DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 98 (May 20, 2016)

Page Range31921-31922
FR Document2016-11897

Federal Register, Volume 81 Issue 98 (Friday, May 20, 2016)
[Federal Register Volume 81, Number 98 (Friday, May 20, 2016)]
[Notices]
[Pages 31921-31922]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-11897]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2335-039]


Brookfield White Pine Hydro LLC; Notice of Application Accepted 
for Filing, Soliciting Motions To Intervene and Protests, Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, 
Preliminary Terms and Conditions, and Preliminary Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2335-039.
    c. Date filed: December 11, 2015.
    d. Applicant: Brookfield White Pine Hydro LLC (White Pine Hydro).
    e. Name of Project: Williams Hydroelectric Project (Williams 
Project).
    f. Location: The existing project is located on the Kennebec River 
in Somerset County, Maine. The project does not occupy federal land.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Ms. Kelly Maloney, Manager of Licensing and 
Compliance, Brookfield White Pine Hydro LLC, 150 Main Street, Lewiston, 
ME 04240; Telephone: (207) 755-5606.
    i. FERC Contact: Amy Chang, (202) 502-8250 or [email protected].
    j. Deadline for filing motions to intervene, protests, comments, 
recommendations, preliminary terms and conditions, and preliminary 
prescriptions: 60 days from the issuance date of this notice; reply 
comments are due 105 days from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, recommendations, preliminary 
terms and conditions, and preliminary prescriptions using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-2335-039.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The Project Description: The Williams Project has a total 
installed capacity of 13-megawatts (MW). The project's average annual 
generation is 96,731 megawatt-hours. The power generated by the project 
is sold on the open market into the regional grid.
    The existing project consists of: (1) A 894.7-foot-long, 46.0-foot-
high dam that includes: (a) A 202-foot-long, 15-foot-high earth 
embankment section with a concrete core wall; (b) a 244-foot-long, 32-
foot-high stone masonry and concrete spillway section with six 32.5-
foot-wide, 20.5-foot-high Tainter gates; (c) a 71.3-foot-long, 19.5-
foot-high stone masonry and concrete abutment section; (d) a 203.3-
foot-long, 26.5-foot-high stone masonry and concrete stanchion bay 
section with two 65.9-foot-wide, 17.5-foot-high and one 46.8-foot-wide, 
17.5-foot-high stanchion bays; (e) a 27-foot-long, 46-foot-high 
bulkhead section with a 20.5-foot-wide, 7.0-foot-high surface weir gate 
and a 6.0-foot-wide, 12.3-foot-high Tainter gate at the upstream end of 
a 162-foot-long, 14-foot-wide steel-lined sluiceway; (f) a 95.5-foot-
wide, 45.5- to 49.4-foot-high intake and powerhouse section with four 
headgates and two double-bay trashracks with 3.5-inch clear-bar 
spacing; and (g) a 51.6-foot-long, 10.5-foot-high concrete cut-off 
wall; (2) a 400-acre impoundment with a gross storage volume of 4,575 
acre-feet and a useable storage volume of 2,065 acre-feet at a normal 
maximum elevation of 320 feet National Geodetic Vertical Datum; (3) a 
40.5-foot-wide, 105.5-foot-long concrete powerhouse that is integral 
with the dam and contains two turbine-generator units rated at 6 and 7 
MW; (4) a 6,000-foot-long, 150- to 175-foot-wide excavated tailrace; 
(5) a 200-foot-long generator lead and a 310-foot-long generator lead 
that connect the turbine-generator units to the regional grid; and (6) 
appurtenant facilities.
    The Williams Project operates in a store-and-release mode where the 
impoundment level is fluctuated up to 6 feet on a daily basis to re-
regulate inflow from upstream hydroelectric projects, maintain 
downstream flow, and meet peak demands for hydroelectric generation. 
The existing license requires an instantaneous minimum flow of 1,360 
cubic feet per second, or inflow (whichever is less), in the tailrace. 
White Pine Hydro proposes to install an upstream eel passage facility, 
improve a canoe portage, and improve angler access. White Pine Hydro 
also proposes to remove 375.5 acres of land and water from the existing 
project boundary because it does not serve a project purpose.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy of the application is also available for 
inspection and reproduction at the address in item h above.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via

[[Page 31922]]

email of new filings and issuances related to this or other pending 
projects. For assistance, contact FERC Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must: (1) Bear in all capital letters the title 
``PROTEST,'' ``MOTION TO INTERVENE,'' ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY PRESCRIPTIONS;'' (2) set forth in the heading the name of 
the applicant and the project number of the application to which the 
filing responds; (3) furnish the name, address, and telephone number of 
the person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. A copy of any protest or motion to intervene must 
be served upon each representative of the applicant specified in the 
particular application. A copy of all other filings in reference to 
this application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    o. Procedural Schedule: The application will be processed according 
to the following revised Hydro Licensing Schedule. Revisions to the 
schedule may be made as appropriate.

------------------------------------------------------------------------
              Milestone                           Target date
------------------------------------------------------------------------
Filing of recommendations,             July 2016.
 preliminary terms and conditions,
 and preliminary prescriptions.
Commission Issues Environmental        November 2016.
 Assessment.
Comments on Environmental Assessment.  December 2016.
Modified terms and conditions........  February 2017.
------------------------------------------------------------------------

    p. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.
    q. A license applicant must file no later than 60 days following 
the date of issuance of the notice of acceptance and ready for 
environmental analysis provided for in 18 CFR 5.22: (1) A copy of the 
water quality certification; (2) a copy of the request for 
certification, including proof of the date on which the certifying 
agency received the request; or (3) evidence of waiver of water quality 
certification.

    Dated: May 13, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-11897 Filed 5-19-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices                                            31921

                                                    Title of Collection: Foreign Graduate                   h. Applicant Contact: Ms. Kelly                     (c) a 71.3-foot-long, 19.5-foot-high stone
                                                  Medical School Consumer Information                     Maloney, Manager of Licensing and                     masonry and concrete abutment section;
                                                  Reporting Form.                                         Compliance, Brookfield White Pine                     (d) a 203.3-foot-long, 26.5-foot-high
                                                    OMB Control Number: 1845–0117.                        Hydro LLC, 150 Main Street, Lewiston,                 stone masonry and concrete stanchion
                                                    Type of Review: An extension of an                    ME 04240; Telephone: (207) 755–5606.                  bay section with two 65.9-foot-wide,
                                                  existing information collection.                          i. FERC Contact: Amy Chang, (202)                   17.5-foot-high and one 46.8-foot-wide,
                                                    Respondents/Affected Public: State,                   502–8250 or amy.chang@ferc.gov.                       17.5-foot-high stanchion bays; (e) a 27-
                                                  Local, and Tribal Governments; Private                    j. Deadline for filing motions to                   foot-long, 46-foot-high bulkhead section
                                                  Sector.                                                 intervene, protests, comments,                        with a 20.5-foot-wide, 7.0-foot-high
                                                    Total Estimated Number of Annual                      recommendations, preliminary terms                    surface weir gate and a 6.0-foot-wide,
                                                  Responses: 28.                                          and conditions, and preliminary                       12.3-foot-high Tainter gate at the
                                                    Total Estimated Number of Annual                      prescriptions: 60 days from the issuance              upstream end of a 162-foot-long, 14-
                                                  Burden Hours: 448.                                      date of this notice; reply comments are               foot-wide steel-lined sluiceway; (f) a
                                                    Abstract: This is a request for a                     due 105 days from the issuance date of                95.5-foot-wide, 45.5- to 49.4-foot-high
                                                  renewal of the information collection to                this notice.                                          intake and powerhouse section with
                                                  obtain consumer information from                          The Commission strongly encourages                  four headgates and two double-bay
                                                  foreign graduate medical institutions                   electronic filing. Please file motions to             trashracks with 3.5-inch clear-bar
                                                  that participate in the Federal Direct                  intervene, protests, comments,                        spacing; and (g) a 51.6-foot-long, 10.5-
                                                  Loan Program. The form is used for                      recommendations, preliminary terms                    foot-high concrete cut-off wall; (2) a
                                                  reporting specific graduation                           and conditions, and preliminary                       400-acre impoundment with a gross
                                                  information to the Department of                        prescriptions using the Commission’s                  storage volume of 4,575 acre-feet and a
                                                  Education in accordance with 34 CFR                     eFiling system at http://www.ferc.gov/                useable storage volume of 2,065 acre-
                                                  668.14(b)(7). This is done to improve                   docs-filing/efiling.asp. Commenters can               feet at a normal maximum elevation of
                                                  consumer information available to                       submit brief comments up to 6,000                     320 feet National Geodetic Vertical
                                                  prospective U.S. medical student                        characters, without prior registration,               Datum; (3) a 40.5-foot-wide, 105.5-foot-
                                                  interested in foreign medical                           using the eComment system at http://                  long concrete powerhouse that is
                                                  institutions.                                           www.ferc.gov/docs-filing/                             integral with the dam and contains two
                                                    Dated: May 17, 2016.                                  ecomment.asp. You must include your                   turbine-generator units rated at 6 and 7
                                                  Kate Mullan,
                                                                                                          name and contact information at the end               MW; (4) a 6,000-foot-long, 150- to 175-
                                                                                                          of your comments. For assistance,                     foot-wide excavated tailrace; (5) a 200-
                                                  Acting Director, Information Collection
                                                  Clearance Division, Office of the Chief Privacy
                                                                                                          please contact FERC Online Support at                 foot-long generator lead and a 310-foot-
                                                  Officer, Office of Management.                          FERCOnlineSupport@ferc.gov, (866)                     long generator lead that connect the
                                                  [FR Doc. 2016–11927 Filed 5–19–16; 8:45 am]
                                                                                                          208–3676 (toll free), or (202) 502–8659               turbine-generator units to the regional
                                                                                                          (TTY). In lieu of electronic filing, please           grid; and (6) appurtenant facilities.
                                                  BILLING CODE 4000–01–P
                                                                                                          send a paper copy to: Secretary, Federal                 The Williams Project operates in a
                                                                                                          Energy Regulatory Commission, 888                     store-and-release mode where the
                                                                                                          First Street NE., Washington, DC 20426.               impoundment level is fluctuated up to
                                                  DEPARTMENT OF ENERGY                                    The first page of any filing should                   6 feet on a daily basis to re-regulate
                                                  Federal Energy Regulatory                               include docket number P–2335–039.                     inflow from upstream hydroelectric
                                                                                                            The Commission’s Rules of Practice                  projects, maintain downstream flow,
                                                  Commission
                                                                                                          require all intervenors filing documents              and meet peak demands for
                                                  [Project No. 2335–039]                                  with the Commission to serve a copy of                hydroelectric generation. The existing
                                                                                                          that document on each person on the                   license requires an instantaneous
                                                  Brookfield White Pine Hydro LLC;                        official service list for the project.                minimum flow of 1,360 cubic feet per
                                                  Notice of Application Accepted for                      Further, if an intervenor files comments              second, or inflow (whichever is less), in
                                                  Filing, Soliciting Motions To Intervene                 or documents with the Commission                      the tailrace. White Pine Hydro proposes
                                                  and Protests, Ready for Environmental                   relating to the merits of an issue that               to install an upstream eel passage
                                                  Analysis, and Soliciting Comments,                      may affect the responsibilities of a                  facility, improve a canoe portage, and
                                                  Recommendations, Preliminary Terms                      particular resource agency, they must                 improve angler access. White Pine
                                                  and Conditions, and Preliminary                         also serve a copy of the document on                  Hydro also proposes to remove 375.5
                                                  Prescriptions                                           that resource agency.                                 acres of land and water from the
                                                    Take notice that the following                          k. This application has been accepted               existing project boundary because it
                                                  hydroelectric application has been filed                for filing and is now ready for                       does not serve a project purpose.
                                                  with the Commission and is available                    environmental analysis.                                  m. A copy of the application is
                                                  for public inspection.                                    l. The Project Description: The                     available for review at the Commission
                                                    a. Type of Application: New Major                     Williams Project has a total installed                in the Public Reference Room or may be
                                                  License.                                                capacity of 13-megawatts (MW). The                    viewed on the Commission’s Web site at
                                                    b. Project No.: 2335–039.                             project’s average annual generation is                http://www.ferc.gov using the
                                                    c. Date filed: December 11, 2015.                     96,731 megawatt-hours. The power                      ‘‘eLibrary’’ link. Enter the docket
                                                    d. Applicant: Brookfield White Pine                   generated by the project is sold on the               number excluding the last three digits in
                                                  Hydro LLC (White Pine Hydro).                           open market into the regional grid.                   the docket number field to access the
                                                                                                            The existing project consists of: (1) A             document. For assistance, contact FERC
mstockstill on DSK3G9T082PROD with NOTICES




                                                    e. Name of Project: Williams
                                                  Hydroelectric Project (Williams Project).               894.7-foot-long, 46.0-foot-high dam that              Online Support. A copy of the
                                                    f. Location: The existing project is                  includes: (a) A 202-foot-long, 15-foot-               application is also available for
                                                  located on the Kennebec River in                        high earth embankment section with a                  inspection and reproduction at the
                                                  Somerset County, Maine. The project                     concrete core wall; (b) a 244-foot-long,              address in item h above.
                                                  does not occupy federal land.                           32-foot-high stone masonry and                           Register online at http://
                                                    g. Filed Pursuant to: Federal Power                   concrete spillway section with six 32.5-              www.ferc.gov/docs-filing/
                                                  Act, 16 U.S.C. 791(a)–825(r).                           foot-wide, 20.5-foot-high Tainter gates;              esubscription.asp to be notified via


                                             VerDate Sep<11>2014   17:40 May 19, 2016   Jkt 238001   PO 00000   Frm 00013   Fmt 4703   Sfmt 4703   E:\FR\FM\20MYN1.SGM   20MYN1


                                                  31922                                      Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices

                                                  email of new filings and issuances                                        All filings must: (1) Bear in all capital                           otherwise comply with the requirements
                                                  related to this or other pending projects.                             letters the title ‘‘PROTEST,’’ ‘‘MOTION                                of 18 CFR 4.34(b). Agencies may obtain
                                                  For assistance, contact FERC Online                                    TO INTERVENE,’’ ‘‘COMMENTS,’’                                          copies of the application directly from
                                                  Support.                                                               ‘‘REPLY COMMENTS,’’                                                    the applicant. A copy of any protest or
                                                    n. Anyone may submit comments, a                                     ‘‘RECOMMENDATIONS,’’                                                   motion to intervene must be served
                                                  protest, or a motion to intervene in                                   ‘‘PRELIMINARY TERMS AND                                                upon each representative of the
                                                  accordance with the requirements of                                    CONDITIONS,’’ or ‘‘PRELIMINARY                                         applicant specified in the particular
                                                  Rules of Practice and Procedure, 18 CFR                                PRESCRIPTIONS;’’ (2) set forth in the                                  application. A copy of all other filings
                                                  385.210, .211, and .214. In determining                                heading the name of the applicant and                                  in reference to this application must be
                                                  the appropriate action to take, the                                    the project number of the application to                               accompanied by proof of service on all
                                                  Commission will consider all protests or                               which the filing responds; (3) furnish                                 persons listed in the service list
                                                  other comments filed, but only those                                   the name, address, and telephone                                       prepared by the Commission in this
                                                  who file a motion to intervene in                                      number of the person protesting or                                     proceeding, in accordance with 18 CFR
                                                  accordance with the Commission’s                                       intervening; and (4) otherwise comply                                  4.34(b) and 385.2010.
                                                  Rules may become a party to the                                        with the requirements of 18 CFR                                          o. Procedural Schedule: The
                                                  proceeding. Any comments, protests, or                                 385.2001 through 385.2005. All                                         application will be processed according
                                                  motions to intervene must be received                                  comments, recommendations, terms and                                   to the following revised Hydro
                                                  on or before the specified comment date                                conditions or prescriptions must set                                   Licensing Schedule. Revisions to the
                                                  for the particular application.                                        forth their evidentiary basis and                                      schedule may be made as appropriate.

                                                                                                                                    Milestone                                                                                             Target date

                                                  Filing of recommendations, preliminary terms and conditions, and preliminary prescriptions ...................................................                                       July 2016.
                                                  Commission Issues Environmental Assessment ........................................................................................................................                  November 2016.
                                                  Comments on Environmental Assessment .................................................................................................................................               December 2016.
                                                  Modified terms and conditions ....................................................................................................................................................   February 2017.



                                                     p. Final amendments to the                                          the Eastern System Upgrade Project                                     planned project and encourage them to
                                                  application must be filed with the                                     (ESU Project) involving construction                                   comment on their areas of concern.
                                                  Commission no later than 30 days from                                  and operation of facilities by                                           If you are a landowner receiving this
                                                  the issuance date of this notice.                                      Millennium Pipeline Company, LLC                                       notice, a pipeline company
                                                     q. A license applicant must file no                                 (Millennium) in Sullivan, Delaware,                                    representative may contact you about
                                                  later than 60 days following the date of                               Orange, and Rockland Counties, New                                     the acquisition of an easement to
                                                  issuance of the notice of acceptance and                               York. The Commission will use this EA                                  construct, operate, and maintain the
                                                  ready for environmental analysis                                       in its decision-making process to                                      planned facilities. The company would
                                                  provided for in 18 CFR 5.22: (1) A copy                                determine whether the ESU Project is in                                seek to negotiate a mutually acceptable
                                                  of the water quality certification; (2) a                              the public convenience and necessity.                                  agreement. However, if the Commission
                                                  copy of the request for certification,                                   This notice announces the opening of                                 approves the ESU Project, that approval
                                                  including proof of the date on which the                               the scoping process the Commission                                     conveys with it the right of eminent
                                                  certifying agency received the request;                                will use to gather input from the public                               domain. Therefore, if easement
                                                  or (3) evidence of waiver of water                                     and interested agencies on the ESU                                     negotiations fail to produce an
                                                  quality certification.                                                 Project. You can make a difference by                                  agreement, the pipeline company could
                                                                                                                         providing us with your specific                                        initiate condemnation proceedings
                                                    Dated: May 13, 2016.
                                                                                                                         comments or concerns about the ESU                                     where compensation would be
                                                  Kimberly D. Bose,                                                      Project. Your comments should focus on                                 determined in accordance with state
                                                  Secretary.                                                             the potential environmental effects,                                   law.
                                                  [FR Doc. 2016–11897 Filed 5–19–16; 8:45 am]                            reasonable alternatives, and measures to                                 A fact sheet prepared by the FERC
                                                  BILLING CODE 6717–01–P                                                 avoid or lessen environmental impacts.                                 entitled ‘‘An Interstate Natural Gas
                                                                                                                         Your input will help the Commission                                    Facility On My Land? What Do I Need
                                                                                                                         staff determine what issues they need to                               To Know?’’ is available for viewing on
                                                  DEPARTMENT OF ENERGY                                                   evaluate in the EA. To ensure that your                                the FERC Web site (www.ferc.gov). This
                                                                                                                         comments are timely and properly                                       fact sheet addresses a number of
                                                  Federal Energy Regulatory                                              recorded, please send your comments so                                 typically asked questions, including the
                                                  Commission                                                             that the Commission receives them in                                   use of eminent domain and how to
                                                  [Docket No. PF16–3–000]                                                Washington, DC on or before June 10,                                   participate in the Commission’s
                                                                                                                         2016.                                                                  proceedings.
                                                  Millennium Pipeline Company, LLC;                                        If you sent comments on the ESU
                                                                                                                         Project to the Commission before the                                   Public Participation
                                                  Notice of Intent To Prepare an
                                                  Environmental Assessment for the                                       opening of this docket on January 19,                                    For your convenience, there are three
                                                  Planned Eastern System Upgrade                                         2016, you will need to file those                                      methods you can use to submit your
                                                                                                                         comments in Docket No. PF16–3–000 to                                   comments to the Commission. The
mstockstill on DSK3G9T082PROD with NOTICES




                                                  Project, and Request for Comments on
                                                  Environmental Issues                                                   ensure they are considered as part of                                  Commission will provide equal
                                                                                                                         this proceeding.                                                       consideration to all comments received,
                                                    The staff of the Federal Energy                                        This notice is being sent to the                                     whether filed in written form or
                                                  Regulatory Commission (FERC or                                         Commission’s current environmental                                     provided verbally. The Commission
                                                  Commission) will prepare an                                            mailing list for the ESU Project. State                                encourages electronic filing of
                                                  environmental assessment (EA) that will                                and local government representatives                                   comments and has expert staff available
                                                  discuss the environmental impacts of                                   should notify their constituents of this                               to assist you at (202) 502–8258 or


                                             VerDate Sep<11>2014        17:40 May 19, 2016        Jkt 238001     PO 00000       Frm 00014       Fmt 4703     Sfmt 4703      E:\FR\FM\20MYN1.SGM             20MYN1



Document Created: 2016-05-20 02:00:03
Document Modified: 2016-05-20 02:00:03
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 31921 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR