81_FR_26628 81 FR 26543 - Proposed Agency Information Collection

81 FR 26543 - Proposed Agency Information Collection

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 85 (May 3, 2016)

Page Range26543-26545
FR Document2016-10259

The Federal Energy Regulatory Commission (Commission) invites public comment in Docket No. RD16-4-000 on a proposed change to a collection of information (FERC-725M) that the Commission is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques or other forms of information technology.

Federal Register, Volume 81 Issue 85 (Tuesday, May 3, 2016)
[Federal Register Volume 81, Number 85 (Tuesday, May 3, 2016)]
[Notices]
[Pages 26543-26545]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-10259]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RD16-4-000]


Proposed Agency Information Collection

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice and request for comments.

-----------------------------------------------------------------------

SUMMARY: The Federal Energy Regulatory Commission (Commission) invites 
public comment in Docket No. RD16-4-000 on a proposed change to a 
collection of information (FERC-725M) that the Commission is developing 
for submission to the Office of Management and Budget (OMB) pursuant to 
the Paperwork Reduction Act of 1995. Comments are invited on: (a) 
Whether the proposed collection of information is necessary for the 
proper performance of the functions of the agency, including whether 
the information shall have practical utility; (b) the accuracy of the 
agency's estimate of the burden of the proposed collection of 
information, including the validity of the methodology and assumptions 
used; (c) ways to enhance the quality, utility, and clarity of the 
information to be collected; and (d) ways to minimize the burden of the 
collection of information on respondents, including through the use of 
automated collection techniques or other forms of information 
technology.

DATES: Comments regarding this proposed information collection must be 
received on or before July 5, 2016.

ADDRESSES: Comments, identified by docket number, may be filed in the 
following ways:
     Electronic Filing through http://www.ferc.gov. Documents 
created electronically using word processing software should be filed 
in native applications or print-to-PDF format and not in a scanned 
format.
     Mail/Hand Delivery: Those unable to file electronically 
may mail or hand-deliver an original of their comments to: Federal 
Energy Regulatory Commission, Secretary of the Commission, 888 First 
Street NE., Washington, DC 20426.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION: The Commission will submit the reporting and 
recordkeeping requirements of proposed Reliability Standard FAC-003-4 
(Transmission Vegetation Management) to OMB for review. Proposed 
Reliability Standard FAC-003-4 replaces the requirements from the 
previous version of the Reliability Standard (FAC-003-3),\1\ which is 
approved under FERC-725M (Mandatory Reliability Standards: Generator 
Requirements at the Transmission Interface, OMB Control No. 1902-0263).
---------------------------------------------------------------------------

    \1\ Reliability Standard FAC-003-3 was approved in Order No. 785 
in Docket No. RM12-16-000. Revisions to Reliability Standard for 
Transmission Vegetation Management, Order No. 777, 142 FERC ] 61,208 
(2013). The associated reporting and recordkeeping requirements in 
FAC-003-3 were approved by OMB on Dec. 17, 2013, under FERC-725M.
---------------------------------------------------------------------------

    Type of Request: Three-year approval of the revised FERC-725M 
information collection requirements with the stated changes to the 
current reporting and record retention requirements.
    Abstract: The Commission requires the information collected by the 
FERC-725M to implement the statutory provisions of section 215 of the 
Federal Power Act (FPA).\2\ On August 8, 2005, Congress enacted into 
law the Electricity Modernization Act of 2005, which is Title XII, 
Subtitle A, of the Energy Policy Act of 2005 (EPAct 2005).\3\ EPAct 
2005 added a new section 215 to the FPA, which requires a Commission-
certified Electric Reliability Organization (ERO) to develop mandatory 
and enforceable Reliability Standards, which are subject to Commission 
review and approval. Once approved, the Reliability Standards may be 
enforced by the ERO subject to Commission oversight, or the Commission 
can independently enforce Reliability Standards.\4\
---------------------------------------------------------------------------

    \2\ 16 U.S.C. 824o (2012).
    \3\ Energy Policy Act of 2005, Pub. L. 109-58, Title XII, 
Subtitle A, 119 Stat. 594, 941 (codified at 16 U.S.C. 824o).
    \4\ 16 U.S.C. 824o(e)(3).
---------------------------------------------------------------------------

    On February 3, 2006, the Commission issued Order No. 672, 
implementing section 215 of the FPA.\5\ Pursuant to Order No. 672, the 
Commission certified one organization, the North American Electric 
Reliability Corporation (NERC),

[[Page 26544]]

as the ERO.\6\ The Reliability Standards developed by the ERO and 
approved by the Commission apply to users, owners and operators of the 
Bulk-Power System as set forth in each Reliability Standard.
---------------------------------------------------------------------------

    \5\ Rules Concerning Certification of the Electric Reliability 
Organization; and Procedures for the Establishment, Approval, and 
Enforcement of Electric Reliability Standards, Order No. 672, FERC 
Stats. & Regs. ] 31,204, order on reh'g, Order No. 672-A, FERC 
Stats. & Regs. ] 31,212 (2006).
    \6\ North American Electric Reliability Corp., 116 FERC ] 
61,062, order on reh'g and compliance, 117 FERC ] 61,126 (2006), 
order on compliance, 118 FERC ] 61,190, order on reh'g, 119 FERC ] 
61,046 (2007), aff'd sub nom. Alcoa Inc. v. FERC, 564 F.3d 1342 
(D.C. Cir. 2009).
---------------------------------------------------------------------------

    On March 14, 2016, NERC filed a petition for Commission approval of 
proposed Reliability Standard FAC-003-4 (Transmission Vegetation 
Management). NERC states in its petition that proposed Reliability 
Standard FAC-003-4 reflects revisions to the current Minimum Vegetation 
Clearance Distances (MVCDs) in Reliability Standard FAC-003-3 based on 
additional testing regarding the appropriate gap factor to be used to 
calculate clearance distances for vegetation. NERC explains that in 
response to the Commission's directive as part of its approval of an 
earlier version of the Reliability Standard, FAC-003-2, NERC contracted 
with the Electric Power Research Institute (EPRI) to conduct this 
testing.\7\ As NERC notes, when the Commission approved Reliability 
Standard FAC-003-2, the Commission stated that ``it is important that 
NERC develop empirical evidence that either confirms assumptions used 
in calculating the MVCD values based on the Gallet equation, or gives 
reason to revisit the Reliability Standard.'' \8\
---------------------------------------------------------------------------

    \7\ NERC Petition at 7 (citing Order No. 777, 142 FERC ] 61,208 
(2013)).
    \8\ Order No. 777, 142 FERC ] 61,208 at P 3.
---------------------------------------------------------------------------

    NERC states in its petition that preliminary testing conducted by 
EPRI indicated that the gap factor used to calculate MVCDs should be 
adjusted. NERC further explains that proposed Reliability Standard FAC-
003-4 proposes higher and more conservative MVCD values, and therefore 
maintains that these revisions will ``enhance reliability and provide 
additional confidence by applying a more conservative approach to 
determining the vegetation clearing distances.'' \9\ NERC states that 
the revised clearances as reflected in Table 2 were moved into the text 
of the proposed Reliability Standard, and that MVCD values were added 
for elevations up to 15,000 feet, but that no other substantive changes 
were made to the currently-effective Reliability Standard FAC-003-
3.\10\
---------------------------------------------------------------------------

    \9\ NERC Petition at 3.
    \10\ Id. at 12, and n. 37 (describing certain non-substantive 
edits to the standard and implementation plan as compared to the 
currently-effective version of the standard).
---------------------------------------------------------------------------

    Type of Respondents: Transmission Owner (TO); and Generator Owner 
(GO).
    Estimate of Annual Burden.\11\ The burden and cost estimates below 
are based on the number of transmission owners and generator owners as 
reflected in NERC's current registry (i.e., updated since the 
Commission's approval of earlier versions of FAC-003).
---------------------------------------------------------------------------

    \11\ The Commission defines burden as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a federal 
agency. See 5 CFR 1320 for additional information on the definition 
of information collection burden.
---------------------------------------------------------------------------

    Transmission owners and applicable generator owners have a one-time 
burden to review and modify existing documentation, plans and 
procedures, as well as an ongoing burden to retain records. Our 
estimate of the number of respondents affected is based on the NERC 
Compliance Registry as of February 25, 2016. According to the 
Compliance Registry, NERC has registered 320 transmission owners and 
940 generator owners within the United States, and we estimate that 
approximately 10 percent (or 94) of the registered generator owners 
have interconnection facilities that meet the requirements for 
applicability under the new standard. The estimated annual burden and 
cost of the new standard follow.\12\
---------------------------------------------------------------------------

    \12\ The estimates for cost per hour (for salary plus benefits) 
are derived from the Bureau of Labor and Statistics' figures for May 
2015 (at http://www.bls.gov/oes/current/naics2_22.htm#11-0000 and 
benefits [updated March 10, 2016] at http://www.bls.gov/news.release/ecec.nr0.htm), as follows:
     $62.16/hour for salary plus benefits [based on the 
average for an electrical engineer (code 17-2071, at $64.20/hour), a 
first-line supervisor of forestry workers (code 45-1011, at $33.34/
hour), and a manager (code 11-0000, at $88.94/hour)]
     $31.76/hour, salary plus benefits for an information 
and record clerk (code 43-4000).
    \13\ The Order in Docket No. RD16-4 does not modify the 
following requirements. However, due to normal fluctuations in 
industry, the number of respondents (TOs and GOs), in the submittal 
to OMB will be updated as follows.
     The Quarterly Reporting (Compliance 1.4) is required of 
102 respondents (94 GOs and 8 Regional Entities), rather than 96 
respondents.
     The requirements for Annual Vegetation Inspection 
Document (M6), annual vegetation work plan (M7), evidence of 
management of vegetation (M1 and M2), confirmed vegetation condition 
(M4), and corrective action (M5) are required of 94 respondents 
(rather than 88).
    \14\ We estimate a total of 414 respondents (320 TOs and 94 GOs) 
are affected.

                                              FERC-725M, Changes Due to FAC-003-4 in Docket No. RD16-4-000
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                          Number of       Number of                                                                        Total annual
     Requirements/ Measures \13\         respondents    responses per   Total number   Average burden hours and    Total annual burden       cost per
                                            \14\         respondent     of responses       cost per response          hours and cost        respondent
                                                  (1)             (2)     (1)*(2)=(3)  (4).....................  (3)*(4)=(5)............             ($)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Strategies, documentation, processes,             414               1             414  4 hrs.; $248.64.........  1,656 hrs.; $102,936.96         $248.64
 & procedures (M3) [one-time].                                                                                    [@$62.16/hr.].
Record Retention (Compliance 1.2)                 414               1             414  1 hr.; $31.76...........  414 hrs.; $13,148.64             $31.76
 [ongoing].                                                                                                       [@$31.76/hr.].
                                                                      ----------------                          -------------------------
    Total Net Change, due to RD16-4..                                             828                            2,070 hrs.; $116,085.60
--------------------------------------------------------------------------------------------------------------------------------------------------------



[[Page 26545]]

    Dated: April 26, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-10259 Filed 5-2-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                    Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices                                                      26543

                                                       Description: Annual Report of                          Dated: April 26, 2016.                              at DataClearance@FERC.gov, telephone
                                                    Operational Imbalances and Cash-out                     Nathaniel J. Davis, Sr.,                              at (202) 502–8663, and fax at (202) 273–
                                                    Activity of Cameron Interstate Pipeline,                Deputy Secretary.                                     0873.
                                                    LLC.                                                    [FR Doc. 2016–10257 Filed 5–2–16; 8:45 am]            SUPPLEMENTARY INFORMATION:      The
                                                       Filed Date: 4/25/16.                                 BILLING CODE 6717–01–P                                Commission will submit the reporting
                                                       Accession Number: 20160425–5214.                                                                           and recordkeeping requirements of
                                                       Comments Due: 5 p.m. ET 5/9/16.                                                                            proposed Reliability Standard FAC–
                                                       Docket Numbers: RP16–871–000.                        DEPARTMENT OF ENERGY                                  003–4 (Transmission Vegetation
                                                       Applicants: Cameron Interstate                                                                             Management) to OMB for review.
                                                                                                            Federal Energy Regulatory
                                                    Pipeline, LLC.                                                                                                Proposed Reliability Standard FAC–
                                                                                                            Commission
                                                       Description: Annual Report of                                                                              003–4 replaces the requirements from
                                                    Operational Imbalances and Cash-out                     [Docket No. RD16–4–000]                               the previous version of the Reliability
                                                    Activity of Cameron Interstate Pipeline,                                                                      Standard (FAC–003–3),1 which is
                                                    LLC.                                                    Proposed Agency Information                           approved under FERC–725M
                                                                                                            Collection                                            (Mandatory Reliability Standards:
                                                       Filed Date: 4/25/16.
                                                       Accession Number: 20160425–5217.                     AGENCY: Federal Energy Regulatory                     Generator Requirements at the
                                                       Comments Due: 5 p.m. ET 5/9/16.                      Commission.                                           Transmission Interface, OMB Control
                                                                                                            ACTION: Notice and request for
                                                                                                                                                                  No. 1902–0263).
                                                       Docket Numbers: RP16–872–000.
                                                       Applicants: El Paso Natural Gas                      comments.                                                Type of Request: Three-year approval
                                                    Company, L.L.C.                                                                                               of the revised FERC–725M information
                                                                                                            SUMMARY:    The Federal Energy                        collection requirements with the stated
                                                       Description: § 4(d) Rate Filing: Non-
                                                                                                            Regulatory Commission (Commission)                    changes to the current reporting and
                                                    Conforming Negotiated Rate Service
                                                                                                            invites public comment in Docket No.                  record retention requirements.
                                                    Agreement Filing (Anadarko) to be
                                                                                                            RD16–4–000 on a proposed change to a                     Abstract: The Commission requires
                                                    effective 5/25/2016.
                                                                                                            collection of information (FERC–725M)                 the information collected by the FERC–
                                                       Filed Date: 4/25/16.                                 that the Commission is developing for
                                                       Accession Number: 20160425–5292.                                                                           725M to implement the statutory
                                                                                                            submission to the Office of Management                provisions of section 215 of the Federal
                                                       Comments Due: 5 p.m. ET 5/9/16.                      and Budget (OMB) pursuant to the                      Power Act (FPA).2 On August 8, 2005,
                                                       Any person desiring to intervene or                  Paperwork Reduction Act of 1995.
                                                                                                                                                                  Congress enacted into law the
                                                    protest in any of the above proceedings                 Comments are invited on: (a) Whether
                                                                                                                                                                  Electricity Modernization Act of 2005,
                                                    must file in accordance with Rules 211                  the proposed collection of information
                                                                                                                                                                  which is Title XII, Subtitle A, of the
                                                    and 214 of the Commission’s                             is necessary for the proper performance
                                                                                                                                                                  Energy Policy Act of 2005 (EPAct
                                                    Regulations (18 CFR 385.211 and                         of the functions of the agency, including
                                                                                                                                                                  2005).3 EPAct 2005 added a new section
                                                    § 385.214) on or before 5:00 p.m. Eastern               whether the information shall have
                                                                                                                                                                  215 to the FPA, which requires a
                                                    time on the specified comment date.                     practical utility; (b) the accuracy of the
                                                                                                                                                                  Commission-certified Electric
                                                    Protests may be considered, but                         agency’s estimate of the burden of the
                                                                                                                                                                  Reliability Organization (ERO) to
                                                    intervention is necessary to become a                   proposed collection of information,
                                                                                                                                                                  develop mandatory and enforceable
                                                    party to the proceeding.                                including the validity of the
                                                                                                                                                                  Reliability Standards, which are subject
                                                                                                            methodology and assumptions used; (c)
                                                    Filings in Existing Proceedings                                                                               to Commission review and approval.
                                                                                                            ways to enhance the quality, utility, and
                                                                                                                                                                  Once approved, the Reliability
                                                       Docket Numbers: RP15–1026–001.                       clarity of the information to be
                                                                                                                                                                  Standards may be enforced by the ERO
                                                       Applicants: Maritimes & Northeast                    collected; and (d) ways to minimize the
                                                                                                                                                                  subject to Commission oversight, or the
                                                    Pipeline, L.L.C.                                        burden of the collection of information
                                                                                                                                                                  Commission can independently enforce
                                                       Description: Compliance filing MNUS                  on respondents, including through the
                                                                                                                                                                  Reliability Standards.4
                                                    Settlement Filing to be effective 5/1/                  use of automated collection techniques
                                                    2016.                                                   or other forms of information                            On February 3, 2006, the Commission
                                                       Filed Date: 4/25/16.                                 technology.                                           issued Order No. 672, implementing
                                                                                                                                                                  section 215 of the FPA.5 Pursuant to
                                                       Accession Number: 20160425–5216.                     DATES:   Comments regarding this                      Order No. 672, the Commission certified
                                                       Comments Due: 5 p.m. ET 5/9/16.                      proposed information collection must                  one organization, the North American
                                                       Any person desiring to protest in any                be received on or before July 5, 2016.                Electric Reliability Corporation (NERC),
                                                    of the above proceedings must file in                   ADDRESSES: Comments, identified by
                                                    accordance with Rule 211 of the                         docket number, may be filed in the                      1 Reliability Standard FAC–003–3 was approved
                                                    Commission’s Regulations (18 CFR                        following ways:                                       in Order No. 785 in Docket No. RM12–16–000.
                                                    385.211) on or before 5:00 p.m. Eastern                   • Electronic Filing through http://                 Revisions to Reliability Standard for Transmission
                                                    time on the specified comment date.                     www.ferc.gov. Documents created                       Vegetation Management, Order No. 777, 142 FERC
                                                                                                                                                                  ¶ 61,208 (2013). The associated reporting and
                                                       The filings are accessible in the                    electronically using word processing                  recordkeeping requirements in FAC–003–3 were
                                                    Commission’s eLibrary system by                         software should be filed in native                    approved by OMB on Dec. 17, 2013, under FERC–
                                                    clicking on the links or querying the                   applications or print-to-PDF format and               725M.
                                                                                                                                                                    2 16 U.S.C. 824o (2012).
                                                    docket number.                                          not in a scanned format.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                       eFiling is encouraged. More detailed                   • Mail/Hand Delivery: Those unable                    3 Energy Policy Act of 2005, Pub. L. 109–58, Title

                                                                                                                                                                  XII, Subtitle A, 119 Stat. 594, 941 (codified at 16
                                                    information relating to filing                          to file electronically may mail or hand-              U.S.C. 824o).
                                                    requirements, interventions, protests,                  deliver an original of their comments to:               4 16 U.S.C. 824o(e)(3).

                                                    service, and qualifying facilities filings              Federal Energy Regulatory Commission,                   5 Rules Concerning Certification of the Electric

                                                    can be found at: http://www.ferc.gov/                   Secretary of the Commission, 888 First                Reliability Organization; and Procedures for the
                                                                                                            Street NE., Washington, DC 20426.                     Establishment, Approval, and Enforcement of
                                                    docs-filing/efiling/filing-req.pdf. For                                                                       Electric Reliability Standards, Order No. 672, FERC
                                                    other information, call (866) 208–3676                  FOR FURTHER INFORMATION CONTACT:                      Stats. & Regs. ¶ 31,204, order on reh’g, Order No.
                                                    (toll free). For TTY, call (202) 502–8659.              Ellen Brown may be reached by email                   672–A, FERC Stats. & Regs. ¶ 31,212 (2006).



                                               VerDate Sep<11>2014   18:53 May 02, 2016   Jkt 238001   PO 00000   Frm 00018   Fmt 4703   Sfmt 4703   E:\FR\FM\03MYN1.SGM   03MYN1


                                                    26544                            Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices

                                                    as the ERO.6 The Reliability Standards                  that NERC develop empirical evidence                          Estimate of Annual Burden.11 The
                                                    developed by the ERO and approved by                    that either confirms assumptions used                       burden and cost estimates below are
                                                    the Commission apply to users, owners                   in calculating the MVCD values based                        based on the number of transmission
                                                    and operators of the Bulk-Power System                  on the Gallet equation, or gives reason                     owners and generator owners as
                                                    as set forth in each Reliability Standard.              to revisit the Reliability Standard.’’ 8                    reflected in NERC’s current registry (i.e.,
                                                      On March 14, 2016, NERC filed a                         NERC states in its petition that                          updated since the Commission’s
                                                    petition for Commission approval of                     preliminary testing conducted by EPRI                       approval of earlier versions of FAC–
                                                    proposed Reliability Standard FAC–                      indicated that the gap factor used to                       003).
                                                    003–4 (Transmission Vegetation                          calculate MVCDs should be adjusted.                           Transmission owners and applicable
                                                    Management). NERC states in its                         NERC further explains that proposed                         generator owners have a one-time
                                                    petition that proposed Reliability                      Reliability Standard FAC–003–4                              burden to review and modify existing
                                                    Standard FAC–003–4 reflects revisions                   proposes higher and more conservative                       documentation, plans and procedures,
                                                    to the current Minimum Vegetation                       MVCD values, and therefore maintains                        as well as an ongoing burden to retain
                                                    Clearance Distances (MVCDs) in                          that these revisions will ‘‘enhance                         records. Our estimate of the number of
                                                    Reliability Standard FAC–003–3 based                    reliability and provide additional                          respondents affected is based on the
                                                    on additional testing regarding the                     confidence by applying a more                               NERC Compliance Registry as of
                                                    appropriate gap factor to be used to                    conservative approach to determining                        February 25, 2016. According to the
                                                    calculate clearance distances for                       the vegetation clearing distances.’’ 9                      Compliance Registry, NERC has
                                                    vegetation. NERC explains that in                       NERC states that the revised clearances                     registered 320 transmission owners and
                                                    response to the Commission’s directive                  as reflected in Table 2 were moved into                     940 generator owners within the United
                                                    as part of its approval of an earlier                   the text of the proposed Reliability                        States, and we estimate that
                                                    version of the Reliability Standard,                    Standard, and that MVCD values were                         approximately 10 percent (or 94) of the
                                                    FAC–003–2, NERC contracted with the                     added for elevations up to 15,000 feet,                     registered generator owners have
                                                    Electric Power Research Institute (EPRI)                but that no other substantive changes                       interconnection facilities that meet the
                                                    to conduct this testing.7 As NERC notes,                were made to the currently-effective                        requirements for applicability under the
                                                    when the Commission approved                            Reliability Standard FAC–003–3.10                           new standard. The estimated annual
                                                    Reliability Standard FAC–003–2, the                       Type of Respondents: Transmission                         burden and cost of the new standard
                                                    Commission stated that ‘‘it is important                Owner (TO); and Generator Owner (GO).                       follow.12

                                                                                  FERC–725M, CHANGES DUE TO FAC–003–4 IN DOCKET NO. RD16–4–000
                                                                                                         Number of                              Average burden hours                                       Total annual
                                                          Requirements/              Number of                             Total number                                          Total annual burden
                                                                                                       responses per                                and cost per                                             cost per
                                                           Measures 13             respondents 14                          of responses                                            hours and cost
                                                                                                         respondent                                   response                                             respondent

                                                                                          (1)                (2)               (1)*(2)=(3)                  (4)                       (3)*(4)=(5)               ($)

                                                    Strategies, documenta-                      414                    1                  414   4 hrs.; $248.64 ...........     1,656 hrs.;                      $248.64
                                                      tion, processes, & pro-                                                                                                     $102,936.96 [@
                                                      cedures (M3) [one-                                                                                                          $62.16/hr.].
                                                      time].
                                                    Record Retention (Com-                      414                    1                  414   1 hr.; $31.76 ...............   414 hrs.; $13,148.64              $31.76
                                                      pliance 1.2) [ongoing].                                                                                                     [@$31.76/hr.].

                                                         Total Net Change,                                                                828                                   2,070 hrs.;
                                                           due to RD16–4.                                                                                                         $116,085.60.




                                                       6 North American Electric Reliability Corp., 116     provide information to or for a federal agency. See           13 The Order in Docket No. RD16–4 does not

                                                    FERC ¶ 61,062, order on reh’g and compliance, 117       5 CFR 1320 for additional information on the                modify the following requirements. However, due
                                                    FERC ¶ 61,126 (2006), order on compliance, 118          definition of information collection burden.                to normal fluctuations in industry, the number of
                                                    FERC ¶ 61,190, order on reh’g, 119 FERC ¶ 61,046          12 The estimates for cost per hour (for salary plus
                                                                                                                                                                        respondents (TOs and GOs), in the submittal to
                                                    (2007), aff’d sub nom. Alcoa Inc. v. FERC, 564 F.3d     benefits) are derived from the Bureau of Labor and          OMB will be updated as follows.
                                                    1342 (D.C. Cir. 2009).                                  Statistics’ figures for May 2015 (at http://                  • The Quarterly Reporting (Compliance 1.4) is
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                       7 NERC Petition at 7 (citing Order No. 777, 142
                                                                                                            www.bls.gov/oes/current/naics2_22.htm#11-0000
                                                                                                                                                                        required of 102 respondents (94 GOs and 8 Regional
                                                    FERC ¶ 61,208 (2013)).                                  and benefits [updated March 10, 2016] at http://
                                                                                                                                                                        Entities), rather than 96 respondents.
                                                       8 Order No. 777, 142 FERC ¶ 61,208 at P 3.           www.bls.gov/news.release/ecec.nr0.htm), as
                                                       9 NERC Petition at 3.                                follows:                                                      • The requirements for Annual Vegetation
                                                       10 Id. at 12, and n. 37 (describing certain non-       • $62.16/hour for salary plus benefits [based on          Inspection Document (M6), annual vegetation work
                                                    substantive edits to the standard and                   the average for an electrical engineer (code 17–            plan (M7), evidence of management of vegetation
                                                    implementation plan as compared to the currently-       2071, at $64.20/hour), a first-line supervisor of           (M1 and M2), confirmed vegetation condition (M4),
                                                    effective version of the standard).                     forestry workers (code 45–1011, at $33.34/hour),            and corrective action (M5) are required of 94
                                                       11 The Commission defines burden as the total        and a manager (code 11–0000, at $88.94/hour)]               respondents (rather than 88).
                                                    time, effort, or financial resources expended by          • $31.76/hour, salary plus benefits for an                  14 We estimate a total of 414 respondents (320

                                                    persons to generate, maintain, retain, or disclose or   information and record clerk (code 43–4000).                TOs and 94 GOs) are affected.


                                               VerDate Sep<11>2014   18:53 May 02, 2016   Jkt 238001   PO 00000    Frm 00019   Fmt 4703    Sfmt 4703   E:\FR\FM\03MYN1.SGM       03MYN1


                                                                                    Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices                                             26545

                                                      Dated: April 26, 2016.                                above list. They are also available for               Commission’s policy that agencies that
                                                    Nathaniel J. Davis, Sr.,                                electronic review in the Commission’s                 cooperate in the preparation of the
                                                    Deputy Secretary.                                       Public Reference Room in Washington,                  environmental document cannot also
                                                    [FR Doc. 2016–10259 Filed 5–2–16; 8:45 am]              DC. There is an eSubscription link on                 intervene. See 94 FERC ¶ 61,076 (2001).
                                                    BILLING CODE 6717–01–P                                  the Web site that enables subscribers to                 k. With this notice, we are initiating
                                                                                                            receive email notification when a                     informal consultation with: (a) The U.S.
                                                                                                            document is added to a subscribed                     Fish and Wildlife Service and/or NOAA
                                                    DEPARTMENT OF ENERGY                                    docket(s). For assistance with any FERC               Fisheries under section 7 of the
                                                                                                            Online service, please email                          Endangered Species Act and the joint
                                                    Federal Energy Regulatory                               FERCOnlineSupport@ferc.gov. or call                   agency regulations thereunder at 50 CFR
                                                    Commission                                              (866) 208–3676 (toll free). For TTY, call             part 402 and (b) the State Historic
                                                                                                            (202) 502–8659.                                       Preservation Officer, as required by
                                                    [Docket No. ER16–1398–001]
                                                                                                                                                                  section 106, National Historic
                                                                                                              Dated: April 26, 2016.
                                                    Provision Power & Gas, LLC;                                                                                   Preservation Act, and the implementing
                                                                                                            Nathaniel J. Davis, Sr.,                              regulations of the Advisory Council on
                                                    Supplemental Notice That Initial                        Deputy Secretary.
                                                    Market-Based Rate Filing Includes                                                                             Historic Preservation at 36 CFR 800.2.
                                                    Request for Blanket Section 204
                                                                                                            [FR Doc. 2016–10258 Filed 5–2–16; 8:45 am]               l. With this notice, we are designating
                                                    Authorization                                           BILLING CODE 6717–01–P                                French Paper Company as the
                                                                                                                                                                  Commission’s non-federal
                                                       This is a supplemental notice in the                                                                       representative for carrying out informal
                                                    above-referenced proceeding of                          DEPARTMENT OF ENERGY                                  consultation, pursuant to section 7 of
                                                    Provision Power & Gas, LLC‘s                                                                                  the Endangered Species Act and section
                                                    application for market-based rate                       Federal Energy Regulatory                             106 of the National Historic
                                                    authority, with an accompanying rate                    Commission                                            Preservation Act.
                                                    tariff, noting that such application                    [Project No. 10624–025]                                  m. French Paper Company filed with
                                                    includes a request for blanket                                                                                the Commission a Pre-Application
                                                    authorization, under 18 CFR part 34, of                 French Paper Company; Notice of                       Document (PAD; including a proposed
                                                    future issuances of securities and                      Intent To File License Application,                   process plan and schedule), pursuant to
                                                    assumptions of liability.                               Filing of Pre-Application Document                    18 CFR 5.6 of the Commission’s
                                                       Any person desiring to intervene or to               (Pad), Commencement of Pre-Filing                     regulations.
                                                    protest should file with the Federal                    Process, and Scoping; Request for                        n. A copy of the PAD is available for
                                                    Energy Regulatory Commission, 888                       Comments on the Pad and Scoping                       review at the Commission in the Public
                                                    First Street NE., Washington, DC 20426,                 Document, and Identification of Issues                Reference Room or may be viewed on
                                                    in accordance with Rules 211 and 214                    and Associated Study Requests                         the Commission’s Web site (http://
                                                    of the Commission’s Rules of Practice                                                                         www.ferc.gov), using the ‘‘eLibrary’’
                                                    and Procedure (18 CFR 385.211 and                          a. Type of Filing: Notice of Intent to             link. Enter the docket number,
                                                    385.214). Anyone filing a motion to                     File License Application for a New                    excluding the last three digits in the
                                                    intervene or protest must serve a copy                  License and Commencing Pre-filing                     docket number field to access the
                                                    of that document on the Applicant.                      Process.                                              document. For assistance, contact FERC
                                                       Notice is hereby given that the                         b. Project No.: 10624–025.                         Online Support at
                                                    deadline for filing protests with regard                   c. Dated Filed: February 26, 2016.                 FERCONlineSupport@ferc.gov, (866)
                                                    to the applicant’s request for blanket                     d. Submitted By: French Paper                      208–3676 (toll free), or (202) 502–8659
                                                    authorization, under 18 CFR part 34, of                 Company.                                              (TTY). A copy is also available for
                                                    future issuances of securities and                         e. Name of Project: French Paper                   inspection and reproduction at the
                                                    assumptions of liability, is May 16,                    Project.                                              address in paragraph h.
                                                    2016.                                                      f. Location: The French Paper Project                 Register online at http://
                                                       The Commission encourages                            is located on the St. Joseph River in the             www.ferc.gov/docs-filing/
                                                    electronic submission of protests and                   City of Niles, Michigan. The project                  esubscription.asp to be notified via
                                                    interventions in lieu of paper, using the               does not occupy federal land.                         email of new filing and issuances
                                                    FERC Online links at http://                               g. Filed Pursuant to: 18 CFR part 5 of             related to this or other pending projects.
                                                    www.ferc.gov. To facilitate electronic                  the Commission’s Regulations.                         For assistance, contact FERC Online
                                                    service, persons with Internet access                      h. Potential Applicant Contact: Shane              Support.
                                                    who will eFile a document and/or be                     Fenske, Vice President of Operations,                    o. With this notice, we are soliciting
                                                    listed as a contact for an intervenor                   French Paper Company, 100 French                      comments on the PAD and
                                                    must create and validate an                             Street, Niles, Michigan 49120; (269)                  Commission’s staff Scoping Document 1
                                                    eRegistration account using the                         683–1100; fenske@frenchpaper.com.                     (SD1), as well as study requests. All
                                                    eRegistration link. Select the eFiling                     i. FERC Contact: Jay Summers at (202)              comments on the PAD and SD1, and
                                                    link to log on and submit the                           502–8764 or email at jay.summers@                     study requests should be sent to the
                                                    intervention or protests.                               ferc.gov.                                             address above in paragraph h. In
                                                       Persons unable to file electronically                   j. Cooperating agencies: Federal, state,           addition, all comments on the PAD and
                                                    should submit an original and 5 copies                  local, and tribal agencies with                       SD1, study requests, requests for
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    of the intervention or protest to the                   jurisdiction and/or special expertise                 cooperating agency status, and all
                                                    Federal Energy Regulatory Commission,                   with respect to environmental issues                  communications to and from
                                                    888 First Street NE., Washington, DC                    that wish to cooperate in the                         Commission staff related to the merits of
                                                    20426.                                                  preparation of the environmental                      the potential application must be filed
                                                       The filings in the above-referenced                  document should follow the                            with the Commission.
                                                    proceeding are accessible in the                        instructions for filing such requests                    The Commission strongly encourages
                                                    Commission’s eLibrary system by                         described in paragraph o below.                       electronic filing. Please file all
                                                    clicking on the appropriate link in the                 Cooperating agencies should note the                  documents using the Commission’s


                                               VerDate Sep<11>2014   18:53 May 02, 2016   Jkt 238001   PO 00000   Frm 00020   Fmt 4703   Sfmt 4703   E:\FR\FM\03MYN1.SGM   03MYN1



Document Created: 2016-05-03 00:30:38
Document Modified: 2016-05-03 00:30:38
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice and request for comments.
DatesComments regarding this proposed information collection must be received on or before July 5, 2016.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.
FR Citation81 FR 26543 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR