing With                   210-foot-long by 74.5-foot-wide
                                                     Filed Date: 1/11/16.                                                                                        powerhouse containing four turbine-
                                                                                                          the Commission and Establishing
                                                     Accession Number: 20160111–5312.                     Procedural Schedule for Licensing and                  generator units, each with a rated
                                                     Comments Due: 5 p.m. ET 2/1/16.                      Deadline for Submission of Final                       capacity of approximately 25.5
                                                     Docket Numbers: ER16–708–000.                        Amendments                                             megawatts; (9) two parallel
                                                     Applicants: Calpine Energy Services,                                                                        approximately 5.5-mile-long, 69-kilovolt
                                                                                                            Take notice that the following                       transmission lines; and (10) appurtenant
                                                  L.P.
                                                                                                          hydroelectric application has been filed               facilities.
                                                     Description: Request for Limited                     with the Commission and is available
                                                  Waiver and Shortened Comment Period                                                                               Hawks Nest Hydro operates the
                                                                                                          for public inspection.                                 project in a run-of-river mode. The
                                                  of Calpine Energy Services, L.P.                          a. Type of Application: New Major
                                                     Filed Date: 1/8/16.                                                                                         existing license (Article 402) requires
                                                                                                          License.
                                                     Accession Number: 20160108–5278.                                                                            that the project release a continuous
                                                                                                            b. Project No.: 2512–075.
                                                                                                            c. Date Filed: December 29, 2015.                    minimum flow of 100 cubic feet per
                                                     Comments Due: 5 p.m. ET 1/19/16.
                                                                                                            d. Applicant: Hawks Nest Hydro, LLC                  second into the bypassed reach between
                                                     Docket Numbers: ER16–710–000.                                                                               the dam and the powerhouse. Hawks
                                                                                                          (Hawks Nest Hydro).
                                                     Applicants: Arizona Public Service                                                                          Nest Hydro proposes to continue run-of-
                                                                                                            e. Name of Project: Hawks Nest
                                                  Company.                                                                                                       river operation and a modified
                                                                                                          Hydroelectric Project.
                                                     Description: Section 205(d) Rate                       f. Location: The existing project is                 minimum flow schedule for the
                                                  Filing: Service Agreement No. 219—                      located on the New River, in Fayette                   bypassed reach. The project generates
                                                  Amendment 2 to be effective 1/1/2016.                   County, West Virginia. The project does                an annual average of 544,253 megawatt-
                                                     Filed Date: 1/11/16.                                 not occupy any federal lands.                          hours.
                                                     Accession Number: 20160111–5297.                       g. Filed Pursuant to: Federal Power                     l. Locations of the Application: A
                                                     Comments Due: 5 p.m. ET 2/1/16.                      Act, 16 U.S.C. 791 (a)–825(r).                         copy of the application is available for
                                                     Docket Numbers: ER16–711–000.                          h. Applicant Contact: Steven Murphy,                 review at the Commission in the Public
                                                                                                          Manager, Licensing, Brookfield                         Reference Room or may be viewed on
                                                     Applicants: Pio Pico Energy Center,
                                                                                                          Renewable Energy Group, 33 West 1st                    the Commission’s Web site at http://
                                                  LLC.
                                                                                                          Street South, Fulton, New York 13069;                  www.ferc.gov using the ‘‘eLibrary’’ link.
                                                     Description: Baseline eTariff Filing:                                                                       Enter the docket number excluding the
                                                                                                          Telephone (315) 598–6130.
                                                  Application for MBR to be effective                                                                            last three digits in the docket number
                                                                                                            i. FERC Contact: Monir Chowdhury,
                                                  3/1/2016.                                                                                                      field to access the document. For
                                                                                                          (202) 502–6736 or monir.chowdhury@
                                                     Filed Date: 1/11/16.                                 ferc.gov.                                              assistance, contact FERC Online
                                                     Accession Number: 20160111–5304.                       j. This application is not ready for                 Support at FERCOnlineSupport@
                                                     Comments Due: 5 p.m. ET 2/1/16.                      environmental analysis at this time.                   ferc.gov or toll-free at 1–866–208–3676,
                                                     The filings are accessible in the                      k. Project Description: The existing                 or for TTY, (202) 502–8659. A copy is
                                                  Commission’s eLibrary system by                         Hawks Nest Hydroelectric Project                       also available for inspection and
                                                  clicking on the links or querying the                   consists of: (1) A 948-foot-long concrete              reproduction at the address in item (h)
                                                  docket number.                                          gravity dam with a crest elevation of                  above.
                                                     Any person desiring to intervene or                  795.0 feet National Geodetic Vertical                     m. You may also register online at
                                                  protest in any of the above proceedings                 Datum of 1929 (NGVD29); (2) 14 ogee-                   http://www.ferc.gov/docs-filing/
                                                  must file in accordance with Rules 211                  type spillway bays extending almost the                esubscription.asp to be notified via
                                                  and 214 of the Commission’s                             entire length of the dam, each with a 25-              email of new filings and issuances
                                                  Regulations (18 CFR 385.211 and                         foot-high by 50-foot-wide Stoney-type                  related to this or other pending projects.
                                                  385.214) on or before 5:00 p.m. Eastern                 steel lift gate and separated by a 9-foot-             For assistance, contact FERC Online
                                                  time on the specified comment date.                     wide concrete pier; (3) a 243-acre                     Support.
                                                  Protests may be considered, but                         reservoir with a gross storage capacity of                n. Procedural Schedule: The
                                                  intervention is necessary to become a                   7,323 acre-feet at a normal pool                       application will be processed according
                                                  party to the proceeding.                                elevation of 819.9 feet NGVD29; (4) an                 to the following preliminary Hydro
                                                     eFiling is encouraged. More detailed                 intake structure located at the right                  Licensing Schedule. Revisions to the
                                                  information relating to filing                          shoreline (looking downstream) of the                  schedule may be made as appropriate.
                                                  requirements, interventions, protests,                  reservoir just upstream of the dam and
                                                  service, and qualifying facilities filings              consisting of a 110-foot-wide by 50-foot-                       Milestone                Target date
                                                  can be found at: http://www.ferc.gov/                   high trashrack structure and a Stoney-
                                                                                                          type 42-foot-high by 50-foot-wide                      Notice of Acceptance/No-        February 2016.
                                                  docs-filing/efiling/filing-req.pdf. For
                                                                                                                                                                    tice of Ready for Envi-
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  other information, call (866) 208–3676                  bulkhead intake gate that sits back
                                                                                                          approximately 50 feet from the opening                    ronmental Analysis.
                                                  (toll free). For TTY, call (202) 502–8659.                                                                     Filing of recommendations,      April 2016.
                                                                                                          where the trashrack is located; (5) a
                                                    Dated: January 11, 2016.                                                                                        preliminary terms and
                                                                                                          16,240-foot-long tunnel that runs along                   conditions, and fishway
                                                  Nathaniel J. Davis, Sr.,                                the right side of the river to convey                     prescriptions.
                                                  Deputy Secretary.                                       water from the intake to the powerhouse                Commission issues EA ......     August 2016.
                                                  [FR Doc. 2016–00702 Filed 1–14–16; 8:45 am]             downstream of the New River; (6) a 600-                Comments on EA ..............   September
                                                  BILLING CODE 6717–01–P                                  foot-long by 170-foot-wide surge basin                                                   2016.



                                             VerDate Sep<11>2014   20:01 Jan 14, 2016   Jkt 238001   PO 00000   Frm 00048   Fmt 4703   Sfmt 4703   E:\FR\FM\15JAN1.SGM   15JAN1


                                                  2208                           Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Notices

                                                           Milestone                    Target date       described in item l below. Cooperating                 topped with flashboards ranging from 6
                                                                                                          agencies should note the Commission’s                  to 8 inches in height and (ii) a 160-foot-
                                                  Modified Terms and Condi-        November 2016.         policy that agencies that cooperate in                 long overflow section with an ice sluice
                                                    tions.                                                the preparation of the environmental                   opening; (2) a 4-acre reservoir with a
                                                  Commission Issues Final          February 2017.         document cannot also intervene. See, 94                storage capacity of 27.9 acre-feet at a
                                                    EA, if necessary.                                     FERC ¶ 61,076 (2001).                                  normal elevation of 769.6 feet NAVD 88;
                                                                                                             k. Pursuant to section 4.32(b)(7) of the            (3) an intake structure with a steel trash
                                                    o. Final amendments to the                            Commission’s regulations, if any                       rack, integral with a powerhouse
                                                  application must be filed with the                      resource agency, Indian Tribe, or person               containing two 500-kW turbine and
                                                  Commission no later than 30 days from                   believes that an additional scientific                 generator units; (4) a tailrace; (5) a 250-
                                                  the issuance date of the notice of ready                study should be conducted in order to                  foot-long, 2.4-kV transmission line
                                                  for environmental analysis.                             form an adequate factual basis for a                   connected to the Upper Beaver Falls
                                                    Dated: January 11, 2016.                              complete analysis of the application on                powerhouse; and (6) appurtenant
                                                  Nathaniel J. Davis, Sr.,                                its merit, the resource agency, Indian                 facilities. The project generates about
                                                  Deputy Secretary.                                       Tribe, or person must file a request for               5,617 MWh annually.
                                                  [FR Doc. 2016–00706 Filed 1–14–16; 8:45 am]             a study with the Commission not later                     The Lower Beaver Falls Project is
                                                                                                          than 60 days from the date of filing of                located approximately 600 feet
                                                  BILLING CODE 6717–01–P
                                                                                                          the application, and serve a copy of the               downstream of the Upper Beaver Falls
                                                                                                          request on the applicant.                              Project. The dams and existing project
                                                  DEPARTMENT OF ENERGY                                       l. Deadline for filing additional study
                                                                                                                                                                 facilities for both projects are owned by
                                                                                                          requests and requests for cooperating
                                                                                                                                                                 the applicant. The applicant proposes
                                                  Federal Energy Regulatory                               agency status: February 28, 2016.
                                                                                                             The Commission strongly encourages                  no new project facilities or operational
                                                  Commission                                                                                                     changes, but proposes that both projects
                                                                                                          electronic filing. Please file additional
                                                  [Project Nos. 2593–031; 2823–020]                       study requests and requests for                        be combined under a single license.
                                                                                                          cooperating agency status using the                       o. A copy of the application is
                                                  Algonquin Power (Beaver Falls), LLC;                    Commission’s eFiling system at http://                 available for review at the Commission
                                                  Notice of Application Tendered for                      www.ferc.gov/docs-filing/efiling.asp. For              in the Public Reference Room or may be
                                                  Filing With the Commission and                          assistance, please contact FERC Online                 viewed on the Commission’s Web site at
                                                  Soliciting Additional Study Requests                    Support at FERCOnlineSupport@                          http://www.ferc.gov using the
                                                  and Establishing Procedural Schedule                    ferc.gov, (866) 208–3676 (toll free), or               ‘‘eLibrary’’ link. Enter one of the docket
                                                  for Relicensing and a Deadline for                      (202) 502–8659 (TTY). In lieu of                       numbers excluding the last three digits
                                                  Submission of Final Amendments                          electronic filing, please send a paper                 in the docket number field to access the
                                                    Take notice that the following                        copy to: Secretary, Federal Energy                     document. For assistance, please contact
                                                  hydroelectric application has been filed                Regulatory Commission, 888 First Street                FERC Online Support at
                                                  with the Commission and is available                    NE., Washington, DC 20426. The first                   FERCOnlineSupport@ferc.gov, (866)
                                                  for public inspection.                                  page of any filing should include docket               208–3676 (toll free), or (202) 502–8659
                                                    a. Type of Application: New Major                     numbers P–2593–031 and P–2823–020.                     (TTY). A copy is also available for
                                                  License.                                                   m. The application is not ready for                 inspection and reproduction at the
                                                    b. Project Nos.: 2593–031 and 2823–                   environmental analysis at this time.                   address in item (h) above.
                                                  020.                                                       n. The existing project works are as                   You may also register online at
                                                    c. Date filed: December 30, 2015.                     follows:                                               http://www.ferc.gov/docs-filing/
                                                    d. Applicant: Algonquin Power                            The Upper Beaver Falls Project                      esubscription.asp to be notified via
                                                  (Beaver Falls), LLC.                                    consists of: (1) A 328-foot-long, 25-foot-             email of new filings and issuances
                                                    e. Name of Projects: Upper Beaver                     high concrete gravity dam with an                      related to these or other pending
                                                  Falls and Lower Beaver Falls projects.                  uncontrolled overflow spillway; (2) a                  projects. For assistance, contact FERC
                                                    f. Location: On the Beaver River, in                  48-acre reservoir with a storage capacity              Online Support.
                                                  the towns of Croghan and New Bremen,                    of 800 acre-feet at elevation 799.4 feet
                                                                                                                                                                    p. Procedural Schedule: The
                                                  Lewis County, New York. The project                     North American Vertical Datum of 1988
                                                                                                                                                                 application will be processed according
                                                  does not occupy lands of the United                     (NAVD 88); (3) a 17-foot-high, 26.5-foot-
                                                                                                                                                                 to the following preliminary Hydro
                                                  States.                                                 wide, 27.5-foot-long intake structure
                                                                                                                                                                 Licensing Schedule. Revisions to the
                                                    g. Filed Pursuant to: Federal Power                   with a steel trash rack; (4) a 90-foot-
                                                                                                                                                                 schedule will be made as appropriate.
                                                  Act 16 U.S.C. 791 (a)–825(r).                           long, 16-foot-wide, 8-foot-high concrete
                                                    h. Applicant Contact: Robert A. Gates,                penstock; (5) a powerhouse containing                  Issue Deficiency Letter (if necessary)—
                                                                                                                                                                    February 2016
                                                  Executive Vice President, Eagle Creek                   one turbine-generator with a nameplate                 Request Additional Information—February
                                                  Renewable Energy, 65 Madison Avenue,                    rating of 1,500 kilowatts (kW); (6) a                     2016
                                                  Suite 500, Morristown, New Jersey                       tailrace excavated in the riverbed; (7) a              Issue Acceptance Letter—May 2016
                                                  07960; (973) 998–8400; bob.gates@                       2,120-foot-long, 2.4-kilovolt (kV)                     Issue Scoping Document 1 for comments—
                                                  eaglecreekre.com.                                       overhead transmission line connecting                     May 2016
                                                    i. FERC Contact: Andy Bernick, (202)                  to an existing National Grid substation;               Request Additional Information (if
                                                  502–8660 or andrew.bernick@ferc.gov.                    and (8) other appurtenances. The project                  necessary)—July 2016
                                                                                                                                                                 Issue Scoping Document 2—September 2016
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                    j. Cooperating agencies: Federal, state,              generates about 8,685 megawatt-hours
                                                  local, and tribal agencies with                         (MWh) annually.                                        Issue notice of ready for environmental
                                                  jurisdiction and/or special expertise                      The Lower Beaver Falls Hydroelectric                   analysis—September 2016
                                                                                                                                                                 Commission issues EA, draft EA, or draft
                                                  with respect to environmental issues                    Project consists of: (1) A 400-foot-long                  EIS—March 2017
                                                  that wish to cooperate in the                           concrete gravity dam with a maximum                    Comments on EA, draft EA, or draft EIS—
                                                  preparation of the environmental                        height of 14 feet, including: (i) A 240-                  April 2017
                                                  document should follow the                              foot-long non-overflow section                         Commission issues final EA or EIS—June
                                                  instructions for filing such requests                   containing an 8-foot-wide spillway                        2017



                                             VerDate Sep<11>2014   20:01 Jan 14, 2016   Jkt 238001   PO 00000   Frm 00049   Fmt 4703   Sfmt 4703   E:\FR\FM\15JAN1.SGM   15JAN1



Document Created: 2018-02-02 12:31:59
Document Modified: 2018-02-02 12:31:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 2207 