81_FR_29645 81 FR 29553 - Algonquin Gas Transmission, LLC; Supplemental Notice of Technical Conference

81 FR 29553 - Algonquin Gas Transmission, LLC; Supplemental Notice of Technical Conference

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 92 (May 12, 2016)

Page Range29553-29554
FR Document2016-11222

Federal Register, Volume 81 Issue 92 (Thursday, May 12, 2016)
[Federal Register Volume 81, Number 92 (Thursday, May 12, 2016)]
[Notices]
[Pages 29553-29554]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-11222]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP16-618-000]


Algonquin Gas Transmission, LLC; Supplemental Notice of Technical 
Conference

    As announced in the Notice of Technical Conference issued on April 
15, 2016 in the above-captioned proceeding, a technical conference will 
be held in this proceeding on Monday, May 9, 2016, beginning at 10:00 
a.m. and ending at approximately 3:30 p.m., at the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The 
purpose of the technical conference is to examine the issues raised in 
the protests and comments regarding the February 19, 2016 filing made 
by Algonquin Gas Transmission, LLC (Algonquin). In that filing, 
Algonquin proposed to exempt from the capacity release bidding 
requirements certain types of capacity releases of firm transportation 
by electric distribution companies that are participating in state-
regulated electric reliability programs.\1\ Issues to be examined at 
the technical conference include concerns raised regarding the basis 
and need for the waiver.
---------------------------------------------------------------------------

    \1\ Algonquin Gas Transmission, LLC, 154 FERC ] 61,269 (2016).
---------------------------------------------------------------------------

    The agenda for this technical conference is attached. Due to the 
number of parties requesting to make presentations, each presentation 
will be limited to fifteen minutes to provide sufficient time for 
discussion. We have allotted time between each presentation for 
questions and comments from staff, panelists, and the audience. Parties 
may file in this docket longer presentations or other materials prior 
to the technical conference. A schedule for post-

[[Page 29554]]

technical comments will be established at the technical conference.
    For more information about this technical conference, please 
contact Anna Fernandez at [email protected] or (202) 502-6682. 
For information related to logistics, please contact Sarah McKinley at 
[email protected] or (202) 502-8368.

    Dated: May 5, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-11222 Filed 5-11-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 81, No. 92 / Thursday, May 12, 2016 / Notices                                                  29553

                                                    helps the public understand the                         DEPARTMENT OF ENERGY                                  notice by the Commission, unless the
                                                    Department’s information collection                                                                           Commission orders otherwise.
                                                    requirements and provide the requested                  Federal Energy Regulatory                                If the project is not subject to section
                                                    data in the desired format. ED is                       Commission                                            15 of the FPA, notice is hereby given
                                                    soliciting comments on the proposed                                                                           that the licensee, Turlock Irrigation
                                                                                                            [Project No. 2299–000]                                District and Modesto Irrigation District,
                                                    information collection request (ICR) that
                                                    is described below. The Department of                                                                         is authorized to continue operation of
                                                                                                            Turlock Irrigation District; Modesto                  the Don Pedro Hydroelectric Project,
                                                    Education is especially interested in                   Irrigation District; Notice of
                                                    public comment addressing the                                                                                 until such time as the Commission acts
                                                                                                            Authorization for Continued Project                   on its application for a subsequent
                                                    following issues: (1) Is this collection                Operation
                                                    necessary to the proper functions of the                                                                      license.
                                                    Department; (2) will this information be                   On April 28, 2014 Turlock Irrigation                 Dated: May 5, 2016.
                                                    processed and used in a timely manner;                  District and Modesto Irrigation District,             Kimberly D. Bose,
                                                    (3) is the estimate of burden accurate;                 licensees for the Don Pedro                           Secretary.
                                                    (4) how might the Department enhance                    Hydroelectric Project, filed an                       [FR Doc. 2016–11221 Filed 5–11–16; 8:45 am]
                                                    the quality, utility, and clarity of the                Application for a New License pursuant
                                                                                                                                                                  BILLING CODE 6717–01–P
                                                    information to be collected; and (5) how                to the Federal Power Act (FPA) and the
                                                                                                            Commission’s regulations thereunder.
                                                    might the Department minimize the
                                                                                                            The Don Pedro Hydroelectric Project                   DEPARTMENT OF ENERGY
                                                    burden of this collection on the
                                                                                                            facilities are located on the Tuolumne
                                                    respondents, including through the use                  River in Tuolumne County, California.                 Federal Energy Regulatory
                                                    of information technology. Please note                     The license for Project No. 2299 was               Commission
                                                    that written comments received in                       issued for a period ending April 30,
                                                    response to this notice will be                         2016. Section 15(a)(1) of the FPA, 16                 [Docket No. RP16–618–000]
                                                    considered public records.                              U.S.C. 808(a)(1), requires the
                                                                                                                                                                  Algonquin Gas Transmission, LLC;
                                                       Title of Collection: Evaluation of the               Commission, at the expiration of a
                                                                                                                                                                  Supplemental Notice of Technical
                                                    ESSA Title I, Part D, Neglected or                      license term, to issue from year-to-year
                                                                                                                                                                  Conference
                                                    Delinquent Programs.                                    an annual license to the then licensee
                                                                                                            under the terms and conditions of the                    As announced in the Notice of
                                                       OMB Control Number: 1875–NEW.
                                                                                                            prior license until a new license is                  Technical Conference issued on April
                                                       Type of Review: A new information                    issued, or the project is otherwise                   15, 2016 in the above-captioned
                                                    collection.                                             disposed of as provided in section 15 or              proceeding, a technical conference will
                                                       Respondents/Affected Public: State,                  any other applicable section of the FPA.              be held in this proceeding on Monday,
                                                    Local, and Tribal Governments.                          If the project’s prior license waived the             May 9, 2016, beginning at 10:00 a.m.
                                                                                                            applicability of section 15 of the FPA,               and ending at approximately 3:30 p.m.,
                                                       Total Estimated Number of Annual
                                                                                                            then, based on section 9(b) of the                    at the Federal Energy Regulatory
                                                    Responses: 502.
                                                                                                            Administrative Procedure Act, 5 U.S.C.                Commission, 888 First Street, NE.,
                                                       Total Estimated Number of Annual                     558(c), and as set forth at 18 CFR                    Washington, DC 20426. The purpose of
                                                    Burden Hours: 392.                                      16.21(a), if the licensee of such project             the technical conference is to examine
                                                       Abstract: The purpose of this study is               has filed an application for a subsequent             the issues raised in the protests and
                                                    to examine how state agencies, school                   license, the licensee may continue to                 comments regarding the February 19,
                                                    districts, and juvenile justice and child               operate the project in accordance with                2016 filing made by Algonquin Gas
                                                    welfare facilities implement education                  the terms and conditions of the license               Transmission, LLC (Algonquin). In that
                                                    and transition programs for youth who                   after the minor or minor part license                 filing, Algonquin proposed to exempt
                                                    are neglected or delinquent (N or D)                    expires, until the Commission acts on                 from the capacity release bidding
                                                                                                            its application. If the licensee of such a            requirements certain types of capacity
                                                    under the Elementary and Secondary
                                                                                                            project has not filed an application for              releases of firm transportation by
                                                    Education Act (ESEA), as amended by
                                                                                                            a subsequent license, then it may be                  electric distribution companies that are
                                                    the Every Student Succeeds Act (ESSA),
                                                                                                            required, pursuant to 18 CFR 16.21(b),                participating in state-regulated electric
                                                    Title I, Part D. The information will be                to continue project operations until the              reliability programs.1 Issues to be
                                                    used by ED to produce and disseminate                   Commission issues someone else a                      examined at the technical conference
                                                    a report detailing how state agencies,                  license for the project or otherwise                  include concerns raised regarding the
                                                    school districts, and juvenile justice and              orders disposition of the project.                    basis and need for the waiver.
                                                    child welfare facilities implement                         If the project is subject to section 15               The agenda for this technical
                                                    education and transition programs for                   of the FPA, notice is hereby given that               conference is attached. Due to the
                                                    youth who are neglected or delinquent                   an annual license for Project No. 2299                number of parties requesting to make
                                                    (N or D).                                               is issued to the licensee for a period                presentations, each presentation will be
                                                      Dated: May 9, 2016.                                   effective May 1, 2016 through April 30,               limited to fifteen minutes to provide
                                                    Kate Mullan,
                                                                                                            2017 or until the issuance of a new                   sufficient time for discussion. We have
                                                                                                            license for the project or other
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                                                                                  allotted time between each presentation
                                                    Acting Director, Information Collection
                                                                                                            disposition under the FPA, whichever                  for questions and comments from staff,
                                                    Clearance Division, Office of the Chief Privacy
                                                                                                            comes first. If issuance of a new license             panelists, and the audience. Parties may
                                                    Officer, Office of Management.
                                                                                                            (or other disposition) does not take                  file in this docket longer presentations
                                                    [FR Doc. 2016–11193 Filed 5–11–16; 8:45 am]
                                                                                                            place on or before April 30, 2017, notice             or other materials prior to the technical
                                                    BILLING CODE 4000–01–P                                  is hereby given that, pursuant to 18 CFR              conference. A schedule for post-
                                                                                                            16.18(c), an annual license under
                                                                                                            section 15(a)(1) of the FPA is renewed                  1 Algonquin Gas Transmission, LLC, 154 FERC ¶

                                                                                                            automatically without further order or                61,269 (2016).



                                               VerDate Sep<11>2014   17:02 May 11, 2016   Jkt 238001   PO 00000   Frm 00032   Fmt 4703   Sfmt 4703   E:\FR\FM\12MYN1.SGM   12MYN1


                                                    29554                          Federal Register / Vol. 81, No. 92 / Thursday, May 12, 2016 / Notices

                                                    technical comments will be established                  kilovolt (kV) transmission line                       DEPARTMENT OF ENERGY
                                                    at the technical conference.                            interconnecting with the existing
                                                       For more information about this                      Blachly-Lane Electric Cooperative                     Federal Energy Regulatory
                                                    technical conference, please contact                    transmission line; and (8) appurtenant                Commission
                                                    Anna Fernandez at Anna.Fernandez@                       facilities. The estimated annual                      [Docket No. PF16–4–000]
                                                    ferc.gov or (202) 502–6682. For                         generation of the Eagle Creek Project
                                                    information related to logistics, please                would be 50 gigawatt-hours.                           Columbia Gas Transmission, LLC;
                                                    contact Sarah McKinley at                                                                                     Notice of Intent To Prepare an
                                                    Sarah.Mckinley@ferc.gov or (202) 502–                      Applicant Contact: Mr. Mark A.
                                                                                                                                                                  Environmental Assessment for the
                                                    8368.                                                   Mikkelsen, 275 Knight Avenue, Eugene,
                                                                                                                                                                  Planned B-System Project and
                                                                                                            Oregon 97404; phone: (541) 520–2233.                  Request for Comments on
                                                      Dated: May 5, 2016.
                                                    Kimberly D. Bose,
                                                                                                               FERC Contact: Karen Sughrue; phone:                Environmental Issues
                                                                                                            (202) 502–8556.
                                                    Secretary.                                                                                                       The staff of the Federal Energy
                                                    [FR Doc. 2016–11222 Filed 5–11–16; 8:45 am]                Deadline for filing comments, motions              Regulatory Commission (FERC or
                                                    BILLING CODE 6717–01–P
                                                                                                            to intervene, competing applications                  Commission) will prepare an
                                                                                                            (without notices of intent), or notices of            environmental assessment (EA) that will
                                                                                                            intent to file competing applications: 60             discuss the environmental impacts of
                                                    DEPARTMENT OF ENERGY                                    days from the issuance of this notice.                the B-System Project involving
                                                                                                            Competing applications and notices of                 abandonment, construction, and
                                                    Federal Energy Regulatory                               intent must meet the requirements of 18               operation of facilities by Columbia Gas
                                                    Commission                                              CFR 4.36.                                             Transmission, LLC (Columbia) in
                                                    [Project No. 14769–000]                                    The Commission strongly encourages                 Fairfield and Franklin Counties, Ohio.
                                                                                                            electronic filing. Please file comments,              The Commission will use this EA in its
                                                    Green Canyon Energy, LLC; Notice of                                                                           decision-making process to determine
                                                                                                            motions to intervene, notices of intent,
                                                    Preliminary Permit Application                                                                                whether the project is in the public
                                                                                                            and competing applications using the
                                                    Accepted for Filing and Soliciting                                                                            convenience and necessity.
                                                                                                            Commission’s eFiling system at http://                   This notice announces the opening of
                                                    Comments, Motions To Intervene, and
                                                                                                            www.ferc.gov/docs-filing/efiling.asp.                 the scoping process the Commission
                                                    Competing Applications
                                                                                                            Commenters can submit brief comments                  will use to gather input from the public
                                                       On March 14, 2016, Green Canyon                      up to 6,000 characters, without prior                 and interested agencies on the project.
                                                    Energy, LLC filed an application for a                  registration, using the eComment system               You can make a difference by providing
                                                    preliminary permit, pursuant to section                 at http://www.ferc.gov/docs-filing/                   us with your specific comments or
                                                    4(f) of the Federal Power Act (FPA),                    ecomment.asp. You must include your                   concerns about the project. Your
                                                    proposing to study the feasibility of the               name and contact information at the end               comments should focus on the potential
                                                    Eagle Creek Hydroelectric Project (Eagle                of your comments. For assistance,                     environmental effects, reasonable
                                                    Creek Project or project) to be located on              please contact FERC Online Support at                 alternatives, and measures to avoid or
                                                    Eagle Creek, in Lane County, Oregon.                    FERCOnlineSupport@ferc.gov, (866)                     lessen environmental impacts. Your
                                                    The proposed project boundary will                      208–3676 (toll free), or (202) 502–8659               input will help the Commission staff
                                                    occupy approximately 14.5 acres of                      (TTY). In lieu of electronic filing, please           determine what issues they need to
                                                    federal land within the Willamette                      send a paper copy to: Secretary, Federal              evaluate in the EA. To ensure that your
                                                    National Forest. The sole purpose of a                  Energy Regulatory Commission, 888                     comments are timely and properly
                                                    preliminary permit, if issued, is to grant                                                                    recorded, please send your comments so
                                                                                                            First Street NE., Washington, DC 20426.
                                                    the permit holder priority to file a                                                                          that the Commission receives them in
                                                                                                            The first page of any filing should
                                                    license application during the permit                                                                         Washington, DC on or before June 6,
                                                    term. A preliminary permit does not                     include docket number P–14769–000.
                                                                                                                                                                  2016.
                                                    authorize the permit holder to perform                     More information about this project,                  If you sent comments on this project
                                                    any land-disturbing activities or                       including a copy of the application, can              to the Commission before the opening of
                                                    otherwise enter upon lands or waters                    be viewed or printed on the ‘‘eLibrary’’              this docket on March 10, 2016, you will
                                                    owned by others without the owners’                     link of Commission’s Web site at http://              need to file those comments in Docket
                                                    express permission.                                     www.ferc.gov/docs-filing/elibrary.asp.                No. PF16–4–000 to ensure they are
                                                       The proposed project would consist of                Enter the docket number (P–14769) in                  considered as part of this proceeding.
                                                    the following new features: (1) A 40-                   the docket number field to access the                    This notice is being sent to the
                                                    foot-long, 9.5-foot-high concrete                       document. For assistance, contact FERC                Commission’s current environmental
                                                    diversion weir traversing Eagle Creek;                  Online Support.                                       mailing list for this project. State and
                                                    (2) an approximately 0.7 acre-foot                                                                            local government representatives should
                                                                                                              Dated: May 5, 2016.
                                                    impoundment; (3) an approximately                                                                             notify their constituents of this planned
                                                    11,470-foot-long, 36-inch-diameter                      Kimberly D. Bose,                                     project and encourage them to comment
                                                    polyvinyl chloride pipe penstock; (4) a                 Secretary.                                            on their areas of concern.
                                                    50-foot-long, 40-foot-wide concrete                     [FR Doc. 2016–11220 Filed 5–11–16; 8:45 am]              If you are a landowner receiving this
                                                    powerhouse; (5) one Pelton turbine/                                                                           notice, a pipeline company
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                            BILLING CODE 6717–01–P
                                                    generator with a total installed capacity                                                                     representative may contact you about
                                                    of 7.0-megawatts; (6) a tailrace                                                                              the acquisition of an easement to
                                                    comprised of a 50-foot-long, 60-inch                                                                          construct, operate, and maintain the
                                                    steel pipe and a 350-foot-long and 25-                                                                        planned facilities. The company would
                                                    foot-wide rip-rapped channel                                                                                  seek to negotiate a mutually acceptable
                                                    discharging flows from the powerhouse                                                                         agreement. However, if the Commission
                                                    back to Eagle Creek; (7) an                                                                                   approves the project, that approval
                                                    approximately 3,960-foot-long, 12.4-                                                                          conveys with it the right of eminent


                                               VerDate Sep<11>2014   17:02 May 11, 2016   Jkt 238001   PO 00000   Frm 00033   Fmt 4703   Sfmt 4703   E:\FR\FM\12MYN1.SGM   12MYN1



Document Created: 2016-05-12 01:07:39
Document Modified: 2016-05-12 01:07:39
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 29553 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR