81_FR_25473 81 FR 25391 - Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

81 FR 25391 - Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act

DEPARTMENT OF ENERGY

Federal Register Volume 81, Issue 82 (April 28, 2016)

Page Range25391-25391
FR Document2016-10013

On April 15, 2016, Mattawoman Energy, LLC, as owner and operator of a new baseload electric generating powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to section 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60 and 501.61. FUA and regulations thereunder require DOE to publish a notice of filing of self-certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 501.61(c).

Federal Register, Volume 81 Issue 82 (Thursday, April 28, 2016)
[Federal Register Volume 81, Number 82 (Thursday, April 28, 2016)]
[Notices]
[Page 25391]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-10013]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[Certification Notice--239]


Notice of Filing of Self-Certification of Coal Capability Under 
the Powerplant and Industrial Fuel Use Act

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of filing.

-----------------------------------------------------------------------

SUMMARY: On April 15, 2016, Mattawoman Energy, LLC, as owner and 
operator of a new baseload electric generating powerplant, submitted a 
coal capability self-certification to the Department of Energy (DOE) 
pursuant to section 201(d) of the Powerplant and Industrial Fuel Use 
Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60 and 
501.61. FUA and regulations thereunder require DOE to publish a notice 
of filing of self-certification in the Federal Register. 42 U.S.C. 
8311(d) and 10 CFR 501.61(c).

ADDRESSES: Copies of coal capability self-certification filings are 
available for public inspection, upon request, in the Office of 
Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-
024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 
20585.

FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586-
5260.

SUPPLEMENTARY INFORMATION: Title II of FUA, as amended (42 U.S.C. 8301 
et seq.), provides that no new base load electric powerplant may be 
constructed or operated without the capability to use coal or another 
alternate fuel as a primary energy source. Pursuant to FUA in order to 
meet the requirement of coal capability, the owner or operator of such 
a facility proposing to use natural gas or petroleum as its primary 
energy source shall certify to the Secretary of Energy (Secretary) 
prior to construction, or prior to operation as a base load electric 
powerplant, that such powerplant has the capability to use coal or 
another alternate fuel. Such certification establishes compliance with 
FUA section 201(a) as of the date it is filed with the Secretary. 42 
U.S.C. 8311.
    The following owner of a proposed new baseload electric generating 
powerplant has filed a self-certification of coal-capability with DOE 
pursuant to FUA section 201(d) and in accordance with DOE regulations 
in 10 CFR 501.60 and 501.61:

OWNER: Mattawoman Energy, LLC,
CAPACITY: 990 megawatts (MW)
PLANT LOCATION: 14175 Brandywine Road, Brandywine, MD 20613
IN-SERVICE DATE: 10/31/2018

    Issued in Washington, DC, on April 21, 2016.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy 
Reliability.
[FR Doc. 2016-10013 Filed 4-27-16; 8:45 am]
BILLING CODE 6450-01-P



                                                                                Federal Register / Vol. 81, No. 82 / Thursday, April 28, 2016 / Notices                                                 25391

                                                  web portal, but if a company is unable                    Dated: April 21, 2016.                              of coal-capability with DOE pursuant to
                                                  to access the secure web portal it may                  C. Pan,                                               FUA section 201(d) and in accordance
                                                  submit a cyber incident report through                  Lieutenant, Judge Advocate General’s Corps,           with DOE regulations in 10 CFR 501.60
                                                  other means of communication (e.g., fax,                U.S. Navy, Alternate Federal Register Liaison         and 501.61:
                                                  telephone, or United States Postal                      Officer.                                              OWNER: Mattawoman Energy, LLC,
                                                  Service). DoD contractors report cyber                  [FR Doc. 2016–09956 Filed 4–27–16; 8:45 am]           CAPACITY: 990 megawatts (MW)
                                                  incidents that affect DoD information,                  BILLING CODE 3810–FF–P                                PLANT LOCATION: 14175 Brandywine
                                                  facilitating cyber situational awareness,                                                                       Road, Brandywine, MD 20613
                                                  cyber threat information sharing, and                                                                         IN-SERVICE DATE: 10/31/2018
                                                  better protection of unclassified defense               DEPARTMENT OF ENERGY                                    Issued in Washington, DC, on April 21,
                                                  information.                                                                                                  2016.
                                                                                                          [Certification Notice—239]
                                                    Dated: April 25, 2016.                                                                                      Christopher Lawrence,
                                                  Aaron Siegel,                                           Notice of Filing of Self-Certification of             Electricity Policy Analyst, Office of Electricity
                                                  Alternate OSD Federal Register, Liaison                 Coal Capability Under the Powerplant                  Delivery and Energy Reliability.
                                                  Officer, Department of Defense.                         and Industrial Fuel Use Act                           [FR Doc. 2016–10013 Filed 4–27–16; 8:45 am]
                                                  [FR Doc. 2016–09954 Filed 4–27–16; 8:45 am]             AGENCY: Office of Electricity Delivery                BILLING CODE 6450–01–P
                                                  BILLING CODE 5001–06–P                                  and Energy Reliability, DOE.
                                                                                                          ACTION: Notice of filing.
                                                                                                                                                                DEPARTMENT OF ENERGY
                                                  DEPARTMENT OF DEFENSE                                   SUMMARY:    On April 15, 2016,
                                                                                                          Mattawoman Energy, LLC, as owner and                  Federal Energy Regulatory
                                                  Department of the Navy                                  operator of a new baseload electric                   Commission
                                                                                                          generating powerplant, submitted a coal               [Project No. 2622–012]
                                                  Notice of Intent To Grant Exclusive                     capability self-certification to the
                                                  Patent License; IRFlex Corporation                      Department of Energy (DOE) pursuant to                Turners Falls Hydro, LLC; Notice of
                                                                                                          section 201(d) of the Powerplant and                  Intent To File License Application,
                                                  AGENCY:    Department of the Navy, DoD.                 Industrial Fuel Use Act of 1978 (FUA),                Filing of Pre-Application Document,
                                                  ACTION:   Notice.                                       as amended, and DOE regulations in 10                 Approving use of the Traditional
                                                                                                          CFR 501.60 and 501.61. FUA and                        Licensing Process
                                                  SUMMARY:   The Department of the Navy                   regulations thereunder require DOE to
                                                                                                                                                                  a. Type of Filing: Notice of Intent To
                                                  hereby gives notice of its intent to grant              publish a notice of filing of self-
                                                                                                                                                                File License Application and Request
                                                  to IRFlex Corporation, a revocable,                     certification in the Federal Register. 42
                                                                                                                                                                To Use the Traditional Licensing
                                                  nonassignable, exclusive license to                     U.S.C. 8311(d) and 10 CFR 501.61(c).
                                                                                                                                                                Process.
                                                  practice in the field of use of nonlinear,              ADDRESSES: Copies of coal capability                    b. Project No.: 2622–012.
                                                  mid-infrared fiber and fiber devices to                 self-certification filings are available for            c. Date Filed: February 26, 2016.
                                                  generate and/or guide mid-infrared                      public inspection, upon request, in the                 d. Submitted By: Turners Falls Hydro,
                                                  sources over long distances (1–500                      Office of Electricity Delivery and Energy             LLC (Turners Falls Hydro).
                                                  meters) in the United States, the                       Reliability, Mail Code OE–20, Room                      e. Name of Project: Turners Falls
                                                  Government-owned invention described                    8G–024, Forrestal Building, 1000                      Hydro Project.
                                                  in U.S. Patent No. 8,710,470 entitled                   Independence Avenue SW.,                                f. Location: On the Connecticut River
                                                  ‘‘Wavelength and Power Scalable                         Washington, DC 20585.                                 in Franklin County, Massachusetts. No
                                                  Waveguiding-Based Infrared Laser                        FOR FURTHER INFORMATION CONTACT:                      federal lands are occupied by the project
                                                  System’’, Navy Case No. 101,907 and                     Christopher Lawrence at (202) 586–                    works or located within the project
                                                  any continuations, divisionals or re-                   5260.                                                 boundary.
                                                  issues thereof.                                         SUPPLEMENTARY INFORMATION: Title II of                  g. Filed Pursuant to: 18 CFR 5.3 of the
                                                  DATES: Anyone wishing to object to the                  FUA, as amended (42 U.S.C. 8301 et                    Commission’s regulations.
                                                  grant of this license must file written                 seq.), provides that no new base load                   h. Potential Applicant Contact: Peter
                                                  objections along with supporting                        electric powerplant may be constructed                Clarke, Turners Falls Hydro, LLC, P.O.
                                                  evidence, if any, not later than May 13,                or operated without the capability to use             Box 149, Hamilton, MA 01936; (978)
                                                  2016.                                                   coal or another alternate fuel as a                   468–3999.
                                                                                                          primary energy source. Pursuant to FUA                  i. FERC Contact: Bill Connelly at (202)
                                                  ADDRESSES:   Written objections are to be               in order to meet the requirement of coal              502–8587; or email at william.connelly@
                                                  filed with the Naval Research                           capability, the owner or operator of such             ferc.gov.
                                                  Laboratory, Code 1004, 4555 Overlook                    a facility proposing to use natural gas or              j. Turners Falls Hydro filed its request
                                                  Avenue SW., Washington, DC 20375–                       petroleum as its primary energy source                to use the Traditional Licensing Process
                                                  5320.                                                   shall certify to the Secretary of Energy              on February 26, 2016. Turners Falls
                                                                                                          (Secretary) prior to construction, or                 Hydro provided public notice of its
                                                  FOR FURTHER INFORMATION CONTACT:    Rita                prior to operation as a base load electric            request on March 3 and March 10, 2016.
                                                  Manak, Head, Technology Transfer                        powerplant, that such powerplant has                  In a letter dated April 22, 2016, the
                                                  Office, NRL Code 1004, 4555 Overlook                    the capability to use coal or another                 Director of the Division of Hydropower
mstockstill on DSK3G9T082PROD with NOTICES




                                                  Avenue SW., Washington, DC 20375–                       alternate fuel. Such certification                    Licensing approved Turners Falls
                                                  5320, telephone 202–767–3083. Due to                    establishes compliance with FUA                       Hydro’s request to use the Traditional
                                                  U.S. Postal delays, please fax 202–404–                 section 201(a) as of the date it is filed             Licensing Process.
                                                  7920, email: rita.manak@nrl.navy.mil or                 with the Secretary. 42 U.S.C. 8311.                     k. With this notice, we are initiating
                                                  use courier delivery to expedite                           The following owner of a proposed                  informal consultation with the U.S. Fish
                                                  response.                                               new baseload electric generating                      and Wildlife Service and NOAA
                                                     Authority: 35 U.S.C. 207, 37 CFR part 404.           powerplant has filed a self-certification             Fisheries under section 7 of the


                                             VerDate Sep<11>2014   22:09 Apr 27, 2016   Jkt 238001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1



Document Created: 2016-04-28 01:05:21
Document Modified: 2016-04-28 01:05:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of filing.
Dates10/31/2018
ContactChristopher Lawrence at (202) 586- 5260.
FR Citation81 FR 25391 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR