81_FR_27511 81 FR 27423 - Whitewater Green Energy, LLC; Notice of Successive Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

81 FR 27423 - Whitewater Green Energy, LLC; Notice of Successive Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 88 (May 6, 2016)

Page Range27423-27423
FR Document2016-10666

Federal Register, Volume 81 Issue 88 (Friday, May 6, 2016)
[Federal Register Volume 81, Number 88 (Friday, May 6, 2016)]
[Notices]
[Page 27423]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-10666]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14383-006]


Whitewater Green Energy, LLC; Notice of Successive Preliminary 
Permit Application Accepted for Filing and Soliciting Comments, Motions 
To Intervene, and Competing Applications

    On January 22, 2016, the Whitewater Green Energy, LLC filed an 
application for a preliminary permit under section 4(f) of the Federal 
Power Act proposing to study the feasibility of the proposed Whitewater 
Hydroelectric Project No. 14383-006, to be located on Russel and 
Whitewater Creeks, near the town of Idanha, in Marion and Linn 
Counties, Oregon. The project would be located entirely on U.S. Forest 
Service lands.
    The proposed project would consist of the following: (1) A 9.5-
foot-high, 40-foot-wide weir on Russell Creek; (2) a 19,500-foot-long, 
60-inch-diameter steel penstock; (3) a 50-foot-long by 40-foot-wide 
concrete powerhouse containing one pelton turbine rated at 11 
megawatts; (4) a 160-foot-long, 72-inch-diameter tailrace discharging 
into Whitewater Creek; (5) an underground 2.25-mile-long, 12,000 
kilovolt-amperes transmission line extending from the project to an 
outside transmission line (the point of interconnection); (6) an access 
road along side of the penstock; and (7) appurtenant facilities. The 
estimated annual generation of the Whitewater Creek Project would be 
95.04 gigawatt-hours.
    Applicant Contact: David Harmon, P.E., 2532 Santiam Highway, 
Albany, Oregon, 97322; phone: (541) 405-5236; email: 
[email protected].
    FERC Contact: Sergiu Serban; phone: (202) 502-6211; email: 
sergiu.serban@ferc,gov.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. The Commission strongly encourages electronic filing. 
Please file comments, motions to intervene, notices of intent, and 
competing applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14383-006.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14383) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: April 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-10666 Filed 5-5-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                      Federal Register / Vol. 81, No. 88 / Friday, May 6, 2016 / Notices                                                  27423

                                                    Nuclear Materials Committee Update                         The proposed project would consist of                Dated: April 29, 2016.
                                                    Public Comments                                         the following: (1) A 9.5-foot-high, 40-               Kimberly D. Bose,
                                                    Adjourn                                                 foot-wide weir on Russell Creek; (2) a                Secretary.
                                                       Public Participation: The EM SSAB,                   19,500-foot-long, 60-inch-diameter steel              [FR Doc. 2016–10666 Filed 5–5–16; 8:45 am]
                                                    Savannah River Site, welcomes the                       penstock; (3) a 50-foot-long by 40-foot-              BILLING CODE 6717–01–P
                                                    attendance of the public at its advisory                wide concrete powerhouse containing
                                                    committee meetings and will make                        one pelton turbine rated at 11
                                                    every effort to accommodate persons                     megawatts; (4) a 160-foot-long, 72-inch-              DEPARTMENT OF ENERGY
                                                    with physical disabilities or special                   diameter tailrace discharging into
                                                    needs. If you require special                           Whitewater Creek; (5) an underground                  Federal Energy Regulatory
                                                    accommodations due to a disability,                                                                           Commission
                                                                                                            2.25-mile-long, 12,000 kilovolt-amperes
                                                    please contact James Giusti at least                    transmission line extending from the                  [Project No. 2766–010]
                                                    seven days in advance of the meeting at
                                                                                                            project to an outside transmission line
                                                    the phone number listed above. Written                                                                        The City of Holyoke Gas & Electric
                                                                                                            (the point of interconnection); (6) an
                                                    statements may be filed with the Board                                                                        Department; Notice of Intent To File
                                                                                                            access road along side of the penstock;
                                                    either before or after the meeting.                                                                           License Application, Filing of Pre-
                                                    Individuals who wish to make oral                       and (7) appurtenant facilities. The
                                                                                                            estimated annual generation of the                    Application Document, and Approving
                                                    statements pertaining to agenda items                                                                         Use of the Traditional Licensing
                                                    should contact James Giusti’s office at                 Whitewater Creek Project would be
                                                                                                                                                                  Process
                                                    the address or telephone listed above.                  95.04 gigawatt-hours.
                                                    Requests must be received five days                        Applicant Contact: David Harmon,                      a. Type of Filing: Notice of Intent to
                                                    prior to the meeting and reasonable                     P.E., 2532 Santiam Highway, Albany,                   File License Application and Request
                                                    provision will be made to include the                   Oregon, 97322; phone: (541) 405–5236;                 To Use the Traditional Licensing
                                                    presentation in the agenda. The Deputy                  email: dave@wwgreenenergy.com.                        Process.
                                                    Designated Federal Officer is                                                                                    b. Project No.: 2766–010.
                                                                                                               FERC Contact: Sergiu Serban; phone:                   c. Date Filed: February 29, 2016.
                                                    empowered to conduct the meeting in a                   (202) 502–6211; email: sergiu.serban@
                                                    fashion that will facilitate the orderly                                                                         d. Submitted By: City of Holyoke Gas
                                                                                                            ferc,gov.                                             & Electric Department.
                                                    conduct of business. Individuals
                                                                                                               Deadline for filing comments, motions                 e. Name of Project: Albion Mill (D
                                                    wishing to make public comments will
                                                                                                            to intervene, competing applications                  Wheel) Hydroelectric Project.
                                                    be provided a maximum of five minutes
                                                                                                            (without notices of intent), or notices of               f. Location: Between the first and
                                                    to present their comments.
                                                                                                            intent to file competing applications: 60             second level canals on the Holyoke
                                                       Minutes: Minutes will be available by
                                                                                                            days from the issuance of this notice.                Canal System adjacent to the
                                                    writing or calling James Giusti at the
                                                                                                                                                                  Connecticut River, in the city of
                                                    address or phone number listed above.                   Competing applications and notices of
                                                                                                                                                                  Holyoke in Hampden County,
                                                    Minutes will also be available at the                   intent must meet the requirements of 18
                                                                                                                                                                  Massachusetts. The project does not
                                                    following Web site: http://cab.srs.gov/                 CFR 4.36. The Commission strongly
                                                                                                                                                                  occupy federal land.
                                                    srs-cab.html.                                           encourages electronic filing. Please file                g. Filed Pursuant to: 18 CFR 5.3 of the
                                                      Issued at Washington, DC on April 29,                 comments, motions to intervene, notices               Commission’s regulations.
                                                    2016.                                                   of intent, and competing applications                    h. Potential Applicant Contact: Paul
                                                    LaTanya R. Butler,                                      using the Commission’s eFiling system                 Ducheney, Superintendent, Holyoke Gas
                                                    Deputy Committee Management Officer.                    at http://www.ferc.gov/docs-filing/                   & Electric, 99 Suffolk Street, Holyoke,
                                                    [FR Doc. 2016–10714 Filed 5–5–16; 8:45 am]              efiling.asp. Commenters can submit                    MA 01040; (413) 536–9340; email—
                                                    BILLING CODE 6450–01–P
                                                                                                            brief comments up to 6,000 characters,                ducheney@hged.com.
                                                                                                            without prior registration, using the                    i. FERC Contact: Matt Buhyoff at (202)
                                                                                                            eComment system at http://                            502–6824; or email at matt.buhyoff@
                                                    DEPARTMENT OF ENERGY                                    www.ferc.gov/docs-filing/                             ferc.gov.
                                                                                                            ecomment.asp. You must include your                      j. Holyoke Gas and Electric filed its
                                                    Federal Energy Regulatory                               name and contact information at the end               request to use the Traditional Licensing
                                                    Commission                                              of your comments. For assistance,                     Process on February 29, 2016. Holyoke
                                                                                                            please contact FERC Online Support at                 Gas and Electric provided public notice
                                                    [Project No. 14383–006]
                                                                                                            FERCOnlineSupport@ferc.gov, (866)                     of its request on February 26, 2016. In
                                                    Whitewater Green Energy, LLC; Notice                    208–3676 (toll free), or (202) 502–8659               a letter dated April 29, 2016, the
                                                    of Successive Preliminary Permit                        (TTY). In lieu of electronic filing, please           Director of the Division of Hydropower
                                                    Application Accepted for Filing and                     send a paper copy to: Secretary, Federal              Licensing approved Holyoke Gas and
                                                    Soliciting Comments, Motions To                         Energy Regulatory Commission, 888                     Electric’s request to use the Traditional
                                                    Intervene, and Competing Applications                   First Street NE., Washington, DC 20426.               Licensing Process.
                                                                                                            The first page of any filing should                      k. With this notice, we are initiating
                                                      On January 22, 2016, the Whitewater                   include docket number P–14383–006.                    informal consultation with the U.S. Fish
                                                    Green Energy, LLC filed an application                                                                        and Wildlife Service and/or NOAA
                                                    for a preliminary permit under section                     More information about this project,               Fisheries under section 7 of the
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    4(f) of the Federal Power Act proposing                 including a copy of the application, can              Endangered Species Act and the joint
                                                    to study the feasibility of the proposed                be viewed or printed on the ‘‘eLibrary’’              agency regulations thereunder at 50
                                                    Whitewater Hydroelectric Project No.                    link of Commission’s Web site at                      CFR, part 402; and NOAA Fisheries
                                                    14383–006, to be located on Russel and                  http://www.ferc.gov/docs-filing/                      under section 305(b) of the Magnuson-
                                                    Whitewater Creeks, near the town of                     elibrary.asp. Enter the docket number                 Stevens Fishery Conservation and
                                                    Idanha, in Marion and Linn Counties,                    (P–14383) in the docket number field to               Management Act and implementing
                                                    Oregon. The project would be located                    access the document. For assistance,                  regulations at 50 CFR 600.920. We are
                                                    entirely on U.S. Forest Service lands.                  contact FERC Online Support.                          also initiating consultation with the


                                               VerDate Sep<11>2014   17:20 May 05, 2016   Jkt 238001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\06MYN1.SGM   06MYN1



Document Created: 2016-05-06 00:30:05
Document Modified: 2016-05-06 00:30:05
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 27423 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR