81_FR_26631 81 FR 26546 - Proposed Information Collection Request; Comment Request

81 FR 26546 - Proposed Information Collection Request; Comment Request

ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 81, Issue 85 (May 3, 2016)

Page Range26546-26551
FR Document2016-10393

The Environmental Protection Agency is planning to submit the below listed information collection requests (ICR) (See item specific ICR title, EPA ICR Number and OMB Control Number provided in the text) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). Before doing so, EPA is soliciting public comments on specific aspects of the proposed information collection as described below. These are proposed extensions of the currently approved ICRs. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.

Federal Register, Volume 81 Issue 85 (Tuesday, May 3, 2016)
[Federal Register Volume 81, Number 85 (Tuesday, May 3, 2016)]
[Notices]
[Pages 26546-26551]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-10393]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[FRL-9946-03-OECA]


Proposed Information Collection Request; Comment Request

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency is planning to submit the 
below listed information collection requests (ICR) (See item specific 
ICR title, EPA ICR Number and OMB Control Number provided in the text) 
to the Office of Management and Budget (OMB) for review and approval in 
accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). 
Before doing so, EPA is soliciting public comments on specific aspects 
of the proposed information collection as described below. These are 
proposed extensions of the currently approved ICRs. An Agency may not 
conduct or sponsor and a person is not required to respond to a 
collection of information unless it displays a currently valid OMB 
control number.

DATES: Comments must be submitted on or before July 5, 2016.

ADDRESSES: Submit your comments, referencing the Docket ID numbers 
provided for each item in the text, online using www.regulations.gov 
(our preferred method), by email to docket.oeca@epa.gov, or by mail to: 
EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 
1200 Pennsylvania Ave. NW., Washington, DC 20460.
    EPA's policy is that all comments received will be included in the 
public docket without change including any personal information 
provided, unless the comment includes profanity, threats, information 
claimed to be Confidential Business Information (CBI) or other 
information whose disclosure is restricted by statute.

FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. 
NW., Washington, DC 20460; telephone number: (202) 564-2970; fax 
number: (202) 564-0050; email address: yellin.patrick@epa.gov.

[[Page 26547]]


SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail 
the information that the EPA will be collecting are available in the 
public docket for this ICR. The docket can be viewed online at 
www.regulations.gov or in person at the EPA Docket Center, EPA West, 
Room 3334, 1301 Constitution Ave. NW., Washington, DC. The telephone 
number for the Docket Center is 202-566-1744. For additional 
information about EPA's public docket, visit http://www.epa.gov/dockets.
    Pursuant to section 3506(c)(2)(A) of the PRA, EPA is soliciting 
comments and information to enable it to: (i) Evaluate whether the 
proposed collection of information is necessary for the proper 
performance of the functions of the Agency, including whether the 
information will have practical utility; (ii) evaluate the accuracy of 
the Agency's estimate of the burden of the proposed collection of 
information, including the validity of the methodology and assumptions 
used; (iii) enhance the quality, utility, and clarity of the 
information to be collected; and (iv) minimize the burden of the 
collection of information on those who are to respond, including 
through the use of appropriate automated electronic, mechanical, or 
other technological collection techniques or other forms of information 
technology, e.g., permitting electronic submission of responses. Burden 
is defined at 5 CFR 1320.03(b). EPA will consider the comments received 
and amend the ICR as appropriate. The final ICR package will then be 
submitted to OMB for review and approval. At that time, EPA will issue 
another Federal Register notice to announce the submission of the ICR 
to OMB and the opportunity to submit additional comments to OMB.
    General Abstract: For all the listed ICRs in this notice, owners 
and operators of affected facilities are required to comply with 
reporting and record keeping requirements for the general provisions of 
40 CFR part 60, subpart A or Part 63, Subpart A, as well as the 
applicable specific standards. This includes submitting initial 
notifications, performance tests and periodic reports and results, and 
maintaining records of the occurrence and duration of any startup, 
shutdown, or malfunction in the operation of an affected facility, or 
any period during which the monitoring system is inoperative. These 
reports are used by EPA to determine compliance with the standards.

    (1) Docket ID Number: EPA-HQ-OECA-2013-0336; Title: NESHAP for Off-
Site Waste and Recovery Operations (40 CFR part 63, subpart DD); EPA 
ICR Number 1717.10, OMB Control Number 2060-0313; Expiration Date: 
October 31, 2016.
    Respondents: Waste management and recovery facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart DD).
    Estimated number of respondents: 236 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 179,000 hours.
    Estimated annual cost: $17,500,000, includes $5,810 annualized 
capital or operation & maintenance (O&M) costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (2) Docket ID Number: EPA-HQ-OECA-2012-0679; Title: NESHAP for 
Petroleum Refineries: Catalytic Cracking Units, Reforming and Sulfur 
Units (40 CFR part 63, subpart UUU); EPA ICR Number 1844.07, OMB 
Control Number 2060-0554; Expiration Date: October 31, 2016.
    Respondents: Petroleum refineries with catalytic cracking units, 
catalytic reforming units and/or sulfur recovery units.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart UUU).
    Estimated number of respondents: 123 (total).
    Frequency of response: Initially, occasionally, and semiannually.
    Estimated annual burden: 10,200 hours.
    Estimated annual cost: $9,400,000, includes $8,400,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
due to expected modification of existing facilities.

    (3) Docket ID Number: EPA-HQ-OECA-2013-0338; Title: NESHAP for the 
Manufacture of Amino/Phenolic Resins (40 CFR part 63, subpart OOO); EPA 
ICR Number 1869.08, OMB Control Number 2060-0434; Expiration Date: 
October 31, 2016.
    Respondents: Facilities that manufacture amino/phenolic resins.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart OOO).
    Estimated number of respondents: 37 (total).
    Frequency of response: Initially, occasionally, and semiannually.
    Estimated annual burden: 22,400 hours.
    Estimated annual cost: $2,200,000, includes $14,800 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (4) Docket ID Number: EPA-HQ-OECA-2013-0341; Title: NESHAP for 
Plywood and Composite Products (40 CFR parts 63, Subpart DDDD); EPA ICR 
Number 1984.06, OMB Control Number 2060-0552; Expiration Date: October 
31, 2016.
    Respondents: Plywood and composite wood products (PCWP) facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart DDDD).
    Estimated number of respondents: 228 (total).
    Frequency of response: Initially, occasionally, and semiannually.
    Estimated annual burden: 11,700 hours.
    Estimated annual cost: $1,160,000, includes $16,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (5) Docket ID Number: EPA-HQ-OECA-2013-0318; Title: NSPS for 
Magnetic Tape Coating Facilities (40 CFR part 60, subpart SSS); EPA ICR 
Number 1135.12, OMB Control Number 2060-0171; Expiration Date: November 
30, 2016.
    Respondents: Magnetic tape coating facilities constructed or 
modified after January 22, 1986.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart SSS).
    Estimated number of respondents: 6 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 2,020 hours.
    Estimated annual cost: $283,000, includes $86,400 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (6) Docket ID Number: EPA-HQ-OECA-2013-0334; Title: NSPS for 
Secondary Brass and Bronze Production, Primary Copper Smelters, Primary 
Zinc Smelters, Primary Lead Smelters, Primary Aluminum Reduction 
Plants, and Ferroalloy Production Facilities (40 CFR part 60, subparts 
M, P, Q, R, S, Z); EPA ICR Number 1604.11, OMB Control Number 2060-
0110; Expiration Date: November 30, 2016.
    Respondents: Secondary brass or bronze production facilities; 
primary

[[Page 26548]]

copper, primary zinc, and primary lead facilities; primary aluminum 
reduction facilities; and ferroalloy production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subparts M, P, Q, R, S, and Z).
    Estimated number of respondents: 19 (total).
    Frequency of response: Initially, occasionally, semiannually, and 
annually.
    Estimated annual burden: 4,960 hours.
    Estimated annual cost: $612,000 includes $127,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (7) Docket ID Number: EPA-HQ-OECA-2013-0339; Title: NESHAP for Boat 
Manufacturing (40 CFR part 63, subpart VVVV); EPA ICR Number 1966.06, 
OMB Control Number 2060-0546; Expiration Date: November 30, 2016.
    Respondents: Boat manufacturing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart VVVV);
    Estimated number of respondents: 144 (total).
    Frequency of response: Initially, occasionally, and semiannually.
    Estimated annual burden: 23,500 hours.
    Estimated annual cost: $2,300,000, includes $800 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (8) Docket ID Number: EPA-HQ-OECA-2013-0345; Title: NESHAP for 
Metal Can Manufacturing Surface Coating (40 CFR part 63, subpart KKKK); 
EPA ICR Number 2079.06, OMB Control Number 2060-0541; Expiration Date: 
November 30, 2016.
    Respondents: Metal can manufacturing facilities that use 1,500 
gallons or more of surface coatings.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart KKKK).
    Estimated number of respondents: 5 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 1,940 hours.
    Estimated annual cost: $196,000, includes $6,000 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (9) Docket ID Number: EPA-HQ-OECA-2013-0313; Title: NSPS for 
Stationary Gas Turbines (40 CFR part 60, subpart GG); EPA ICR Number 
1071.12, OMB Control Number 2060-0028; Expiration Date: December 31, 
2016.
    Respondents: Stationary gas turbines.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart GG).
    Estimated number of respondents: 535 (total).
    Frequency of response: Initially and semiannually.
    Estimated annual burden: 68,400 hours.
    Estimated annual cost: $6,700,000, includes $0 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (10) Docket ID Number: EPA-HQ-OECA-2013-0333; Title: Standards of 
Performance for Air Emission Standards for Tanks, Surface Impoundments 
and Containers (40 CFR part 264, subpart CC and 40 CFR part 265, 
subpart CC); EPA ICR Number 1593.10, OMB Control Number 2060-0318; 
Expiration Date: December 31, 2016.
    Respondents: Facilities that treat, store, or dispose of hazardous 
wastes in tanks, surface impoundments, and containers.
    Respondent's obligation to respond: Mandatory (40 CFR part 264, 
subpart CC and 40 CFR part 265, subpart CC).
    Estimated number of respondents: 6,200 (total).
    Frequency of response: Occasionally.
    Estimated annual burden: 712,000 hours.
    Estimated annual cost: $82,100,000, includes $12,400,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (11) Docket ID Number: EPA-HQ-OECA-2013-0335; Title: NESHAP for 
Aerospace Manufacturing and Rework Facilities (40 CFR part 63, subpart 
GG); EPA ICR Number 1687.10, OMB Control Number 2060-0314; Expiration 
Date: December 31, 2016.
    Respondents: Aerospace manufacturing and rework facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart GG).
    Estimated number of respondents: 136 (total).
    Frequency of response: Initially, occasionally, and semiannually.
    Estimated annual burden: 141,000 hours.
    Estimated annual cost: $13,900,000, includes $136,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (12) Docket ID Number: EPA-HQ-OECA-2013-0340; Title: NESHAP for 
Stationary Reciprocating Internal Combustion Engines (40 CFR part 63, 
subpart ZZZZ); EPA ICR Number 1975.10, OMB Control Number 2060-0548; 
Expiration Date: December 31, 2016.
    Respondents: Stationary reciprocating internal combustion engines.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart ZZZZ).
    Estimated number of respondents: 903,000 (total).
    Frequency of response: Initially, occasionally, semiannually, and 
annually.
    Estimated annual burden: 3,430,000 hours.
    Estimated annual cost: $425,000,000, includes $27,900,000 
annualized capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
due to an increase in the respondent universe.

    (13) Docket ID Number: EPA-HQ-OECA-2013-0346; Title: NESHAP for 
Acrylic/Modacrylic Fibers Prod., Carbon Black Prod., Chemical Mfg: 
Chromium Compounds, Flexible Polyurethane Foam Production/Fabrication, 
Lead Acid Battery Mfg, Wood Preserving (40 CFR part 63, subparts 
LLLLLL, MMMMMM, NNNNNN, OOOOOO, PPPPPP, and QQQQQQ); EPA ICR Number 
2256.05, OMB Control Number 2060-0598; Expiration Date: December 31, 
2016.
    Respondents: Acrylic or modacrylic fibers production plants, carbon 
black production plants, chemical manufacturing that use chromite ore 
as the basic feedstock, flexible polyurethane foam manufacturing or 
fabrication facilities, lead acid battery manufacturing facilities, and 
wood preserving facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subparts LLLLLL, MMMMMM, NNNNNN, OOOOOO, PPPPPP, and QQQQQQ).
    Estimated number of respondents: 956 (total).
    Frequency of response: Initially, occasionally, and semiannually.
    Estimated annual burden: 3,220 hours.
    Estimated annual cost: $315,000, includes $0 annualized capital or 
O&M costs.

[[Page 26549]]

    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (14) Docket ID Number: EPA-HQ-OECA-2013-0301; Title: NESHAP for 
Beryllium (40 CFR part 61, subpart C); EPA ICR Number 0193.12, OMB 
Control Number 2060-0092; Expiration Date: January 31, 2017.
    Respondents: Facilities processing beryllium and its derivatives.
    Respondent's obligation to respond: Mandatory (40 CFR part 61, 
subpart C).
    Estimated number of respondents: 33 (total).
    Frequency of response: Initially, occasionally, and monthly.
    Estimated annual burden: 2,630 hours.
    Estimated annual cost: $292,000, includes $35,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (15) Docket ID Number: EPA-HQ-OECA-2013-0310; Title: NSPS for 
Sewage Sludge Treatment Plants (40 CFR part 60, subpart O); EPA ICR 
Number 1063.13, OMB Control Number 2060-0035; Expiration Date: January 
31, 2017.
    Respondents: Sewage sludge treatment plants.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart O).
    Estimated number of respondents: 112 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 12,500.
    Estimated annual cost: $5,180,000, includes $3,960,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is an increase in burden due to 
expected construction of new facilities or modifications of existing 
facilities.

    (16) Docket ID Number: EPA-HQ-OECA-2013-0314; Title: NSPS for 
Phosphate Rock Plants (40 CFR part 60, subpart NN); EPA ICR Number 
1078.11, OMB Control Number 2060-0111; Expiration Date: January 31, 
2017.
    Respondents: Phosphate rock facilities that commenced construction 
or reconstruction after September 21, 1979.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart NN).
    Estimated number of respondents: 14 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 1,720 hours.
    Estimated annual cost: $302,000, includes $133,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden due 
to an increase in the number of new or modified sources.

    (17) Docket ID Number: EPA-HQ-OECA-2013-0329; Title: NSPS for 
Rubber Tire Manufacturing (40 CFR part 60, subpart BBB); EPA ICR Number 
1158.12, OMB Control Number 2060-0156; Expiration Date: January 31, 
2017.
    Respondents: Rubber tire manufacturing plants that commenced 
construction or modification after January 20, 1983.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart BBB).
    Estimated number of respondents: 41 (total).
    Frequency of response: Initially, occasionally, semiannually, and 
annually.
    Estimated annual burden: 17,700 hours.
    Estimated annual cost: $1,750,000, includes $16,400 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (18) Docket ID Number: EPA-HQ-OECA-2013-0331; Title: NSPS for New 
Residential Wood Heaters (40 CFR part 60, subpart AAA); EPA ICR Number 
1176.12, OMB Control Number 2060-0161; Expiration Date: January 31, 
2017.
    Respondents: Manufacturers, retailers, and certification 
laboratories of new residential wood heaters.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart AAA).
    Estimated number of respondents: 947 (total).
    Frequency of response: Initially and occasionally.
    Estimated annual burden: 11,700 hours.
    Estimated annual cost: $2,890,000, includes $1,740,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (19) Docket ID Number: EPA-HQ-OECA-2013-0342; Title: NESHAP for 
Lime Manufacturing (40 CFR part 63, subpart AAAAA); EPA ICR Number 
2072.06, OMB Control Number 2060-0544; Expiration Date: January 31, 
2017.
    Respondents: Lime manufacturing plants.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart AAAAA).
    Estimated number of respondents: 65 (total).
    Frequency of response: Initially, occasionally, and semiannually.
    Estimated annual burden: 15,400 hours.
    Estimated annual cost: $1,820,000, includes $312,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is an increase in burden hours from the 
previous ICR due to an expected increase in the number of respondents.

    (20) Docket ID Number: EPA-HQ-OECA-2013-0302; Title: NSPS for 
Graphic Arts Industry (40 CFR part 60, subpart QQ); EPA ICR Number 
0657.12, OMB Control Number 2060-0105; Expiration Date: February 28, 
2017.
    Respondents: Graphics arts facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart QQ).
    Estimated number of respondents: 20 (total).
    Frequency of response: Initially, occasionally and semiannually.
    Estimated annual burden: 1,800 hours.
    Estimated annual cost: $176,000, includes $0 annualized capital or 
O&M costs.
    Changes in Estimates: There is an increase in burden hours from the 
previous ICR due to an expected increase in respondent universe.

    (21) Docket ID Number: EPA-HQ-OECA-2013-0325; Title: NESHAP for 
Benzene Emission from Benzene Storage Vessels and Coke-By-Product 
Recovery Plants (40 CFR part 61, subparts L and Y); EPA ICR Number 
1080.15, OMB Control Number 2060-0185; Expiration Date: March 31, 2017.
    Respondents: Owners or operators of benzene storage vessels and 
coke by-product recovery plants.
    Respondent's obligation to respond: Mandatory (40 CFR part 61, 
subparts L and Y).
    Estimated number of respondents: 21 (total).
    Frequency of response: Initially, occasionally, semiannually, and 
annually.
    Estimated annual burden: 3,190 hours.
    Estimated annual cost: $312,000, includes $0 annualized capital or 
O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (22) Docket ID Number: EPA-HQ-OECA-2013-0319; Title: NSPS for VOC 
Emissions from Petroleum Refinery Wastewater Systems (40 CFR part 60, 
subpart QQQ); EPA ICR Number

[[Page 26550]]

1136.12, OMB Control Number 2060-0172; Expiration Date: March 31, 2017.
    Respondents: Petroleum refineries with wastewater systems.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart QQQ).
    Estimated number of respondents: 135 (total).
    Frequency of response: Initially, occasionally, and semiannually.
    Estimated annual burden: 9,240 hours.
    Estimated annual cost: $922,000, includes $17,600 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (23) Docket ID Number: EPA-HQ-OECA-2013-0353; Title: NSPS for 
Stationary Spark Ignition Internal Combustion Engines (40 CFR part 60, 
subpart JJJJ); EPA ICR Number 2227.05, OMB Control Number 2060-0610; 
Expiration Date: March 31, 2017.
    Respondents: Stationary spark ignition internal combustion engines.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart JJJJ).
    Estimated number of respondents: 17,600 (total).
    Frequency of response: Initially and annually.
    Estimated annual burden: 23,300 hours.
    Estimated annual cost: $4,640,000, includes $2,360,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to growth in the respondent universe.

    (24) Docket ID Number: EPA-HQ-OECA-2013-0321; Title: NSPS for 
Sewage Sludge Incinerators (40 CFR part 60, subpart LLLL); EPA ICR 
Number 2369.04, OMB Control Number 2060-0658; Expiration Date: March 
31, 2017.
    Respondents: New or modified sewage sludge incinerators.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart LLLL).
    Estimated number of respondents: 4 (total).
    Frequency of response: Initially, occasionally, and annually.
    Estimated annual burden: 798 hours.
    Estimated annual cost: $448,000, includes $370,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to growth in the respondent universe.

    (25) Docket ID Number: EPA-HQ-OECA-2013-0317; Title: NESHAP for 
Gold Mine Ore Processing (40 CFR part 63, subpart EEEEEEE); EPA ICR 
Number 2383.04, OMB Control Number 2060-0659; Expiration Date: March 
31, 2017.
    Respondents: Gold mine ore processing and production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart EEEEEEE).
    Estimated number of respondents: 21 (total).
    Frequency of response: Initially, occasionally, semiannually, and 
annually.
    Estimated annual burden: 2,360 hours.
    Estimated annual cost: $445,000, includes $227,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (26) Docket ID Number: EPA-HQ-OECA-2016-0009; Title: NESHAP for 
Group IV Polymers and Resins (40 CFR part 63, subpart JJJ); EPA ICR 
Number 2457.03, OMB Control Number 2060-0682; Expiration Date: March 
31, 2017.
    Respondents: Thermoplastic resin production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart JJJ).
    Estimated number of respondents: 31 (total).
    Frequency of response: Semiannually.
    Estimated annual burden: 459 hours.
    Estimated annual cost: $1,110,000, includes $542,000 annualized 
capital or O&M costs.

    (27) Docket ID Number: EPA-HQ-OECA-2014-0063; Title: NESHAP for 
Polyether Polyols Production (40 CFR part 63, subpart PPP); EPA ICR 
Number 1811.10, OMB Control Number 2060-0415; Expiration Date: May 31, 
2017.
    Respondents: Polyether polyols production facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
subpart PPP).
    Estimated number of respondents: 23 (total).
    Frequency of response: Occasionally and semiannually.
    Estimated annual burden: 3,700 hours.
    Estimated annual cost: $433,000, includes $226,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (28) Docket ID Number: EPA-HQ-OECA-2013-0303; Title: NSPS for 
Equipment Leaks of VOC in Petroleum Refineries (40 CFR part 60, 
subparts GGG and GGGa); EPA ICR Number 0983.15, OMB Control Number 
2060-0067; Expiration Date: June 30, 2017.
    Respondents: Petroleum refineries.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subparts GGG and GGGa).
    Estimated number of respondents: 130 (total).
    Frequency of response: Initially, occasionally, and semiannually.
    Estimated annual burden: 24,900 hours.
    Estimated annual cost: $2,430,000, includes $0 annualized capital 
or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    (29) Docket ID Number: EPA-HQ-OECA-2013-0350; Title: The 
Consolidated Air Rule (CAR) for the Synthetic Organic Chemical 
Manufacturing Industry (SOCMI); EPA ICR Number 1854.10, OMB Control 
Number 2060-0443; Expiration Date: June 30, 2017.
    Respondents: Synthetic organic chemical manufacturing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 65).
    Estimated number of respondents: 4,620 (total).
    Frequency of response: Initially, occasionally, semiannually and 
annually.
    Estimated annual burden: 2,130,000 hours.
    Estimated annual cost: $309,000,000, includes $101,000,000 
annualized capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to growth in the respondent universe.

    (30) Docket ID Number: EPA-HQ-OECA-2013-0315; Title: NSPS for 
Commercial and Industrial Solid Waste Incineration (CISWI) Units (40 
CFR part 60, subpart CCCC); EPA ICR Number 2384.04, OMB Control Number 
2060-0662; Expiration Date: June 30, 2017.
    Respondents: Commercial and industrial solid waste incineration 
units.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart CCCC).
    Estimated number of respondents: 4 (total).
    Frequency of response: Initially, occasionally, semiannually, and 
annually.
    Estimated annual burden: 1,040 hours.
    Estimated annual cost: $451,000, includes $350,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to growth in the respondent universe.


[[Page 26551]]


    (31) Docket ID Number: EPA-HQ-OECA-2014-0034; Title: NSPS for Kraft 
Pulp Mills (40 CFR part 60, subpart BB); EPA ICR Number 2485.03, OMB 
Control Number 2060-0690; Expiration Date: June 30, 2017.
    Respondents: Kraft pulp mills.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subpart BB).
    Estimated number of respondents: 4 (total).
    Frequency of response: Initially, occasionally, and semiannually.
    Estimated annual burden: 1,910 hours.
    Estimated annual cost: $753,000, includes $567,000 annualized 
capital or O&M costs.
    Changes in Estimates: There is an expected increase in burden hours 
from the previous ICR due to growth in the respondent universe.

    (32) Docket ID Number: EPA-HQ-OECA-2013-0316; Title: NSPS for 
Onshore Natural Gas Processing Plants (40 CFR part 60, subparts KKK and 
LLL); EPA ICR Number 1086.12, OMB Control Number 2060-0120; Expiration 
Date: August 31, 2017.
    Respondents: Onshore natural gas processing plants.
    Respondent's obligation to respond: Mandatory (40 CFR part 60, 
subparts KKK and LLL).
    Estimated number of respondents: 577 (total).
    Frequency of response: Initially, occasionally, and semiannually.
    Estimated annual burden: 122,000 hours.
    Estimated annual cost: $12,000,000, includes $68,400 annualized 
capital or O&M costs.
    Changes in Estimates: There is no change in burden hours from the 
previous ICR.

    Dated: April 18, 2016.
Edward J. Messina,
Director, Monitoring, Assistance and Media Programs Division.
[FR Doc. 2016-10393 Filed 5-2-16; 8:45 am]
 BILLING CODE 6560-50-P



                                                    26546                           Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices

                                                    eFiling system at http://www.ferc.gov/                     Location: Four Flags Area Chamber of                 Dated: April 26, 2016.
                                                    docs-filing/efiling.asp. Commenters can                 Commerce, 321 E. Main Street, Niles,                  Kimberly D. Bose,
                                                    submit brief comments up to 6,000                       Michigan 49120.                                       Secretary.
                                                    characters, without prior registration,                    Phone Number: (269) 683–3720.                      [FR Doc. 2016–10247 Filed 5–2–16; 8:45 am]
                                                    using the eComment system at http://                       Scoping Document 1 (SD1), which                    BILLING CODE 6717–01–P
                                                    www.ferc.gov/docs-filing/                               outlines the subject areas to be
                                                    ecomment.asp. You must include your                     addressed in the environmental
                                                    name and contact information at the end                 document, was mailed to the
                                                    of your comments. For assistance,                       individuals and entities on the                       ENVIRONMENTAL PROTECTION
                                                    please contact FERC Online Support at                   Commission’s mailing list. Copies of                  AGENCY
                                                    FERCOnlineSupport@ferc.gov. In lieu of                  SD1 will be available at the scoping                  [FRL–9946–03–OECA]
                                                    electronic filing, please send a paper                  meetings, or may be viewed on the web
                                                    copy to: Secretary, Federal Energy                      at http://www.ferc.gov, using the                     Proposed Information Collection
                                                    Regulatory Commission, 888 First Street                 ‘‘eLibrary’’ link. Follow the directions              Request; Comment Request
                                                    NE., Washington, DC 20426. The first                    for accessing information in paragraph
                                                    page of any filing should include docket                n. Based on all oral and written                      AGENCY: Environmental Protection
                                                    number P–10624–025.                                     comments, a Scoping Document 2 (SD2)                  Agency (EPA).
                                                       All filings with the Commission must                 may be issued. SD2 may include a                      ACTION: Notice.
                                                    bear the appropriate heading:                           revised process plan and schedule, as
                                                    ‘‘Comments on Pre-Application                           well as a list of issues, identified                  SUMMARY:   The Environmental Protection
                                                    Document,’’ ‘‘Study Requests,’’                         through the scoping process.                          Agency is planning to submit the below
                                                    ‘‘Comments on Scoping Document 1,’’                                                                           listed information collection requests
                                                                                                            Environmental Site Review                             (ICR) (See item specific ICR title, EPA
                                                    ‘‘Request for Cooperating Agency
                                                    Status,’’ or ‘‘Communications to and                      The potential applicant and                         ICR Number and OMB Control Number
                                                    from Commission Staff.’’ Any                            Commission staff will conduct an                      provided in the text) to the Office of
                                                    individual or entity interested in                      Environmental Site Review of the                      Management and Budget (OMB) for
                                                    submitting study requests, commenting                   project on Wednesday, May 11, 2016,                   review and approval in accordance with
                                                    on the PAD or SD1, and any agency                       starting at 2:00 p.m. All participants                the Paperwork Reduction Act (44 U.S.C.
                                                    requesting cooperating status must do so                should meet at French Paper Dam,                      3501 et seq.). Before doing so, EPA is
                                                    by June 25, 2016.                                       located at 100 French Street, Niles,                  soliciting public comments on specific
                                                       p. Although our current intent is to                 Michigan 49120. All participants are                  aspects of the proposed information
                                                    prepare an environmental assessment                     responsible for their own transportation.             collection as described below. These are
                                                    (EA), there is the possibility that an                  Please notify Shane Fenske at (269)                   proposed extensions of the currently
                                                    Environmental Impact Statement (EIS)                    683–1100, or fenske@frenchpaper.com                   approved ICRs. An Agency may not
                                                    will be required. Nevertheless, this                    by May 6, 2016, if you plan to attend the             conduct or sponsor and a person is not
                                                    meeting will satisfy the NEPA scoping                   environmental site review.                            required to respond to a collection of
                                                    requirements, irrespective of whether an                                                                      information unless it displays a
                                                                                                            Meeting Objectives                                    currently valid OMB control number.
                                                    EA or EIS is issued by the Commission.
                                                                                                               At the scoping meetings, staff will: (1)           DATES: Comments must be submitted on
                                                    Scoping Meetings                                        Initiate scoping of the issues; (2) review            or before July 5, 2016.
                                                      Commission staff will hold two                        and discuss existing conditions and
                                                                                                                                                                  ADDRESSES: Submit your comments,
                                                    scoping meetings in the vicinity of the                 resource management objectives; (3)
                                                                                                                                                                  referencing the Docket ID numbers
                                                    project at the time and place noted                     review and discuss existing information
                                                                                                                                                                  provided for each item in the text,
                                                    below. The daytime meeting will focus                   and identify preliminary information
                                                                                                                                                                  online using www.regulations.gov (our
                                                    on resource agency, Indian tribes, and                  and study needs; (4) review and discuss
                                                                                                                                                                  preferred method), by email to
                                                    non-governmental organization                           the process plan and schedule for pre-
                                                                                                                                                                  docket.oeca@epa.gov, or by mail to: EPA
                                                    concerns, while the evening meeting is                  filing activity that incorporates the time
                                                                                                                                                                  Docket Center, Environmental
                                                    primarily for receiving input from the                  frames provided for in Part 5 of the
                                                                                                                                                                  Protection Agency, Mail Code 28221T,
                                                    public. We invite all interested                        Commission’s regulations and, to the
                                                                                                                                                                  1200 Pennsylvania Ave. NW.,
                                                    individuals, organizations, and agencies                extent possible, maximizes coordination
                                                                                                                                                                  Washington, DC 20460.
                                                    to attend one or both of the meetings,                  of federal, state, and tribal permitting
                                                                                                                                                                     EPA’s policy is that all comments
                                                    and to assist staff in identifying                      and certification processes; and (5)
                                                                                                                                                                  received will be included in the public
                                                    particular study needs, as well as the                  discuss the appropriateness of any
                                                                                                                                                                  docket without change including any
                                                    scope of environmental issues to be                     federal or state agency or Indian tribe
                                                                                                                                                                  personal information provided, unless
                                                    addressed in the environmental                          acting as a cooperating agency for
                                                                                                                                                                  the comment includes profanity, threats,
                                                    document. The times and locations of                    development of an environmental
                                                                                                                                                                  information claimed to be Confidential
                                                    these meetings are as follows:                          document.
                                                                                                               Meeting participants should come                   Business Information (CBI) or other
                                                    Daytime Scoping Meeting                                 prepared to discuss their issues and/or               information whose disclosure is
                                                                                                            concerns. Please review the PAD in                    restricted by statute.
                                                      Date and Time: Thursday, May 12,
                                                                                                                                                                  FOR FURTHER INFORMATION CONTACT:
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    2016 at 9:00 a.m.                                       preparation for the scoping meetings.
                                                      Location: Four Flags Area Chamber of                  Directions on how to obtain a copy of                 Patrick Yellin, Monitoring, Assistance,
                                                    Commerce, 321 E. Main Street, Niles,                    the PAD and SD1 are included in                       and Media Programs Division, Office of
                                                    Michigan 49120.                                         paragraph n of this document.                         Compliance, Mail Code 2227A,
                                                      Phone Number: (269) 683–3720.                                                                               Environmental Protection Agency, 1200
                                                                                                            Meeting Procedures                                    Pennsylvania Ave. NW., Washington,
                                                    Evening Scoping Meeting                                   The meetings will be recorded by a                  DC 20460; telephone number: (202)
                                                      Date and Time: Wednesday, May 11,                     stenographer and will be placed in the                564–2970; fax number: (202) 564–0050;
                                                    2016 at 6:30 p.m.                                       public records of the project.                        email address: yellin.patrick@epa.gov.


                                               VerDate Sep<11>2014   18:53 May 02, 2016   Jkt 238001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\03MYN1.SGM   03MYN1


                                                                                    Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices                                           26547

                                                    SUPPLEMENTARY INFORMATION:                              Off-Site Waste and Recovery Operations                   Estimated annual cost: $2,200,000,
                                                    Supporting documents which explain in                   (40 CFR part 63, subpart DD); EPA ICR                 includes $14,800 annualized capital or
                                                    detail the information that the EPA will                Number 1717.10, OMB Control Number                    O&M costs.
                                                    be collecting are available in the public               2060–0313; Expiration Date: October 31,                  Changes in Estimates: There is no
                                                    docket for this ICR. The docket can be                  2016.                                                 change in burden hours from the
                                                    viewed online at www.regulations.gov                      Respondents: Waste management and                   previous ICR.
                                                    or in person at the EPA Docket Center,                  recovery facilities.                                     (4) Docket ID Number: EPA–HQ–
                                                    EPA West, Room 3334, 1301                                 Respondent’s obligation to respond:                 OECA–2013–0341; Title: NESHAP for
                                                    Constitution Ave. NW., Washington,                      Mandatory (40 CFR part 63, subpart                    Plywood and Composite Products (40
                                                    DC. The telephone number for the                        DD).                                                  CFR parts 63, Subpart DDDD); EPA ICR
                                                    Docket Center is 202–566–1744. For                        Estimated number of respondents:                    Number 1984.06, OMB Control Number
                                                    additional information about EPA’s                      236 (total).                                          2060–0552; Expiration Date: October 31,
                                                    public docket, visit http://www.epa.gov/                  Frequency of response: Initially,                   2016.
                                                    dockets.                                                occasionally and semiannually.                           Respondents: Plywood and composite
                                                       Pursuant to section 3506(c)(2)(A) of                   Estimated annual burden: 179,000                    wood products (PCWP) facilities.
                                                    the PRA, EPA is soliciting comments                     hours.                                                   Respondent’s obligation to respond:
                                                    and information to enable it to: (i)                      Estimated annual cost: $17,500,000,                 Mandatory (40 CFR part 63, subpart
                                                    Evaluate whether the proposed                           includes $5,810 annualized capital or                 DDDD).
                                                    collection of information is necessary                  operation & maintenance (O&M) costs.                     Estimated number of respondents:
                                                    for the proper performance of the                         Changes in Estimates: There is no                   228 (total).
                                                    functions of the Agency, including                      change in burden hours from the                          Frequency of response: Initially,
                                                    whether the information will have                       previous ICR.                                         occasionally, and semiannually.
                                                    practical utility; (ii) evaluate the                      (2) Docket ID Number: EPA–HQ–                          Estimated annual burden: 11,700
                                                    accuracy of the Agency’s estimate of the                OECA–2012–0679; Title: NESHAP for                     hours.
                                                    burden of the proposed collection of                    Petroleum Refineries: Catalytic Cracking                 Estimated annual cost: $1,160,000,
                                                    information, including the validity of                  Units, Reforming and Sulfur Units (40                 includes $16,000 annualized capital or
                                                    the methodology and assumptions used;                   CFR part 63, subpart UUU); EPA ICR                    O&M costs.
                                                    (iii) enhance the quality, utility, and                 Number 1844.07, OMB Control Number                       Changes in Estimates: There is no
                                                    clarity of the information to be                        2060–0554; Expiration Date: October 31,               change in burden hours from the
                                                    collected; and (iv) minimize the burden                 2016.                                                 previous ICR.
                                                    of the collection of information on those                 Respondents: Petroleum refineries                      (5) Docket ID Number: EPA–HQ–
                                                    who are to respond, including through                   with catalytic cracking units, catalytic              OECA–2013–0318; Title: NSPS for
                                                    the use of appropriate automated                        reforming units and/or sulfur recovery                Magnetic Tape Coating Facilities (40
                                                    electronic, mechanical, or other                        units.                                                CFR part 60, subpart SSS); EPA ICR
                                                    technological collection techniques or                    Respondent’s obligation to respond:                 Number 1135.12, OMB Control Number
                                                    other forms of information technology,                  Mandatory (40 CFR part 63, subpart                    2060–0171; Expiration Date: November
                                                    e.g., permitting electronic submission of               UUU).                                                 30, 2016.
                                                    responses. Burden is defined at 5 CFR                     Estimated number of respondents:                       Respondents: Magnetic tape coating
                                                    1320.03(b). EPA will consider the                       123 (total).                                          facilities constructed or modified after
                                                    comments received and amend the ICR                       Frequency of response: Initially,                   January 22, 1986.
                                                    as appropriate. The final ICR package                   occasionally, and semiannually.                          Respondent’s obligation to respond:
                                                    will then be submitted to OMB for                         Estimated annual burden: 10,200                     Mandatory (40 CFR part 60, subpart
                                                    review and approval. At that time, EPA                  hours.                                                SSS).
                                                    will issue another Federal Register                       Estimated annual cost: $9,400,000,                     Estimated number of respondents: 6
                                                    notice to announce the submission of                    includes $8,400,000 annualized capital                (total).
                                                    the ICR to OMB and the opportunity to                   or O&M costs.                                            Frequency of response: Initially,
                                                    submit additional comments to OMB.                        Changes in Estimates: There is an                   occasionally and semiannually.
                                                       General Abstract: For all the listed                 expected increase in burden hours due                    Estimated annual burden: 2,020
                                                    ICRs in this notice, owners and                         to expected modification of existing                  hours.
                                                    operators of affected facilities are                    facilities.                                              Estimated annual cost: $283,000,
                                                    required to comply with reporting and                      (3) Docket ID Number: EPA–HQ–                      includes $86,400 annualized capital or
                                                    record keeping requirements for the                     OECA–2013–0338; Title: NESHAP for                     O&M costs.
                                                    general provisions of 40 CFR part 60,                   the Manufacture of Amino/Phenolic                        Changes in Estimates: There is no
                                                    subpart A or Part 63, Subpart A, as well                Resins (40 CFR part 63, subpart OOO);                 change in burden hours from the
                                                    as the applicable specific standards.                   EPA ICR Number 1869.08, OMB Control                   previous ICR.
                                                    This includes submitting initial                        Number 2060–0434; Expiration Date:                       (6) Docket ID Number: EPA–HQ–
                                                    notifications, performance tests and                    October 31, 2016.                                     OECA–2013–0334; Title: NSPS for
                                                    periodic reports and results, and                          Respondents: Facilities that                       Secondary Brass and Bronze
                                                    maintaining records of the occurrence                   manufacture amino/phenolic resins.                    Production, Primary Copper Smelters,
                                                    and duration of any startup, shutdown,                     Respondent’s obligation to respond:                Primary Zinc Smelters, Primary Lead
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    or malfunction in the operation of an                   Mandatory (40 CFR part 63, subpart                    Smelters, Primary Aluminum Reduction
                                                    affected facility, or any period during                 OOO).                                                 Plants, and Ferroalloy Production
                                                    which the monitoring system is                             Estimated number of respondents: 37                Facilities (40 CFR part 60, subparts M,
                                                    inoperative. These reports are used by                  (total).                                              P, Q, R, S, Z); EPA ICR Number 1604.11,
                                                    EPA to determine compliance with the                       Frequency of response: Initially,                  OMB Control Number 2060–0110;
                                                    standards.                                              occasionally, and semiannually.                       Expiration Date: November 30, 2016.
                                                       (1) Docket ID Number: EPA–HQ–                           Estimated annual burden: 22,400                       Respondents: Secondary brass or
                                                    OECA–2013–0336; Title: NESHAP for                       hours.                                                bronze production facilities; primary


                                               VerDate Sep<11>2014   18:53 May 02, 2016   Jkt 238001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\03MYN1.SGM   03MYN1


                                                    26548                           Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices

                                                    copper, primary zinc, and primary lead                    (9) Docket ID Number: EPA–HQ–                         Estimated annual cost: $13,900,000,
                                                    facilities; primary aluminum reduction                  OECA–2013–0313; Title: NSPS for                       includes $136,000 annualized capital or
                                                    facilities; and ferroalloy production                   Stationary Gas Turbines (40 CFR part                  O&M costs.
                                                    facilities.                                             60, subpart GG); EPA ICR Number                         Changes in Estimates: There is no
                                                       Respondent’s obligation to respond:                  1071.12, OMB Control Number 2060–                     change in burden hours from the
                                                    Mandatory (40 CFR part 60, subparts M,                  0028; Expiration Date: December 31,                   previous ICR.
                                                    P, Q, R, S, and Z).                                     2016.                                                   (12) Docket ID Number: EPA–HQ–
                                                       Estimated number of respondents: 19                    Respondents: Stationary gas turbines.               OECA–2013–0340; Title: NESHAP for
                                                    (total).                                                  Respondent’s obligation to respond:                 Stationary Reciprocating Internal
                                                       Frequency of response: Initially,                    Mandatory (40 CFR part 60, subpart                    Combustion Engines (40 CFR part 63,
                                                    occasionally, semiannually, and                         GG).                                                  subpart ZZZZ); EPA ICR Number
                                                    annually.                                                 Estimated number of respondents:                    1975.10, OMB Control Number 2060–
                                                       Estimated annual burden: 4,960                       535 (total).                                          0548; Expiration Date: December 31,
                                                    hours.                                                    Frequency of response: Initially and                2016.
                                                       Estimated annual cost: $612,000                      semiannually.                                           Respondents: Stationary reciprocating
                                                    includes $127,000 annualized capital or                   Estimated annual burden: 68,400                     internal combustion engines.
                                                    O&M costs.                                              hours.                                                  Respondent’s obligation to respond:
                                                       Changes in Estimates: There is no                      Estimated annual cost: $6,700,000,                  Mandatory (40 CFR part 63, subpart
                                                    change in burden hours from the                         includes $0 annualized capital or O&M                 ZZZZ).
                                                    previous ICR.                                           costs.                                                  Estimated number of respondents:
                                                       (7) Docket ID Number: EPA–HQ–                          Changes in Estimates: There is no                   903,000 (total).
                                                    OECA–2013–0339; Title: NESHAP for                       change in burden hours from the                         Frequency of response: Initially,
                                                    Boat Manufacturing (40 CFR part 63,                     previous ICR.                                         occasionally, semiannually, and
                                                    subpart VVVV); EPA ICR Number                             (10) Docket ID Number: EPA–HQ–                      annually.
                                                    1966.06, OMB Control Number 2060–                       OECA–2013–0333; Title: Standards of                     Estimated annual burden: 3,430,000
                                                    0546; Expiration Date: November 30,                     Performance for Air Emission Standards                hours.
                                                    2016.                                                   for Tanks, Surface Impoundments and                     Estimated annual cost: $425,000,000,
                                                       Respondents: Boat manufacturing                      Containers (40 CFR part 264, subpart CC               includes $27,900,000 annualized capital
                                                    facilities.                                             and 40 CFR part 265, subpart CC); EPA                 or O&M costs.
                                                       Respondent’s obligation to respond:                                                                          Changes in Estimates: There is an
                                                                                                            ICR Number 1593.10, OMB Control
                                                    Mandatory (40 CFR part 63, subpart                                                                            expected increase in burden hours due
                                                                                                            Number 2060–0318; Expiration Date:
                                                    VVVV);                                                                                                        to an increase in the respondent
                                                                                                            December 31, 2016.
                                                       Estimated number of respondents:                                                                           universe.
                                                                                                              Respondents: Facilities that treat,
                                                    144 (total).
                                                       Frequency of response: Initially,                    store, or dispose of hazardous wastes in                 (13) Docket ID Number: EPA–HQ–
                                                    occasionally, and semiannually.                         tanks, surface impoundments, and                      OECA–2013–0346; Title: NESHAP for
                                                       Estimated annual burden: 23,500                      containers.                                           Acrylic/Modacrylic Fibers Prod., Carbon
                                                    hours.                                                    Respondent’s obligation to respond:                 Black Prod., Chemical Mfg: Chromium
                                                       Estimated annual cost: $2,300,000,                   Mandatory (40 CFR part 264, subpart CC                Compounds, Flexible Polyurethane
                                                    includes $800 annualized capital or                     and 40 CFR part 265, subpart CC).                     Foam Production/Fabrication, Lead
                                                    O&M costs.                                                Estimated number of respondents:                    Acid Battery Mfg, Wood Preserving (40
                                                       Changes in Estimates: There is no                    6,200 (total).                                        CFR part 63, subparts LLLLLL,
                                                    change in burden hours from the                           Frequency of response: Occasionally.                MMMMMM, NNNNNN, OOOOOO,
                                                    previous ICR.                                             Estimated annual burden: 712,000                    PPPPPP, and QQQQQQ); EPA ICR
                                                                                                            hours.                                                Number 2256.05, OMB Control Number
                                                       (8) Docket ID Number: EPA–HQ–
                                                                                                              Estimated annual cost: $82,100,000,                 2060–0598; Expiration Date: December
                                                    OECA–2013–0345; Title: NESHAP for
                                                                                                            includes $12,400,000 annualized capital               31, 2016.
                                                    Metal Can Manufacturing Surface
                                                                                                            or O&M costs.                                            Respondents: Acrylic or modacrylic
                                                    Coating (40 CFR part 63, subpart
                                                                                                              Changes in Estimates: There is no                   fibers production plants, carbon black
                                                    KKKK); EPA ICR Number 2079.06, OMB
                                                                                                            change in burden hours from the                       production plants, chemical
                                                    Control Number 2060–0541; Expiration
                                                                                                            previous ICR.                                         manufacturing that use chromite ore as
                                                    Date: November 30, 2016.
                                                       Respondents: Metal can                                 (11) Docket ID Number: EPA–HQ–                      the basic feedstock, flexible
                                                    manufacturing facilities that use 1,500                 OECA–2013–0335; Title: NESHAP for                     polyurethane foam manufacturing or
                                                    gallons or more of surface coatings.                    Aerospace Manufacturing and Rework                    fabrication facilities, lead acid battery
                                                       Respondent’s obligation to respond:                  Facilities (40 CFR part 63, subpart GG);              manufacturing facilities, and wood
                                                    Mandatory (40 CFR part 63, subpart                      EPA ICR Number 1687.10, OMB Control                   preserving facilities.
                                                    KKKK).                                                  Number 2060–0314; Expiration Date:                       Respondent’s obligation to respond:
                                                       Estimated number of respondents: 5                   December 31, 2016.                                    Mandatory (40 CFR part 63, subparts
                                                    (total).                                                  Respondents: Aerospace                              LLLLLL, MMMMMM, NNNNNN,
                                                       Frequency of response: Initially,                    manufacturing and rework facilities.                  OOOOOO, PPPPPP, and QQQQQQ).
                                                                                                              Respondent’s obligation to respond:                    Estimated number of respondents:
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    occasionally and semiannually.
                                                       Estimated annual burden: 1,940                       Mandatory (40 CFR part 63, subpart                    956 (total).
                                                    hours.                                                  GG).                                                     Frequency of response: Initially,
                                                       Estimated annual cost: $196,000,                       Estimated number of respondents:                    occasionally, and semiannually.
                                                    includes $6,000 annualized capital or                   136 (total).                                             Estimated annual burden: 3,220
                                                    O&M costs.                                                Frequency of response: Initially,                   hours.
                                                       Changes in Estimates: There is no                    occasionally, and semiannually.                          Estimated annual cost: $315,000,
                                                    change in burden hours from the                           Estimated annual burden: 141,000                    includes $0 annualized capital or O&M
                                                    previous ICR.                                           hours.                                                costs.


                                               VerDate Sep<11>2014   18:53 May 02, 2016   Jkt 238001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\03MYN1.SGM   03MYN1


                                                                                    Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices                                            26549

                                                       Changes in Estimates: There is no                       Estimated annual cost: $302,000,                      Estimated number of respondents: 65
                                                    change in burden hours from the                         includes $133,000 annualized capital or               (total).
                                                    previous ICR.                                           O&M costs.                                               Frequency of response: Initially,
                                                       (14) Docket ID Number: EPA–HQ–                          Changes in Estimates: There is an                  occasionally, and semiannually.
                                                    OECA–2013–0301; Title: NESHAP for                       expected increase in burden due to an                    Estimated annual burden: 15,400
                                                    Beryllium (40 CFR part 61, subpart C);                  increase in the number of new or                      hours.
                                                    EPA ICR Number 0193.12, OMB Control                     modified sources.                                        Estimated annual cost: $1,820,000,
                                                    Number 2060–0092; Expiration Date:                         (17) Docket ID Number: EPA–HQ–                     includes $312,000 annualized capital or
                                                    January 31, 2017.                                       OECA–2013–0329; Title: NSPS for                       O&M costs.
                                                       Respondents: Facilities processing                   Rubber Tire Manufacturing (40 CFR part                   Changes in Estimates: There is an
                                                    beryllium and its derivatives.                          60, subpart BBB); EPA ICR Number                      increase in burden hours from the
                                                       Respondent’s obligation to respond:                  1158.12, OMB Control Number 2060–                     previous ICR due to an expected
                                                    Mandatory (40 CFR part 61, subpart C).                  0156; Expiration Date: January 31, 2017.              increase in the number of respondents.
                                                       Estimated number of respondents: 33                     Respondents: Rubber tire                              (20) Docket ID Number: EPA–HQ–
                                                    (total).                                                manufacturing plants that commenced                   OECA–2013–0302; Title: NSPS for
                                                       Frequency of response: Initially,                    construction or modification after                    Graphic Arts Industry (40 CFR part 60,
                                                    occasionally, and monthly.                              January 20, 1983.                                     subpart QQ); EPA ICR Number 0657.12,
                                                       Estimated annual burden: 2,630                          Respondent’s obligation to respond:                OMB Control Number 2060–0105;
                                                    hours.                                                  Mandatory (40 CFR part 60, subpart                    Expiration Date: February 28, 2017.
                                                       Estimated annual cost: $292,000,                     BBB).                                                    Respondents: Graphics arts facilities.
                                                    includes $35,000 annualized capital or                     Estimated number of respondents: 41                   Respondent’s obligation to respond:
                                                    O&M costs.                                              (total).                                              Mandatory (40 CFR part 60, subpart
                                                       Changes in Estimates: There is no                       Frequency of response: Initially,                  QQ).
                                                    change in burden hours from the                         occasionally, semiannually, and                          Estimated number of respondents: 20
                                                    previous ICR.                                           annually.                                             (total).
                                                                                                               Estimated annual burden: 17,700                       Frequency of response: Initially,
                                                       (15) Docket ID Number: EPA–HQ–                       hours.                                                occasionally and semiannually.
                                                    OECA–2013–0310; Title: NSPS for                            Estimated annual cost: $1,750,000,                    Estimated annual burden: 1,800
                                                    Sewage Sludge Treatment Plants (40                      includes $16,400 annualized capital or                hours.
                                                    CFR part 60, subpart O); EPA ICR                        O&M costs.                                               Estimated annual cost: $176,000,
                                                    Number 1063.13, OMB Control Number                         Changes in Estimates: There is no                  includes $0 annualized capital or O&M
                                                    2060–0035; Expiration Date: January 31,                 change in burden hours from the                       costs.
                                                    2017.                                                   previous ICR.                                            Changes in Estimates: There is an
                                                       Respondents: Sewage sludge                                                                                 increase in burden hours from the
                                                                                                               (18) Docket ID Number: EPA–HQ–
                                                    treatment plants.                                                                                             previous ICR due to an expected
                                                                                                            OECA–2013–0331; Title: NSPS for New
                                                       Respondent’s obligation to respond:                                                                        increase in respondent universe.
                                                                                                            Residential Wood Heaters (40 CFR part
                                                    Mandatory (40 CFR part 60, subpart O).                                                                           (21) Docket ID Number: EPA–HQ–
                                                                                                            60, subpart AAA); EPA ICR Number
                                                       Estimated number of respondents:                     1176.12, OMB Control Number 2060–                     OECA–2013–0325; Title: NESHAP for
                                                    112 (total).                                            0161; Expiration Date: January 31, 2017.              Benzene Emission from Benzene Storage
                                                       Frequency of response: Initially,                       Respondents: Manufacturers, retailers,             Vessels and Coke-By-Product Recovery
                                                    occasionally and semiannually.                          and certification laboratories of new                 Plants (40 CFR part 61, subparts L and
                                                       Estimated annual burden: 12,500.                     residential wood heaters.                             Y); EPA ICR Number 1080.15, OMB
                                                       Estimated annual cost: $5,180,000,                      Respondent’s obligation to respond:                Control Number 2060–0185; Expiration
                                                    includes $3,960,000 annualized capital                  Mandatory (40 CFR part 60, subpart                    Date: March 31, 2017.
                                                    or O&M costs.                                           AAA).                                                    Respondents: Owners or operators of
                                                       Changes in Estimates: There is an                       Estimated number of respondents:                   benzene storage vessels and coke by-
                                                    increase in burden due to expected                      947 (total).                                          product recovery plants.
                                                    construction of new facilities or                          Frequency of response: Initially and                  Respondent’s obligation to respond:
                                                    modifications of existing facilities.                   occasionally.                                         Mandatory (40 CFR part 61, subparts L
                                                       (16) Docket ID Number: EPA–HQ–                          Estimated annual burden: 11,700                    and Y).
                                                    OECA–2013–0314; Title: NSPS for                         hours.                                                   Estimated number of respondents: 21
                                                    Phosphate Rock Plants (40 CFR part 60,                     Estimated annual cost: $2,890,000,                 (total).
                                                    subpart NN); EPA ICR Number 1078.11,                    includes $1,740,000 annualized capital                   Frequency of response: Initially,
                                                    OMB Control Number 2060–0111;                           or O&M costs.                                         occasionally, semiannually, and
                                                    Expiration Date: January 31, 2017.                         Changes in Estimates: There is no                  annually.
                                                       Respondents: Phosphate rock                          change in burden hours from the                          Estimated annual burden: 3,190
                                                    facilities that commenced construction                  previous ICR.                                         hours.
                                                    or reconstruction after September 21,                      (19) Docket ID Number: EPA–HQ–                        Estimated annual cost: $312,000,
                                                    1979.                                                   OECA–2013–0342; Title: NESHAP for                     includes $0 annualized capital or O&M
                                                       Respondent’s obligation to respond:                  Lime Manufacturing (40 CFR part 63,                   costs.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    Mandatory (40 CFR part 60, subpart                      subpart AAAAA); EPA ICR Number                           Changes in Estimates: There is no
                                                    NN).                                                    2072.06, OMB Control Number 2060–                     change in burden hours from the
                                                       Estimated number of respondents: 14                  0544; Expiration Date: January 31, 2017.              previous ICR.
                                                    (total).                                                   Respondents: Lime manufacturing                       (22) Docket ID Number: EPA–HQ–
                                                       Frequency of response: Initially,                    plants.                                               OECA–2013–0319; Title: NSPS for VOC
                                                    occasionally and semiannually.                             Respondent’s obligation to respond:                Emissions from Petroleum Refinery
                                                       Estimated annual burden: 1,720                       Mandatory (40 CFR part 63, subpart                    Wastewater Systems (40 CFR part 60,
                                                    hours.                                                  AAAAA).                                               subpart QQQ); EPA ICR Number


                                               VerDate Sep<11>2014   18:53 May 02, 2016   Jkt 238001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\03MYN1.SGM   03MYN1


                                                    26550                           Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices

                                                    1136.12, OMB Control Number 2060–                       Gold Mine Ore Processing (40 CFR part                    Respondents: Petroleum refineries.
                                                    0172; Expiration Date: March 31, 2017.                  63, subpart EEEEEEE); EPA ICR Number                     Respondent’s obligation to respond:
                                                       Respondents: Petroleum refineries                    2383.04, OMB Control Number 2060–                     Mandatory (40 CFR part 60, subparts
                                                    with wastewater systems.                                0659; Expiration Date: March 31, 2017.                GGG and GGGa).
                                                       Respondent’s obligation to respond:                     Respondents: Gold mine ore                            Estimated number of respondents:
                                                    Mandatory (40 CFR part 60, subpart                      processing and production facilities.                 130 (total).
                                                    QQQ).                                                      Respondent’s obligation to respond:                   Frequency of response: Initially,
                                                       Estimated number of respondents:                     Mandatory (40 CFR part 63, subpart                    occasionally, and semiannually.
                                                    135 (total).                                            EEEEEEE).                                                Estimated annual burden: 24,900
                                                       Frequency of response: Initially,                       Estimated number of respondents: 21                hours.
                                                    occasionally, and semiannually.                         (total).                                                 Estimated annual cost: $2,430,000,
                                                       Estimated annual burden: 9,240                          Frequency of response: Initially,                  includes $0 annualized capital or O&M
                                                    hours.                                                  occasionally, semiannually, and                       costs.
                                                       Estimated annual cost: $922,000,                     annually.                                                Changes in Estimates: There is no
                                                    includes $17,600 annualized capital or                     Estimated annual burden: 2,360                     change in burden hours from the
                                                    O&M costs.                                              hours.                                                previous ICR.
                                                       Changes in Estimates: There is no                       Estimated annual cost: $445,000,                      (29) Docket ID Number: EPA–HQ–
                                                    change in burden hours from the                         includes $227,000 annualized capital or               OECA–2013–0350; Title: The
                                                    previous ICR.                                           O&M costs.                                            Consolidated Air Rule (CAR) for the
                                                       (23) Docket ID Number: EPA–HQ–                          Changes in Estimates: There is no                  Synthetic Organic Chemical
                                                    OECA–2013–0353; Title: NSPS for                         change in burden hours from the                       Manufacturing Industry (SOCMI); EPA
                                                    Stationary Spark Ignition Internal                      previous ICR.                                         ICR Number 1854.10, OMB Control
                                                    Combustion Engines (40 CFR part 60,                        (26) Docket ID Number: EPA–HQ–                     Number 2060–0443; Expiration Date:
                                                    subpart JJJJ); EPA ICR Number 2227.05,                  OECA–2016–0009; Title: NESHAP for                     June 30, 2017.
                                                    OMB Control Number 2060–0610;                           Group IV Polymers and Resins (40 CFR                     Respondents: Synthetic organic
                                                    Expiration Date: March 31, 2017.                        part 63, subpart JJJ); EPA ICR Number                 chemical manufacturing facilities.
                                                       Respondents: Stationary spark                        2457.03, OMB Control Number 2060–                        Respondent’s obligation to respond:
                                                    ignition internal combustion engines.                   0682; Expiration Date: March 31, 2017.                Mandatory (40 CFR part 65).
                                                       Respondent’s obligation to respond:                     Respondents: Thermoplastic resin                      Estimated number of respondents:
                                                    Mandatory (40 CFR part 60, subpart JJJJ).               production facilities.                                4,620 (total).
                                                       Estimated number of respondents:                        Respondent’s obligation to respond:                   Frequency of response: Initially,
                                                    17,600 (total).                                         Mandatory (40 CFR part 63, subpart JJJ).              occasionally, semiannually and
                                                       Frequency of response: Initially and                    Estimated number of respondents: 31                annually.
                                                    annually.                                               (total).                                                 Estimated annual burden: 2,130,000
                                                       Estimated annual burden: 23,300                         Frequency of response: Semiannually.               hours.
                                                    hours.                                                     Estimated annual burden: 459 hours.                   Estimated annual cost: $309,000,000,
                                                       Estimated annual cost: $4,640,000,                      Estimated annual cost: $1,110,000,                 includes $101,000,000 annualized
                                                    includes $2,360,000 annualized capital                  includes $542,000 annualized capital or               capital or O&M costs.
                                                    or O&M costs.                                           O&M costs.                                               Changes in Estimates: There is an
                                                       Changes in Estimates: There is an                       (27) Docket ID Number: EPA–HQ–                     expected increase in burden hours from
                                                    expected increase in burden hours from                  OECA–2014–0063; Title: NESHAP for                     the previous ICR due to growth in the
                                                    the previous ICR due to growth in the                   Polyether Polyols Production (40 CFR                  respondent universe.
                                                    respondent universe.                                    part 63, subpart PPP); EPA ICR Number                    (30) Docket ID Number: EPA–HQ–
                                                       (24) Docket ID Number: EPA–HQ–                       1811.10, OMB Control Number 2060–                     OECA–2013–0315; Title: NSPS for
                                                    OECA–2013–0321; Title: NSPS for                         0415; Expiration Date: May 31, 2017.                  Commercial and Industrial Solid Waste
                                                    Sewage Sludge Incinerators (40 CFR                         Respondents: Polyether polyols                     Incineration (CISWI) Units (40 CFR part
                                                    part 60, subpart LLLL); EPA ICR                         production facilities.                                60, subpart CCCC); EPA ICR Number
                                                    Number 2369.04, OMB Control Number                         Respondent’s obligation to respond:                2384.04, OMB Control Number 2060–
                                                    2060–0658; Expiration Date: March 31,                   Mandatory (40 CFR part 63, subpart                    0662; Expiration Date: June 30, 2017.
                                                    2017.                                                   PPP).                                                    Respondents: Commercial and
                                                       Respondents: New or modified                            Estimated number of respondents: 23                industrial solid waste incineration
                                                    sewage sludge incinerators.                             (total).                                              units.
                                                       Respondent’s obligation to respond:                     Frequency of response: Occasionally                   Respondent’s obligation to respond:
                                                    Mandatory (40 CFR part 60, subpart                      and semiannually.                                     Mandatory (40 CFR part 60, subpart
                                                    LLLL).                                                     Estimated annual burden: 3,700                     CCCC).
                                                       Estimated number of respondents: 4                   hours.                                                   Estimated number of respondents: 4
                                                    (total).                                                   Estimated annual cost: $433,000,                   (total).
                                                       Frequency of response: Initially,                    includes $226,000 annualized capital or                  Frequency of response: Initially,
                                                    occasionally, and annually.                             O&M costs.                                            occasionally, semiannually, and
                                                       Estimated annual burden: 798 hours.                     Changes in Estimates: There is no                  annually.
                                                       Estimated annual cost: $448,000,                     change in burden hours from the                          Estimated annual burden: 1,040
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    includes $370,000 annualized capital or                 previous ICR.                                         hours.
                                                    O&M costs.                                                 (28) Docket ID Number: EPA–HQ–                        Estimated annual cost: $451,000,
                                                       Changes in Estimates: There is an                    OECA–2013–0303; Title: NSPS for                       includes $350,000 annualized capital or
                                                    expected increase in burden hours from                  Equipment Leaks of VOC in Petroleum                   O&M costs.
                                                    the previous ICR due to growth in the                   Refineries (40 CFR part 60, subparts                     Changes in Estimates: There is an
                                                    respondent universe.                                    GGG and GGGa); EPA ICR Number                         expected increase in burden hours from
                                                       (25) Docket ID Number: EPA–HQ–                       0983.15, OMB Control Number 2060–                     the previous ICR due to growth in the
                                                    OECA–2013–0317; Title: NESHAP for                       0067; Expiration Date: June 30, 2017.                 respondent universe.


                                               VerDate Sep<11>2014   18:53 May 02, 2016   Jkt 238001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\03MYN1.SGM   03MYN1


                                                                                    Federal Register / Vol. 81, No. 85 / Tuesday, May 3, 2016 / Notices                                              26551

                                                       (31) Docket ID Number: EPA–HQ–                       (SAB) Staff Office announces a public                 hold a public meeting to discuss and
                                                    OECA–2014–0034; Title: NSPS for Kraft                   meeting and a public teleconference of                deliberate on the topics below.
                                                    Pulp Mills (40 CFR part 60, subpart BB);                the chartered SAB to conduct a quality                   (1) Quality review of the SAB Draft 4–
                                                    EPA ICR Number 2485.03, OMB Control                     review of a draft SAB report on an                    26–16 Review of EPA’s draft Assessment
                                                    Number 2060–0690; Expiration Date:                      assessment of potential impacts of                    of the Potential Impacts of Hydraulic
                                                    June 30, 2017.                                          hydraulic fracturing on drinking water                Fracturing for Oil and Gas on Drinking
                                                       Respondents: Kraft pulp mills.                       resources and to receive briefings on                 Water Resources. The EPA’s Office of
                                                       Respondent’s obligation to respond:                  topics of interest for possible future SAB            Research and Development (ORD)
                                                    Mandatory (40 CFR part 60, subpart BB).                 advice.                                               requested the SAB to conduct a peer
                                                       Estimated number of respondents: 4                   DATES: The public meeting will be held                review of the draft assessment report
                                                    (total).                                                on Tuesday, June 14, 2016, from 8:30                  concerning the relationship between
                                                       Frequency of response: Initially,                    a.m. to 5:00 p.m. and Wednesday, June                 hydraulic fracturing and drinking water
                                                    occasionally, and semiannually.                         15, 2016, from 8:30 a.m. to 1:00 p.m.                 in the United States. The purpose of the
                                                       Estimated annual burden: 1,910                       The teleconference, if needed to                      report, Assessment of the Potential
                                                    hours.                                                  accommodate registered public                         Impacts of Hydraulic Fracturing for Oil
                                                       Estimated annual cost: $753,000,                     speakers, will be held on June 8, 2016                and Gas on Drinking Water Resources
                                                    includes $567,000 annualized capital or                 from 2:00 p.m. to 5:00 p.m. (Eastern                  (May 2015 External Review Draft, EPA/
                                                    O&M costs.                                              Time).                                                600/R–15/047), is to synthesize
                                                       Changes in Estimates: There is an                                                                          available scientific literature and data to
                                                                                                            ADDRESSES: The meeting will be held at
                                                    expected increase in burden hours from                                                                        assess the potential for hydraulic
                                                                                                            the Westin Alexandria, 400 Courthouse
                                                    the previous ICR due to growth in the                                                                         fracturing for oil and gas to impact the
                                                                                                            Square, Alexandria, VA 22314.
                                                    respondent universe.                                                                                          quality or quantity of drinking water
                                                                                                            FOR FURTHER INFORMATION CONTACT: Any                  resources, and identify factors affecting
                                                       (32) Docket ID Number: EPA–HQ–                       member of the public who wants further
                                                    OECA–2013–0316; Title: NSPS for                                                                               the frequency or severity of any
                                                                                                            information concerning the meeting                    potential impacts.
                                                    Onshore Natural Gas Processing Plants                   may contact Mr. Thomas Carpenter,                        The SAB Hydraulic Fracturing
                                                    (40 CFR part 60, subparts KKK and                       Designated Federal Officer (DFO), EPA                 Research Advisory Panel conducted a
                                                    LLL); EPA ICR Number 1086.12, OMB                       Science Advisory Board (1400R), U.S.                  peer review of the EPA draft assessment
                                                    Control Number 2060–0120; Expiration                    Environmental Protection Agency, 1200                 and the chartered SAB will conduct a
                                                    Date: August 31, 2017.                                  Pennsylvania Avenue NW., Washington,                  quality review of the panel’s draft
                                                       Respondents: Onshore natural gas                     DC 20460; via telephone/voice mail                    report. Quality review is a key function
                                                    processing plants.                                      (202) 564–4885, or email at                           of the chartered SAB. Draft reports
                                                       Respondent’s obligation to respond:                  carpenter.thomas@epa.gov. General                     prepared by SAB committees, panels, or
                                                    Mandatory (40 CFR part 60, subparts                     information concerning the SAB can be                 work groups must be reviewed and
                                                    KKK and LLL).                                           found on the EPA Web site at http://                  approved by the chartered SAB before
                                                       Estimated number of respondents:                     www.epa.gov/sab.                                      transmittal to the EPA Administrator.
                                                    577 (total).                                               Technical Contact for EPA’s Draft                  Consistent with FACA, the chartered
                                                       Frequency of response: Initially,                    Report: Any technical questions                       SAB makes a determination in a public
                                                    occasionally, and semiannually.                         concerning EPA’s draft report,                        meeting about each draft report and
                                                       Estimated annual burden: 122,000                     Assessment of the Potential Impacts of                determines whether the report is ready
                                                    hours.                                                  Hydraulic Fracturing for Oil and Gas on               to be transmitted to the EPA
                                                       Estimated annual cost: $12,000,000,                  Drinking Water Resources (May 2015                    Administrator.
                                                    includes $68,400 annualized capital or                  External Review Draft, EPA/600/R–15/                     Background on the current advisory
                                                    O&M costs.                                              047), should be directed to Dr. Jeffrey               activity, Assessment of the Potential
                                                       Changes in Estimates: There is no                    Frithsen, National Center for                         Impacts of Hydraulic Fracturing for Oil
                                                    change in burden hours from the                         Environmental Assessment, Office of                   and Gas on Drinking Water Resources,
                                                    previous ICR.                                           Research and Development, U.S. EPA,                   can be found on the SAB Web site at
                                                      Dated: April 18, 2016.                                1200 Pennsylvania Avenue NW., Mail                    https://yosemite.epa.gov/sab/
                                                    Edward J. Messina,                                      Code 8601P, Washington, DC 20460,                     sabproduct.nsf//LookupWebProjects
                                                    Director, Monitoring, Assistance and Media              telephone (703) 347–8623 or via email                 CurrentBOARD/F7A9DB9ABBAC0
                                                    Programs Division.                                      at frithsen.jeff@epa.gov.                             15785257E540052DD54?Open
                                                    [FR Doc. 2016–10393 Filed 5–2–16; 8:45 am]              SUPPLEMENTARY INFORMATION:                            Document.
                                                    BILLING CODE 6560–50–P
                                                                                                               Background: The SAB was                               (2) Briefings from representatives of
                                                                                                            established pursuant to the                           the EPA and other EPA advisory
                                                                                                            Environmental Research, Development,                  Committees on topics of interest for
                                                    ENVIRONMENTAL PROTECTION                                and Demonstration Authorization Act                   possible future SAB advice.
                                                    AGENCY                                                  (ERDDAA), codified at 42 U.S.C. 4365,                    If the SAB Staff Office determines that
                                                                                                            to provide independent scientific and                 there will be insufficient time during
                                                    [FRL–9945–99–OA]                                        technical advice to the Administrator on              the June 14–15, 2016 meeting to
                                                                                                            the scientific and technical basis for                accommodate the members of the public
                                                    Notification of a Public Meeting and
                                                                                                            Agency positions and regulations. The                 who registered in advance to provide
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    Public Teleconference of the Chartered
                                                                                                            SAB is a Federal Advisory Committee                   oral public comments, the
                                                    Science Advisory Board
                                                                                                            chartered under the Federal Advisory                  teleconference will be held on June 8,
                                                    AGENCY: Environmental Protection                        Committee Act (FACA), 5 U.S.C., App.                  2016 to provide additional time for oral
                                                    Agency (EPA).                                           2. The SAB will comply with the                       public comments.
                                                    ACTION: Notice.                                         provisions of FACA and all appropriate                   Availability of Meeting Materials: A
                                                                                                            SAB Staff Office procedural policies.                 meeting agenda and other materials for
                                                    SUMMARY: The Environmental Protection                   Pursuant to FACA and EPA policy,                      the meeting will be placed on the SAB
                                                    Agency (EPA) Science Advisory Board                     notice is hereby given that the SAB will              Web site at http://epa.gov/sab.


                                               VerDate Sep<11>2014   18:53 May 02, 2016   Jkt 238001   PO 00000   Frm 00026   Fmt 4703   Sfmt 4703   E:\FR\FM\03MYN1.SGM   03MYN1



Document Created: 2016-05-03 00:31:01
Document Modified: 2016-05-03 00:31:01
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesComments must be submitted on or before July 5, 2016.
ContactPatrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW., Washington, DC 20460; telephone number: (202) 564-2970; fax
FR Citation81 FR 26546 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR