81_FR_25474 81 FR 25392 - Energy Resources USA Inc.; Notice Of Preliminary Permit Application Accepted For Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

81 FR 25392 - Energy Resources USA Inc.; Notice Of Preliminary Permit Application Accepted For Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 82 (April 28, 2016)

Page Range25392-25392
FR Document2016-09937

Federal Register, Volume 81 Issue 82 (Thursday, April 28, 2016)
[Federal Register Volume 81, Number 82 (Thursday, April 28, 2016)]
[Notices]
[Page 25392]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-09937]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14768-000]


Energy Resources USA Inc.; Notice Of Preliminary Permit 
Application Accepted For Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On March 11, 2016, the Energy Resources USA Inc. filed an 
application for a preliminary permit under section 4(f) of the Federal 
Power Act proposing to study the feasibility of the proposed Salamonie 
Lake Dam Hydroelectric Project No. 14768-000, to be located at the 
existing Salamonie Lake Dam on the Salamonie River, near the town of 
Wabash, in Wabash County, Indiana. The Salamonie Lake Dam is owned by 
the United States government and operated by the U.S. Army Corps of 
Engineers, Louisville District.
    The proposed project would consist of: (1) A new 15-foot by 10-foot 
by 90-foot-long concrete conduit; (2) a new 98-foot by 45-foot 
reinforced concrete powerhouse containing two 2.5-megawatt (MW) 
vertical Kaplan turbine-generators having a total combined generating 
capacity of 5 MW; (3) a new 300-foot-long by 95-foot-wide tailrace; (4) 
a new 60-foot-long by 50-foot-wide substation with a 6-mega-volt-ampere 
4.16/69-kilovolt three-phase step-up transformer; (5) a new 2-mile-
long, 69-kilovolt transmission line; and (6) appurtenant facilities. 
The project would have an estimated annual generation of 13.76 
gigawatt-hours.
    Applicant Contact: Mr. Ander Gonzalez, 350 Lincoln Road, 2nd Floor, 
Miami, FL 33139; telephone (954) 248-8425.
    FERC Contact: Sergiu Serban, (202) 502-6211.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. The Commission strongly encourages electronic filing. 
Please file comments, motions to intervene, notices of intent, and 
competing applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14768-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14768) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: April 22, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-09937 Filed 4-27-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                  25392                         Federal Register / Vol. 81, No. 82 / Thursday, April 28, 2016 / Notices

                                                  Endangered Species Act and the joint                    DEPARTMENT OF ENERGY                                  comments. For assistance, please
                                                  agency regulations there under at 50                                                                          contact FERC Online Support at
                                                  CFR part 402 and implementing                           Federal Energy Regulatory                             FERCOnlineSupport@ferc.gov, (866)
                                                  regulations at 50 CFR 600.920. We are                   Commission                                            208–3676 (toll free), or (202) 502–8659
                                                  also initiating consultation with the                   [Project No. 14768–000]                               (TTY). In lieu of electronic filing, please
                                                  Massachusetts State Historic                                                                                  send a paper copy to: Secretary, Federal
                                                  Preservation Officer, as required by                    Energy Resources USA Inc.; Notice Of                  Energy Regulatory Commission, 888
                                                  section 106, National Historic                          Preliminary Permit Application                        First Street NE., Washington, DC 20426.
                                                  Preservation Act, and the implementing                  Accepted For Filing and Soliciting                    The first page of any filing should
                                                  regulations of the Advisory Council on                  Comments, Motions To Intervene, and                   include docket number P–14768–000.
                                                  Historic Preservation at 36 CFR 800.2.                  Competing Applications                                   More information about this project,
                                                                                                                                                                including a copy of the application, can
                                                     l. Turners Falls Hydro filed a Pre-                     On March 11, 2016, the Energy                      be viewed or printed on the ‘‘eLibrary’’
                                                  Application Document (PAD; including                    Resources USA Inc. filed an application               link of Commission’s Web site at http://
                                                  a proposed process plan and schedule)                   for a preliminary permit under section                www.ferc.gov/docs-filing/elibrary.asp.
                                                  with the Commission, pursuant to 18                     4(f) of the Federal Power Act proposing               Enter the docket number (P–14768) in
                                                  CFR 5.6 of the Commission’s                             to study the feasibility of the proposed              the docket number field to access the
                                                  regulations.                                            Salamonie Lake Dam Hydroelectric                      document. For assistance, contact FERC
                                                                                                          Project No. 14768–000, to be located at               Online Support.
                                                     m. A copy of the PAD is available for                the existing Salamonie Lake Dam on the
                                                  electronic review at the Commission in                  Salamonie River, near the town of                       Dated: April 22, 2016.
                                                  the Public Reference Room or may be                     Wabash, in Wabash County, Indiana.                    Kimberly D. Bose,
                                                  viewed on the Commission’s Web site                     The Salamonie Lake Dam is owned by                    Secretary.
                                                  (http://www.ferc.gov), using the                        the United States government and                      [FR Doc. 2016–09937 Filed 4–27–16; 8:45 am]
                                                  ‘‘eLibrary’’ link. Enter the docket                     operated by the U.S. Army Corps of                    BILLING CODE 6717–01–P
                                                  number, excluding the last three digits                 Engineers, Louisville District.
                                                  in the docket number field to access the                   The proposed project would consist
                                                  document. For assistance, contact FERC                  of: (1) A new 15-foot by 10-foot by 90-               DEPARTMENT OF ENERGY
                                                  Online Support at                                       foot-long concrete conduit; (2) a new 98-
                                                  FERCOnlineSupport@ferc.gov, (866)                       foot by 45-foot reinforced concrete                   Federal Energy Regulatory
                                                  208–3676 (toll free), or (202) 502–8659                 powerhouse containing two 2.5-                        Commission
                                                  (TTY). A copy is also available for                     megawatt (MW) vertical Kaplan turbine-                [Project No. 14767–000]
                                                  inspection and reproduction at the                      generators having a total combined
                                                  address in paragraph h.                                 generating capacity of 5 MW; (3) a new                Energy Resources USA INC.;Notice of
                                                                                                          300-foot-long by 95-foot-wide tailrace;               Preliminary Permit Application
                                                     n. The licensee states its unequivocal               (4) a new 60-foot-long by 50-foot-wide                Accepted for Filing and Soliciting
                                                  intent to submit an application for a                   substation with a 6-mega-volt-ampere                  Comments, Motions To Intervene, and
                                                  new license for Project No. 2622.                       4.16/69-kilovolt three-phase step-up                  Competing Applications
                                                  Pursuant to 18 CFR 16.8, 16.9, and 16.10                transformer; (5) a new 2-mile-long, 69-
                                                  each application for a new license and                  kilovolt transmission line; and (6)                   April 22, 2016.
                                                  any competing license applications                      appurtenant facilities. The project                      On March 11, 2016, the Energy
                                                  must be filed with the Commission at                    would have an estimated annual                        Resources USA Inc. filed an application
                                                  least 24 months prior to the expiration                 generation of 13.76 gigawatt-hours.                   for a preliminary permit under section
                                                  of the existing license. All applications                  Applicant Contact: Mr. Ander                       4(f) of the Federal Power Act proposing
                                                  for license for this project must be filed              Gonzalez, 350 Lincoln Road, 2nd Floor,                to study the feasibility of the proposed
                                                  by February 28, 2019.                                   Miami, FL 33139; telephone (954) 248–                 Monroe Lake Dam Hydroelectric Project
                                                                                                          8425.                                                 No. 14767–000, to be located at the
                                                     o. Register online at http://www.ferc.                  FERC Contact: Sergiu Serban, (202)                 existing Mississinewa Lake Dam on the
                                                  gov/docs-filing/esubscription.asp to be                 502–6211.                                             Salt Creek River, near the town of
                                                  notified via email of new filing and                       Deadline for filing comments, motions              Bloomington, in Monroe County,
                                                  issuances related to this or other                      to intervene, competing applications                  Indiana. The Monroe Lake Dam is
                                                  pending projects. For assistance, contact               (without notices of intent), or notices of            owned by the United States government
                                                  FERC Online Support.                                    intent to file competing applications: 60             and operated by the U.S. Army Corps of
                                                    Dated: April 22, 2016.                                days from the issuance of this notice.                Engineers, Louisville District.
                                                  Kimberly D. Bose,
                                                                                                          Competing applications and notices of                    The proposed project would consist
                                                                                                          intent must meet the requirements of 18               of: (1) A new 15-foot by 10-foot by 90-
                                                  Secretary.
                                                                                                          CFR 4.36. The Commission strongly                     foot-long concrete conduit; (2) a new 98-
                                                  [FR Doc. 2016–09935 Filed 4–27–16; 8:45 am]             encourages electronic filing. Please file             foot by 45-foot reinforced concrete
                                                  BILLING CODE 6717–01–P                                  comments, motions to intervene, notices               powerhouse containing two 2-megawatt
                                                                                                          of intent, and competing applications                 (MW) vertical Kaplan turbine-generators
                                                                                                          using the Commission’s eFiling system                 having a total combined generating
                                                                                                          at http://www.ferc.gov/docs-filing/                   capacity of 4 MW; (3) a new 300-foot-
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                          efiling.asp. Commenters can submit                    long by 95-foot-wide tailrace; (4) a new
                                                                                                          brief comments up to 6,000 characters,                60-foot-long by 50-foot-wide substation
                                                                                                          without prior registration, using the                 with a 5-mega-volt-ampere 4.16/69-
                                                                                                          eComment system at http://www.ferc.                   kilovolt three-phase step-up
                                                                                                          gov/docs-filing/ecomment.asp. You                     transformer; (5) a new 3-mile-long, 69-
                                                                                                          must include your name and contact                    kilovolt transmission line; and (6)
                                                                                                          information at the end of your                        appurtenant facilities. The project


                                             VerDate Sep<11>2014   22:09 Apr 27, 2016   Jkt 238001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\28APN1.SGM   28APN1



Document Created: 2016-04-28 01:05:38
Document Modified: 2016-04-28 01:05:38
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 25392 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR