81 FR 24459 - Airworthiness Directives; Airbus Airplanes

DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration

Federal Register Volume 81, Issue 80 (April 26, 2016)

Page Range24459-24462
FR Document2016-08951

We are superseding Airworthiness Directive (AD) 2014-03-14 for all Airbus Model A330-200 and -300 series airplanes, and Model A340- 200, -300, -500, and -600 series airplanes. AD 2014-03-14 required removing bulb-type maintenance lights; installing a drain mast on certain airplanes; and installing muffs on connecting bleed elements on certain airplanes. For certain Model A340-200 and -300 series airplanes, this new AD also requires replacing certain insulation sleeves with new insulation sleeves. This AD results from fuel system reviews conducted by the airplane manufacturer. We are issuing this AD to prevent ignition sources inside fuel tanks, which, in combination with flammable fuel vapors, could result in fuel tank explosions and consequent loss of the airplane.

Federal Register, Volume 81 Issue 80 (Tuesday, April 26, 2016)
[Federal Register Volume 81, Number 80 (Tuesday, April 26, 2016)]
[Rules and Regulations]
[Pages 24459-24462]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-08951]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2015-6547; Directorate Identifier 2014-NM-129-AD; 
Amendment 39-18490; AD 2016-08-14]
RIN 2120-AA64


Airworthiness Directives; Airbus Airplanes

AGENCY: Federal Aviation Administration (FAA), Department of 
Transportation (DOT).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: We are superseding Airworthiness Directive (AD) 2014-03-14 for 
all Airbus Model A330-200 and -300 series airplanes, and Model A340-
200, -300, -500, and -600 series airplanes. AD 2014-03-14 required 
removing bulb-type maintenance lights; installing a drain mast on 
certain airplanes; and installing muffs on connecting bleed elements on 
certain airplanes. For certain Model A340-200 and -300 series 
airplanes, this new AD also requires replacing certain insulation 
sleeves with new insulation sleeves. This AD results from fuel system 
reviews conducted by the airplane manufacturer. We are issuing this AD 
to prevent ignition sources inside fuel tanks, which, in combination 
with flammable fuel vapors, could result in fuel tank explosions and 
consequent loss of the airplane.

DATES: This AD is effective May 31, 2016.
    The Director of the Federal Register approved the incorporation by 
reference of certain publications listed in this AD as of May 31, 2016.
    The Director of the Federal Register approved the incorporation by 
reference of certain other publications listed in this AD as of March 
26, 2014 (79 FR 9382, February 19, 2014).

ADDRESSES: For service information identified in this final rule, 
contact Airbus SAS, Airworthiness Office--EAL, 1 Rond Point Maurice 
Bellonte, 31707 Blagnac Cedex, France; telephone +33 5 61 93 36 96; fax 
+33 5 61 93 45 80; email [email protected]; Internet 
http://www.airbus.com. You may view this referenced service information 
at the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., 
Renton, WA. For information on the availability of this material at the 
FAA, call 425-227-1221. It is also available on the Internet at http://www.regulations.gov by searching for and locating Docket No. FAA-2015-
6547.

Examining the AD Docket

    You may examine the AD docket on the Internet at http://www.regulations.gov by searching for and locating Docket No. FAA-2015-
6547; or in person at the Docket Management Facility between 9 a.m. and 
5 p.m., Monday through Friday, except Federal holidays. The AD docket 
contains this AD, the regulatory evaluation, any comments received, and 
other information. The address for the Docket Office (telephone 800-
647-5527) is Docket Management Facility, U.S. Department of 
Transportation, Docket Operations, M-30, West Building Ground Floor, 
Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590.

FOR FURTHER INFORMATION CONTACT: Vladimir Ulyanov, Aerospace Engineer, 
International Branch, ANM-116, Transport Airplane Directorate, FAA, 
1601 Lind Avenue SW., Renton, WA 98057-3356; telephone 425-227-1138; 
fax 425-227-1149.

SUPPLEMENTARY INFORMATION:

Discussion

    We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR 
part 39 to supersede AD 2014-03-14, Amendment 39-17752 (79 FR 9382, 
February 19, 2014) (``AD 2014-03-14''). AD 2014-03-14 applied to all 
Airbus Model A330-200 and -300 series airplanes, and Model A340-200, -
300, -500, and -600 series airplanes. The NPRM published in the Federal 
Register on December 11, 2015 (80 FR 76875) (``the NPRM''). The NPRM 
was prompted by fuel system reviews conducted by the airplane 
manufacturer. The NPRM proposed to continue to require removing bulb-
type maintenance lights; installing a drain mast on certain airplanes; 
and installing muffs on connecting bleed elements on certain airplanes. 
The NPRM also proposed to require, for certain Model A340-200 and -300 
series airplanes, replacing certain insulation sleeves with new 
insulation sleeves. We are issuing this AD to prevent ignition sources 
inside fuel tanks, which, in combination with flammable fuel vapors, 
could result in fuel tank explosions and consequent loss of the 
airplane.
    The European Aviation Safety Agency (EASA), which is the Technical 
Agent for the Member States of the European Union, has issued EASA 
Airworthiness Directive 2014-0148, dated June 13, 2014 (referred to 
after this the Mandatory Continuing Airworthiness Information, or ``the 
MCAI''), to correct an unsafe condition for all Airbus Model A330-200 
and -300 series airplanes, and Model A340-200, -300, -500, and -600 
series airplanes. The MCAI states:

    [Subsequent to accidents involving Fuel Tank Systems in flight 
and on ground] * * *, the FAA published Special Federal Aviation 
Regulation (SFAR) 88 [(66 FR 23086, May 7, 2001)], and the Joint 
Aviation Authorities (JAA) published Interim Policy INT/POL/25/12.
    In response to these regulations, a global design review 
conducted by Airbus on the A330 and A340 type design Section 19, 
which is a flammable fluid leakage zone and a zone adjacent to a 
fuel tank, highlighted potential deviations. The specific identified 
cases were that in-flight fuel drainage is insufficient on A340-500/
-600 aeroplanes, maintenance lights are not qualified explosion-
proof, and hot surfaces may exist on bleed systems during normal/
failure operations.

[[Page 24460]]

    This condition, if not corrected, in combination with a fuel 
leak generating flammable vapours in the area, could result in a 
fuel tank explosion and consequent loss of the aeroplane.
    To address this unsafe condition, Airbus developed various 
modifications of the aeroplane, to be embodied in service.
    Consequently, EASA issued AD 2013-0033 [http://ad.easa.europa.eu/blob/easa_ad_2013-0033_superseded.pdf/AD_2013-0033_1, which corresponds to FAA AD 2014-03-14, Amendment 39-17752 
(79 FR 9382, February 19, 2014)] to require removal of bulb type 
maintenance lights for all aeroplanes, installation of a drain mast 
between Frame (FR) 80 and FR83 for A340-500/-600 aeroplanes, and 
installation of muffs on connecting bleed elements to minimize hot 
surfaces on A330 and A340-200/-300 aeroplanes.
    Since that [EASA] AD was issued, it was reported that, for A340-
200/-300 aeroplanes, accomplishment instructions in the applicable 
Airbus Service Bulletins (SB) for aeroplanes in Configurations 002 
and 005 were detailed in Configuration 003 and, conversely, 
accomplishment instructions for aeroplane[s] in Configuration 003 
were detailed in Configurations 002 and 005. This can lead to 
incorrect installation of some insulation sleeves on the Auxiliary 
Power Unit (APU) Air Bleed Ducts between Frame 83 and 84 for 
configurations 002, 003 and 005 as per Airbus SB A340-36-4035 at 
original issue. Prompted by this finding, Airbus revised the 
affected SB with additional work required for aeroplanes included in 
configurations 002, 003 and 005 that were modified using the 
original issue of the SB.
    For the reasons described above, this [EASA] AD retains the 
requirements of EASA AD 2013-0033, which is superseded, incorporates 
reference to the corrected Airbus SB A340-36-4035 Revision 01 and 
requires the additional work as specified in Airbus SB A340-36-4035 
Revision 01 for aeroplanes already modified per the original SB 
A340-36-4035.

    The additional work is replacing the insulation sleeves between 
FR83 and FR84 with new insulation sleeves. You may examine the MCAI in 
the AD docket on the Internet at http://www.regulations.gov by 
searching for and locating Docket No. FAA-2015-6547.

Comments

    We gave the public the opportunity to participate in developing 
this AD. We received no comments on the NPRM or on the determination of 
the cost to the public.

Change Made To This Final Rule: Updated Service Information

    Airbus has issued Service Bulletin A330-36-3038, Revision 01, dated 
May 11, 2015. The additional work specified in this service information 
is minimal and consists of modifying the routing of a harness. This 
additional work is not required for airplanes on which the actions 
previously required by paragraph (h) of AD 2014-03-14 have been done 
before the effective date of this AD. Paragraph (h) of this AD retains 
the requirements of paragraph (h) of AD 2014-03-14. We have revised 
paragraph (h)(1) of this AD to specify Airbus Service Bulletin A330-36-
3038, Revision 01, dated May 11, 2015, as an appropriate source of 
service information.

Conclusion

    We reviewed the available data and determined that air safety and 
the public interest require adopting this AD with the change described 
previously and minor editorial changes. We have determined that these 
changes:
     Are consistent with the intent that was proposed in the 
NPRM for correcting the unsafe condition; and
     Do not add any additional burden upon the public than was 
already proposed in the NPRM.

Related Service Information Under 1 CFR Part 51

    Airbus has issued the following service bulletins.
     Airbus Service Bulletin A330-33-3041, Revision 02, dated 
November 7, 2013, which describes procedures for removing bulb-type 
maintenance lights.
     Airbus Service Bulletin A330-36-3037, Revision 02, 
including Appendix 01, dated April 7, 2014, which describes procedures 
for modifying the bleed leak detection loop of the auxiliary power unit 
(APU).
     Airbus Service Bulletin A330-36-3038, Revision 01, dated 
May 11, 2015, which describes procedures for bleed leak detection loop 
modification of the APU.
     Airbus Service Bulletin A340-33-4026, Revision 02, dated 
November 7, 2013, which describes procedures for removing bulb-type 
maintenance lights.
     Airbus Service Bulletin A340-36-4033, Revision 02, 
including Appendix 01, dated May 19, 2014, which describes procedures 
for bleed leak detection loop modification of the APU.
     Airbus Service Bulletin A340-36-4035, including Appendix 
01, dated September 18, 2012, which describes procedures for installing 
muffs on connecting bleed elements on certain airplanes.
    This service information is reasonably available because the 
interested parties have access to it through their normal course of 
business or by the means identified in the ADDRESSES section.

Costs of Compliance

    We estimate that this AD affects 43 Model A330 series airplanes of 
U.S. registry. There are no Model A340 airplanes registered in the U.S.
    The actions required by AD 2014-03-14, and retained in this AD take 
about 21 work-hours per product, at an average labor rate of $85 per 
work-hour. Required parts cost about $5,219 per product. Based on these 
figures, the estimated cost of the actions that were required by AD 
2014-03-14 is $7,004 per product.
    We also estimate that it will take about 6 work-hours per product 
to comply with the basic requirements of this AD. The average labor 
rate is $85 per work-hour. Required parts will cost about $279 per 
product. Based on these figures, we estimate the cost of this AD on 
U.S. operators to be $33,927, or $789 per product.

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. ``Subtitle VII: Aviation 
Programs,'' describes in more detail the scope of the Agency's 
authority.
    We are issuing this rulemaking under the authority described in 
``Subtitle VII, Part A, Subpart III, Section 44701: General 
requirements.'' Under that section, Congress charges the FAA with 
promoting safe flight of civil aircraft in air commerce by prescribing 
regulations for practices, methods, and procedures the Administrator 
finds necessary for safety in air commerce. This regulation is within 
the scope of that authority because it addresses an unsafe condition 
that is likely to exist or develop on products identified in this 
rulemaking action.

Regulatory Findings

    We determined that this AD will not have federalism implications 
under Executive Order 13132. This AD will not have a substantial direct 
effect on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government.
    For the reasons discussed above, I certify that this AD:
    1. Is not a ``significant regulatory action'' under Executive Order 
12866;
    2. Is not a ``significant rule'' under the DOT Regulatory Policies 
and Procedures (44 FR 11034, February 26, 1979);
    3. Will not affect intrastate aviation in Alaska; and

[[Page 24461]]

    4. Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

    Accordingly, under the authority delegated to me by the 
Administrator, the FAA amends 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority:  49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13  [Amended]

0
2. The FAA amends Sec.  39.13 by removing Airworthiness Directive (AD) 
2014-03-14, Amendment 39-17752 (79 FR 9382, February 19, 2014), and 
adding the following new AD:

2016-08-14 Airbus: Amendment 39-18490. Docket No. FAA-2015-6547; 
Directorate Identifier 2014-NM-129-AD.

(a) Effective Date

    This AD is effective May 31, 2016.

(b) Affected ADs

    This AD replaces AD 2014-03-14, Amendment 39-17752 (79 FR 9382, 
February 19, 2014) (``AD 2014-03-14'').

(c) Applicability

    This AD applies to the Airbus airplanes, certificated in any 
category, specified in paragraphs (c)(1) and (c)(2) of this AD, all 
manufacturer serial numbers.
    (1) Airbus Model A330-201, -202, -203, -223, -243, -301, -302, -
303, -321, -322, -323, -341, -342, and -343 airplanes.
    (2) Airbus Model A340-211, -212, -213, -311, -312, -313, -541, 
and -642 airplanes.

(d) Subject

    Air Transport Association (ATA) of America Code 26, Fire 
protection; 33, Lights; 36, Pneumatic; 53, Fuselage.

(e) Reason

    This AD results from fuel system reviews conducted by the 
airplane manufacturer. We are issuing this AD to prevent ignition 
sources inside fuel tanks, which, in combination with flammable fuel 
vapors, could result in fuel tank explosions and consequent loss of 
the airplane.

(f) Compliance

    Comply with this AD within the compliance times specified, 
unless already done.

(g) Retained Maintenance Light Removal, With New Service Information

    This paragraph restates the requirements of paragraph (g) of AD 
2014-03-14, with new service information. Except for airplanes on 
which Airbus Modification 56739 has been incorporated in production: 
Within 26 months after March 26, 2014 (the effective date of AD 
2014-03-14), remove the maintenance lights, in accordance with the 
Accomplishment Instructions of the applicable Airbus service 
information specified in paragraphs (g)(1), (g)(2), and (g)(3) of 
this AD.
    (1) Airbus Mandatory Service Bulletin A330-33-3041, Revision 01, 
dated July 10, 2012; or Airbus Service Bulletin A330-33-3041, 
Revision 02, dated November 7, 2013 (for Model A330 series 
airplanes). As of the effective date of this AD, use only Airbus 
Service Bulletin A330-33-3041, Revision 02, dated November 7, 2013, 
for the actions required by paragraph (g) of this AD.
    (2) Airbus Mandatory Service Bulletin A340-33-4026, Revision 01, 
dated July 10, 2012; or Airbus Service Bulletin A340-33-4026, 
Revision 02, dated November 7, 2013 (for Model A340-200 and -300 
series airplanes). As of the effective date of this AD, use only 
Airbus Service Bulletin A340-33-4026, Revision 02, dated November 7, 
2013, for the actions required by paragraph (g) of this AD.
    (3) Airbus Mandatory Service Bulletin A340-33-5006, dated 
January 3, 2012 (for Model A340-500 and -600 series airplanes).

    Note 1 to paragraph (g) of this AD:  For Model A340-500 and -600 
series airplanes, Airbus has issued Airbus Service Bulletin A340-33-
5007 to introduce halogen-type lights, which are qualified as 
explosion-proof, and that can be installed (at operators' 
discretion) after removal of the non-explosion-proof lights required 
by paragraph (g) of this AD. For Model A330 series airplanes and 
Model A340-200 and -300 series airplanes, Airbus has issued Airbus 
Service Bulletins A330-33-3042 and A340-33-4027 for the installation 
of similar lights.

(h) Retained Insulation Muff Installation, With New Service Information

    This paragraph restates the requirements of paragraph (h) of AD 
2014-03-14, with new service information. For Model A330-200 and -
300 series airplanes, and Model A340-200 and -300 series airplanes, 
except those airplanes on which Airbus Modification 52260 has been 
incorporated in production: Within 26 months after March 26, 2014 
(the effective date of AD 2014-03-14), install insulation muffs on 
the connecting auxiliary power unit (APU) bleed air duct, in 
accordance with the Accomplishment Instructions of the applicable 
Airbus service information specified in paragraphs (h)(1), (h)(2), 
and (h)(3) of this AD.
    (1) Airbus Service Bulletin A330-36-3038, dated January 16, 
2012; or Airbus Service Bulletin A330-36-3038, Revision 01, dated 
May 11, 2015; for Model A330 series airplanes on which Airbus 
Service Bulletin A330-36-3032 has been incorporated. As of the 
effective date of this AD, use only Airbus Service Bulletin A330-36-
3038, Revision 01, dated May 11, 2015.
    (2) Airbus Mandatory Service Bulletin A330-36-3040, Revision 01, 
dated November 26, 2012, for Model A330 series airplanes on which 
Airbus Service Bulletin A330-36-3032 has not been incorporated.
    (3) Airbus Mandatory Service Bulletin A340-36-4035, Revision 01, 
dated September 24, 2013, for Model A340 series airplanes.

(i) Retained Alternative Action to Paragraph (h) of This AD, With New 
Service Information

    This paragraph restates the alternative action specified in 
paragraph (i) of AD 2014-03-14, with new service information. For 
Model A330 series airplanes on which the modification specified in 
Airbus Service Bulletin A330-36-3032 has not been incorporated, and 
for Model A340 series airplanes: Doing the bleed leak detection loop 
modification of the APU, in accordance with the Accomplishment 
Instructions of the applicable Airbus service information specified 
in paragraphs (i)(1) and (i)(2) of this AD, is an acceptable 
alternative to the actions required by paragraph (h) of this AD, 
provided the modification is accomplished within 26 months after 
March 26, 2014 (the effective date of AD 2014-03-14).
    (1) Airbus Service Bulletin A330-36-3037, Revision 02, including 
Appendix 01, dated April 7, 2014.
    (2) Airbus Service Bulletin A340-36-4033, Revision 02, including 
Appendix 01, dated May 19, 2014.

(j) Retained Drain Mast Installation, With No Changes

    This paragraph restates the requirements of paragraph (j) of AD 
2014-03-14, with no changes. For Model A340-500 and -600 series 
airplanes, except those on which Airbus Modification 54636 or 54637 
has been incorporated in production: Within 26 months after March 
26, 2014 (the effective date of AD 2014-03-14), install a drain mast 
between frame (FR) 80 and FR83, in accordance with the 
Accomplishment Instructions of Airbus Mandatory Service Bulletin 
A340-53-5031, Revision 02, dated August 3, 2011.

(k) New Requirement of This AD: Replacement of Certain Insulation 
Sleeves

    For Model A340 series airplanes in configurations 002, 003, and 
005, as described in Airbus Service Bulletin A340-36-4035, including 
Appendix 01, dated September 18, 2012, that have been modified 
before the effective date of this AD as specified in Airbus Service 
Bulletin A340-36-4035, including Appendix 01, dated September 18, 
2012: Within 14 months after the effective date of this AD, replace 
the insulation sleeves between FR83 and FR84 with new insulation 
sleeves, in accordance with the Accomplishment Instructions of 
Airbus Service Bulletin A340-36-4035, Revision 01, dated September 
24, 2013.

(l) Credit for Previous Actions

    (1) This paragraph provides credit for actions required by 
paragraph (g) of this AD, if those actions were performed before 
March 26, 2014 (the effective date of AD 2014-03-14), using Airbus 
Service Bulletin A330-33-

[[Page 24462]]

3041, dated January 3, 2012; or Airbus Service Bulletin A340-33-
4026, dated January 3, 2012; as applicable. This service information 
is not incorporated by reference in this AD.
    (2) This paragraph provides credit for actions required by 
paragraph (h) of this AD, if those actions were performed before 
March 26, 2014 (the effective date of AD 2014-03-14), using Airbus 
Service Bulletin A330-36-3040, dated September 18, 2012. This 
service information is not incorporated by reference in this AD.
    (3) For Model A340 series airplanes in configurations 001 and 
004, as described in Airbus Service Bulletin A340-36-4035, including 
Appendix 01, dated September 18, 2012: This paragraph provides 
credit for actions required by paragraph (h) of this AD, if those 
actions were performed before the effective date of this AD using 
Airbus Service Bulletin A340-36-4035, including Appendix 01, dated 
September 18, 2012.
    (4) This paragraph provides credit for actions required by 
paragraph (j) of this AD, if those actions were performed before 
March 26, 2014 (the effective date of AD 2014-03-14), using Airbus 
Service Bulletin A340-53-5031, dated July 31, 2006; or Airbus 
Service Bulletin A340-53-5031, Revision 01, dated January 10, 2008; 
as applicable. This service information is not incorporated by 
reference in this AD.

(m) Other FAA AD Provisions

    The following provisions also apply to this AD:
    (1) Alternative Methods of Compliance (AMOCs): The Manager, 
International Branch, ANM-116, Transport Airplane Directorate, FAA, 
has the authority to approve AMOCs for this AD, if requested using 
the procedures found in 14 CFR 39.19. In accordance with 14 CFR 
39.19, send your request to your principal inspector or local Flight 
Standards District Office, as appropriate. If sending information 
directly to the International Branch, send it to ATTN: Vladimir 
Ulyanov, Aerospace Engineer, International Branch, ANM-116, 
Transport Airplane Directorate, FAA, 1601 Lind Avenue SW., Renton, 
WA 98057-3356; telephone 425-227-1138; fax 425-227-1149. Information 
may be emailed to: [email protected].
    (i) Before using any approved AMOC, notify your appropriate 
principal inspector, or lacking a principal inspector, the manager 
of the local flight standards district office/certificate holding 
district office. The AMOC approval letter must specifically 
reference this AD.
    (ii) AMOCs approved previously for paragraphs (g) and (h) of AD 
2014-03-14 are approved as AMOCs for the corresponding provisions of 
paragraphs (g) and (h) of this AD.
    (2) Contacting the Manufacturer: As of the effective date of 
this AD, for any requirement in this AD to obtain corrective actions 
from a manufacturer, the action must be accomplished using a method 
approved by the Manager, International Branch, ANM-116, Transport 
Airplane Directorate, FAA; or the European Aviation Safety Agency 
(EASA); or Airbus's EASA Design Organization Approval (DOA). If 
approved by the DOA, the approval must include the DOA-authorized 
signature.
    (3) Required for Compliance (RC): If any service information 
contains procedures or tests that are identified as RC, those 
procedures and tests must be done to comply with this AD; any 
procedures or tests that are not identified as RC are recommended. 
Those procedures and tests that are not identified as RC may be 
deviated from using accepted methods in accordance with the 
operator's maintenance or inspection program without obtaining 
approval of an AMOC, provided the procedures and tests identified as 
RC can be done and the airplane can be put back in an airworthy 
condition. Any substitutions or changes to procedures or tests 
identified as RC require approval of an AMOC.

(n) Related Information

    (1) Refer to Mandatory Continuing Airworthiness Information 
(MCAI) EASA Airworthiness Directive 2014-0148, dated June 13, 2014, 
for related information. This MCAI may be found in the AD docket on 
the Internet at http://www.regulations.gov by searching for and 
locating Docket No. FAA-2015-6547.
    (2) Service information identified in this AD that is not 
incorporated by reference is available at the addresses specified in 
paragraphs (o)(5) and (o)(6) of this AD.

(o) Material Incorporated by Reference

    (1) The Director of the Federal Register approved the 
incorporation by reference (IBR) of the service information listed 
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
    (2) You must use this service information as applicable to do 
the actions required by this AD, unless this AD specifies otherwise.
    (3) The following service information was approved for IBR on 
May 31, 2016.
    (i) Airbus Service Bulletin A330-33-3041, Revision 02, dated 
November 7, 2013.
    (ii) Airbus Service Bulletin A330-36-3037, Revision 02, 
including Appendix 01, dated April 7, 2014.
    (iii) Airbus Service Bulletin A330-36-3038, Revision 01, dated 
May 11, 2015.
    (iv) Airbus Service Bulletin A340-33-4026, Revision 02, dated 
November 7, 2013.
    (v) Airbus Service Bulletin A340-36-4033, Revision 02, including 
Appendix 01, dated May 19, 2014.
    (vi) Airbus Service Bulletin A340-36-4035, including Appendix 
01, dated September 18, 2012.
    (4) The following service information was approved for IBR on 
March 26, 2014 79 FR 9382, February 19, 2014).
    (i) Airbus Mandatory Service Bulletin A330-33-3041, Revision 01, 
dated July 10, 2012.
    (ii) Airbus Mandatory Service Bulletin A330-36-3040, Revision 
01, dated November 26, 2012.
    (iii) Airbus Mandatory Service Bulletin A340-33-4026, Revision 
01, dated July 10, 2012.
    (iv) Airbus Mandatory Service Bulletin A340-33-5006, dated 
January 3, 2012.
    (v) Airbus Mandatory Service Bulletin A340-36-4035, Revision 01, 
dated September 24, 2013.
    (vi) Airbus Mandatory Service Bulletin A340-53-5031, Revision 
02, dated August 3, 2011.
    (5) For service information identified in this AD, contact 
Airbus SAS, Airworthiness Office--EAL, 1 Rond Point Maurice 
Bellonte, 31707 Blagnac Cedex, France; telephone +33 5 61 93 36 96; 
fax +33 5 61 93 45 80; email [email protected]; 
Internet http://www.airbus.com.
    (6) You may view this service information at the FAA, Transport 
Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For 
information on the availability of this material at the FAA, call 
425-227-1221.
    (7) You may view this service information that is incorporated 
by reference at the National Archives and Records Administration 
(NARA). For information on the availability of this material at 
NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

    Issued in Renton, Washington, on April 8, 2016.
Michael Kaszycki,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 2016-08951 Filed 4-25-16; 8:45 am]
 BILLING CODE 4910-13-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionFinal rule.
DatesThis AD is effective May 31, 2016.
ContactVladimir Ulyanov, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue SW., Renton, WA 98057-3356; telephone 425-227-1138; fax 425-227-1149.
FR Citation81 FR 24459 
RIN Number2120-AA64
CFR AssociatedAir Transportation; Aircraft; Aviation Safety; Incorporation by Reference and Safety

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR