81_FR_32020 81 FR 31922 - Millennium Pipeline Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Eastern System Upgrade Project, and Request for Comments on Environmental Issues

81 FR 31922 - Millennium Pipeline Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Eastern System Upgrade Project, and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 98 (May 20, 2016)

Page Range31922-31924
FR Document2016-11908

Federal Register, Volume 81 Issue 98 (Friday, May 20, 2016)
[Federal Register Volume 81, Number 98 (Friday, May 20, 2016)]
[Notices]
[Pages 31922-31924]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-11908]


-----------------------------------------------------------------------

 DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PF16-3-000]


Millennium Pipeline Company, LLC; Notice of Intent To Prepare an 
Environmental Assessment for the Planned Eastern System Upgrade 
Project, and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Eastern System Upgrade Project 
(ESU Project) involving construction and operation of facilities by 
Millennium Pipeline Company, LLC (Millennium) in Sullivan, Delaware, 
Orange, and Rockland Counties, New York. The Commission will use this 
EA in its decision-making process to determine whether the ESU Project 
is in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the ESU Project. You can make a difference by providing us 
with your specific comments or concerns about the ESU Project. Your 
comments should focus on the potential environmental effects, 
reasonable alternatives, and measures to avoid or lessen environmental 
impacts. Your input will help the Commission staff determine what 
issues they need to evaluate in the EA. To ensure that your comments 
are timely and properly recorded, please send your comments so that the 
Commission receives them in Washington, DC on or before June 10, 2016.
    If you sent comments on the ESU Project to the Commission before 
the opening of this docket on January 19, 2016, you will need to file 
those comments in Docket No. PF16-3-000 to ensure they are considered 
as part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for the ESU Project. State and local government 
representatives should notify their constituents of this planned 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the planned facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the ESU Project, that approval conveys with it 
the right of eminent domain. Therefore, if easement negotiations fail 
to produce an agreement, the pipeline company could initiate 
condemnation proceedings where compensation would be determined in 
accordance with state law.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' is available for 
viewing on the FERC Web site (www.ferc.gov). This fact sheet addresses 
a number of typically asked questions, including the use of eminent 
domain and how to participate in the Commission's proceedings.

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission will provide equal 
consideration to all comments received, whether filed in written form 
or provided verbally. The Commission encourages electronic filing of 
comments and has expert staff available to assist you at (202) 502-8258 
or

[[Page 31923]]

[email protected]. Please carefully follow these instructions so that 
your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the ESU Project docket 
number (PF16-3-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, 
Washington, DC 20426

Summary of the Planned Project

    Millennium plans to construct and operate about 7.8 miles of 30- 
and 36-inch-diameter pipeline loop \1\ in Orange County, New York. The 
planned pipeline loop would transport natural gas from Millennium's 
existing Corning Compressor Station to an existing interconnect with 
Algonquin Gas Transmission, LLC in Ramapo, New York. Millennium would 
also construct a new compressor station in Sullivan County, New York; 
install additional compression at the Hancock Compressor Station in 
Delaware County, New York; and modify the Westtown Meter Station in 
Orange County, New York and the Ramapo Meter Station in Rockland 
County, New York. According to Millennium, the ESU Project would be 
designed to transport approximately 200,000 dekatherms per day of 
additional natural gas service. The general location of the ESU Project 
facilities is shown in appendix 1.\2\
---------------------------------------------------------------------------

    \1\ A pipeline loop is a segment of pipe constructed parallel to 
an existing pipeline to increase capacity.
    \2\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of the appendices were sent to all of 
those receiving this notice in the mail and are available at 
www.ferc.gov using the link called ``eLibrary'' or from the 
Commission's Public Reference Room, 888 First Street NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------

    The ESU Project would consist of the following facilities in New 
York:
     Approximately 7.8 miles of new 30- and 36-inch-diameter 
pipeline loop to be located generally adjacent to Millennium's existing 
mainline in Orange County;
     a new 22,400-horsepower compressor station in Sullivan 
County;
     an additional 22,400 horsepower of compression at the 
existing Hancock Compressor Station in Delaware County;
     modifications at the existing Ramapo Meter Station in 
Rockland County;
     modifications at the existing Huguenot and Westtown Meter 
Stations in Orange County; and
     construction of an interconnect to Millennium's proposed 
Valley Lateral Pipeline.

Land Requirements for Construction

    Construction of the planned facilities would disturb about 199.6 
acres of land for the aboveground facilities and the pipeline loop. 
Millennium would maintain about 51.0 acres for permanent operation of 
the ESU Project's facilities following construction; the remaining 
acreage would be restored and revert to former uses. Most of the 
pipeline loop would be located within Millennium's existing easements, 
offset about 25 feet from Millennium's existing pipeline.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\3\ to discover and address concerns the public may have about 
proposals. This process is referred to as scoping. The main goal of the 
scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to be addressed in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \3\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the planned project under these 
general headings:
     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife, including migratory birds;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts.
    We will also evaluate possible alternatives to the planned ESU 
Project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    Although no formal application has been filed, we have already 
initiated our NEPA review under the Commission's pre-filing process. 
The purpose of the pre-filing process is to encourage early involvement 
of interested stakeholders and to identify and resolve issues before 
the FERC receives an application. As part of our pre-filing review, we 
have begun to contact some federal and state agencies to discuss their 
involvement in the scoping process and the preparation of the EA.
    The EA will present our independent analysis of the issues and will 
be available in the public record through eLibrary. Depending on the 
comments received during the scoping process, we may also publish and 
distribute the EA to the public for an allotted comment period. We will 
consider all comments on the EA before we make our recommendations to 
the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues 
related to this project to formally cooperate with us in the 
preparation of the EA.\4\ Agencies that would like to request 
cooperating agency status should follow the instructions for filing 
comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \4\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the New York State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the ESU Project's potential effects on

[[Page 31924]]

historic properties.\5\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the ESU 
Project develops. For natural gas facility projects, the APE at a 
minimum encompasses all areas subject to ground disturbance (examples 
include construction right-of-way, contractor/pipe storage yards, 
compressor stations, and access roads). Our EA for this project will 
document our findings on the impacts on historic properties and 
summarize the status of consultations under section 106.
---------------------------------------------------------------------------

    \5\ The Advisory Council on Historic Preservation regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the ESU Project. We will update the environmental mailing 
list as the analysis proceeds to ensure that we send the information 
related to this environmental review to all individuals, organizations, 
and government entities interested in and/or potentially affected by 
the planned project.
    Copies of the EA will be sent to the environmental mailing list for 
public review and comment. If you would prefer to receive a paper copy 
of the document instead of the CD version or would like to remove your 
name from the mailing list, please return the attached Information 
Request (see appendix 2).

Becoming an Intervenor

    Once Millennium files its application with the Commission, you may 
want to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the User's Guide under the ``e-filing'' link on the Commission's Web 
site. Please note that the Commission will not accept requests for 
intervenor status at this time. You must wait until the Commission 
receives a formal application for the ESU Project.

Additional Information

    Additional information about the ESU Project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., PF16-
3). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp. 
Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-11908 Filed 5-19-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                  31922                                      Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices

                                                  email of new filings and issuances                                        All filings must: (1) Bear in all capital                           otherwise comply with the requirements
                                                  related to this or other pending projects.                             letters the title ‘‘PROTEST,’’ ‘‘MOTION                                of 18 CFR 4.34(b). Agencies may obtain
                                                  For assistance, contact FERC Online                                    TO INTERVENE,’’ ‘‘COMMENTS,’’                                          copies of the application directly from
                                                  Support.                                                               ‘‘REPLY COMMENTS,’’                                                    the applicant. A copy of any protest or
                                                    n. Anyone may submit comments, a                                     ‘‘RECOMMENDATIONS,’’                                                   motion to intervene must be served
                                                  protest, or a motion to intervene in                                   ‘‘PRELIMINARY TERMS AND                                                upon each representative of the
                                                  accordance with the requirements of                                    CONDITIONS,’’ or ‘‘PRELIMINARY                                         applicant specified in the particular
                                                  Rules of Practice and Procedure, 18 CFR                                PRESCRIPTIONS;’’ (2) set forth in the                                  application. A copy of all other filings
                                                  385.210, .211, and .214. In determining                                heading the name of the applicant and                                  in reference to this application must be
                                                  the appropriate action to take, the                                    the project number of the application to                               accompanied by proof of service on all
                                                  Commission will consider all protests or                               which the filing responds; (3) furnish                                 persons listed in the service list
                                                  other comments filed, but only those                                   the name, address, and telephone                                       prepared by the Commission in this
                                                  who file a motion to intervene in                                      number of the person protesting or                                     proceeding, in accordance with 18 CFR
                                                  accordance with the Commission’s                                       intervening; and (4) otherwise comply                                  4.34(b) and 385.2010.
                                                  Rules may become a party to the                                        with the requirements of 18 CFR                                          o. Procedural Schedule: The
                                                  proceeding. Any comments, protests, or                                 385.2001 through 385.2005. All                                         application will be processed according
                                                  motions to intervene must be received                                  comments, recommendations, terms and                                   to the following revised Hydro
                                                  on or before the specified comment date                                conditions or prescriptions must set                                   Licensing Schedule. Revisions to the
                                                  for the particular application.                                        forth their evidentiary basis and                                      schedule may be made as appropriate.

                                                                                                                                    Milestone                                                                                             Target date

                                                  Filing of recommendations, preliminary terms and conditions, and preliminary prescriptions ...................................................                                       July 2016.
                                                  Commission Issues Environmental Assessment ........................................................................................................................                  November 2016.
                                                  Comments on Environmental Assessment .................................................................................................................................               December 2016.
                                                  Modified terms and conditions ....................................................................................................................................................   February 2017.



                                                     p. Final amendments to the                                          the Eastern System Upgrade Project                                     planned project and encourage them to
                                                  application must be filed with the                                     (ESU Project) involving construction                                   comment on their areas of concern.
                                                  Commission no later than 30 days from                                  and operation of facilities by                                           If you are a landowner receiving this
                                                  the issuance date of this notice.                                      Millennium Pipeline Company, LLC                                       notice, a pipeline company
                                                     q. A license applicant must file no                                 (Millennium) in Sullivan, Delaware,                                    representative may contact you about
                                                  later than 60 days following the date of                               Orange, and Rockland Counties, New                                     the acquisition of an easement to
                                                  issuance of the notice of acceptance and                               York. The Commission will use this EA                                  construct, operate, and maintain the
                                                  ready for environmental analysis                                       in its decision-making process to                                      planned facilities. The company would
                                                  provided for in 18 CFR 5.22: (1) A copy                                determine whether the ESU Project is in                                seek to negotiate a mutually acceptable
                                                  of the water quality certification; (2) a                              the public convenience and necessity.                                  agreement. However, if the Commission
                                                  copy of the request for certification,                                   This notice announces the opening of                                 approves the ESU Project, that approval
                                                  including proof of the date on which the                               the scoping process the Commission                                     conveys with it the right of eminent
                                                  certifying agency received the request;                                will use to gather input from the public                               domain. Therefore, if easement
                                                  or (3) evidence of waiver of water                                     and interested agencies on the ESU                                     negotiations fail to produce an
                                                  quality certification.                                                 Project. You can make a difference by                                  agreement, the pipeline company could
                                                                                                                         providing us with your specific                                        initiate condemnation proceedings
                                                    Dated: May 13, 2016.
                                                                                                                         comments or concerns about the ESU                                     where compensation would be
                                                  Kimberly D. Bose,                                                      Project. Your comments should focus on                                 determined in accordance with state
                                                  Secretary.                                                             the potential environmental effects,                                   law.
                                                  [FR Doc. 2016–11897 Filed 5–19–16; 8:45 am]                            reasonable alternatives, and measures to                                 A fact sheet prepared by the FERC
                                                  BILLING CODE 6717–01–P                                                 avoid or lessen environmental impacts.                                 entitled ‘‘An Interstate Natural Gas
                                                                                                                         Your input will help the Commission                                    Facility On My Land? What Do I Need
                                                                                                                         staff determine what issues they need to                               To Know?’’ is available for viewing on
                                                  DEPARTMENT OF ENERGY                                                   evaluate in the EA. To ensure that your                                the FERC Web site (www.ferc.gov). This
                                                                                                                         comments are timely and properly                                       fact sheet addresses a number of
                                                  Federal Energy Regulatory                                              recorded, please send your comments so                                 typically asked questions, including the
                                                  Commission                                                             that the Commission receives them in                                   use of eminent domain and how to
                                                  [Docket No. PF16–3–000]                                                Washington, DC on or before June 10,                                   participate in the Commission’s
                                                                                                                         2016.                                                                  proceedings.
                                                  Millennium Pipeline Company, LLC;                                        If you sent comments on the ESU
                                                                                                                         Project to the Commission before the                                   Public Participation
                                                  Notice of Intent To Prepare an
                                                  Environmental Assessment for the                                       opening of this docket on January 19,                                    For your convenience, there are three
                                                  Planned Eastern System Upgrade                                         2016, you will need to file those                                      methods you can use to submit your
                                                                                                                         comments in Docket No. PF16–3–000 to                                   comments to the Commission. The
mstockstill on DSK3G9T082PROD with NOTICES




                                                  Project, and Request for Comments on
                                                  Environmental Issues                                                   ensure they are considered as part of                                  Commission will provide equal
                                                                                                                         this proceeding.                                                       consideration to all comments received,
                                                    The staff of the Federal Energy                                        This notice is being sent to the                                     whether filed in written form or
                                                  Regulatory Commission (FERC or                                         Commission’s current environmental                                     provided verbally. The Commission
                                                  Commission) will prepare an                                            mailing list for the ESU Project. State                                encourages electronic filing of
                                                  environmental assessment (EA) that will                                and local government representatives                                   comments and has expert staff available
                                                  discuss the environmental impacts of                                   should notify their constituents of this                               to assist you at (202) 502–8258 or


                                             VerDate Sep<11>2014        17:40 May 19, 2016        Jkt 238001     PO 00000       Frm 00014       Fmt 4703     Sfmt 4703      E:\FR\FM\20MYN1.SGM             20MYN1


                                                                                    Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices                                                     31923

                                                  efiling@ferc.gov. Please carefully follow                  • Approximately 7.8 miles of new 30-                  • air quality and noise;
                                                  these instructions so that your                          and 36-inch-diameter pipeline loop to                   • endangered and threatened species;
                                                  comments are properly recorded.                          be located generally adjacent to                        • public safety; and
                                                     (1) You can file your comments                        Millennium’s existing mainline in                       • cumulative impacts.
                                                  electronically using the eComment                        Orange County;                                          We will also evaluate possible
                                                  feature on the Commission’s Web site                       • a new 22,400-horsepower                          alternatives to the planned ESU Project
                                                  (www.ferc.gov) under the link to                         compressor station in Sullivan County;               or portions of the project, and make
                                                  Documents and Filings. This is an easy                     • an additional 22,400 horsepower of               recommendations on how to lessen or
                                                  method for submitting brief, text-only                   compression at the existing Hancock
                                                  comments on a project;                                                                                        avoid impacts on the various resource
                                                                                                           Compressor Station in Delaware County;               areas.
                                                     (2) You can file your comments                          • modifications at the existing
                                                  electronically by using the eFiling                                                                              Although no formal application has
                                                                                                           Ramapo Meter Station in Rockland
                                                  feature on the Commission’s Web site                                                                          been filed, we have already initiated our
                                                                                                           County;
                                                  (www.ferc.gov) under the link to                           • modifications at the existing                    NEPA review under the Commission’s
                                                  Documents and Filings. With eFiling,                     Huguenot and Westtown Meter Stations                 pre-filing process. The purpose of the
                                                  you can provide comments in a variety                    in Orange County; and                                pre-filing process is to encourage early
                                                  of formats by attaching them as a file                     • construction of an interconnect to               involvement of interested stakeholders
                                                  with your submission. New eFiling                        Millennium’s proposed Valley Lateral                 and to identify and resolve issues before
                                                  users must first create an account by                    Pipeline.                                            the FERC receives an application. As
                                                  clicking on ‘‘eRegister.’’ If you are filing                                                                  part of our pre-filing review, we have
                                                  a comment on a particular project,                       Land Requirements for Construction                   begun to contact some federal and state
                                                  please select ‘‘Comment on a Filing’’ as                    Construction of the planned facilities            agencies to discuss their involvement in
                                                  the filing type; or                                      would disturb about 199.6 acres of land              the scoping process and the preparation
                                                     (3) You can file a paper copy of your                 for the aboveground facilities and the               of the EA.
                                                  comments by mailing them to the                          pipeline loop. Millennium would                         The EA will present our independent
                                                  following address. Be sure to reference                  maintain about 51.0 acres for permanent              analysis of the issues and will be
                                                  the ESU Project docket number (PF16–                     operation of the ESU Project’s facilities            available in the public record through
                                                  3–000) with your submission: Kimberly                    following construction; the remaining                eLibrary. Depending on the comments
                                                  D. Bose, Secretary, Federal Energy                       acreage would be restored and revert to              received during the scoping process, we
                                                  Regulatory Commission, 888 First Street                  former uses. Most of the pipeline loop               may also publish and distribute the EA
                                                  NE., Room 1A, Washington, DC 20426                       would be located within Millennium’s                 to the public for an allotted comment
                                                  Summary of the Planned Project                           existing easements, offset about 25 feet             period. We will consider all comments
                                                                                                           from Millennium’s existing pipeline.                 on the EA before we make our
                                                    Millennium plans to construct and                                                                           recommendations to the Commission.
                                                  operate about 7.8 miles of 30- and 36-                   The EA Process                                       To ensure we have the opportunity to
                                                  inch-diameter pipeline loop 1 in Orange                    The National Environmental Policy                  consider and address your comments,
                                                  County, New York. The planned                            Act (NEPA) requires the Commission to                please carefully follow the instructions
                                                  pipeline loop would transport natural                                                                         in the Public Participation section,
                                                                                                           take into account the environmental
                                                  gas from Millennium’s existing Corning                                                                        beginning on page 2.
                                                                                                           impacts that could result from an action
                                                  Compressor Station to an existing
                                                                                                           whenever it considers the issuance of a                 With this notice, we are asking
                                                  interconnect with Algonquin Gas
                                                                                                           Certificate of Public Convenience and                agencies with jurisdiction by law and/
                                                  Transmission, LLC in Ramapo, New
                                                                                                           Necessity. NEPA also requires us 3 to                or special expertise with respect to the
                                                  York. Millennium would also construct
                                                                                                           discover and address concerns the                    environmental issues related to this
                                                  a new compressor station in Sullivan
                                                                                                           public may have about proposals. This                project to formally cooperate with us in
                                                  County, New York; install additional
                                                                                                           process is referred to as scoping. The               the preparation of the EA.4 Agencies
                                                  compression at the Hancock Compressor
                                                                                                           main goal of the scoping process is to               that would like to request cooperating
                                                  Station in Delaware County, New York;
                                                                                                           focus the analysis in the EA on the                  agency status should follow the
                                                  and modify the Westtown Meter Station
                                                                                                           important environmental issues. By this              instructions for filing comments
                                                  in Orange County, New York and the
                                                                                                           notice, the Commission requests public               provided under the Public Participation
                                                  Ramapo Meter Station in Rockland
                                                                                                           comments on the scope of the issues to               section of this notice.
                                                  County, New York. According to
                                                                                                           be addressed in the EA. We will
                                                  Millennium, the ESU Project would be                                                                          Consultations Under Section 106 of the
                                                                                                           consider all filed comments during the
                                                  designed to transport approximately                                                                           National Historic Preservation Act
                                                                                                           preparation of the EA.
                                                  200,000 dekatherms per day of
                                                                                                             In the EA we will discuss impacts that               In accordance with the Advisory
                                                  additional natural gas service. The
                                                                                                           could occur as a result of the                       Council on Historic Preservation’s
                                                  general location of the ESU Project
                                                                                                           construction and operation of the                    implementing regulations for section
                                                  facilities is shown in appendix 1.2
                                                                                                           planned project under these general                  106 of the National Historic
                                                    The ESU Project would consist of the
                                                                                                           headings:                                            Preservation Act, we are using this
                                                  following facilities in New York:
                                                                                                             • Geology and soils;                               notice to initiate consultation with the
                                                    1 A pipeline loop is a segment of pipe constructed
                                                                                                             • land use;                                        New York State Historic Preservation
                                                  parallel to an existing pipeline to increase capacity.     • water resources, fisheries, and                  Office (SHPO), and to solicit their views
mstockstill on DSK3G9T082PROD with NOTICES




                                                    2 The appendices referenced in this notice will        wetlands;                                            and those of other government agencies,
                                                  not appear in the Federal Register. Copies of the          • cultural resources;                              interested Indian tribes, and the public
                                                  appendices were sent to all of those receiving this        • vegetation and wildlife, including               on the ESU Project’s potential effects on
                                                  notice in the mail and are available at www.ferc.gov
                                                  using the link called ‘‘eLibrary’’ or from the           migratory birds;
                                                  Commission’s Public Reference Room, 888 First                                                                   4 The Council on Environmental Quality

                                                  Street NE., Washington, DC 20426, or call (202)            3 ‘‘We,’’
                                                                                                                     ‘‘us,’’ and ‘‘our’’ refer to the           regulations addressing cooperating agency
                                                  502–8371. For instructions on connecting to              environmental staff of the Commission’s Office of    responsibilities are at Title 40, Code of Federal
                                                  eLibrary, refer to the last page of this notice.         Energy Projects.                                     Regulations, Part 1501.6.



                                             VerDate Sep<11>2014   17:40 May 19, 2016   Jkt 238001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\20MYN1.SGM   20MYN1


                                                  31924                              Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices

                                                  historic properties.5 We will define the                  intervenor are in the User’s Guide under              discuss cultural resources related to the
                                                  project-specific Area of Potential Effects                the ‘‘e-filing’’ link on the Commission’s             following six proposed hydroelectric
                                                  (APE) in consultation with the SHPO as                    Web site. Please note that the                        projects to be located on the
                                                  the ESU Project develops. For natural                     Commission will not accept requests for               Monongahela River: Opekiska Lock and
                                                  gas facility projects, the APE at a                       intervenor status at this time. You must              Dam Hydroelectric Project No. 13753,
                                                  minimum encompasses all areas subject                     wait until the Commission receives a                  Morgantown Lock and Dam
                                                  to ground disturbance (examples                           formal application for the ESU Project.               Hydroelectric Project No. 13762, Gray’s
                                                  include construction right-of-way,                                                                              Landing Lock and Dam Hydroelectric
                                                                                                            Additional Information
                                                  contractor/pipe storage yards,                                                                                  Project No. 13763, Maxwell Lock and
                                                  compressor stations, and access roads).                      Additional information about the ESU               Dam Hydroelectric Project No. 13766,
                                                  Our EA for this project will document                     Project is available from the                         Monongahela Lock and Dam Number
                                                  our findings on the impacts on historic                   Commission’s Office of External Affairs,              Four Hydroelectric Project No. 13767,
                                                  properties and summarize the status of                    at (866) 208–FERC, or on the FERC Web                 and Point Marion Lock and Dam
                                                  consultations under section 106.                          site (www.ferc.gov) using the eLibrary                Hydroelectric Project No. 13771.
                                                                                                            link. Click on the eLibrary link, click on              The technical conference will begin at
                                                  Environmental Mailing List                                ‘‘General Search’’ and enter the docket               1:00 p.m. Eastern Daylight Time. The
                                                     The environmental mailing list                         number, excluding the last three digits               conference will be held at the Federal
                                                  includes federal, state, and local                        in the Docket Number field (i.e., PF16–               Energy Regulatory Commission
                                                  government representatives and                            3). Be sure you have selected an                      headquarters building located at 888 1st
                                                  agencies; elected officials;                              appropriate date range. For assistance,               Street NE., Washington, DC, and will
                                                  environmental and public interest                         please contact FERC Online Support at                 include teleconference capabilities.
                                                  groups; Native American Tribes; other                     FercOnlineSupport@ferc.gov or toll free                 All local, state, and federal agencies,
                                                  interested parties; and local libraries                   at (866) 208–3676, or for TTY, contact                Indian tribes, and other interested
                                                  and newspapers. This list also includes                   (202) 502–8659. The eLibrary link also                parties are invited to participate. There
                                                  all affected landowners (as defined in                    provides access to the texts of formal                will be no transcript of the conference,
                                                  the Commission’s regulations) who are                     documents issued by the Commission,                   but a summary of the meeting will be
                                                  potential right-of-way grantors, whose                    such as orders, notices, and                          prepared for the project record. If you
                                                  property may be used temporarily for                      rulemakings.                                          are interested in participating in the
                                                  project purposes, or who own homes                           In addition, the Commission offers a
                                                                                                                                                                  meeting you must contact Allyson
                                                  within certain distances of aboveground                   free service called eSubscription which
                                                                                                                                                                  Conner at (202) 502–6082 or
                                                  facilities, and anyone who submits                        allows you to keep track of all formal
                                                                                                                                                                  allyson.conner@ferc.gov by May 31,
                                                  comments on the ESU Project. We will                      issuances and submittals in specific
                                                                                                                                                                  2016 to receive specific instructions on
                                                  update the environmental mailing list as                  dockets. This can reduce the amount of
                                                                                                                                                                  how to participate.
                                                  the analysis proceeds to ensure that we                   time you spend researching proceedings
                                                                                                                                                                    Commission conferences are
                                                  send the information related to this                      by automatically providing you with
                                                                                                                                                                  accessible under section 508 of the
                                                  environmental review to all individuals,                  notification of these filings, document
                                                                                                                                                                  Rehabilitation Act of 1973. For
                                                  organizations, and government entities                    summaries, and direct links to the
                                                                                                                                                                  accessibility accommodations, please
                                                  interested in and/or potentially affected                 documents. Go to www.ferc.gov/docs-
                                                                                                                                                                  send an email to accessibility@ferc.gov
                                                  by the planned project.                                   filing/esubscription.asp. Finally, public
                                                                                                                                                                  or call toll free 1–866–208–3372 (voice)
                                                     Copies of the EA will be sent to the                   meetings or site visits will be posted on
                                                                                                                                                                  or 202–502–8659 (TTY), or send a FAX
                                                  environmental mailing list for public                     the Commission’s calendar located at
                                                                                                                                                                  to 202–208–2106 with the required
                                                  review and comment. If you would                          www.ferc.gov/EventCalendar/
                                                                                                                                                                  accommodations.
                                                  prefer to receive a paper copy of the                     EventsList.aspx along with other related
                                                                                                                                                                    For more information about this
                                                  document instead of the CD version or                     information.
                                                                                                                                                                  technical conference, please contact:
                                                  would like to remove your name from                       Kimberly D. Bose,                                     Sarah McKinley, Office of External
                                                  the mailing list, please return the                       Secretary.                                            Affairs, Federal Energy Regulatory
                                                  attached Information Request (see                                                                               Commission, 888 First Street NE.,
                                                                                                            [FR Doc. 2016–11908 Filed 5–19–16; 8:45 am]
                                                  appendix 2).                                                                                                    Washington, DC 20426, (202) 502–8368,
                                                                                                            BILLING CODE 6717–01–P
                                                  Becoming an Intervenor                                                                                          sarah.mckinley@ferc.gov.
                                                    Once Millennium files its application                                                                           Dated: May 12, 2016.
                                                  with the Commission, you may want to                      DEPARTMENT OF ENERGY                                  Kimberly D. Bose,
                                                  become an ‘‘intervenor’’ which is an                      Federal Energy Regulatory                             Secretary.
                                                  official party to the Commission’s                        Commission                                            [FR Doc. 2016–11907 Filed 5–19–16; 8:45 am]
                                                  proceeding. Intervenors play a more                                                                             BILLING CODE 6717–01–P
                                                  formal role in the process and are able                   [Project No. 13753–002; Project No. 13762–
                                                  to file briefs, appear at hearings, and be                002; Project No. 13763–002; Project No.
                                                                                                            13766–002; Project No. 13767–002; Project
                                                  heard by the courts if they choose to                                                                           DEPARTMENT OF ENERGY
                                                                                                            No. 13771–002]
                                                  appeal the Commission’s final ruling.
                                                  An intervenor formally participates in                    FFP Missouri 16, LLC; FFP Missouri                    Federal Energy Regulatory
                                                  the proceeding by filing a request to                     15, LLC; FFP Missouri 13, LLC; Solia                  Commission
mstockstill on DSK3G9T082PROD with NOTICES




                                                  intervene. Instructions for becoming an                   5 Hydroelectric, LLC ; Solia 4                        [Docket No. RP16–618–000]
                                                                                                            Hydroelectric, LLC ; Solia 8
                                                    5 The Advisory Council on Historic Preservation
                                                                                                            Hydroelectric, LLC ; Notice of                        Algonquin Gas Transmission, LLC;
                                                  regulations are at Title 36, Code of Federal
                                                  Regulations, Part 800. Those regulations define           Technical Conference                                  Notice Establishing Comment Period
                                                  historic properties as any prehistoric or historic
                                                  district, site, building, structure, or object included
                                                                                                              On Wednesday, June 1, 2016, Federal                   On May 9, 2016, Federal Energy
                                                  in or eligible for inclusion in the National Register     Energy Regulatory Commission staff                    Regulatory Commission staff held a
                                                  of Historic Places.                                       will hold a technical conference to                   technical conference to discuss issues


                                             VerDate Sep<11>2014    17:40 May 19, 2016    Jkt 238001   PO 00000   Frm 00016   Fmt 4703   Sfmt 4703   E:\FR\FM\20MYN1.SGM   20MYN1



Document Created: 2016-05-20 01:59:54
Document Modified: 2016-05-20 01:59:54
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 31922 