81_FR_23367 81 FR 23291 - Texas LNG Brownsville LLC; Notice of Application

81 FR 23291 - Texas LNG Brownsville LLC; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 76 (April 20, 2016)

Page Range23291-23292
FR Document2016-09085

Federal Register, Volume 81 Issue 76 (Wednesday, April 20, 2016)
[Federal Register Volume 81, Number 76 (Wednesday, April 20, 2016)]
[Notices]
[Pages 23291-23292]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-09085]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP16-116-000; PF15-14-000]


Texas LNG Brownsville LLC; Notice of Application

    Take notice that on March 31, 2016, Texas LNG Brownsville LLC 
(Texas LNG), 2800 North Loop West, Suite 910, Houston, Texas 77092, 
filed an application pursuant to section 3(a) of the Natural Gas Act 
(NGA) and Part 153 of the Commission's Regulations, requesting 
authorization to site, construct, modify, and operate a new liquefied 
natural gas export terminal (Texas LNG Project) located in the Port of 
Brownsville, Texas. The filing may be viewed on the web at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
[email protected] or call toll-free (886) 208-3676 or TYY 
(202) 502-8659.
    Any questions regarding this application should be directed to 
Langtry Meyer, Chief Operating Officer, Texas LNG Brownsville LLC, 2800 
North Loop West, Suite 910, Houston, Texas 77092, telephone (832) 849-
4920, or email [email protected].
    Specifically, Texas LNG proposes to construct two 2 million ton per 
annum liquefaction trains; two single containment, 210,000 cubic meter 
capacity, storage tanks; one LNG carrier berth and dredged maneuvering 
basin; and all necessary ancillary and support facilities. These 
facilities will enable Texas LNG to liquefy and export up to 0.6 
billion cubic feet of natural gas per day. Texas LNG states it will 
receive natural gas via a non-jurisdictional intrastate natural gas 
pipeline.
    On April 14, 2015, the Commission staff granted Texas LNG's request 
to use the National Environmental Policy Act (NEPA) Pre-Filing Process 
and assigned Docket No. PF15-14-000 to staff activities involving the 
proposed facilities. Now, as of the filing of this application on March 
31, 2016, the NEPA Pre-Filing Process for this project has ended. From 
this time forward, this proceeding will be conducted in Docket

[[Page 23292]]

No. CP16-116-000, as noted in the caption of this Notice.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule will serve to 
notify federal and state agencies of the timing for the completion of 
all necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 5 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    Motions to intervene, protests and comments may be filed 
electronically via the internet in lieu of paper; see, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. The Commission strongly encourages 
electronic filings.
    Comment Date: 5:00 p.m. Eastern Time on May 5, 2016.

    Dated: April 14, 2016.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-09085 Filed 4-19-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                          Federal Register / Vol. 81, No. 76 / Wednesday, April 20, 2016 / Notices                                                 23291

                                                Filed Date: 4/13/16.                                    Accession Number: 20160413–5244.                     Dated: April 14, 2016.
                                                Accession Number: 20160413–5258.                        Comments Due: 5 p.m. ET 5/4/16.                    Kimberly D. Bose,
                                                Comments Due: 5 p.m. ET 5/4/16.                         Docket Numbers: ER16–1404–000.                     Secretary.
                                                Take notice that the Commission                         Applicants: New York Independent                   [FR Doc. 2016–09093 Filed 4–19–16; 8:45 am]
                                             received the following exempt                           System Operator, Inc.                                 BILLING CODE 6717–01–P
                                             wholesale generator filings:                               Description: Compliance filing:
                                                Docket Numbers: EG16–87–000.                         Compliance—BSM Rule Renewable and
                                                Applicants: Peak View Wind Energy                    Self Supply Exemptions to be effective                DEPARTMENT OF ENERGY
                                             LLC.                                                    10/9/2015.
                                                Description: Notice of Self-                                                                               Federal Energy Regulatory
                                                                                                        Filed Date: 4/13/16.                               Commission
                                             Certification of Exempt Wholesale                          Accession Number: 20160413–5246.
                                             Generator Status of Peak View Wind                         Comments Due: 5 p.m. ET 5/4/16.                    [Docket Nos. CP16–116–000; PF15–14–000]
                                             Energy LLC.
                                                Filed Date: 4/14/16.                                    Docket Numbers: ER16–1405–000.
                                                                                                                                                           Texas LNG Brownsville LLC; Notice of
                                                Accession Number: 20160414–5055.                        Applicants: Western Spirit Clean Line
                                                                                                                                                           Application
                                                Comments Due: 5 p.m. ET 5/5/16.                      LLC.
                                                Take notice that the Commission                         Description: Application for                          Take notice that on March 31, 2016,
                                             received the following electric rate                    authorization to sell transmission                    Texas LNG Brownsville LLC (Texas
                                             filings:                                                service rights at negotiated rates, request           LNG), 2800 North Loop West, Suite 910,
                                                                                                     for approval of capacity allocation                   Houston, Texas 77092, filed an
                                                Docket Numbers: ER13–1431–001.
                                                                                                     process, and request for waivers of                   application pursuant to section 3(a) of
                                                Applicants: Northampton Generating
                                                                                                     Western Spirit Clean Line LLC.                        the Natural Gas Act (NGA) and Part 153
                                             Company, L.P.
                                                Description: Compliance filing:                         Filed Date: 4/13/16.                               of the Commission’s Regulations,
                                             Informational Filing and Unopposed                         Accession Number: 20160413–5257.                   requesting authorization to site,
                                             Request for Limited Waiver to be                           Comments Due: 5 p.m. ET 5/4/16.                    construct, modify, and operate a new
                                             effective N/A.                                                                                                liquefied natural gas export terminal
                                                                                                        Docket Numbers: ER16–1406–000.
                                                Filed Date: 4/7/16.                                                                                        (Texas LNG Project) located in the Port
                                                                                                        Applicants: Peak View Wind Energy                  of Brownsville, Texas. The filing may be
                                                Accession Number: 20160407–5195.                     LLC.
                                                Comments Due: 5 p.m. ET 4/28/16.                                                                           viewed on the web at http://
                                                                                                        Description: Baseline eTariff Filing:              www.ferc.gov using the ‘‘eLibrary’’ link.
                                                Docket Numbers: ER16–1400–000.                       Application for Market-Based Rate                     Enter the docket number excluding the
                                                Applicants: Golden Fields Solar I,                   Authorization to be effective 6/14/2016.              last three digits in the docket number
                                             LLC.                                                       Filed Date: 4/14/16.                               field to access the document. For
                                                Description: Baseline eTariff Filing:                   Accession Number: 20160414–5047.                   assistance, contact FERC at
                                             Shared Facilities Agreement, FERC                          Comments Due: 5 p.m. ET 5/5/16.                    FERCOnlineSupport@ferc.gov or call
                                             Electric Rate Schedule No. 1 to be                                                                            toll-free (886) 208–3676 or TYY (202)
                                             effective 4/14/2016.                                       Docket Numbers: ER16–1406–001.
                                                                                                        Applicants: Peak View Wind Energy                  502–8659.
                                                Filed Date: 4/13/16.                                                                                          Any questions regarding this
                                                Accession Number: 20160413–5240.                     LLC.
                                                                                                        Description: Tariff Amendment:                     application should be directed to
                                                Comments Due: 5 p.m. ET 5/4/16.                                                                            Langtry Meyer, Chief Operating Officer,
                                                Docket Numbers: ER16–1401–000.                       Supplement to April 14, 2016 Market-
                                                                                                     Based Rate Application to be effective 6/             Texas LNG Brownsville LLC, 2800
                                                Applicants: Golden Fields Solar II,                                                                        North Loop West, Suite 910, Houston,
                                             LLC.                                                    14/2016.
                                                                                                        Filed Date: 4/14/16.                               Texas 77092, telephone (832) 849–4920,
                                                Description: Baseline eTariff Filing:                                                                      or email lmeyer@txlng.com.
                                             Shared Facilities Agreement, FERC                          Accession Number: 20160414–5054.
                                                                                                                                                              Specifically, Texas LNG proposes to
                                             Electric Rate Schedule No. 1 to be                         Comments Due: 5 p.m. ET 5/5/16.                    construct two 2 million ton per annum
                                             effective 4/14/2016.                                       The filings are accessible in the                  liquefaction trains; two single
                                                Filed Date: 4/13/16.                                 Commission’s eLibrary system by                       containment, 210,000 cubic meter
                                                Accession Number: 20160413–5242.                     clicking on the links or querying the                 capacity, storage tanks; one LNG carrier
                                                Comments Due: 5 p.m. ET 5/4/16.                      docket number.                                        berth and dredged maneuvering basin;
                                                Docket Numbers: ER16–1402–000.                          Any person desiring to intervene or                and all necessary ancillary and support
                                                Applicants: Golden Fields Solar III,                 protest in any of the above proceedings               facilities. These facilities will enable
                                             LLC.                                                    must file in accordance with Rules 211                Texas LNG to liquefy and export up to
                                                Description: Baseline eTariff Filing:                and 214 of the Commission’s                           0.6 billion cubic feet of natural gas per
                                             Shared Facilities Agreement, FERC                       Regulations (18 CFR 385.211 and                       day. Texas LNG states it will receive
                                             Electric Rate Schedule No. 1 to be                      385.214) on or before 5:00 p.m. Eastern               natural gas via a non-jurisdictional
                                             effective 4/14/2016.                                    time on the specified comment date.                   intrastate natural gas pipeline.
                                                Filed Date: 4/13/16.                                 Protests may be considered, but                          On April 14, 2015, the Commission
                                                Accession Number: 20160413–5243.                     intervention is necessary to become a                 staff granted Texas LNG’s request to use
                                                Comments Due: 5 p.m. ET 5/4/16.                      party to the proceeding.                              the National Environmental Policy Act
                                                Docket Numbers: ER16–1403–000.                          eFiling is encouraged. More detailed               (NEPA) Pre-Filing Process and assigned
Lhorne on DSK5TPTVN1PROD with NOTICES




                                                Applicants: Golden Fields Solar IV,                  information relating to filing                        Docket No. PF15–14–000 to staff
                                             LLC.                                                    requirements, interventions, protests,                activities involving the proposed
                                                Description: Baseline eTariff Filing:                service, and qualifying facilities filings            facilities. Now, as of the filing of this
                                             Shared Facilities Agreement, FERC                       can be found at: http://www.ferc.gov/                 application on March 31, 2016, the
                                             Electric Rate Schedule No. 1 to be                      docs-filing/efiling/filing-req.pdf. For               NEPA Pre-Filing Process for this project
                                             effective 4/14/2016.                                    other information, call (866) 208–3676                has ended. From this time forward, this
                                                Filed Date: 4/13/16.                                 (toll free). For TTY, call (202) 502–8659.            proceeding will be conducted in Docket


                                        VerDate Sep<11>2014   14:53 Apr 19, 2016   Jkt 238001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\20APN1.SGM   20APN1


                                             23292                        Federal Register / Vol. 81, No. 76 / Wednesday, April 20, 2016 / Notices

                                             No. CP16–116–000, as noted in the                       the party or parties directly involved in             Lincoln County, Wisconsin. The project
                                             caption of this Notice.                                 the protest.                                          would occupy 0.1 acres of Federal land
                                                Pursuant to section 157.9 of the                        Persons who wish to comment only                   managed by the Bureau of Land
                                             Commission’s rules, 18 CFR 157.9,                       on the environmental review of this                   Management.
                                             within 90 days of this Notice the                       project should submit an original and                    g. Filed Pursuant to: Federal Power
                                             Commission staff will either: Complete                  two copies of their comments to the                   Act 16 U.S.C. 791(a)–825(r).
                                             its environmental assessment (EA) and                   Secretary of the Commission.                             h. Applicant Contact: Todd P.
                                             place it into the Commission’s public                   Environmental commenters will be                      Jastremski, Asset Manager Hydro
                                             record (eLibrary) for this proceeding, or               placed on the Commission’s                            Operations, WE Energies, 800 Industrial
                                             issue a Notice of Schedule for                          environmental mailing list, will receive              Park Drive, Iron Mountain, MI 49801; or
                                             Environmental Review. If a Notice of                    copies of the environmental documents,                at (906) 779–4099.
                                             Schedule for Environmental Review is                    and will be notified of meetings                         i. FERC Contact: Lee Emery at (202)
                                             issued, it will indicate, among other                   associated with the Commission’s                      502–8379 or by email at lee.emery@
                                             milestones, the anticipated date for the                environmental review process.                         ferc.gov.
                                                                                                     Environmental commenters will not be                     j. This application is not ready for
                                             Commission staff’s issuance of the final
                                                                                                     required to serve copies of filed                     environmental analysis at this time.
                                             environmental impact statement (FEIS)                                                                            k. The existing Grandfather Falls
                                             or EA for this proposal. The filing of the              documents on all other parties.
                                                                                                     However, the non-party commenters                     Hydroelectric Project consists of (1) a
                                             EA in the Commission’s public record                                                                          36-foot-high, 625-foot-long reinforced
                                             for this proceeding or the issuance of a                will not receive copies of all documents
                                                                                                     filed by other parties or issued by the               concrete main dam with a crest
                                             Notice of Schedule will serve to notify                                                                       elevation of 1,402 feet National Geodetic
                                             federal and state agencies of the timing                Commission (except for the mailing of
                                                                                                     environmental documents issued by the                 Vertical Datum (NGVD) that includes a
                                             for the completion of all necessary                                                                           masonry non-overflow wall, a concrete
                                             reviews, and the subsequent need to                     Commission) and will not have the right
                                                                                                                                                           spillway section with seven Tainter
                                             complete all federal authorizations                     to seek court review of the
                                                                                                                                                           gates, and a non-overflow masonry dam
                                             within 90 days of the date of issuance                  Commission’s final order.
                                                                                                        Motions to intervene, protests and                 and a rockfill embankment with
                                             of the Commission staff’s FEIS or EA.                                                                         masonry core wall; (2) a 340-acre
                                                There are two ways to become                         comments may be filed electronically
                                                                                                     via the internet in lieu of paper; see, 18            reservoir at a full-pool elevation of
                                             involved in the Commission’s review of                                                                        1,397.1 feet NGVD; (3) a 67-foot-long by
                                             this project. First, any person wishing to              CFR 385.2001(a)(1)(iii) and the
                                                                                                     instructions on the Commission’s Web                  51-foot-wide powerhouse containing an
                                             obtain legal status by becoming a party                                                                       11–MW turbine-generator and a 6.2-
                                             to the proceedings for this project                     site under the ‘‘e-Filing’’ link. The
                                                                                                                                                           megawatt (MW) turbine-generator
                                             should, on or before the comment date                   Commission strongly encourages
                                                                                                                                                           providing a combined installed capacity
                                             stated below, file with the Federal                     electronic filings.
                                                                                                        Comment Date: 5:00 p.m. Eastern                    17.2 MW; (4) a 300-foot-wide by 4,000-
                                             Energy Regulatory Commission, 888                                                                             foot-long intake canal; (5) an 11-foot-
                                             First Street NE., Washington, DC 20426,                 Time on May 5, 2016.
                                                                                                                                                           diameter by 1,325-foot-long wooden
                                             a motion to intervene in accordance                       Dated: April 14, 2016.                              stave penstock and a 13.5-foot-diameter
                                             with the requirements of the                            Kimberly D. Bose,                                     by 1,325-foot-long wooden stave
                                             Commission’s Rules of Practice and                      Secretary.                                            penstock to the powerhouse; (7) a steel
                                             Procedure (18 CFR 385.214 or 385.211)                   [FR Doc. 2016–09085 Filed 4–19–16; 8:45 am]           surge tank connected to each penstock;
                                             and the Regulations under the NGA (18                   BILLING CODE 6717–01–P                                (8) an intake structure at the
                                             CFR 157.10). A person obtaining party                                                                         downstream end of the intake canal
                                             status will be placed on the service list                                                                     with two 55.5-foot-wide by 30.5-foot-
                                             maintained by the Secretary of the                      DEPARTMENT OF ENERGY                                  high trashracks with a clear bar spacing
                                             Commission and will receive copies of                                                                         of 2.5 inches; (9) a 20-foot-wide by 167-
                                             all documents filed by the applicant and                Federal Energy Regulatory                             foot long concrete sluiceway at the canal
                                             by all other parties. A party must submit               Commission                                            intake structure; (10) 6.9-kilovolt (kV)
                                             5 copies of filings made with the                       [Project No. 1966–054]                                generator leads; (11) a 300-foot-long, 46
                                             Commission and must mail a copy to                                                                            kV overhead transmission line; and (12)
                                             the applicant and to every other party in               Wisconsin Public Service Corporation;                 appurtenant facilities. The intake canal
                                             the proceeding. Only parties to the                     Notice of Application Tendered For                    and penstocks bypass about 4,800 feet of
                                             proceeding can ask for court review of                  Filing with the Commission and                        the Wisconsin River.
                                             Commission orders in the proceeding.                    Establishing Procedural Schedule For                     The Grandfather Falls Project is
                                                However, a person does not have to                   Licensing and Deadline For                            operated in a limited peaking mode. The
                                             intervene in order to have comments                     Submission of Final Amendments                        project is fully automated and is
                                             considered. The second way to                                                                                 remotely operated from Wisconsin
                                                                                                       Take notice that the following
                                             participate is by filing with the                                                                             Public Service’s control center in Green
                                                                                                     hydroelectric application has been filed
                                             Secretary of the Commission, as soon as                                                                       Bay, which is staffed 24 hours a day,
                                                                                                     with the Commission and is available
                                             possible, an original and two copies of                                                                       and 365 days a year. Remote operation
                                                                                                     for public inspection.
                                             comments in support of or in opposition                   a. Type of Application: New Major                   includes starting and stopping the
                                             to this project. The Commission will                    License.                                              project generators, monitoring kilowatt
                                             consider these comments in                                b. Project No.: P–1966–054.                         output, monitoring headwater and
Lhorne on DSK5TPTVN1PROD with NOTICES




                                             determining the appropriate action to be                  c. Date filed: March 30, 2016.                      tailwater gage elevations, and
                                             taken, but the filing of a comment alone                  d. Applicant: Wisconsin Public                      maintaining headwater elevations
                                             will not serve to make the filer a party                Service Corporation.                                  through the operation of a heated gate
                                             to the proceeding. The Commission’s                       e. Name of Project: Grandfather Falls               structure. The project is required to
                                             rules require that persons filing                       Hydroelectric Project.                                maintain a minimum flow of 400 cubic
                                             comments in opposition to the project                     f. Location: The existing project is                feet per second (cfs) or inflow,
                                             provide copies of their protests only to                located on the Wisconsin River in                     whichever is less, as measured below


                                        VerDate Sep<11>2014   14:53 Apr 19, 2016   Jkt 238001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\20APN1.SGM   20APN1



Document Created: 2016-04-20 01:51:33
Document Modified: 2016-04-20 01:51:33
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on May 5, 2016.
FR Citation81 FR 23291 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR