81_FR_30272 81 FR 30178 - Drawbridge Operation Regulation; Lake Washington Ship Canal, Seattle, WA

81 FR 30178 - Drawbridge Operation Regulation; Lake Washington Ship Canal, Seattle, WA

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 81, Issue 94 (May 16, 2016)

Page Range30178-30178
FR Document2016-11495

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Montlake Bridge across the Lake Washington Ship Canal, mile 5.2, at Seattle, WA. The deviation is necessary to accommodate the University of Washington, and University of Washington Bothell commencement ceremony traffic. This deviation allows the bridge to remain in the closed-to-navigation position to accommodate the timely movement of vehicular traffic.

Federal Register, Volume 81 Issue 94 (Monday, May 16, 2016)
[Federal Register Volume 81, Number 94 (Monday, May 16, 2016)]
[Rules and Regulations]
[Page 30178]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-11495]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2016-0392]


Drawbridge Operation Regulation; Lake Washington Ship Canal, 
Seattle, WA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Montlake Bridge across the Lake 
Washington Ship Canal, mile 5.2, at Seattle, WA. The deviation is 
necessary to accommodate the University of Washington, and University 
of Washington Bothell commencement ceremony traffic. This deviation 
allows the bridge to remain in the closed-to-navigation position to 
accommodate the timely movement of vehicular traffic.

DATES: This deviation is effective from 9:30 a.m. on June 11, 2016 to 
6:15 p.m. on June 12, 2016.

ADDRESSES: The docket for this deviation, [USCG-2016-0392] is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Steven Fischer, Bridge 
Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, 
email [email protected].

SUPPLEMENTARY INFORMATION: The University of Washington, through the 
Washington Department of Transportation, has requested that the 
Montlake Bridge bascule span remain in the closed-to-navigation 
position, and need not open to marine traffic to facilitate timely 
movement of commencement vehicular traffic.
    The Montlake Bridge across the Lake Washington Ship Canal, at mile 
5.2, in the closed position provides 30 feet of vertical clearance 
throughout the navigation channel, and 46 feet of vertical clearance 
throughout the center 60-feet of the bridge; vertical clearance 
references to the Mean Water Level of Lake Washington. The normal 
operating schedule for Montlake Bridge operates in accordance with 33 
CFR 117.1051(e).
    The deviation period is from 9:30 a.m. to 12:30 p.m. and from 4:30 
p.m. to 6:30 p.m. on June 11, 2016; and from 11:45 a.m. to 1:45 p.m. 
and from 4:15 p.m. to 6:15 p.m. on June 12, 2016. The deviation allows 
the bascule span of the Montlake Bridge to remain in the closed-to-
navigation position for the times and dates herein. Waterway usage on 
the Lake Washington Ship Canal ranges from commercial tug and barge to 
small pleasure craft.
    Vessels able to pass through the bridge in the closed-to-navigation 
position may do so at anytime. The bridge will be able to open for 
emergencies and there is no immediate alternate route for marine 
vessels to pass. The Coast Guard will also inform the users of the 
waterways through our Local and Broadcast Notices to Mariners of the 
change in operating schedule for the bridge so that vessels can arrange 
their transits to minimize any impact caused by the temporary 
deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the designated 
time period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: May 10, 2016.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard District.
[FR Doc. 2016-11495 Filed 5-13-16; 8:45 am]
 BILLING CODE 9110-04-P



                                           30178               Federal Register / Vol. 81, No. 94 / Monday, May 16, 2016 / Rules and Regulations

                                           applicant of any liens, encumbrances, or                Washington Department of                              ACTION:Notice of deviation from
                                           infirmities that the Secretary identified               Transportation, has requested that the                drawbridge regulation.
                                           and may seek additional information                     Montlake Bridge bascule span remain in
                                           from the applicant needed to address                    the closed-to-navigation position, and                SUMMARY:    The Coast Guard has issued a
                                           such issues. The Secretary may require                  need not open to marine traffic to                    temporary deviation from the operating
                                           the elimination of any such liens,                      facilitate timely movement of                         schedule that governs the upper deck of
                                           encumbrances, or infirmities prior to                   commencement vehicular traffic.                       the Steel Bridge, mile 12.1, and the
                                           taking final approval action on the                        The Montlake Bridge across the Lake                Burnside Bridge, mile 12.4, both
                                           acquisition, and she shall require                      Washington Ship Canal, at mile 5.2, in                crossing the Willamette River, at
                                           elimination prior to such approval if she               the closed position provides 30 feet of               Portland, OR. The deviation is necessary
                                           determines that the liens, encumbrances                 vertical clearance throughout the                     to accommodate the annual Rose
                                           or infirmities make title to the land                   navigation channel, and 46 feet of                    Festival Parade event, which crosses the
                                           unmarketable.                                           vertical clearance throughout the center              Steel Bridge and Burnside Bridge. This
                                                                                                   60-feet of the bridge; vertical clearance             deviation allows the upper deck of the
                                             Dated: May 11, 2016.
                                                                                                   references to the Mean Water Level of                 Steel Bridge and Burnside Bridge to
                                           Lawrence S. Roberts,
                                                                                                   Lake Washington. The normal operating                 remain in the closed-to-navigation
                                           Acting Assistant Secretary—Indian Affairs.                                                                    position and need not open for marine
                                                                                                   schedule for Montlake Bridge operates
                                           [FR Doc. 2016–11489 Filed 5–13–16; 8:45 am]             in accordance with 33 CFR 117.1051(e).                traffic to allow for the safe movement of
                                           BILLING CODE 4337–15–P                                     The deviation period is from 9:30 a.m.             event participants.
                                                                                                   to 12:30 p.m. and from 4:30 p.m. to 6:30              DATES: This deviation is effective from
                                                                                                   p.m. on June 11, 2016; and from 11:45                 7 a.m. to 2 p.m. on June 11, 2016.
                                           DEPARTMENT OF HOMELAND                                  a.m. to 1:45 p.m. and from 4:15 p.m. to               ADDRESSES: The docket for this
                                           SECURITY                                                6:15 p.m. on June 12, 2016. The                       deviation, [USCG–2016–0380] is
                                                                                                   deviation allows the bascule span of the              available at http://www.regulations.gov.
                                           Coast Guard                                             Montlake Bridge to remain in the                      Type the docket number in the
                                                                                                   closed-to-navigation position for the                 ‘‘SEARCH’’ box and click ‘‘SEARCH.’’
                                           33 CFR Part 117                                         times and dates herein. Waterway usage                Click on Open Docket Folder on the line
                                           [Docket No. USCG–2016–0392]                             on the Lake Washington Ship Canal                     associated with this deviation.
                                                                                                   ranges from commercial tug and barge to
                                                                                                                                                         FOR FURTHER INFORMATION CONTACT: If
                                           Drawbridge Operation Regulation;                        small pleasure craft.
                                           Lake Washington Ship Canal, Seattle,                       Vessels able to pass through the                   you have questions on this temporary
                                           WA                                                      bridge in the closed-to-navigation                    deviation, call or email Mr. Steven
                                                                                                   position may do so at anytime. The                    Fischer, Bridge Administrator,
                                           AGENCY: Coast Guard, DHS.                               bridge will be able to open for                       Thirteenth Coast Guard District;
                                           ACTION:Notice of deviation from                         emergencies and there is no immediate                 telephone 206–220–7282, email d13-pf-
                                           drawbridge regulation.                                  alternate route for marine vessels to                 d13bridges@uscg.mil.
                                                                                                   pass. The Coast Guard will also inform                SUPPLEMENTARY INFORMATION: TriMet
                                           SUMMARY:   The Coast Guard has issued a
                                                                                                   the users of the waterways through our                Public Transit and Multnomah County
                                           temporary deviation from the operating
                                                                                                   Local and Broadcast Notices to Mariners               have requested that the upper deck of
                                           schedule that governs the Montlake
                                                                                                   of the change in operating schedule for               the Steel Bridge and the Burnside
                                           Bridge across the Lake Washington Ship
                                                                                                   the bridge so that vessels can arrange                Bridge remain in the closed-to-
                                           Canal, mile 5.2, at Seattle, WA. The
                                                                                                   their transits to minimize any impact                 navigation position to accommodate the
                                           deviation is necessary to accommodate
                                           the University of Washington, and                       caused by the temporary deviation.                    annual Rose Festival Parade event. The
                                           University of Washington Bothell                           In accordance with 33 CFR 117.35(e),               Steel Bridge, mile 12.1, and the
                                           commencement ceremony traffic. This                     the drawbridge must return to its regular             Burnside Bridge, mile 12.4, both cross
                                           deviation allows the bridge to remain in                operating schedule immediately at the                 the Willamette River.
                                                                                                   end of the designated time period. This                  The Steel Bridge is a double-deck lift
                                           the closed-to-navigation position to
                                                                                                   deviation from the operating regulations              bridge with a lower lift deck and an
                                           accommodate the timely movement of
                                                                                                   is authorized under 33 CFR 117.35.                    upper lift deck which operate
                                           vehicular traffic.
                                                                                                     Dated: May 10, 2016.
                                                                                                                                                         independent of each other. When both
                                           DATES: This deviation is effective from
                                                                                                                                                         decks are in the down position the
                                           9:30 a.m. on June 11, 2016 to 6:15 p.m.                 Steven M. Fischer,
                                                                                                                                                         bridge provides 26 feet of vertical
                                           on June 12, 2016.                                       Bridge Administrator, Thirteenth Coast Guard
                                                                                                                                                         clearance. When the lower deck is in the
                                           ADDRESSES: The docket for this                          District.
                                                                                                                                                         up position, the bridge provides 71 feet
                                           deviation, [USCG–2016–0392] is                          [FR Doc. 2016–11495 Filed 5–13–16; 8:45 am]
                                                                                                                                                         of vertical clearance. This deviation
                                           available at http://www.regulations.gov.                BILLING CODE 9110–04–P
                                                                                                                                                         does not affect the operating schedule of
                                           Type the docket number in the                                                                                 the lower deck which opens on signal.
                                           ‘‘SEARCH’’ box and click ‘‘SEARCH.’’                                                                          The normal operating schedule for the
                                           Click on Open Docket Folder on the line                 DEPARTMENT OF HOMELAND
                                                                                                                                                         upper deck of the Steel Bridge operates
                                           associated with this deviation.                         SECURITY
                                                                                                                                                         in accordance with 33 CFR
                                           FOR FURTHER INFORMATION CONTACT: If                                                                           117.897(c)(3)(ii).
                                                                                                   Coast Guard
                                           you have questions on this temporary                                                                             The Burnside Bridge provides a
                                           deviation, call or email Mr. Steven                     33 CFR Part 117                                       vertical clearance of 64 feet in the
Lhorne on DSK30JT082PROD with RULES




                                           Fischer, Bridge Administrator,                                                                                closed-to-navigation position. The
                                           Thirteenth Coast Guard District;                        [Docket No. USCG–2016–0380]                           normal operating schedule for the
                                           telephone 206–220–7282, email d13-pf-                                                                         Burnside Bridge operates in accordance
                                           d13bridges@uscg.mil.                                    Drawbridge Operation Regulation;
                                                                                                                                                         with 33 CFR 117.897(c)(3)(iii). The Steel
                                                                                                   Willamette River, Portland, OR
                                           SUPPLEMENTARY INFORMATION: The                                                                                Bridge and Burnside Bridge clearances
                                           University of Washington, through the                   AGENCY:    Coast Guard, DHS.                          are above Columbia River Datum 0.0.


                                      VerDate Sep<11>2014   14:36 May 13, 2016   Jkt 238001   PO 00000   Frm 00022   Fmt 4700   Sfmt 4700   E:\FR\FM\16MYR1.SGM   16MYR1



Document Created: 2016-05-14 01:17:39
Document Modified: 2016-05-14 01:17:39
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 9:30 a.m. on June 11, 2016 to 6:15 p.m. on June 12, 2016.
ContactIf you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email [email protected]
FR Citation81 FR 30178 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR