81_FR_27514 81 FR 27426 - National Fuel Gas Supply Corporation; Notice of Intent To Prepare an Environmental Assessment for the Proposed Line T2KNY Install, Line TNY Replacement, and Line KNY Abandonment Project, and Request for Comments on Environmental Issues

81 FR 27426 - National Fuel Gas Supply Corporation; Notice of Intent To Prepare an Environmental Assessment for the Proposed Line T2KNY Install, Line TNY Replacement, and Line KNY Abandonment Project, and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 88 (May 6, 2016)

Page Range27426-27428
FR Document2016-10675

Federal Register, Volume 81 Issue 88 (Friday, May 6, 2016)
[Federal Register Volume 81, Number 88 (Friday, May 6, 2016)]
[Notices]
[Pages 27426-27428]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-10675]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-125-000]


National Fuel Gas Supply Corporation; Notice of Intent To Prepare 
an Environmental Assessment for the Proposed Line T2KNY Install, Line 
TNY Replacement, and Line KNY Abandonment Project, and Request for 
Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Line T2KNY Install, Line TNY 
Replacement, and Line KNY Abandonment Project involving construction 
and operation of facilities by National Fuel Gas Supply Corporation 
(National Fuel) in Erie County, New York. The Commission will use this 
EA in its decision-making process to determine whether the project is 
in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before June 2, 2016.
    If you sent comments on this project to the Commission before the 
opening of this docket on April 4, 2016, you will need to file those 
comments in Docket No. CP16-125-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    National Fuel provided landowners with a fact sheet prepared by the 
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do 
I Need To Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC Web site (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP16-125-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    National Fuel proposes to install approximately 1.2 miles of new 
20-inch-diameter natural gas pipeline (Line T2KNY), replace 
approximately 6.7 miles of 20-inch-diameter bare steel pipeline with 
7.0 miles of 24-inch-diameter coated natural gas pipeline (Line TNY), 
abandon approximately 14.9 miles of 20-inch-diameter bare steel natural 
gas pipeline (Line KNY), make modifications at two existing National 
Fuel meter and regulator stations (North Boston and East Eden), and 
make modifications at National Fuel's existing Zoar Compressor Station 
in Erie County, New York. The Line T2KNY Install, Line TNY Replacement, 
and Line KNY Abandonment Project would allow National Fuel to cure 
operating deficiencies on Line TNY and would provide an additional 
2,600 dekatherms per day of new firm capacity which would be offered in 
an open season. This project would eliminate vintage bare steel 
pipeline, replacing it with modern, high strength, coated steel 
pipeline, therefore increasing the overall integrity and reliability of 
National Fuel's pipeline system.
    The general location of the project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE., Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb about 112 
acres of land for the aboveground facilities and the pipeline. 
Following construction, National Fuel would maintain about 52 acres for 
permanent operation of the project's facilities; the remaining

[[Page 27427]]

acreage would be restored and revert to former uses. About 54 percent 
of the proposed pipeline route parallels existing pipeline, utility, or 
road rights-of-way.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed project under these 
general headings:
     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts.
    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\3\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\4\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
proposed project.
    If we publish and distribute the EA, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the ``Document-less Intervention Guide'' under the ``e-filing'' link on 
the Commission's Web site. Motions to intervene are more fully 
described at http://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP16-
125). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.


[[Page 27428]]


    Dated: May 2, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-10675 Filed 5-5-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    27426                             Federal Register / Vol. 81, No. 88 / Friday, May 6, 2016 / Notices

                                                    Schedule for Environmental Review               input will help the Commission staff                          feature on the Commission’s Web site
                                                                                                    determine what issues they need to                            (www.ferc.gov) under the link to
                                                    Issuance of the EA .....           May 13, 2016 evaluate in the EA. To ensure that your                       Documents and Filings. With eFiling,
                                                    90-day Federal Author-                          comments are timely and properly                              you can provide comments in a variety
                                                       ization Decision                             recorded, please send your comments so                        of formats by attaching them as a file
                                                       Deadline .................. August 11, 2016 that the Commission receives them in                           with your submission. New eFiling
                                                                                                    Washington, DC on or before June 2,                           users must first create an account by
                                                       If a schedule change becomes                 2016.                                                         clicking on ‘‘eRegister.’’ If you are filing
                                                    necessary, an additional notice will be            If you sent comments on this project                       a comment on a particular project,
                                                    provided so that the relevant agencies          to the Commission before the opening of                       please select ‘‘Comment on a Filing’’ as
                                                    are kept informed of the project’s              this docket on April 4, 2016, you will                        the filing type; or
                                                    progress.                                       need to file those comments in Docket                            (3) You can file a paper copy of your
                                                    Additional Information                          No. CP16–125–000 to ensure they are                           comments by mailing them to the
                                                                                                    considered as part of this proceeding.                        following address. Be sure to reference
                                                       In order to receive notification of the         This notice is being sent to the                           the project docket number (CP16–125–
                                                    issuance of the EA and to keep track of         Commission’s current environmental                            000) with your submission: Kimberly D.
                                                    all formal issuances and submittals in          mailing list for this project. State and                      Bose, Secretary, Federal Energy
                                                    specific dockets, the Commission offers         local government representatives should                       Regulatory Commission, 888 First Street
                                                    a free service called eSubscription             notify their constituents of this                             NE., Room 1A, Washington, DC 20426.
                                                    (http://www.ferc.gov/docs-filing/               proposed project and encourage them to
                                                    esubscription.asp).                                                                                           Summary of the Proposed Project
                                                                                                    comment on their areas of concern.
                                                       Dated: April 29, 2016.                          If you are a landowner receiving this                        National Fuel proposes to install
                                                    Kimberly D. Bose,                               notice, a pipeline company                                    approximately 1.2 miles of new 20-inch-
                                                    Secretary.                                      representative may contact you about                          diameter natural gas pipeline (Line
                                                    [FR Doc. 2016–10670 Filed 5–5–16; 8:45 am]      the acquisition of an easement to                             T2KNY), replace approximately 6.7
                                                    BILLING CODE 6717–01–P                          construct, operate, and maintain the                          miles of 20-inch-diameter bare steel
                                                                                                    proposed facilities. The company would                        pipeline with 7.0 miles of 24-inch-
                                                                                                    seek to negotiate a mutually acceptable                       diameter coated natural gas pipeline
                                                    DEPARTMENT OF ENERGY                            agreement. However, if the Commission                         (Line TNY), abandon approximately
                                                                                                    approves the project, that approval                           14.9 miles of 20-inch-diameter bare steel
                                                    Federal Energy Regulatory                       conveys with it the right of eminent                          natural gas pipeline (Line KNY), make
                                                    Commission                                      domain. Therefore, if easement                                modifications at two existing National
                                                                                                    negotiations fail to produce an                               Fuel meter and regulator stations (North
                                                    [Docket No. CP16–125–000]
                                                                                                    agreement, the pipeline company could                         Boston and East Eden), and make
                                                    National Fuel Gas Supply Corporation; initiate condemnation proceedings                                       modifications at National Fuel’s existing
                                                    Notice of Intent To Prepare an                  where compensation would be                                   Zoar Compressor Station in Erie County,
                                                    Environmental Assessment for the                determined in accordance with state                           New York. The Line T2KNY Install,
                                                    Proposed Line T2KNY Install, Line TNY law.                                                                    Line TNY Replacement, and Line KNY
                                                    Replacement, and Line KNY                          National Fuel provided landowners                          Abandonment Project would allow
                                                    Abandonment Project, and Request for with a fact sheet prepared by the FERC                                   National Fuel to cure operating
                                                    Comments on Environmental Issues                entitled ‘‘An Interstate Natural Gas                          deficiencies on Line TNY and would
                                                                                                    Facility On My Land? What Do I Need                           provide an additional 2,600 dekatherms
                                                       The staff of the Federal Energy              To Know?’’ This fact sheet addresses a                        per day of new firm capacity which
                                                    Regulatory Commission (FERC or                  number of typically asked questions,                          would be offered in an open season.
                                                    Commission) will prepare an                     including the use of eminent domain                           This project would eliminate vintage
                                                    environmental assessment (EA) that will and how to participate in the                                         bare steel pipeline, replacing it with
                                                    discuss the environmental impacts of            Commission’s proceedings. It is also                          modern, high strength, coated steel
                                                    the Line T2KNY Install, Line TNY                available for viewing on the FERC Web                         pipeline, therefore increasing the overall
                                                    Replacement, and Line KNY                       site (www.ferc.gov).                                          integrity and reliability of National
                                                    Abandonment Project involving                                                                                 Fuel’s pipeline system.
                                                    construction and operation of facilities        Public Participation                                            The general location of the project
                                                    by National Fuel Gas Supply                        For your convenience, there are three                      facilities is shown in appendix 1.1
                                                    Corporation (National Fuel) in Erie             methods you can use to submit your                            Land Requirements for Construction
                                                    County, New York. The Commission                comments to the Commission. The
                                                    will use this EA in its decision-making         Commission encourages electronic filing                         Construction of the proposed facilities
                                                    process to determine whether the                of comments and has expert staff                              would disturb about 112 acres of land
                                                    project is in the public convenience and available to assist you at (202) 502–8258                            for the aboveground facilities and the
                                                    necessity.                                      or efiling@ferc.gov. Please carefully                         pipeline. Following construction,
                                                       This notice announces the opening of follow these instructions so that your                                National Fuel would maintain about 52
                                                    the scoping process the Commission              comments are properly recorded.                               acres for permanent operation of the
                                                    will use to gather input from the public           (1) You can file your comments                             project’s facilities; the remaining
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    and interested agencies on the project.         electronically using the eComment                               1 The appendices referenced in this notice will
                                                    You can make a difference by providing feature on the Commission’s Web site
                                                                                                                                                                  not appear in the Federal Register. Copies of
                                                    us with your specific comments or               (www.ferc.gov) under the link to                              appendices were sent to all those receiving this
                                                    concerns about the project. Your                Documents and Filings. This is an easy                        notice in the mail and are available at www.ferc.gov
                                                    comments should focus on the potential method for submitting brief, text-only                                 using the link called ‘‘eLibrary’’ or from the
                                                    environmental effects, reasonable                                                                             Commission’s Public Reference Room, 888 First
                                                                                                    comments on a project;                                        Street NE., Washington, DC 20426, or call (202)
                                                    alternatives, and measures to avoid or             (2) You can file your comments                             502–8371. For instructions on connecting to
                                                    lessen environmental impacts. Your              electronically by using the eFiling                           eLibrary, refer to the last page of this notice.



                                               VerDate Sep<11>2014   17:20 May 05, 2016   Jkt 238001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\06MYN1.SGM   06MYN1


                                                                                      Federal Register / Vol. 81, No. 88 / Friday, May 6, 2016 / Notices                                                 27427

                                                    acreage would be restored and revert to                 formally cooperate with us in the                         interested in and/or potentially affected
                                                    former uses. About 54 percent of the                    preparation of the EA.3 Agencies that                     by the proposed project.
                                                    proposed pipeline route parallels                       would like to request cooperating                           If we publish and distribute the EA,
                                                    existing pipeline, utility, or road rights-             agency status should follow the                           copies will be sent to the environmental
                                                    of-way.                                                 instructions for filing comments                          mailing list for public review and
                                                                                                            provided under the Public Participation                   comment. If you would prefer to receive
                                                    The EA Process
                                                                                                            section of this notice.                                   a paper copy of the document instead of
                                                       The National Environmental Policy                                                                              the CD version or would like to remove
                                                    Act (NEPA) requires the Commission to                   Consultations Under Section 106 of the
                                                                                                            National Historic Preservation Act                        your name from the mailing list, please
                                                    take into account the environmental                                                                               return the attached Information Request
                                                    impacts that could result from an action                  In accordance with the Advisory                         (appendix 2).
                                                    whenever it considers the issuance of a                 Council on Historic Preservation’s
                                                    Certificate of Public Convenience and                   implementing regulations for section                      Becoming an Intervenor
                                                    Necessity. NEPA also requires us 2 to                   106 of the National Historic                                 In addition to involvement in the EA
                                                    discover and address concerns the                       Preservation Act, we are using this                       scoping process, you may want to
                                                    public may have about proposals. This                   notice to initiate consultation with the                  become an ‘‘intervenor’’ which is an
                                                    process is referred to as ‘‘scoping.’’ The              applicable State Historic Preservation                    official party to the Commission’s
                                                    main goal of the scoping process is to                  Office (SHPO), and to solicit their views                 proceeding. Intervenors play a more
                                                    focus the analysis in the EA on the                     and those of other government agencies,                   formal role in the process and are able
                                                    important environmental issues. By this                 interested Indian tribes, and the public                  to file briefs, appear at hearings, and be
                                                    notice, the Commission requests public                  on the project’s potential effects on                     heard by the courts if they choose to
                                                    comments on the scope of the issues to                  historic properties.4 We will define the                  appeal the Commission’s final ruling.
                                                    address in the EA. We will consider all                 project-specific Area of Potential Effects                An intervenor formally participates in
                                                    filed comments during the preparation                   (APE) in consultation with the SHPO as                    the proceeding by filing a request to
                                                    of the EA.                                              the project develops. On natural gas                      intervene. Instructions for becoming an
                                                       In the EA we will discuss impacts that               facility projects, the APE at a minimum                   intervenor are in the ‘‘Document-less
                                                    could occur as a result of the                          encompasses all areas subject to ground                   Intervention Guide’’ under the ‘‘e-filing’’
                                                    construction and operation of the                       disturbance (examples include                             link on the Commission’s Web site.
                                                    proposed project under these general                    construction right-of-way, contractor/                    Motions to intervene are more fully
                                                    headings:                                               pipe storage yards, compressor stations,                  described at http://www.ferc.gov/
                                                       • Geology and soils;                                 and access roads). Our EA for this                        resources/guides/how-to/intervene.asp.
                                                       • land use;                                          project will document our findings on
                                                       • water resources, fisheries, and                    the impacts on historic properties and                    Additional Information
                                                    wetlands;                                               summarize the status of consultations                        Additional information about the
                                                       • cultural resources;                                under section 106.                                        project is available from the
                                                       • vegetation and wildlife;                                                                                     Commission’s Office of External Affairs,
                                                       • air quality and noise;                             Environmental Mailing List
                                                                                                                                                                      at (866) 208–FERC, or on the FERC Web
                                                       • endangered and threatened species;                    The environmental mailing list                         site at www.ferc.gov using the
                                                       • public safety; and                                 includes federal, state, and local                        ‘‘eLibrary’’ link. Click on the eLibrary
                                                       • cumulative impacts.                                government representatives and                            link, click on ‘‘General Search’’ and
                                                       We will also evaluate reasonable                     agencies; elected officials;                              enter the docket number, excluding the
                                                    alternatives to the proposed project or                 environmental and public interest                         last three digits in the Docket Number
                                                    portions of the project, and make                       groups; Native American Tribes; other                     field (i.e., CP16–125). Be sure you have
                                                    recommendations on how to lessen or                     interested parties; and local libraries                   selected an appropriate date range. For
                                                    avoid impacts on the various resource                   and newspapers. This list also includes                   assistance, please contact FERC Online
                                                    areas.                                                  all affected landowners (as defined in                    Support at FercOnlineSupport@ferc.gov
                                                       The EA will present our independent                  the Commission’s regulations) who are                     or toll free at (866) 208–3676, or for
                                                    analysis of the issues. The EA will be                  potential right-of-way grantors, whose                    TTY, contact (202) 502–8659. The
                                                    available in the public record through                  property may be used temporarily for                      eLibrary link also provides access to the
                                                    eLibrary. Depending on the comments                     project purposes, or who own homes                        texts of formal documents issued by the
                                                    received during the scoping process, we                 within certain distances of aboveground                   Commission, such as orders, notices,
                                                    may also publish and distribute the EA                  facilities, and anyone who submits                        and rulemakings.
                                                    to the public for an allotted comment                   comments on the project. We will                             In addition, the Commission offers a
                                                    period. We will consider all comments                   update the environmental mailing list as                  free service called eSubscription which
                                                    on the EA before making our                             the analysis proceeds to ensure that we                   allows you to keep track of all formal
                                                    recommendations to the Commission.                      send the information related to this                      issuances and submittals in specific
                                                    To ensure we have the opportunity to                    environmental review to all individuals,                  dockets. This can reduce the amount of
                                                    consider and address your comments,                     organizations, and government entities                    time you spend researching proceedings
                                                    please carefully follow the instructions
                                                                                                                                                                      by automatically providing you with
                                                    in the Public Participation section,                      3 The Council on Environmental Quality                  notification of these filings, document
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    beginning on page 2.                                    regulations addressing cooperating agency                 summaries, and direct links to the
                                                       With this notice, we are asking                      responsibilities are at Title 40, Code of Federal
                                                                                                            Regulations, Part 1501.6.
                                                                                                                                                                      documents. Go to www.ferc.gov/docs-
                                                    agencies with jurisdiction by law and/
                                                                                                              4 The Advisory Council on Historic Preservation’s       filing/esubscription.asp.
                                                    or special expertise with respect to the
                                                                                                            regulations are at Title 36, Code of Federal                 Finally, public meetings or site visits
                                                    environmental issues of this project to                 Regulations, Part 800. Those regulations define           will be posted on the Commission’s
                                                                                                            historic properties as any prehistoric or historic
                                                      2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the            district, site, building, structure, or object included
                                                                                                                                                                      calendar located at www.ferc.gov/
                                                    environmental staff of the Commission’s Office of       in or eligible for inclusion in the National Register     EventCalendar/EventsList.aspx along
                                                    Energy Projects.                                        of Historic Places.                                       with other related information.


                                               VerDate Sep<11>2014   17:20 May 05, 2016   Jkt 238001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:\FR\FM\06MYN1.SGM     06MYN1


                                                    27428                             Federal Register / Vol. 81, No. 88 / Friday, May 6, 2016 / Notices

                                                      Dated: May 2, 2016.                                      • a new meter and regulating station               Documents and Filings. With eFiling,
                                                    Kimberly D. Bose,                                       in New London County, Connecticut;                    you can provide comments in a variety
                                                    Secretary.                                                 • modifications to three existing                  of formats by attaching them as a file
                                                    [FR Doc. 2016–10675 Filed 5–5–16; 8:45 am]              compressor stations in Rockland                       with your submission. New eFiling
                                                    BILLING CODE 6717–01–P
                                                                                                            County, New York and Windham and                      users must first create an account by
                                                                                                            New Haven Counties, Connecticut;                      clicking on ‘‘eRegister.’’ You must select
                                                                                                               • modifications to five existing meter             the type of filing you are making. If you
                                                    DEPARTMENT OF ENERGY                                    and regulating stations and one                       are filing a comment on a particular
                                                                                                            regulator station in New York,                        project, please select ‘‘Comment on a
                                                    Federal Energy Regulatory                               Connecticut, Massachusetts, and Maine;                Filing’’; or
                                                    Commission                                              and                                                      (3) You can file a paper copy of your
                                                                                                               • ancillary facilities associated with             comments by mailing them to the
                                                    [Docket No. CP16–9–000]                                 the new pipeline including mainline                   following address: Nathaniel J. Davis,
                                                                                                            valves and pig launcher/receiver                      Sr., Deputy Secretary, Federal Energy
                                                    Algonquin Gas Transmission, LLC,                        facilities.
                                                    Maritimes & Northeast Pipeline, LLC;                                                                          Regulatory Commission, 888 First Street
                                                                                                               The FERC staff mailed copies of the
                                                    Notice of Availability of the                                                                                 NE., Room 1A, Washington, DC 20426.
                                                                                                            EA to federal, state, and local
                                                    Environmental Assessment for the                        government representatives and                           Any person seeking to become a party
                                                    Proposed Atlantic Bridge Project                        agencies; elected officials;                          to the proceeding must file a motion to
                                                    Replacement Project                                     environmental and public interest                     intervene pursuant to Rule 214 of the
                                                                                                            groups; Native American tribes;                       Commission’s Rules of Practice and
                                                      The staff of the Federal Energy                       potentially affected landowners and                   Procedures (Title 18 Code of Federal
                                                    Regulatory Commission (FERC or                          other interested individuals and groups;              Regulations Part 385.214).1 Only
                                                    Commission) has prepared an                             and newspapers and libraries in the                   intervenors have the right to seek
                                                    environmental assessment (EA) for the                   project area. In addition, the EA is                  rehearing of the Commission’s decision.
                                                    Atlantic Bridge Project proposed by                     available for public viewing on the                   The Commission grants affected
                                                    Algonquin Gas Transmission, LLC                         FERC’s Web site (www.ferc.gov) using                  landowners and others with
                                                    (Algonquin) and Maritimes & Northeast                   the eLibrary link. A limited number of                environmental concerns intervenor
                                                    Pipeline, LLC (Maritimes), collectively                 copies of the EA are available for                    status upon showing good cause by
                                                    referred to as the Applicants, in the                   distribution and public inspection at:                stating that they have a clear and direct
                                                    above-referenced docket. The                            Federal Energy Regulatory Commission,                 interest in this proceeding that no other
                                                    Applicants request authorization to                     Public Reference Room, 888 First Street               party can adequately represent. Simply
                                                    expand existing pipeline systems to                     NE., Room 2A, Washington, DC 20426,                   filing environmental comments will not
                                                    deliver up to 132,705 dekatherms per                    (202) 502–8371.                                       give you intervenor status, but you do
                                                    day of natural gas transportation service                  Any person wishing to comment on                   not need intervenor status to have your
                                                    to the New England and Maritimes                        the EA may do so. Your comments                       comments considered.
                                                    provinces of Canada markets.                            should focus on the potential                            Additional information about the
                                                      The EA assesses the potential                         environmental effects, reasonable                     project is available from the
                                                    environmental effects of the                            alternatives, and measures to avoid or                Commission’s Office of External Affairs,
                                                    construction and operation of the                       lessen environmental impacts. The more                at (866) 208–FERC, or on the FERC Web
                                                    Atlantic Bridge Project in accordance                   specific your comments, the more useful               site (www.ferc.gov) using the eLibrary
                                                    with the requirements of the National                   they will be. To ensure that the                      link. Click on the eLibrary link, click on
                                                    Environmental Policy Act. The FERC                      Commission has the opportunity to                     ‘‘General Search,’’ and enter the docket
                                                    staff concludes that approval of the                    consider your comments prior to                       number excluding the last three digits in
                                                    proposed project, with appropriate                      making its decision on this project, it is            the Docket Number field (i.e., CP16–9).
                                                    mitigating measures, would not                          important that we receive your                        Be sure you have selected an
                                                    constitute a major federal action                       comments in Washington, DC on or                      appropriate date range. For assistance,
                                                    significantly affecting the quality of the              before June 1, 2016.                                  please contact FERC Online Support at
                                                    human environment.                                         For your convenience, there are three              FercOnlineSupport@ferc.gov or toll free
                                                      The U.S. Environmental Protection                     methods you can use to file your                      at (866) 208–3676, or for TTY, contact
                                                    Agency is a cooperating agency assisting                comments with the Commission. In all                  (202) 502–8659. The eLibrary link also
                                                    us in the preparation of this EA because                instances please reference the project                provides access to the texts of formal
                                                    they have special expertise with respect                docket number (CP16–9–000) with your                  documents issued by the Commission,
                                                    to environmental impacts associated                     submission. The Commission                            such as orders, notices, and
                                                    with the Applicants’ proposals.                         encourages electronic filing of                       rulemakings.
                                                      The proposed Atlantic Bridge Project                  comments and has expert staff available                  In addition, the Commission offers a
                                                    includes the following facilities:                      to assist you at 202–502–8258 or                      free service called eSubscription, which
                                                      • 4.0 miles of 42-inch-diameter                       efiling@ferc.gov.                                     allows you to keep track of all formal
                                                    pipeline to replace existing 26-inch                       (1) You can file your comments                     issuances and submittals in specific
                                                    diameter pipeline in Westchester                        electronically using the eComment                     dockets. This can reduce the amount of
                                                    County, New York;                                       feature located on the Commission’s
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                                                                                  time you spend researching proceedings
                                                      • 2.3 miles of 42-inch-diameter                       Web site (www.ferc.gov) under the link                by automatically providing you with
                                                    pipeline to replace existing 26-inch                    to Documents and Filings. This is an                  notification of these filings, document
                                                    diameter pipeline in Fairfield County,                  easy method for submitting brief, text-               summaries, and direct links to the
                                                    Connecticut;                                            only comments on a project;                           documents. Go to www.ferc.gov/docs-
                                                      • a new 7,700 horsepower                                 (2) You can also file your comments                filing/esubscription.asp.
                                                    compressor station (Weymouth                            electronically using the eFiling feature
                                                    Compressor Station) in Norfolk County,                  on the Commission’s Web site                             1 See the previous discussion on the methods for

                                                    Massachusetts;                                          (www.ferc.gov) under the link to                      filing comments.



                                               VerDate Sep<11>2014   17:20 May 05, 2016   Jkt 238001   PO 00000   Frm 00042   Fmt 4703   Sfmt 4703   E:\FR\FM\06MYN1.SGM   06MYN1



Document Created: 2016-05-06 00:29:49
Document Modified: 2016-05-06 00:29:49
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 27426 