81_FR_32017 81 FR 31919 - Proposals by Non-Federal Interests, for Feasibility Studies and for Modifications to an Authorized Water Resources Development Project or Feasibility Study, for Inclusion in the Annual Report to Congress on Future Water Resources Development

81 FR 31919 - Proposals by Non-Federal Interests, for Feasibility Studies and for Modifications to an Authorized Water Resources Development Project or Feasibility Study, for Inclusion in the Annual Report to Congress on Future Water Resources Development

DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers

Federal Register Volume 81, Issue 98 (May 20, 2016)

Page Range31919-31920
FR Document2016-11944

Section 7001 of Water Resources Reform and Development Act (WRRDA) 2014 requires that the Secretary of the Army to annually submit to the Congress a report (Annual Report) that identifies feasibility reports, proposed feasibility studies submitted by non-Federal interests, and proposed modifications to an authorized water resources development project or feasibility study that meet certain criteria. The Annual Report is to be based, in part, upon requests for proposals submitted by non-Federal interests.

Federal Register, Volume 81 Issue 98 (Friday, May 20, 2016)
[Federal Register Volume 81, Number 98 (Friday, May 20, 2016)]
[Notices]
[Pages 31919-31920]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-11944]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers


Proposals by Non-Federal Interests, for Feasibility Studies and 
for Modifications to an Authorized Water Resources Development Project 
or Feasibility Study, for Inclusion in the Annual Report to Congress on 
Future Water Resources Development

AGENCY: U.S. Army Corps of Engineers, DoD.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: Section 7001 of Water Resources Reform and Development Act 
(WRRDA) 2014 requires that the Secretary of the Army to annually submit 
to the Congress a report (Annual Report) that identifies feasibility 
reports, proposed feasibility studies submitted by non-Federal 
interests, and proposed modifications to an authorized water resources 
development project or feasibility study that meet certain criteria. 
The Annual Report is to be based, in part, upon requests for proposals 
submitted by non-Federal interests.

DATES: Proposals must be submitted online by September 19, 2016.

ADDRESSES: Submit proposals online at: http://www.usace.army.mil/Missions/CivilWorks/ProjectPlanning/WRRDA7001Proposals.aspx. If a 
different method of submission is required, use the further information 
below to arrange an alternative submission process.

FOR FURTHER INFORMATION CONTACT: Send an email to the help desk at 
[email protected] or call Lisa Kiefel, Planning and 
Policy Division, Headquarters, USACE, Washington, DC at 202-761-0626.

SUPPLEMENTARY INFORMATION: Section 7001 of WRRDA 2014 requires the 
publication of a notice in the Federal Register to request proposals by 
non-Federal interests for feasibility studies and modifications to an 
authorized USACE water resources development project or feasibility 
study. Project feasibility reports that have successfully completed 
Executive Branch review, but have not been authorized will be included 
in the Annual Report table by the Secretary of the Army and these 
proposals do not need to be submitted in response to this notice.
    Proposals by non-Federal interests must be entered online and 
require the following information:
    1. The name of all non-Federal interests planning to act as the 
sponsor, including any non-Federal interest that has contributed to or 
is expected to contribute toward the non-Federal share of the proposed 
feasibility study or modification.
    2. State if this proposal is for a feasibility study or a 
modification to an authorized USACE water resources development project 
or feasibility study and, if a modification, specify the authorized 
water resources development project or study that is proposed for 
modification.
    3. State the specific project purpose(s) of the proposed study or 
modification.
    4. Provide an estimate, to the extent practicable, of the total 
cost, and the Federal and non-Federal share of those costs, of the 
proposed study and, separately, an estimate of the cost of construction 
or modification.
    5. Describe, to the extent applicable and practicable, an estimate 
of the anticipated monetary and non-monetary benefits of the proposal 
with regard to benefits to the protection of human life and property; 
improvement to transportation; the national economy; the environment; 
or the national security interests of the United States.
    6. Describe if local support exists for the proposal.
    7. State if the non-Federal interest has the financial ability to 
provide for the required cost share, reference ER 1105-2-100.
    8. Upload a letter or statement of support from each associated 
non-Federal interest.
    All provided information may be included in the Annual Report to 
Congress on Future Water Resources Development. Therefore, information 
that is Confidential Business Information; information that should not 
be disclosed because of statutory restrictions; or other information 
that a non-Federal interest would not want to appear in the Annual 
Report should not be included.
    Process: Proposals received within the time frame set forth in this 
notice will be reviewed by the Chief of Engineers and Secretary of the 
Army and will be presented in one of two tables. The first table will 
be in the Annual Report itself, and the second table will be in an 
appendix. To be included in the Annual Report table, the proposals must 
meet the following criteria:
    1. Are related to the missions and authorities of the USACE;
    Involves a proposed or existing USACE water resources project or 
effort whose primary purpose is flood and storm damage reduction, 
commercial navigation, or aquatic ecosystem restoration. Following 
long-standing USACE practice, related proposals such as for recreation, 
hydropower, or water supply, are eligible for inclusion if undertaken 
in conjunction with such a project or effort.
    2. Require specific congressional authorization, including by an 
Act of Congress;
    This is envisioned to comprise the following cases:
    a. SEEKING CONSTRUCTION AUTHORIZATION.
     Signed Chief's Reports or non-Federal feasibility reports 
submitted to the Secretary of the Army under Section 203 of WRDA 1986, 
as amended, under review,
     Signed Chief's Report or non-Federal feasibility reports 
not yet submitted to the Secretary of the Army under Section 203 of 
WRDA 1986, as amended,
     Ongoing feasibility studies that are expected to result in 
a Chief's Report, and
     Proposed modifications to authorized water resources 
development projects requested by non-Federal interests through the 
Section 7001 of WRRDA 2014 process.
    b. SEEKING STUDY AUTHORIZATION.
     New feasibility studies proposed by non-Federal interests 
through the Section 7001 of WRRDA 2014 process will be evaluated by the 
USACE to determine whether or not there is existing study authority, 
and
     Proposed modifications to studies requested by non-Federal 
interests through the Section 7001 of WRRDA 2014 process.
    c. The following cases are NOT CONSIDERED ELIGIBLE to be included 
in the Annual Report and will be included in the appendix for 
transparency:
     Proposals for modifications to non-Federal activities 
where USACE has provided previous technical assistance. Examples of 
this type of work include the various environmental infrastructure 
programs. Authorization to provide technical assistance does not 
provide authorization of a water resources development project.
     Proposals for construction of a new water resources 
development project that is not the subject of a currently

[[Page 31920]]

authorized USACE project or a complete or ongoing feasibility study.
     Proposals that do not include a request for a potential 
future water resources development project through completed 
feasibility reports, proposed feasibility studies, and proposed 
modifications to authorized projects or studies.
    d. For proposals seeking new construction authorization, 
CONSTRUCTION ON ANY PROJECT IN THE ANNUAL REPORT TABLE CANNOT PROCEED 
UNTIL Congress authorizes and funds the project.
    3. Have not been congressionally authorized;
    4. Have not been included in the Annual Report table of any 
previous Annual Report to Congress on Future Water Resources 
Development; and
     If the proposal was included in the Annual Report table in 
a previous Report to Congress on Future Water Resources Development, 
then the proposal is not eligible to be included in the Annual Report 
table. If a proposal was previously included in an appendix it may be 
re-submitted.
    5. If authorized, could be carried out by the USACE.
     Whether following the USACE Chief's Report process or 
Section 7001 of WRRDA 2014, a proposal for a project or a project 
modification would need a current decision document to provide updated 
information on the scope of the potential project and demonstrate a 
clear Federal interest. This determination would include an assessment 
of whether the proposal is:

--Technically sound, economically viable and environmentally 
acceptable.
--Compliant with environmental and other laws including but not limited 
to National Environmental Policy Act, Endangered Species Act, Coastal 
Zone Management Act, and the National Historic Preservation Act.
--Compliant with statutes and regulations related to water resources 
development including various water resources provisions related to the 
authorized cost of projects, level of detail, separable elements, fish 
and wildlife mitigation, project justification, matters to be addressed 
in planning, and the 1958 Water Supply Act.

    Feasibility study proposals submitted by non-Federal interests are 
for the study only. If Congressional authorization of a feasibility 
study results from inclusion in the Annual Report, it is anticipated 
that such authorization would be for the study not for construction. 
Once a decision document is completed in accordance with Executive 
Branch policies and procedures, the Secretary will determine whether to 
recommend the project for authorization.
    Section 902 of WRDA 1986 establishes a maximum authorized cost for 
projects (902 limit). A Post Authorization Change Report (PACR) is 
required to be completed to support potential modifications, updates to 
project costs, and an increase to the 902 limit. Authority to undertake 
a 902 study is inherent in the project authority, so no authority is 
required to proceed with the study. Since these PACRs support project 
modifications, they may be considered for inclusion in the Annual 
Report if a report's recommendation requires Congressional 
authorization.
    The Secretary shall include in the Annual Report to Congress on 
Future Water Resources Development a certification stating that each 
feasibility report, proposed feasibility study, and proposed 
modification to an authorized water resources development project or 
feasibility study included in the Annual Report meets the criteria 
established in Section 7001 of WRRDA 2014.
    Please contact the appropriate district office or use the contact 
information above for assistance in researching and identifying 
existing authorizations and existing USACE decision documents. Those 
proposals that do not meet the criteria will be included in an appendix 
table included in the Annual Report to Congress on Future Water 
Resources Development. Proposals in the appendix table will include a 
description of why those proposals did not meet the criteria.

    Dated: May 6, 2016.
Steven L. Stockton,
Director of Civil Works.
[FR Doc. 2016-11944 Filed 5-19-16; 8:45 am]
 BILLING CODE 3710-58-P



                                                                                   Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices                                           31919

                                                  or developed an illness on any incident                 have not been authorized will be                      Report table, the proposals must meet
                                                  occurring at Exchange facilities.                       included in the Annual Report table by                the following criteria:
                                                    Dated: May 16, 2016.                                  the Secretary of the Army and these                      1. Are related to the missions and
                                                                                                          proposals do not need to be submitted                 authorities of the USACE;
                                                  Aaron Siegel,
                                                                                                          in response to this notice.                              Involves a proposed or existing
                                                  Alternate OSD Federal Register Liaison                                                                        USACE water resources project or effort
                                                  Officer, Department of Defense.                            Proposals by non-Federal interests
                                                                                                          must be entered online and require the                whose primary purpose is flood and
                                                  [FR Doc. 2016–11890 Filed 5–19–16; 8:45 am]
                                                                                                          following information:                                storm damage reduction, commercial
                                                  BILLING CODE 5001–06–P                                                                                        navigation, or aquatic ecosystem
                                                                                                             1. The name of all non-Federal
                                                                                                          interests planning to act as the sponsor,             restoration. Following long-standing
                                                                                                          including any non-Federal interest that               USACE practice, related proposals such
                                                  DEPARTMENT OF DEFENSE                                                                                         as for recreation, hydropower, or water
                                                                                                          has contributed to or is expected to
                                                  Department of the Army, Corps of                        contribute toward the non-Federal share               supply, are eligible for inclusion if
                                                  Engineers                                               of the proposed feasibility study or                  undertaken in conjunction with such a
                                                                                                          modification.                                         project or effort.
                                                  Proposals by Non-Federal Interests,                        2. State if this proposal is for a                    2. Require specific congressional
                                                  for Feasibility Studies and for                         feasibility study or a modification to an             authorization, including by an Act of
                                                  Modifications to an Authorized Water                    authorized USACE water resources                      Congress;
                                                  Resources Development Project or                        development project or feasibility study                 This is envisioned to comprise the
                                                  Feasibility Study, for Inclusion in the                 and, if a modification, specify the                   following cases:
                                                  Annual Report to Congress on Future                     authorized water resources development                   a. SEEKING CONSTRUCTION
                                                  Water Resources Development                             project or study that is proposed for                 AUTHORIZATION.
                                                                                                          modification.                                            • Signed Chief’s Reports or non-
                                                  AGENCY:    U.S. Army Corps of Engineers,                                                                      Federal feasibility reports submitted to
                                                                                                             3. State the specific project purpose(s)
                                                  DoD.                                                                                                          the Secretary of the Army under Section
                                                                                                          of the proposed study or modification.
                                                  ACTION:   Notice.                                                                                             203 of WRDA 1986, as amended, under
                                                                                                             4. Provide an estimate, to the extent
                                                                                                                                                                review,
                                                                                                          practicable, of the total cost, and the
                                                  SUMMARY:    Section 7001 of Water                                                                                • Signed Chief’s Report or non-
                                                  Resources Reform and Development Act                    Federal and non-Federal share of those
                                                                                                                                                                Federal feasibility reports not yet
                                                  (WRRDA) 2014 requires that the                          costs, of the proposed study and,
                                                                                                                                                                submitted to the Secretary of the Army
                                                  Secretary of the Army to annually                       separately, an estimate of the cost of
                                                                                                                                                                under Section 203 of WRDA 1986, as
                                                  submit to the Congress a report (Annual                 construction or modification.
                                                                                                                                                                amended,
                                                  Report) that identifies feasibility reports,               5. Describe, to the extent applicable                 • Ongoing feasibility studies that are
                                                  proposed feasibility studies submitted                  and practicable, an estimate of the                   expected to result in a Chief’s Report,
                                                  by non-Federal interests, and proposed                  anticipated monetary and non-monetary                 and
                                                  modifications to an authorized water                    benefits of the proposal with regard to                  • Proposed modifications to
                                                  resources development project or                        benefits to the protection of human life              authorized water resources development
                                                  feasibility study that meet certain                     and property; improvement to                          projects requested by non-Federal
                                                  criteria. The Annual Report is to be                    transportation; the national economy;                 interests through the Section 7001 of
                                                  based, in part, upon requests for                       the environment; or the national                      WRRDA 2014 process.
                                                  proposals submitted by non-Federal                      security interests of the United States.                 b. SEEKING STUDY
                                                  interests.                                                 6. Describe if local support exists for            AUTHORIZATION.
                                                                                                          the proposal.                                            • New feasibility studies proposed by
                                                  DATES:  Proposals must be submitted                        7. State if the non-Federal interest has
                                                  online by September 19, 2016.                                                                                 non-Federal interests through the
                                                                                                          the financial ability to provide for the              Section 7001 of WRRDA 2014 process
                                                  ADDRESSES: Submit proposals online at:                  required cost share, reference ER 1105–               will be evaluated by the USACE to
                                                  http://www.usace.army.mil/Missions/                     2–100.                                                determine whether or not there is
                                                  CivilWorks/ProjectPlanning/                                8. Upload a letter or statement of                 existing study authority, and
                                                  WRRDA7001Proposals.aspx. If a                           support from each associated non-                        • Proposed modifications to studies
                                                  different method of submission is                       Federal interest.                                     requested by non-Federal interests
                                                  required, use the further information                      All provided information may be                    through the Section 7001 of WRRDA
                                                  below to arrange an alternative                         included in the Annual Report to                      2014 process.
                                                  submission process.                                     Congress on Future Water Resources                       c. The following cases are NOT
                                                  FOR FURTHER INFORMATION CONTACT:                        Development. Therefore, information                   CONSIDERED ELIGIBLE to be included
                                                  Send an email to the help desk at                       that is Confidential Business                         in the Annual Report and will be
                                                  WRRDA7001Proposal@usace.army.mil                        Information; information that should                  included in the appendix for
                                                  or call Lisa Kiefel, Planning and Policy                not be disclosed because of statutory                 transparency:
                                                  Division, Headquarters, USACE,                          restrictions; or other information that a                • Proposals for modifications to non-
                                                  Washington, DC at 202–761–0626.                         non-Federal interest would not want to                Federal activities where USACE has
                                                  SUPPLEMENTARY INFORMATION: Section                      appear in the Annual Report should not                provided previous technical assistance.
                                                  7001 of WRRDA 2014 requires the                         be included.                                          Examples of this type of work include
                                                  publication of a notice in the Federal                     Process: Proposals received within the             the various environmental infrastructure
mstockstill on DSK3G9T082PROD with NOTICES




                                                  Register to request proposals by non-                   time frame set forth in this notice will              programs. Authorization to provide
                                                  Federal interests for feasibility studies               be reviewed by the Chief of Engineers                 technical assistance does not provide
                                                  and modifications to an authorized                      and Secretary of the Army and will be                 authorization of a water resources
                                                  USACE water resources development                       presented in one of two tables. The first             development project.
                                                  project or feasibility study. Project                   table will be in the Annual Report itself,               • Proposals for construction of a new
                                                  feasibility reports that have successfully              and the second table will be in an                    water resources development project
                                                  completed Executive Branch review, but                  appendix. To be included in the Annual                that is not the subject of a currently


                                             VerDate Sep<11>2014   17:40 May 19, 2016   Jkt 238001   PO 00000   Frm 00011   Fmt 4703   Sfmt 4703   E:\FR\FM\20MYN1.SGM   20MYN1


                                                  31920                            Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices

                                                  authorized USACE project or a complete                  document is completed in accordance                   proposing an extension of an existing
                                                  or ongoing feasibility study.                           with Executive Branch policies and                    information collection.
                                                     • Proposals that do not include a                    procedures, the Secretary will                        DATES: Interested persons are invited to
                                                  request for a potential future water                    determine whether to recommend the                    submit comments on or before June 20,
                                                  resources development project through                   project for authorization.                            2016.
                                                  completed feasibility reports, proposed                   Section 902 of WRDA 1986                            ADDRESSES: To access and review all the
                                                  feasibility studies, and proposed                       establishes a maximum authorized cost                 documents related to the information
                                                  modifications to authorized projects or                 for projects (902 limit). A Post                      collection listed in this notice, please
                                                  studies.                                                Authorization Change Report (PACR) is                 use http://www.regulations.gov by
                                                     d. For proposals seeking new                         required to be completed to support                   searching the Docket ID number ED–
                                                  construction authorization,                             potential modifications, updates to                   2016–ICCD–0029. Comments submitted
                                                  CONSTRUCTION ON ANY PROJECT IN                          project costs, and an increase to the 902             in response to this notice should be
                                                  THE ANNUAL REPORT TABLE                                 limit. Authority to undertake a 902                   submitted electronically through the
                                                  CANNOT PROCEED UNTIL Congress                           study is inherent in the project                      Federal eRulemaking Portal at http://
                                                  authorizes and funds the project.                       authority, so no authority is required to             www.regulations.gov by selecting the
                                                     3. Have not been congressionally                     proceed with the study. Since these                   Docket ID number or via postal mail,
                                                  authorized;                                             PACRs support project modifications,                  commercial delivery, or hand delivery.
                                                     4. Have not been included in the                     they may be considered for inclusion in               Please note that comments submitted by
                                                  Annual Report table of any previous                     the Annual Report if a report’s                       fax or email and those submitted after
                                                  Annual Report to Congress on Future                     recommendation requires Congressional                 the comment period will not be
                                                  Water Resources Development; and                        authorization.                                        accepted. Written requests for
                                                     • If the proposal was included in the                  The Secretary shall include in the                  information or comments submitted by
                                                  Annual Report table in a previous                       Annual Report to Congress on Future                   postal mail or delivery should be
                                                  Report to Congress on Future Water                      Water Resources Development a                         addressed to the Director of the
                                                  Resources Development, then the                         certification stating that each feasibility           Information Collection Clearance
                                                  proposal is not eligible to be included                 report, proposed feasibility study, and               Division, U.S. Department of Education,
                                                  in the Annual Report table. If a proposal               proposed modification to an authorized                400 Maryland Avenue SW., LBJ, Room
                                                  was previously included in an appendix                  water resources development project or                2E–103, Washington, DC 20202–4537.
                                                  it may be re-submitted.                                 feasibility study included in the Annual              FOR FURTHER INFORMATION CONTACT: For
                                                     5. If authorized, could be carried out               Report meets the criteria established in              specific questions related to collection
                                                  by the USACE.                                           Section 7001 of WRRDA 2014.                           activities, please contact Beth
                                                     • Whether following the USACE                          Please contact the appropriate district             Grebeldinger, 202–377–4018.
                                                  Chief’s Report process or Section 7001                  office or use the contact information                 SUPPLEMENTARY INFORMATION: The
                                                  of WRRDA 2014, a proposal for a project                 above for assistance in researching and               Department of Education (ED), in
                                                  or a project modification would need a                  identifying existing authorizations and               accordance with the Paperwork
                                                  current decision document to provide                    existing USACE decision documents.                    Reduction Act of 1995 (PRA) (44 U.S.C.
                                                  updated information on the scope of the                 Those proposals that do not meet the                  3506(c)(2)(A)), provides the general
                                                  potential project and demonstrate a                     criteria will be included in an appendix              public and Federal agencies with an
                                                  clear Federal interest. This                            table included in the Annual Report to                opportunity to comment on proposed,
                                                  determination would include an                          Congress on Future Water Resources                    revised, and continuing collections of
                                                  assessment of whether the proposal is:                  Development. Proposals in the appendix                information. This helps the Department
                                                  —Technically sound, economically                        table will include a description of why               assess the impact of its information
                                                     viable and environmentally                           those proposals did not meet the                      collection requirements and minimize
                                                     acceptable.                                          criteria.                                             the public’s reporting burden. It also
                                                  —Compliant with environmental and                         Dated: May 6, 2016.                                 helps the public understand the
                                                     other laws including but not limited                 Steven L. Stockton,                                   Department’s information collection
                                                     to National Environmental Policy Act,                Director of Civil Works.                              requirements and provide the requested
                                                     Endangered Species Act, Coastal Zone                 [FR Doc. 2016–11944 Filed 5–19–16; 8:45 am]           data in the desired format. ED is
                                                     Management Act, and the National                                                                           soliciting comments on the proposed
                                                                                                          BILLING CODE 3710–58–P
                                                     Historic Preservation Act.                                                                                 information collection request (ICR) that
                                                  —Compliant with statutes and                                                                                  is described below. The Department of
                                                     regulations related to water resources                                                                     Education is especially interested in
                                                     development including various water                  DEPARTMENT OF EDUCATION
                                                                                                                                                                public comment addressing the
                                                     resources provisions related to the                  [Docket No.: ED–2016–ICCD–0029]                       following issues: (1) Is this collection
                                                     authorized cost of projects, level of                                                                      necessary to the proper functions of the
                                                     detail, separable elements, fish and                 Agency Information Collection                         Department; (2) will this information be
                                                     wildlife mitigation, project                         Activities; Submission to the Office of               processed and used in a timely manner;
                                                     justification, matters to be addressed               Management and Budget for Review                      (3) is the estimate of burden accurate;
                                                     in planning, and the 1958 Water                      and Approval; Comment Request;                        (4) how might the Department enhance
                                                     Supply Act.                                          Foreign Graduate Medical School                       the quality, utility, and clarity of the
                                                     Feasibility study proposals submitted                Consumer Information Reporting Form                   information to be collected; and (5) how
mstockstill on DSK3G9T082PROD with NOTICES




                                                  by non-Federal interests are for the                    AGENCY: Federal Student Aid (FSA),                    might the Department minimize the
                                                  study only. If Congressional                            Department of Education (ED).                         burden of this collection on the
                                                  authorization of a feasibility study                    ACTION: Notice.                                       respondents, including through the use
                                                  results from inclusion in the Annual                                                                          of information technology. Please note
                                                  Report, it is anticipated that such                     SUMMARY:  In accordance with the                      that written comments received in
                                                  authorization would be for the study not                Paperwork Reduction Act of 1995 (44                   response to this notice will be
                                                  for construction. Once a decision                       U.S.C. chapter 3501 et seq.), ED is                   considered public records.


                                             VerDate Sep<11>2014   17:40 May 19, 2016   Jkt 238001   PO 00000   Frm 00012   Fmt 4703   Sfmt 4703   E:\FR\FM\20MYN1.SGM   20MYN1



Document Created: 2016-05-20 01:59:21
Document Modified: 2016-05-20 01:59:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesProposals must be submitted online by September 19, 2016.
ContactSend an email to the help desk at [email protected] or call Lisa Kiefel, Planning and Policy Division, Headquarters, USACE, Washington, DC at 202-761-0626.
FR Citation81 FR 31919 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR