81_FR_27512 81 FR 27424 - St. Charles Mesa Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

81 FR 27424 - St. Charles Mesa Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 88 (May 6, 2016)

Page Range27424-27425
FR Document2016-10673

Federal Register, Volume 81 Issue 88 (Friday, May 6, 2016)
[Federal Register Volume 81, Number 88 (Friday, May 6, 2016)]
[Notices]
[Pages 27424-27425]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-10673]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD16-11-000]


St. Charles Mesa Water District; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On April 26, 2016, the St. Charles Mesa Water District (SCMWD) 
filed a notice of intent to construct a qualifying conduit hydropower 
facility, pursuant to section 30 of the Federal Power Act (FPA), as 
amended by section 4 of the Hydropower Regulatory Efficiency Act of 
2013 (HREA). The proposed Hydro-Electric Station at the SCMWD Treatment 
Plant Project would have an installed capacity of 40 kilowatts (kW), 
and would be located adjacent to the outlet of an existing raw water 
supply pipeline at the SCMWD's existing raw water storage reservoir. 
The project would be located near Pueblo, in Pueblo County, Colorado.
    Applicant Contact: David Simpson, District Manager, 1397 Aspen 
Road, Pueblo, CO 81006, Phone No. (719) 542-4380.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A new powerhouse, approximately 20 feet 
by 62 feet, along an existing 18-inch-diameter raw water supply 
pipeline; (2) three turbine/generating units, two units with installed 
capacities of 10 kW each and one unit with an installed capacity of 20 
kW, for a total installed capacity of 40 kW, and a potential future 
fourth unit with an installed capacity of 20 kW; (3) three short intake 
pipes with diameters of 8 inches, 10 inches, and 12 inches, and a 
potential future 12-inch-diameter intake pipe; (4) three short 
discharge pipes with diameters of 8 inches, 10 inches, and 12 inches, 
and a potential future 12-inch-diameter discharge pipe; and (5) 
appurtenant facilities.
    The proposed project would have a total installed capacity of 40 
kW.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision              Description       Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by   The conduit the                      Y
 HREA.                            facility uses is a
                                  tunnel, canal,
                                  pipeline, aqueduct,
                                  flume, ditch, or
                                  similar manmade water
                                  conveyance that is
                                  operated for the
                                  distribution of water
                                  for agricultural,
                                  municipal, or
                                  industrial
                                  consumption and not
                                  primarily for the
                                  generation of
                                  electricity.
FPA 30(a)(3)(C)(i), as amended   The facility is                      Y
 by HREA.                         constructed,
                                  operated, or
                                  maintained for the
                                  generation of
                                  electric power and
                                  uses for such
                                  generation only the
                                  hydroelectric
                                  potential of a non-
                                  federally owned
                                  conduit.
FPA 30(a)(3)(C)(ii), as amended  The facility has an                  Y
 by HREA.                         installed capacity
                                  that does not exceed
                                  5 megawatts.
FPA 30(a)(3)(C)(iii), as         On or before August 9,               Y
 amended by HREA.                 2013, the facility is
                                  not licensed, or
                                  exempted from the
                                  licensing
                                  requirements of Part
                                  I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed addition of the 
hydroelectric project along the existing raw water supply pipeline will 
not alter its primary purpose of supplying water to the water treatment 
plant's storage reservoir. Therefore, based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility, which is 
not required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified

[[Page 27425]]

deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD16-11) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.

    Dated: April 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-10673 Filed 5-5-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    27424                             Federal Register / Vol. 81, No. 88 / Friday, May 6, 2016 / Notices

                                                    Massachusetts State Historic                            Commission at least 24 months prior to                installed capacity of 40 kilowatts (kW),
                                                    Preservation Officer, as required by                    the expiration of the existing license.               and would be located adjacent to the
                                                    section 106, National Historical                        All applications for license for this                 outlet of an existing raw water supply
                                                    Preservation Act, and the implementing                  project must be filed by February 28,                 pipeline at the SCMWD’s existing raw
                                                    regulations of the Advisory Council on                  2019.                                                 water storage reservoir. The project
                                                    Historic Preservation at 36 CFR 800.2.                    p. Register online at http://                       would be located near Pueblo, in Pueblo
                                                       l. With this notice, we are designating              www.ferc.gov/docs-filing/                             County, Colorado.
                                                    Holyoke Gas and Electric as the                         esubscription.asp to be notified via                    Applicant Contact: David Simpson,
                                                    Commission’s non-federal                                email of new filing and issuances                     District Manager, 1397 Aspen Road,
                                                    representative for carrying out informal                related to this or other pending projects.            Pueblo, CO 81006, Phone No. (719) 542–
                                                    consultation pursuant to section 7 of the               For assistance, contact FERC Online                   4380.
                                                    Endangered Species Act and section 106                  Support.                                                FERC Contact: Christopher Chaney,
                                                    of the National Historic Preservation                                                                         Phone No. (202) 502–6778, email:
                                                                                                              Dated: April 29, 2016.
                                                    Act.                                                                                                          Christopher.Chaney@ferc.gov.
                                                       m. Holyoke Gas & Electric filed a Pre-               Kimberly D. Bose,
                                                                                                            Secretary.                                              Qualifying Conduit Hydropower
                                                    Application Document (PAD; including
                                                                                                                                                                  Facility Description: The proposed
                                                    a proposed process plan and schedule)                   [FR Doc. 2016–10663 Filed 5–5–16; 8:45 am]
                                                                                                                                                                  project would consist of: (1) A new
                                                    with the Commission, pursuant to 18                     BILLING CODE 6717–01–P
                                                    CFR 5.6 of the Commission’s                                                                                   powerhouse, approximately 20 feet by
                                                    regulations.                                                                                                  62 feet, along an existing 18-inch-
                                                       n. A copy of the PAD is available for                DEPARTMENT OF ENERGY                                  diameter raw water supply pipeline; (2)
                                                    review at the Commission in the Public                                                                        three turbine/generating units, two units
                                                    Reference Room or may be viewed on                      Federal Energy Regulatory                             with installed capacities of 10 kW each
                                                    the Commission’s Web site (http://                      Commission                                            and one unit with an installed capacity
                                                    www.ferc.gov), using the ‘‘eLibrary’’                                                                         of 20 kW, for a total installed capacity
                                                                                                            [Docket No. CD16–11–000]                              of 40 kW, and a potential future fourth
                                                    link. Enter the docket number,
                                                    excluding the last three digits in the                                                                        unit with an installed capacity of 20
                                                                                                            St. Charles Mesa Water District; Notice               kW; (3) three short intake pipes with
                                                    docket number field to access the                       of Preliminary Determination of a
                                                    document. For assistance, contact FERC                                                                        diameters of 8 inches, 10 inches, and 12
                                                                                                            Qualifying Conduit Hydropower                         inches, and a potential future 12-inch-
                                                    Online Support at                                       Facility and Soliciting Comments and
                                                    FERCONlineSupport@ferc.gov, (866)                                                                             diameter intake pipe; (4) three short
                                                                                                            Motions To Intervene                                  discharge pipes with diameters of 8
                                                    208–3676 (toll free), or (202) 502–8659
                                                    (TTY). A copy is also available for                       On April 26, 2016, the St. Charles                  inches, 10 inches, and 12 inches, and a
                                                    inspection and reproduction at the                      Mesa Water District (SCMWD) filed a                   potential future 12-inch-diameter
                                                    address in paragraph h.                                 notice of intent to construct a qualifying            discharge pipe; and (5) appurtenant
                                                       o. The licensee states its unequivocal               conduit hydropower facility, pursuant                 facilities.
                                                    intent to submit an application for a                   to section 30 of the Federal Power Act                  The proposed project would have a
                                                    new license for Project No. 2766.                       (FPA), as amended by section 4 of the                 total installed capacity of 40 kW.
                                                    Pursuant to 18 CFR 16.8, 16.9, and                      Hydropower Regulatory Efficiency Act                    A qualifying conduit hydropower
                                                    16.10, each application for a new                       of 2013 (HREA). The proposed Hydro-                   facility is one that is determined or
                                                    license and any competing license                       Electric Station at the SCMWD                         deemed to meet all of the criteria shown
                                                    applications must be filed with the                     Treatment Plant Project would have an                 in the table below.

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                    Satisfies
                                                                Statutory provision                                                            Description                                           (Y/N)

                                                    FPA 30(a)(3)(A), as amended by HREA ..             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or          Y
                                                                                                         similar manmade water conveyance that is operated for the distribution of water
                                                                                                         for agricultural, municipal, or industrial consumption and not primarily for the gen-
                                                                                                         eration of electricity.
                                                    FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric             Y
                                                                                                         power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                         erally owned conduit.
                                                    FPA 30(a)(3)(C)(ii), as amended              by    The facility has an installed capacity that does not exceed 5 megawatts ..................      Y
                                                      HREA.
                                                    FPA 30(a)(3)(C)(iii), as amended             by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-             Y
                                                      HREA.                                             censing requirements of Part I of the FPA.



                                                      Preliminary Determination: The                        proposal satisfies the requirements for a               Deadline for filing motions to
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    proposed addition of the hydroelectric                  qualifying conduit hydropower facility,               intervene is 30 days from the issuance
                                                    project along the existing raw water                    which is not required to be licensed or               date of this notice.
                                                    supply pipeline will not alter its                      exempted from licensing.                                Anyone may submit comments or a
                                                    primary purpose of supplying water to                     Comments and Motions to Intervene:                  motion to intervene in accordance with
                                                    the water treatment plant’s storage                     Deadline for filing comments contesting               the requirements of Rules of Practice
                                                    reservoir. Therefore, based upon the                    whether the facility meets the qualifying             and Procedure, 18 CFR 385.210 and
                                                    above criteria, Commission staff                        criteria is 45 days from the issuance                 385.214. Any motions to intervene must
                                                    preliminarily determines that the                       date of this notice.                                  be received on or before the specified


                                               VerDate Sep<11>2014   17:20 May 05, 2016   Jkt 238001   PO 00000   Frm 00038   Fmt 4703   Sfmt 4703   E:\FR\FM\06MYN1.SGM   06MYN1


                                                                                         Federal Register / Vol. 81, No. 88 / Friday, May 6, 2016 / Notices                                                27425

                                                    deadline date for the particular                           Dated: April 29, 2016.                                Dated: April 29, 2016.
                                                    proceeding.                                              Kimberly D. Bose,                                     Kimberly D. Bose,
                                                       Filing and Service of Responsive                      Secretary.                                            Secretary.
                                                    Documents: All filings must (1) bear in                  [FR Doc. 2016–10673 Filed 5–5–16; 8:45 am]            [FR Doc. 2016–10672 Filed 5–5–16; 8:45 am]
                                                    all capital letters the ‘‘COMMENTS                       BILLING CODE 6717–01–P                                BILLING CODE 6717–01–P
                                                    CONTESTING QUALIFICATION FOR A
                                                    CONDUIT HYDROPOWER FACILITY’’
                                                    or ‘‘MOTION TO INTERVENE,’’ as                           DEPARTMENT OF ENERGY                                  DEPARTMENT OF ENERGY
                                                    applicable; (2) state in the heading the                 Federal Energy Regulatory                             Federal Energy Regulatory
                                                    name of the applicant and the project                    Commission                                            Commission
                                                    number of the application to which the
                                                    filing responds; (3) state the name,                     [Docket No. AD16–2–000]                               [Docket No. EL16–54–000]
                                                    address, and telephone number of the
                                                    person filing; and (4) otherwise comply                  Review of Cost Submittals by Other                    Lakewood Cogeneration, L.P.;
                                                    with the requirements of sections                        Federal Agencies for Administering                    Essential Power Rock Springs, LLC;
                                                    385.2001 through 385.2005 of the                         Part I of the Federal Power Act; Notice               Essential Power OPP, LLC; Notice of
                                                    Commission’s regulations.1 All                           Requesting Questions and Comments                     Institution of Section 206 Proceeding
                                                    comments contesting Commission staff’s                   on Fiscal Year 2016 Other Federal                     and Refund Effective Date
                                                    preliminary determination that the                       Agency Cost Submissions
                                                                                                                                                                      On April 28, 2016, the Commission
                                                    facility meets the qualifying criteria                      In its Order on Rehearing                          issued an order in Docket No. EL16–54–
                                                    must set forth their evidentiary basis.                  Consolidating Administrative Annual                   000, pursuant to section 206 of the
                                                       The Commission strongly encourages                    Charges Bill Appeals and Modifying                    Federal Power Act (FPA), 16 U.S.C.
                                                    electronic filing. Please file motions to                Annual Charges Billing Procedures, 109                824e (2012), instituting an investigation
                                                    intervene and comments using the                         FERC ¶ 61,040 (2004) (October 8 Order)                into the justness and reasonableness of
                                                    Commission’s eFiling system at http://                   the Commission set forth an annual                    the individual reactive power rates of
                                                    www.ferc.gov/docs-filing/efiling.asp.                    process for Other Federal Agencies                    Lakewood Cogeneration, L.P., Essential
                                                    Commenters can submit brief comments                     (OFAs) to submit their costs related to               Power Rock Springs, LLC, and Essential
                                                    up to 6,000 characters, without prior                    Administering Part I of the Federal                   Power OPP, LLC. Lakewood
                                                                                                             Power Act. Pursuant to the established                Cogeneration, L.P., 155 FERC ¶ 61,109
                                                    registration, using the eComment system
                                                                                                             process, the Director of the Financial                (2016).
                                                    at http://www.ferc.gov/docs-filing/
                                                                                                             Management Division, Office of the                       The refund effective date in Docket
                                                    ecomment.asp. You must include your                      Executive Director, on October 13, 2015,
                                                    name and contact information at the end                                                                        No. EL16–54–000, established pursuant
                                                                                                             issued a letter requesting the OFAs to                to section 206(b) of the FPA, will be the
                                                    of your comments. For assistance,                        submit their costs by December 31, 2015               date of publication of this notice in the
                                                    please contact FERC Online Support at                    using the OFA Cost Submission Form.                   Federal Register.
                                                    FERCOnlineSupport@ferc.gov, (866)                           Upon receipt of the agency
                                                    208–3676 (toll free), or (202) 502–8659                                                                          Dated: April 29, 2016.
                                                                                                             submissions, the Commission posted
                                                    (TTY). In lieu of electronic filing, please              the information in eLibrary, and issued,              Kimberly D. Bose,
                                                    send a paper copy to: Secretary, Federal                 on March 17, 2016, a notice announcing                Secretary.
                                                    Energy Regulatory Commission, 888                        the date for a technical conference to                [FR Doc. 2016–10676 Filed 5–5–16; 8:45 am]
                                                    First Street NE., Washington, DC 20426.                  review the submitted costs. On April 7,               BILLING CODE 6717–01–P
                                                    A copy of all other filings in reference                 2016, the Commission held the
                                                    to this application must be accompanied                  technical conference. Technical
                                                    by proof of service on all persons listed                conference transcripts, submitted cost                DEPARTMENT OF ENERGY
                                                    in the service list prepared by the                      forms, and detailed supporting
                                                                                                                                                                   Federal Energy Regulatory
                                                    Commission in this proceeding, in                        documents are all available for review
                                                                                                                                                                   Commission
                                                    accordance with 18 CFR 4.34(b) and                       under Docket No. AD16–2. These
                                                    385.2010.                                                documents are accessible on-line at
                                                                                                             http://www.ferc.gov, using the                        [Docket No. CP15–118–000]
                                                       Locations of Notice of Intent: Copies
                                                                                                             ‘‘eLibrary’’ link and are available for               Transcontinental Gas Pipe Line
                                                    of the notice of intent can be obtained
                                                                                                             review in the Commission’s Public                     Company, LLC; Notice of Revised
                                                    directly from the applicant or such
                                                                                                             Reference Room in Washington, DC.                     Schedule for Environmental Review of
                                                    copies can be viewed and reproduced at
                                                                                                                Interested parties may file specific               the Virginia Southside Expansion
                                                    the Commission in its Public Reference                   questions and comments on the FY 2015
                                                    Room, Room 2A, 888 First Street NE.,                                                                           Project II
                                                                                                             OFA cost submissions with the
                                                    Washington, DC 20426. The filing may                     Commission under Docket No. AD16–2,                      This notice identifies the Federal
                                                    also be viewed on the web at http://                     no later than May 13, 2016. Once filed,               Energy Regulatory Commission
                                                    www.ferc.gov/docs-filing/elibrary.asp                    the Commission will forward the                       (Commission or FERC) staff’s revised
                                                    using the ‘‘eLibrary’’ link. Enter the                   questions and comments to the OFAs                    schedule for the completion of the
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    docket number (i.e., CD16–11) in the                     for response.                                         environmental assessment (EA) for
                                                    docket number field to access the                           Anyone with questions pertaining to                Transcontinental Gas Pipe Line
                                                    document. For assistance, call toll-free                 the technical conference or this notice               Company, LLC’s Virginia Southside
                                                    1–866–208–3676 or email                                  should contact Norman Richardson at                   Expansion Project II. The first notice of
                                                    FERCOnlineSupport@ferc.gov. For TTY,                     (202) 502–6219 (via email at                          schedule, issued on March 7, 2016,
                                                    call (202) 502–8659.                                     norman.richardson@ferc.gov) or Raven                  identified April 29, 2016 as the EA
                                                                                                             A. Rodriguez at (202) 502–6276 (via                   issuance date. Staff has revised the
                                                      1 18   CFR 385.2001–2005 (2015).                       email at raven.rodriguez@ferc.gov).                   schedule for issuance of the EA.


                                               VerDate Sep<11>2014    17:20 May 05, 2016   Jkt 238001   PO 00000   Frm 00039   Fmt 4703   Sfmt 4703   E:\FR\FM\06MYN1.SGM   06MYN1



Document Created: 2016-05-06 00:30:19
Document Modified: 2016-05-06 00:30:19
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 27424 

2025 Federal Register | Disclaimer | Privacy Policy