81_FR_29651 81 FR 29559 - Utah Board of Water Resources; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

81 FR 29559 - Utah Board of Water Resources; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 92 (May 12, 2016)

Page Range29559-29559
FR Document2016-11226

Federal Register, Volume 81 Issue 92 (Thursday, May 12, 2016)
[Federal Register Volume 81, Number 92 (Thursday, May 12, 2016)]
[Notices]
[Page 29559]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-11226]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12966-004]


Utah Board of Water Resources; Notice of Application Tendered for 
Filing With the Commission and Establishing Procedural Schedule for 
Licensing and Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major Unconstructed License.
    b. Project No.: 12966-004.
    c. Date Filed: May 2, 2016.
    d. Applicant: Utah Board of Water Resources.
    e. Name of Project: Lake Powell Pipeline Project.
    f. Location: In Washington and Kane counties, Utah, and in Coconino 
and Mohave counties, Arizona. The project would occupy 449 acres of 
federal land managed by the Bureau of Land Management.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Bill Leeflang, Project Manager, Utah Division 
of Water Resources; Telephone (801) 538-7293 or [email protected].
    i. FERC Contact: Jim Fargo, (202) 502-6095 or [email protected].
    j. This application is not ready for environmental analysis at this 
time.
    k. The proposed Lake Powell Pipeline Project would consist of: (1) 
140 miles of 69-inch-diameter pipeline and penstock, (2) a combined 
conventional peaking and pumped storage hydro station, (3) four 
conventional in-pipeline hydro stations, (4) a conventional hydro 
station, and (4) transmission lines.
    The proposed project's water intake would convey water from the 
Bureau of Reclamation's Lake Powell up to a high point within the Grand 
Staircase-Escalante National Monument, after which it would flow 
through a series of hydroelectric turbines, ending at Sand Hollow 
reservoir, near St. George, Utah.
    The energy generation components of the proposed project would 
include: (1) An inline single-unit, 1-megawatt (MW) facility at Hydro 
Station 1 in the Grand Staircase-Escalante National Monument; (2) an 
inline single-unit, 1.7-MW facility at Hydro Station 2 east of Colorado 
City, Arizona; (3) an inline single-unit, 1-MW facility in Hildale 
City, Utah; (4) an inline single-unit, 1.7-MW facility above the 
Hurricane Cliffs forebay reservoir; (5) a 2-unit, 300-MW (150-MW each 
unit) hydroelectric pumped storage development at Hurricane Cliffs, 
with the forebay and afterbay sized to provide ten hours of continuous 
300-MW output; (6) a single-unit, 35-MW conventional energy recovery 
generation unit built within the Hurricane Cliffs development; and (7) 
a single-unit, 5-MW facility at the existing Sand Hollow Reservoir.
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at http://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in item (h) above.
    m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural Schedule:
    The application will be processed according to the following 
preliminary Hydro Licensing Schedule. Revisions to the schedule may be 
made as appropriate.

------------------------------------------------------------------------
             Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of      January 2017.
 Ready for Environmental Analysis.
Filing of recommendations,          March 2017.
 preliminary terms and conditions.
Commission issues Draft             September 2017.
 Environmental Impact Statement
 (DEIS).
Comments on DEIS..................  November 2017.
Modified terms and conditions.....  January 2018.
Commission issues Final EIS.......  April 2018.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: May 6, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-11226 Filed 5-11-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                             Federal Register / Vol. 81, No. 92 / Thursday, May 12, 2016 / Notices                                                                                  29559

                                                    DEPARTMENT OF ENERGY                                                       a. Type of Application: Major                                         facility at Hydro Station 2 east of
                                                                                                                            Unconstructed License.                                                   Colorado City, Arizona; (3) an inline
                                                    Federal Energy Regulatory                                                  b. Project No.: 12966–004.                                            single-unit, 1–MW facility in Hildale
                                                    Commission                                                                 c. Date Filed: May 2, 2016.                                           City, Utah; (4) an inline single-unit, 1.7–
                                                                                                                               d. Applicant: Utah Board of Water                                     MW facility above the Hurricane Cliffs
                                                    Staff Notice of Alleged Violations                                      Resources.                                                               forebay reservoir; (5) a 2-unit, 300–MW
                                                      Take notice 1 that in a nonpublic                                        e. Name of Project: Lake Powell                                       (150–MW each unit) hydroelectric
                                                    investigation pursuant to 18 CFR part 1b                                Pipeline Project.                                                        pumped storage development at
                                                    (2015), the staff of the Office of                                         f. Location: In Washington and Kane                                   Hurricane Cliffs, with the forebay and
                                                    Enforcement of the Federal Energy                                       counties, Utah, and in Coconino and                                      afterbay sized to provide ten hours of
                                                    Regulatory Commission has preliminary                                   Mohave counties, Arizona. The project                                    continuous 300–MW output; (6) a
                                                    determined that Saracen Energy                                          would occupy 449 acres of federal land                                   single-unit, 35–MW conventional
                                                    Midwest, LP, violated Southwest Power                                   managed by the Bureau of Land                                            energy recovery generation unit built
                                                    Pool, Inc.’s Open Access Transmission                                   Management.                                                              within the Hurricane Cliffs
                                                    Tariff, Attachment AE, 7.4.1(4), by                                        g. Filed Pursuant to: Federal Power                                   development; and (7) a single-unit, 5–
                                                    submitting bids for Transmission                                        Act, 16 U.S.C. 791(a)–825(r).                                            MW facility at the existing Sand Hollow
                                                    Congestion Rights at Electronically                                        h. Applicant Contact: Bill Leeflang,                                  Reservoir.
                                                    Equivalent Settlement Locations                                         Project Manager, Utah Division of Water                                     l. Locations of the Application: A
                                                    between August 2014 and March 2015.                                     Resources; Telephone (801) 538–7293 or                                   copy of the application is available for
                                                      This Notice does not confer a right on                                billleeflang@utah.gov.                                                   review at the Commission in the Public
                                                    third parties to intervene in the                                          i. FERC Contact: Jim Fargo, (202) 502–                                Reference Room or may be viewed on
                                                    investigation or any other right with                                   6095 or james.fargo@ferc.gov.                                            the Commission’s Web site at http://
                                                    respect to the investigation.                                              j. This application is not ready for                                  www.ferc.gov using the ‘‘eLibrary’’ link.
                                                      Dated: May 6, 2016.                                                   environmental analysis at this time.                                     Enter the docket number excluding the
                                                    Kimberly D. Bose,
                                                                                                                               k. The proposed Lake Powell Pipeline                                  last three digits in the docket number
                                                                                                                            Project would consist of: (1) 140 miles                                  field to access the document. For
                                                    Secretary.
                                                                                                                            of 69-inch-diameter pipeline and                                         assistance, please contact FERC Online
                                                    [FR Doc. 2016–11224 Filed 5–11–16; 8:45 am]
                                                                                                                            penstock, (2) a combined conventional                                    Support at FERCOnlineSupport@
                                                    BILLING CODE 6717–01–P
                                                                                                                            peaking and pumped storage hydro                                         ferc.gov, (866) 208–3676 (toll free), or
                                                                                                                            station, (3) four conventional in-                                       (202) 502–8659 (TTY). A copy is also
                                                                                                                            pipeline hydro stations, (4) a                                           available for inspection and
                                                    DEPARTMENT OF ENERGY
                                                                                                                            conventional hydro station, and (4)                                      reproduction at the address in item (h)
                                                    Federal Energy Regulatory                                               transmission lines.                                                      above.
                                                    Commission                                                                 The proposed project’s water intake
                                                                                                                            would convey water from the Bureau of                                       m. You may also register online at
                                                    [Project No. 12966–004]                                                 Reclamation’s Lake Powell up to a high                                   http://www.ferc.gov/docs-filing/
                                                                                                                            point within the Grand Staircase-                                        esubscription.asp to be notified via
                                                    Utah Board of Water Resources;                                                                                                                   email of new filings and issuances
                                                                                                                            Escalante National Monument, after
                                                    Notice of Application Tendered for                                                                                                               related to this or other pending projects.
                                                                                                                            which it would flow through a series of
                                                    Filing With the Commission and                                                                                                                   For assistance, contact FERC Online
                                                                                                                            hydroelectric turbines, ending at Sand
                                                    Establishing Procedural Schedule for                                                                                                             Support.
                                                                                                                            Hollow reservoir, near St. George, Utah.
                                                    Licensing and Deadline for                                                                                                                          n. Procedural Schedule:
                                                                                                                               The energy generation components of
                                                    Submission of Final Amendments
                                                                                                                            the proposed project would include: (1)                                     The application will be processed
                                                      Take notice that the following                                        An inline single-unit, 1-megawatt (MW)                                   according to the following preliminary
                                                    hydroelectric application has been filed                                facility at Hydro Station 1 in the Grand                                 Hydro Licensing Schedule. Revisions to
                                                    with the Commission and is available                                    Staircase-Escalante National Monument;                                   the schedule may be made as
                                                    for public inspection.                                                  (2) an inline single-unit, 1.7–MW                                        appropriate.

                                                                                                                                  Milestone                                                                                             Target date

                                                    Notice of Acceptance/Notice of Ready for Environmental Analysis ................................................................................                              January 2017.
                                                    Filing of recommendations, preliminary terms and conditions .........................................................................................                         March 2017.
                                                    Commission issues Draft Environmental Impact Statement (DEIS) ................................................................................                                September 2017.
                                                    Comments on DEIS ..........................................................................................................................................................   November 2017.
                                                    Modified terms and conditions .........................................................................................................................................       January 2018.
                                                    Commission issues Final EIS ...........................................................................................................................................       April 2018.



                                                      o. Final amendments to the                                              Dated: May 6, 2016.
                                                    application must be filed with the                                      Kimberly D. Bose,
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    Commission no later than 30 days from                                   Secretary.
                                                    the issuance date of the notice of ready                                [FR Doc. 2016–11226 Filed 5–11–16; 8:45 am]
                                                    for environmental analysis.                                             BILLING CODE 6717–01–P




                                                      1 Enforcement of Statutes, Regulations, and

                                                    Orders, 129 FERC ¶ 61,247 (2009), order on reh’g,
                                                    134 FERC ¶ 61,054 (2011).

                                               VerDate Sep<11>2014        17:02 May 11, 2016        Jkt 238001      PO 00000       Frm 00038       Fmt 4703      Sfmt 9990      E:\FR\FM\12MYN1.SGM             12MYN1



Document Created: 2016-05-12 01:07:43
Document Modified: 2016-05-12 01:07:43
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 29559 