81_FR_26619 81 FR 26534 - Notice of Intent To Grant Partially Exclusive Patent License to 3D-sensIR, Inc.; Stevenson Ranch, CA

81 FR 26534 - Notice of Intent To Grant Partially Exclusive Patent License to 3D-sensIR, Inc.; Stevenson Ranch, CA

DEPARTMENT OF DEFENSE
Department of the Army

Federal Register Volume 81, Issue 85 (May 3, 2016)

Page Range26534-26535
FR Document2016-10264

In compliance with 35 U.S.C. 209(e) and 37 CFR 404.7(a)(1)(i), the Department of the Army hereby gives notice of its intent to grant to 3D-sensIR, Inc.; a corporation having its principle place of business at 25762 Hawthorne Place, Stevenson Ranch, CA 91381, a partially exclusive license, for their design and development of handheld 3D smart cameras with specific application in the areas of photorealistic 3D measurements in the fields of Architecture, Engineering, Construction (AEC), Utility Assets Management, Law Enforcement (i.e., crime and accident scene investigations), Real- Estate, Arts and Entertainment, Commercial Drones, Commercial Robotics and Logistics. The proposed license would be relative to the following: <bullet> U.S. Patent Number 8,081,301 entitled ``LADAR Transmitting and Receiving System and Method'', Inventors Stann, Giza and Lawler, Issue Date Dec. 20, 2011.

Federal Register, Volume 81 Issue 85 (Tuesday, May 3, 2016)
[Federal Register Volume 81, Number 85 (Tuesday, May 3, 2016)]
[Notices]
[Pages 26534-26535]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-10264]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army


Notice of Intent To Grant Partially Exclusive Patent License to 
3D-sensIR, Inc.; Stevenson Ranch, CA

AGENCY: Department of the Army, DoD.

ACTION: Notice of intent.

-----------------------------------------------------------------------

SUMMARY: In compliance with 35 U.S.C. 209(e) and 37 CFR 404.7(a)(1)(i), 
the Department of the Army hereby gives notice of its intent to grant 
to 3D-sensIR, Inc.; a corporation having its principle place of 
business at 25762 Hawthorne Place, Stevenson Ranch, CA 91381, a 
partially exclusive license, for their design and development of 
handheld 3D smart cameras with specific application in the areas of 
photorealistic 3D measurements in the fields of Architecture, 
Engineering, Construction (AEC), Utility Assets Management, Law 
Enforcement (i.e., crime and accident scene investigations), Real-
Estate, Arts and Entertainment, Commercial Drones, Commercial Robotics 
and Logistics. The proposed license would be relative to the following:
     U.S. Patent Number 8,081,301 entitled ``LADAR Transmitting 
and Receiving System and Method'', Inventors Stann, Giza and Lawler, 
Issue Date Dec. 20, 2011.

DATES: The prospective partially exclusive license may be granted 
unless within fifteen (15) days from the date of this published notice, 
the U.S. Army Research Laboratory receives written objections including 
evidence and argument that establish that the grant of the license 
would not be consistent with the requirements of 35 U.S.C. 209 and 37 
CFR 404.7. Competing applications completed and received by the U.S. 
Army Research Laboratory within fifteen (15) days from the date of this 
published notice will also be treated as objections to the grant of the 
contemplated exclusive license.
    Objections submitted in response to this notice will not be made 
available to

[[Page 26535]]

the public for inspection and, to the extent permitted by law, will not 
be released under the Freedom of Information Act, 5 U.S.C. 552.

ADDRESSES: Send written objections to U.S. Army Research Laboratory 
Technology Transfer and Outreach Office, RDRL-DPT/Thomas Mulkern, 
Building 321 Room 110, Aberdeen Proving Ground, MD 21005-5425.

FOR FURTHER INFORMATION CONTACT: Thomas Mulkern, (410) 278-0889, email: 
ORTA@arl.army.mil

SUPPLEMENTARY INFORMATION: None.

Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 2016-10264 Filed 5-2-16; 8:45 am]
 BILLING CODE 5001-03-P



                                                    26534                           Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices

                                                    education (e.g., four-year college,                     repayment plans, affect consumer                        6. How could the visual presentation
                                                    community college, for-profit college,                  decision-making? Personalized                         of information, including the
                                                    vocational school);                                     information means repayment                           presentation of additional or
                                                      j. Borrowers who are currently                        information based on a borrower’s                     supplemental information in electronic
                                                    enrolled in an income-driven repayment                  personal information, including income                communications, affect consumer
                                                    plan;                                                   and family size.                                      decision-making when repaying student
                                                      k. Borrowers who are in school or in                     2. Please provide any additional                   loans?
                                                    a grace period;                                         relevant information related to written                 Dated: April 25, 2016.
                                                      l. Borrowers with Direct Loans;                       communications with student loan                      Richard Cordray,
                                                      m. Borrowers with Federal Family                      borrowers regarding repayment options,                Director, Bureau of Consumer Financial
                                                    Education Loan Program (FFELP) loans;                   including, for example:                               Protection.
                                                      n. Borrowers with Perkins loans;                         a. Examples of existing written                    [FR Doc. 2016–10327 Filed 5–2–16; 8:45 am]
                                                      o. Parents with loans made through                    communications provided to student                    BILLING CODE 4810–AM–P
                                                    the PLUS program; and                                   loan borrowers;
                                                      p. Borrowers with Federal                                b. Information about the advantages
                                                    Consolidation Loans or Direct                           and disadvantages of such
                                                    Consolidation Loans.                                                                                          DEPARTMENT OF DEFENSE
                                                                                                            communications, including any relevant
                                                    Section II. Specific Questions to                       information related to implementation,                Department of the Army
                                                    Borrowers About Elements of Payback                     operations, and maintenance associated
                                                    Playbooks A and C                                       with dissemination of these                           Notice of Intent To Grant Partially
                                                                                                            communications;                                       Exclusive Patent License to 3D-sensIR,
                                                      To supplement this request for                           c. Information related to privacy and              Inc.; Stevenson Ranch, CA
                                                    information, the Bureau launched a                      data security considerations when
                                                    consumer-facing landing page soliciting                                                                       AGENCY:   Department of the Army, DoD.
                                                                                                            populating and disseminating
                                                    feedback on these prototype Payback                     information about borrowers’ loans,                   ACTION:   Notice of intent.
                                                    Playbooks.23 The Bureau developed the                   income information, or other sensitive
                                                    following specific questions for                                                                              SUMMARY:    In compliance with 35 U.S.C.
                                                                                                            financial or personal information,                    209(e) and 37 CFR 404.7(a)(1)(i), the
                                                    individual student loan borrowers, in                   including protecting the privacy of
                                                    order to better understand how the                                                                            Department of the Army hereby gives
                                                                                                            borrowers in electronic communications                notice of its intent to grant to 3D-sensIR,
                                                    Playbook could most effectively serve                   like email or text message;
                                                    their needs. Although all commenters                                                                          Inc.; a corporation having its principle
                                                                                                               d. Feedback about information                      place of business at 25762 Hawthorne
                                                    are encouraged to review this request for               systems and other technical
                                                    information in its entirety, consumers                                                                        Place, Stevenson Ranch, CA 91381, a
                                                                                                            considerations when populating and                    partially exclusive license, for their
                                                    should consider following questions                     disseminating personalized information
                                                    when evaluating these prototype                                                                               design and development of handheld 3D
                                                                                                            about student loans, including any                    smart cameras with specific application
                                                    borrower communications:                                feedback about existing information
                                                      1. How would the Playbook help you                                                                          in the areas of photorealistic 3D
                                                                                                            systems that provide accurate,                        measurements in the fields of
                                                    understand and evaluate the options                     personalized information to consumers
                                                    you have to pay your student loan if it                                                                       Architecture, Engineering, Construction
                                                                                                            with student loans;                                   (AEC), Utility Assets Management, Law
                                                    reflected your likely payments based on
                                                                                                               e. Information about the availability,             Enforcement (i.e., crime and accident
                                                    your actual income?
                                                                                                            cost, and accuracy of potential data                  scene investigations), Real-Estate, Arts
                                                      2. How could the Playbook better
                                                                                                            sources that include the income and                   and Entertainment, Commercial Drones,
                                                    provide you with important information
                                                                                                            family size of student loan borrowers;                Commercial Robotics and Logistics. The
                                                    about your repayment options?
                                                                                                            and                                                   proposed license would be relative to
                                                      3. How would it be best to see the
                                                                                                               f. Information about the use of                    the following:
                                                    Playbook (e.g., in monthly billing
                                                    statements, when you log on to your
                                                                                                            consumer data, in order to populate                      • U.S. Patent Number 8,081,301
                                                                                                            information contained in personalized                 entitled ‘‘LADAR Transmitting and
                                                    account online, etc.)?
                                                                                                            communications.                                       Receiving System and Method’’,
                                                      4. At what point during repayment
                                                    would you like to receive personalized                     3. How could the communication                     Inventors Stann, Giza and Lawler, Issue
                                                    information about available repayment                   channel (e.g., U.S. Mail, email, SMS,                 Date Dec. 20, 2011.
                                                    options (e.g., during your grace period,                online portal) used to deliver borrower               DATES: The prospective partially
                                                    during repayment, etc.)?                                communications affect borrower                        exclusive license may be granted unless
                                                                                                            engagement (e.g., email open rates,                   within fifteen (15) days from the date of
                                                    Section III: General Questions About the                click-through rates, inbound telephone                this published notice, the U.S. Army
                                                    Communication of Information to                         calls)?                                               Research Laboratory receives written
                                                    Student Loan Borrowers in Repayment                        4. How could personalized                          objections including evidence and
                                                       The following questions solicit input                information obtained to populate                      argument that establish that the grant of
                                                    from the public about the effects of                    written communications be adapted to                  the license would not be consistent with
                                                    increased disclosure of information                     enhance oral communications with                      the requirements of 35 U.S.C. 209 and
                                                                                                            consumers?                                            37 CFR 404.7. Competing applications
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    regarding repayment options in written
                                                    communications to student loan                             5. Please provide any relevant                     completed and received by the U.S.
                                                    borrowers from student loan servicers.                  information about the applicability of                Army Research Laboratory within
                                                       1. How could personalized                            personalized communications to                        fifteen (15) days from the date of this
                                                    information related to repayment                        different segments of the student loan                published notice will also be treated as
                                                    options, including income-driven                        market (i.e., private student loans,                  objections to the grant of the
                                                                                                            guaranteed loans made under the                       contemplated exclusive license.
                                                      23 http://www.consumerfinance.gov/payback-            Federal Family Education Loan                            Objections submitted in response to
                                                    playbook.                                               Program, and Direct Loans).                           this notice will not be made available to


                                               VerDate Sep<11>2014   18:53 May 02, 2016   Jkt 238001   PO 00000   Frm 00009   Fmt 4703   Sfmt 4703   E:\FR\FM\03MYN1.SGM   03MYN1


                                                                                    Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices                                                   26535

                                                    the public for inspection and, to the                   ADDRESSES:    To obtain a copy of the SIR             that construction activities may occur
                                                    extent permitted by law, will not be                    send requests to Ms. Amanda Cruz, U.S.                year-round with suspension of in-
                                                    released under the Freedom of                           Army Corps of Engineers, San Francisco                channel work and implementation of a
                                                    Information Act, 5 U.S.C. 552.                          District, 1455 Market Street, 17th Floor,             Project-specific Rain Event Action Plan
                                                    ADDRESSES: Send written objections to                   San Francisco, CA 94103–1398 or email:                (REAP) if 0.5 inch or greater
                                                    U.S. Army Research Laboratory                           Amanda.B.Cruz@usace.army.mil.                         precipitation is forecast by the National
                                                    Technology Transfer and Outreach                        FOR FURTHER INFORMATION CONTACT:                      Weather Service in their 72-hour
                                                    Office, RDRL–DPT/Thomas Mulkern,                        Amanda Cruz, (415) 503–6955.                          forecast for the Project area.
                                                    Building 321 Room 110, Aberdeen                         SUPPLEMENTARY INFORMATION: The                           The SIR evaluates the potential effects
                                                    Proving Ground, MD 21005–5425.                          March 2014 Final GRR/EIS for the                      on environmental resources of removing
                                                    FOR FURTHER INFORMATION CONTACT:                        Berryessa Creek Element, and its                      the exercise pocket park and allowing
                                                    Thomas Mulkern, (410) 278–0889,                         accompanying CWA § 404(b)(1)                          in-channel work year-round in the
                                                    email: ORTA@arl.army.mil                                alternatives analysis, recommended an                 absence of substantial rainfall. Effects
                                                                                                            earthen trapezoidal channel section                   on the following environmental
                                                    SUPPLEMENTARY INFORMATION: None.
                                                                                                            with varying bottom width and 2H:1V                   resources were considered: Air quality;
                                                    Brenda S. Bowen,                                        side slopes that provides protection                  climate change; water resources and
                                                    Army Federal Register Liaison Officer.                  against the one-percent annual chance                 quality; fisheries; biological resources;
                                                    [FR Doc. 2016–10264 Filed 5–2–16; 8:45 am]              exceedance flood event from I–680 in                  topography and soils; geology and
                                                    BILLING CODE 5001–03–P                                  San Jose to Calaveras Boulevard in                    seismicity; cultural resources; land use
                                                                                                            Milpitas (hereinafter ‘‘Project’’). These             and socioeconomics; traffic and
                                                                                                            environmental analyses determined the                 circulation; noise; recreation and public
                                                    DEPARTMENT OF DEFENSE                                   Project to be the National Economic                   access; aesthetics and visual resources;
                                                                                                            Development Plan (NED), the National                  hazardous, toxic, and radiological
                                                    Department of the Army, U.S. Army                       Environmental Policy Act (NEPA)                       waste; growth-inducing effects; and
                                                    Corps of Engineers                                      environmentally preferable alternative,               cumulative effects. Based on this
                                                                                                            the California Environmental Quality                  analysis, the USACE has determined
                                                    Notice of Availability of Supplemental                                                                        that removing the exercise pocket park
                                                                                                            Act (CEQA) § 15126.6(e)(2)
                                                    Information Report for Berryessa                                                                              and allowing in-channel work year-
                                                                                                            environmentally superior alternative,
                                                    Creek Element, Coyote and Berryessa                                                                           round in the absence of substantial
                                                                                                            and the CWA § 404 Least
                                                    Creek, Flood Control Project, Santa                                                                           rainfall will not result in new significant
                                                                                                            Environmentally Damaging Practicable
                                                    Clara County, CA                                                                                              environmental impacts not already
                                                                                                            Alternative (LEDPA). The USACE
                                                    AGENCY:  Department of the Army, U.S.                   Director of Civil Works signed the                    identified in the GRR/EIS.
                                                    Army Corps of Engineers, DOD.                           Record of Decision (ROD) on May 29,                      Because removing the exercise pocket
                                                                                                            2014.                                                 park features and allowing in-channel
                                                    ACTION: Public notice.
                                                                                                               The SIR serves to update the Project               work year-round in the absence of
                                                    SUMMARY:   The U.S. Army Corps of                       description and impact analysis in the                substantial rainfall will not result in
                                                    Engineers (USACE) has prepared a                        GRR/EIS to include the removal of the                 new significant environmental impacts,
                                                    Supplemental Information Report (SIR)                   pocket exercise park facilities and                   these elements do not amount to
                                                    to update and clarify the General                       clarify that in-channel construction may              substantial changes to the proposed
                                                    Reevaluation Report/Environmental                       occur year-round in the absence of                    action and do not constitute significant
                                                    Impact Statement (GRR/EIS) for the                      substantial rainfall. The Project as                  new circumstances or information
                                                    Berryessa Creek Element of the Coyote                   described in the GRR/EIS would remove                 bearing upon the proposed action or its
                                                    and Berryessa Creek, California, Flood                  an existing pocket park with permanent                impacts. Therefore, the USACE
                                                    Control Project (Project) to account for                outdoor exercise equipment and about                  concludes that preparation of a
                                                    the fact that the Project will remove an                460 linear feet of paved trail located on             supplement to the GRR/EIS, as defined
                                                    existing exercise ‘‘pocket park’’ and                   property owned by the Project’s non-                  in section 1502.9(c) of the CEQ
                                                    paved trail within the Project footprint                Federal sponsor, the Santa Clara Valley               Regulations, is not necessary. The
                                                    and will involve in-channel work year-                  Water District, in order to allow for                 Project remains the environmentally
                                                    round in the absence of substantial                     construction of the widened channel.                  preferable alternative.
                                                    rainfall (defined as 0.5 inch or greater                The existence of these features and the               John C. Morrow,
                                                    precipitation forecast by the National                  fact that they would be removed by the                Lieutenant Colonel, U.S. Army, District
                                                    Weather Service in their 72-hour                        Project were inadvertently omitted from               Engineer.
                                                    forecast for the Project area). The                     the GRR–EIS. Additionally, the GRR–                   [FR Doc. 2016–10263 Filed 5–2–16; 8:45 am]
                                                    removal of the existing exercise pocket                 EIS stated that ‘‘construction activities             BILLING CODE 3720–58–P
                                                    park facilities was omitted from the                    would occur primarily during the dry
                                                    original GRR/EIS and the clarification                  season from May to the end of October’’
                                                    regarding in-channel work year-round                    and included a mitigation measure
                                                                                                                                                                  DELAWARE RIVER BASIN
                                                    when weather permits (i.e., in the                      stating that best management practices
                                                                                                                                                                  COMMISSION
                                                    absence of substantial rainfall) is in                  for the Project would include
                                                    response to informal comments. The                      preparation and implementation of ‘‘an
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                                                                                  Notice of Public Hearing and Business
                                                    USACE has determined that these                         Erosion and Sediment Control Plan                     Meeting
                                                    elements do not amount to substantial                   consistent with RWQCB policy and
                                                    changes to the proposed action and do                   guidelines’’ that would require                       May 11 and June 15, 2016.
                                                    not constitute significant new                          contractors to ‘‘limit in-channel                       Notice is hereby given that the
                                                    circumstances or information bearing                    construction to the low-flow period                   Delaware River Basin Commission will
                                                    upon the proposed action or its impacts.                between April 15 and October 31 to                    hold a public hearing on Wednesday,
                                                    Therefore, a supplement to the GRR/EIS                  minimize soil erosion.’’ This SIR                     May 11, 2016. A business meeting will
                                                    is not necessary.                                       clarifies the measure to specifically state           be held the following month, on


                                               VerDate Sep<11>2014   18:53 May 02, 2016   Jkt 238001   PO 00000   Frm 00010   Fmt 4703   Sfmt 4703   E:\FR\FM\03MYN1.SGM   03MYN1



Document Created: 2016-05-03 00:30:15
Document Modified: 2016-05-03 00:30:15
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of intent.
DatesThe prospective partially exclusive license may be granted unless within fifteen (15) days from the date of this published notice, the U.S. Army Research Laboratory receives written objections including evidence and argument that establish that the grant of the license would not be consistent with the requirements of 35 U.S.C. 209 and 37 CFR 404.7. Competing applications completed and received by the U.S. Army Research Laboratory within fifteen (15) days from the date of this published notice will also be treated as objections to the grant of the contemplated exclusive license.
ContactThomas Mulkern, (410) 278-0889, email: [email protected]
FR Citation81 FR 26534 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR