81_FR_32027 81 FR 31929 - Columbia Gas Transmission, LLC; Notice of Application

81 FR 31929 - Columbia Gas Transmission, LLC; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 98 (May 20, 2016)

Page Range31929-31929
FR Document2016-11893

Federal Register, Volume 81 Issue 98 (Friday, May 20, 2016)
[Federal Register Volume 81, Number 98 (Friday, May 20, 2016)]
[Notices]
[Page 31929]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-11893]



[[Page 31929]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP16-357-000 and PF15-31-000]


Columbia Gas Transmission, LLC; Notice of Application

    Take notice that on April 29, 2016, Columbia Gas Transmission, LLC 
(Columbia Gas) 5151 San Felipe, Suite 2500, Houston, Texas 77056, filed 
in Docket No. CP16-357-000 an application pursuant to sections 7(b) and 
7(c) of the Natural Gas Act (NGA), and Part 157 of the Commission's 
regulations requesting authorization to construct and operate the 
Mountaineer XPress Project, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection. The filing is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site web 
at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
[email protected] or call toll-free, (866) 208-3676 or TYY, 
(202) 502-8659.
    Any questions concerning this application may be directed to S. 
Diane Neal, Assistant General Counsel, Columbia Gas Transmission, LLC, 
5151 San Felipe, Suite 2500, Houston, Texas 77056, at (713) 386-3745.
    Specifically Columbia Gas proposes to: (i) Construct and operate 
approximately 170.1 miles of various diameter pipeline, (ii) modify 
threes existing compressor stations, (iii) construct and operate three 
new compressor stations, (iv) and install various appurtenant and 
auxiliary facilities, all located in either Marshall, Wetzel, Tyler, 
Doddridge, Ritchie, Calhoun, Wirt, Roane, Jackson, Mason, Putnam, 
Kanawha, Cabell, and Wayne Counties, West Virginia. The project will 
provide approximately 2.7 million dekatherms per day of additional 
capacity for firm transportation service. Columbia Gas is proposing 
incremental rates for transportation service on the facilities proposed 
for construction herein. The cost of the project will be approximately 
$2.059 billion.
    On September 16, 2015 the Commission staff granted Columbia Gas' 
request to utilize the Pre-Filing Process and assigned Docket No. PF15-
31-000 to staff activities involved in the Project. Now, as of the 
filing of the April 29, 2016 application, the Pre-Filing Process for 
this project has ended. From this time forward, this proceeding will be 
conducted in Docket No. CP16-357-000, as noted in the caption of this 
Notice.
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit seven copies of filings made in the proceeding with the 
Commission and must mail a copy to the applicant and to every other 
party. Only parties to the proceeding can ask for court review of 
Commission orders in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 7 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on June 3, 2016.

    Dated: May 13, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-11893 Filed 5-19-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 81, No. 98 / Friday, May 20, 2016 / Notices                                                  31929

                                                  DEPARTMENT OF ENERGY                                    for this project has ended. From this                 rules require that persons filing
                                                                                                          time forward, this proceeding will be                 comments in opposition to the project
                                                  Federal Energy Regulatory                               conducted in Docket No. CP16–357–                     provide copies of their protests only to
                                                  Commission                                              000, as noted in the caption of this                  the party or parties directly involved in
                                                  [Docket Nos. CP16–357–000 and PF15–31–                  Notice.                                               the protest.
                                                  000]                                                       Pursuant to section 157.9 of the                      Persons who wish to comment only
                                                                                                          Commission’s rules (18 CFR 157.9),                    on the environmental review of this
                                                  Columbia Gas Transmission, LLC;                         within 90 days of this Notice, the                    project should submit an original and
                                                  Notice of Application                                   Commission staff will either: Complete                two copies of their comments to the
                                                                                                          its environmental assessment (EA) and                 Secretary of the Commission.
                                                     Take notice that on April 29, 2016,                  place it into the Commission’s public                 Environmental commentors will be
                                                  Columbia Gas Transmission, LLC                          record (eLibrary) for this proceeding; or             placed on the Commission’s
                                                  (Columbia Gas) 5151 San Felipe, Suite                   issue a Notice of Schedule for                        environmental mailing list, will receive
                                                  2500, Houston, Texas 77056, filed in                    Environmental Review. If a Notice of                  copies of the environmental documents,
                                                  Docket No. CP16–357–000 an                              Schedule for Environmental Review is                  and will be notified of meetings
                                                  application pursuant to sections 7(b)                   issued, it will indicate, among other                 associated with the Commission’s
                                                  and 7(c) of the Natural Gas Act (NGA),                  milestones, the anticipated date for the              environmental review process.
                                                  and Part 157 of the Commission’s                        Commission staff’s issuance of the final              Environmental commentors will not be
                                                  regulations requesting authorization to                 environmental impact statement (FEIS)                 required to serve copies of filed
                                                  construct and operate the Mountaineer                   or EA for this proposal. The filing of the            documents on all other parties.
                                                  XPress Project, all as more fully set forth             EA in the Commission’s public record                  However, the non-party commentors
                                                  in the application which is on file with                for this proceeding or the issuance of a              will not receive copies of all documents
                                                  the Commission and open to public                       Notice of Schedule for Environmental                  filed by other parties or issued by the
                                                  inspection. The filing is available for                 Review will serve to notify federal and               Commission (except for the mailing of
                                                  review at the Commission in the Public                  state agencies of the timing for the                  environmental documents issued by the
                                                  Reference Room or may be viewed on                      completion of all necessary reviews, and              Commission) and will not have the right
                                                  the Commission’s Web site web at                        the subsequent need to complete all                   to seek court review of the
                                                  http://www.ferc.gov using the                           federal authorizations within 90 days of              Commission’s final order.
                                                  ‘‘eLibrary’’ link. Enter the docket                     the date of issuance of the Commission                   The Commission strongly encourages
                                                  number excluding the last three digits in               staff’s FEIS or EA.                                   electronic filings of comments, protests
                                                  the docket number field to access the                      There are two ways to become                       and interventions in lieu of paper using
                                                  document. For assistance, contact FERC                  involved in the Commission’s review of                the ‘‘eFiling’’ link at http://
                                                  at FERCOnlineSupport@ferc.gov or call                   this project. First, any person wishing to            www.ferc.gov. Persons unable to file
                                                  toll-free, (866) 208–3676 or TYY, (202)                 obtain legal status by becoming a party               electronically should submit an original
                                                  502–8659.                                               to the proceedings for this project                   and 7 copies of the protest or
                                                     Any questions concerning this                        should, on or before the comment date                 intervention to the Federal Energy
                                                  application may be directed to S. Diane                 stated below file with the Federal                    Regulatory Commission, 888 First Street
                                                  Neal, Assistant General Counsel,                        Energy Regulatory Commission, 888                     NE., Washington, DC 20426.
                                                  Columbia Gas Transmission, LLC, 5151                    First Street NE., Washington, DC 20426,                  Comment Date: 5:00 p.m. Eastern
                                                  San Felipe, Suite 2500, Houston, Texas                  a motion to intervene in accordance                   Time on June 3, 2016.
                                                  77056, at (713) 386–3745.                               with the requirements of the                            Dated: May 13, 2016.
                                                     Specifically Columbia Gas proposes                   Commission’s Rules of Practice and
                                                  to: (i) Construct and operate                                                                                 Kimberly D. Bose,
                                                                                                          Procedure (18 CFR 385.214 or 385.211)
                                                  approximately 170.1 miles of various                                                                          Secretary.
                                                                                                          and the Regulations under the NGA (18
                                                  diameter pipeline, (ii) modify threes                   CFR 157.10). A person obtaining party                 [FR Doc. 2016–11893 Filed 5–19–16; 8:45 am]
                                                  existing compressor stations, (iii)                     status will be placed on the service list             BILLING CODE 6717–01–P
                                                  construct and operate three new                         maintained by the Secretary of the
                                                  compressor stations, (iv) and install                   Commission and will receive copies of
                                                  various appurtenant and auxiliary                       all documents filed by the applicant and              DEPARTMENT OF ENERGY
                                                  facilities, all located in either Marshall,             by all other parties. A party must submit             Federal Energy Regulatory
                                                  Wetzel, Tyler, Doddridge, Ritchie,                      seven copies of filings made in the                   Commission
                                                  Calhoun, Wirt, Roane, Jackson, Mason,                   proceeding with the Commission and
                                                  Putnam, Kanawha, Cabell, and Wayne                      must mail a copy to the applicant and                 [Project No. 1889–085; Project No. 2485–
                                                  Counties, West Virginia. The project                    to every other party. Only parties to the             071]
                                                  will provide approximately 2.7 million                  proceeding can ask for court review of
                                                  dekatherms per day of additional                                                                              FirstLight Hydro Generating Company;
                                                                                                          Commission orders in the proceeding.
                                                  capacity for firm transportation service.                  However, a person does not have to                 Notice of Application Tendered for
                                                  Columbia Gas is proposing incremental                   intervene in order to have comments                   Filing With the Commission and
                                                  rates for transportation service on the                 considered. The second way to                         Establishing Procedural Schedule for
                                                  facilities proposed for construction                    participate is by filing with the                     Licensing and Deadline for
                                                  herein. The cost of the project will be                 Secretary of the Commission, as soon as               Submission of Final Amendments
                                                  approximately $2.059 billion.                           possible, an original and two copies of
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                                                                                  Take notice that the following
                                                     On September 16, 2015 the                            comments in support of or in opposition               hydroelectric application has been filed
                                                  Commission staff granted Columbia Gas’                  to this project. The Commission will                  with the Commission and is available
                                                  request to utilize the Pre-Filing Process               consider these comments in                            for public inspection.
                                                  and assigned Docket No. PF15–31–000                     determining the appropriate action to be                a. Type of Application: New Major
                                                  to staff activities involved in the Project.            taken, but the filing of a comment alone              License.
                                                  Now, as of the filing of the April 29,                  will not serve to make the filer a party                b. Project Nos.: 1889–085 and 2485–
                                                  2016 application, the Pre-Filing Process                to the proceeding. The Commission’s                   071.


                                             VerDate Sep<11>2014   17:40 May 19, 2016   Jkt 238001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\20MYN1.SGM   20MYN1



Document Created: 2016-05-20 02:00:21
Document Modified: 2016-05-20 02:00:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on June 3, 2016.
FR Citation81 FR 31929 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR